Submitted By:
Student ID: 1405006, 1405012
Submitted To:
Md. Rabiul Islam
Assistant Professor, Department of Urban and Regional Planning
Md. Shah Jalal Mishuk
Lecturer, Department of Urban and Regional Planning
Course No. URP 342 Course Title: Traffic and Transportation Studio
Department of Urban and Regional Planning
Chittagong University of Engineering and Technology
LEVEL OF SERVICE
Level of service (LOS) is a qualitative measure used to relate the quality of traffic service.
LOS is used to analyze highways by categorizing traffic flow and assigning quality levels of
traffic based on performance measure like speed, density, delay etc.
Source: Kadiyali. 2010 Source: Highway Capacity Manual, 1994
Fig 1.2 V/C Ratio & LOS
VOLUME/CAPACITY RATIO
LOS A
LOS B
LOS F
LOS E
LOS D
LOS C
Fig 1.1 Level of Service A to F
CLASSIFICATION OF LEVEL OF SERVICE
๏ฑThe parameter which is used to measure LOS are:
a)Density b)Delay c)Speed
๏ฑMost important classification of transportation facilities from the engineering
perspective is based on the continuity of flow, that is
a) uninterrupted flow and
b) interrupted flow
๏ฑClassification is also possible basing on intersections. such as:
a) Signalized and
b) unsignalized
CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ
LOS FOR A BASIC FREEWAY SEGMENT
LOS Vehicles per km
per lane
Velocity v/c
(veh/km/lane) (Km/hr)
A 0-7 120 0.35
B 7-11 120 0.55
C 11-16 114 0.77
D 16-22 99 0.92
E 22-28 85 1.0
F > 28 < 85 > 1.0
LOS FOR AN INTERSECTION
LOS Control Delay Delay
sec/veh
(signalised)
sec/veh (unsignalised)
A โ‰ค 10 โ‰ค 10
B 10-20 10-15
C 20-35 15-25
D 35-55 25-35
E 55-80 35-50
F > 80 > 50
CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ
โ–LOS A:
โ–ช Traffic flows or above the posted speed
โ–ช complete mobility between lanes.
โ–ช average spacing between vehicles is about 550 ft(167 m)
or 27 car lengths.
โ–ช Motorists have a high-level of physical and psychological
comfort.
โ–ช generally occurs late at night in urban areas and
frequently in rural areas.
โ–LOS B:
โ–ช reasonably free flow.
โ–ช traffic stream is slightly restricted than LOS A.
โ–ช The lowest average vehicle spacing is about 330 ft(100
m) or 16 car lengths.
โ–ช Motorists still have a high level of physical and
psychological comfort.
CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ
LOS A
LOS B
โ– LOS C:
โ–ช stable flow, at or near free flow.
โ–ช lane changes require more driver awareness.
โ–ช Minimum vehicle spacing is about 220 ft(67 m) or 11 car
lengths.
โ–ช Most experienced drivers are comfortable
โ–ช Posted speed is maintained.
โ–ช This is the target LOS for some urban and most rural
highways.
โ– LOS D:
โ–ช approaching unstable flow.
โ–ช Freedom to maneuver within the traffic stream is much more
limited
โ–ช driver comfort levels decrease. Vehicles are spaced about
160 ft(50m) or 8 car lengths.
โ–ช Minor incidents i.e. a busy shopping corridor in the middle
of a weekday, or a functional urban highway during
commuting hours.
โ–ช It is a common goal for urban streets during peak hours.
โ–ช attaining LOS C would require prohibitive cost and
societal impact in bypass roads and lane additions.
CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ
LOS D
LOS C
โ– LOS E:
โ–ช Unstable flow, operating at capacity.
โ–ช Flow becomes irregular and speed varies rapidly
โ–ช Speeds rarely reach the posted limit.
โ–ช Vehicle spacing is about 6 car lengths, but speeds are still
at or above 50 mi/h(80 km/h).
โ–ช Any incident will create serious delays.
โ–ช Drivers' level of comfort become poor.
โ–ช This is a common standard in larger urban areas, where
some roadway congestion is inevitable.
โ– LOS F:
โ–ช Forced or breakdown flow. Every vehicle moves in
lockstep with the vehicle in front of it.
โ–ช Travel time cannot be predicted.
โ–ช A road in a constant traffic jam is at this los, because los
is an average or typical service rather than a constant
state.
โ–ช For example, a highway might be at los d for the am peak
hour.
CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ
LOS E
LOS F
Factors Affecting Capacity and Level of Service
1. Roadway Factors
i. Laneway Width
ii. Lateral Clearance
iii. Shoulders
iv. Surface Condition
v. Alignment
vi. Grades
2. Traffic Factors
3. Speed and Travel Time
4. Freedom to Travel with Desired Speed
5. Driving Comfort and Convenience
6. Operating Cost
Factors Affecting Capacity and Level of ServiceLOS in other Transportation Network Elements
Performance of other transportation network elements can also be communicated by LOS.
Among them are:
1. Two-lane roadways
2. Multilane roadways
3. Open freeway segments
4. Freeway entrances (merges), exits (diverges), and weaving lanes
5. Bicycle facilities (measure of effectiveness: events per hour;
6. Bicyclist or overtaking a bicyclist traveling in the same direction)
7. Pedestrian facilities (HCM measure of effectiveness: pedestrians per unit area)
LOS for Different Types of Transportation Networks
LOS Operating Speed
(in K.P.H)
P.C.U(passenger
Car Units)
A 100 700
B 95 1100
C 90 1550
D 75 1850
E 50-6-0 2000
F 50
Urban Streets:
LOS Travel Speed
(in K.P.H)
Volume/Capacit
y Ratio
A 80 0.60
B 40 0.70
C 30 0.80
D 25 0.90
E 25 .95
F 15 >1
Two-Lane Rural Highways:
LOS Operating Speed
(in K.P.H)
Service Volumes
Per hour
A 100 420
B 90 750
C 80 1200
D 60 1800
E 50 2800
F <50 2000
LOS Operating Speed
(In K.P.H)
Service Volumes
Per hour
A 100 650
B 90 1000
C 75 1300
D 60 1600
E 50 2000
F <50
Freeways in Rural Areas :
Multi-Lane Rural Highways:
Calculation Methods:
Capacity is analyzed for each lane group entering the intersection. The capacity for each
lane group is
Ci = Si (gi / C)
where
Ci = capacity for a lane group I,
Si = saturation flow rate for lane group I, gi/C = effective green time over cycle time ratio
Although the capacity for the intersection as a whole can not be defined, a composite v/c
ratio can be defined by summing the v/c ratio for the critical lane group.
This is the critical v/c ratio, designated as Xc. This can be calculated from the equation
Xc = S (v/s) ci [C/(C-L)]
Where, Xc = critical v/c ratio for the intersection
S (v/s)ci =summation of the flow ratios for all critical lane groups I where v =
demand volume and s = saturation flow for each critical lane group
C = cycle length (use maximum acceptable)
L = total lost time per cycle
References:
Kadiyali, L. (2010). Traffic Engineering And Transportation Planning . New Delhi:
Khanna Publishers.
Rao, T. V. (2007). Capacity and Level of Service. In Introduction to Transportation
Engineering.
A Policy on Geometric Design of Highway and Streets. Washington DC: AASTHO,
1994.
Highway Capacity Manual. Washington DC: Transportation Research Board, 2000.
Final congestion management program for 2005, Retrieved from
http://ccag.ca.gov/wp-content/uploads/2014/07/cmp_2005_Appendix_B.pdf
Level of Service(LOS) of a road with Calculation Method

More Related Content

What's hot

Chapter 3&amp;4
Chapter 3&amp;4Chapter 3&amp;4
Chapter 3&amp;4EWIT
ย 
Traffic impact assessment
Traffic impact assessmentTraffic impact assessment
Traffic impact assessmentVivek Pai
ย 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
ย 
Measurement of spot speed
Measurement of spot speedMeasurement of spot speed
Measurement of spot speedSagar Vekariya
ย 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume studyAglaia Connect
ย 
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...Hossam Shafiq I
ย 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 junPrathamesh Kulkarni
ย 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Civil Zone
ย 
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringTraffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringMohammadOsamaJafry
ย 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineeringAKANSHA GURELE
ย 
Highway Classifications
Highway ClassificationsHighway Classifications
Highway ClassificationsMuhammad Saleem
ย 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Vijai Krishnan V
ย 
Traffic assignment
Traffic assignmentTraffic assignment
Traffic assignmentMNIT,JAIPUR
ย 
Land use transportation relation
Land use  transportation relationLand use  transportation relation
Land use transportation relationSiddhi Vakharia
ย 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange Spice Shuvo
ย 
Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011 Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011 Pronob Ghosh
ย 
Transportation Planning & Travel Demand Forecasting (Transportation Engineering)
Transportation Planning & Travel Demand Forecasting (Transportation Engineering)Transportation Planning & Travel Demand Forecasting (Transportation Engineering)
Transportation Planning & Travel Demand Forecasting (Transportation Engineering)Hossam Shafiq I
ย 
Modal split analysis
Modal split analysis Modal split analysis
Modal split analysis ashahit
ย 

What's hot (20)

Chapter 3&amp;4
Chapter 3&amp;4Chapter 3&amp;4
Chapter 3&amp;4
ย 
Traffic impact assessment
Traffic impact assessmentTraffic impact assessment
Traffic impact assessment
ย 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
ย 
Unit 2
Unit 2Unit 2
Unit 2
ย 
Measurement of spot speed
Measurement of spot speedMeasurement of spot speed
Measurement of spot speed
ย 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
ย 
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
ย 
Cross section of road
Cross section of roadCross section of road
Cross section of road
ย 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
ย 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
ย 
Traffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineeringTraffic study project for final year CIVIL engineering
Traffic study project for final year CIVIL engineering
ย 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
ย 
Highway Classifications
Highway ClassificationsHighway Classifications
Highway Classifications
ย 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
ย 
Traffic assignment
Traffic assignmentTraffic assignment
Traffic assignment
ย 
Land use transportation relation
Land use  transportation relationLand use  transportation relation
Land use transportation relation
ย 
Trumpet interchange
Trumpet interchange Trumpet interchange
Trumpet interchange
ย 
Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011 Traffic volume study report by pronob ghosh buet 1204011
Traffic volume study report by pronob ghosh buet 1204011
ย 
Transportation Planning & Travel Demand Forecasting (Transportation Engineering)
Transportation Planning & Travel Demand Forecasting (Transportation Engineering)Transportation Planning & Travel Demand Forecasting (Transportation Engineering)
Transportation Planning & Travel Demand Forecasting (Transportation Engineering)
ย 
Modal split analysis
Modal split analysis Modal split analysis
Modal split analysis
ย 

Similar to Level of Service(LOS) of a road with Calculation Method

Traffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publishTraffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publishGizaw Mekonnen
ย 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysRaghupathi Kandiboina
ย 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptmihiretuTefera
ย 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptmihiretuTefera
ย 
Traffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationTraffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationDanilign Mekonnen
ย 
Evaluation of level of service at chatikara, Mathura
Evaluation of level of service at chatikara, MathuraEvaluation of level of service at chatikara, Mathura
Evaluation of level of service at chatikara, MathuraSHASHANK KAMAL
ย 
Highway capacity and level of service.pptx
Highway capacity and level of service.pptxHighway capacity and level of service.pptx
Highway capacity and level of service.pptxNaveenNavi148500
ย 
Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Hossam Shafiq I
ย 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxSoKhit1
ย 
Capacity analysis Of Highways
Capacity analysis Of HighwaysCapacity analysis Of Highways
Capacity analysis Of HighwaysLatif Hyder Wadho
ย 
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...Arun Chandra Babu
ย 
Pedestrian level of service for crosswalks at urban intersections
Pedestrian level of service for crosswalks at urban intersectionsPedestrian level of service for crosswalks at urban intersections
Pedestrian level of service for crosswalks at urban intersectionsTHOTA AKHIL
ย 
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
ย 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planningDhwani Shah
ย 
L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments Hossam Shafiq I
ย 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdfEr. Bam Bhandari
ย 
paper 170
paper 170paper 170
paper 170AJAYI SAMUEL
ย 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdfRoshani Shahi
ย 
IRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in NigeriaIRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in NigeriaIRJET Journal
ย 

Similar to Level of Service(LOS) of a road with Calculation Method (20)

Traffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publishTraffic enginering highway capacity and los print mood publish
Traffic enginering highway capacity and los print mood publish
ย 
Capacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghwaysCapacity and LOS of Multi-Lane HIghways
Capacity and LOS of Multi-Lane HIghways
ย 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
ย 
CHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.pptCHAPTER 5 Highway capacity and level of service.ppt
CHAPTER 5 Highway capacity and level of service.ppt
ย 
Traffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentationTraffic enginering highway capacity and los presentation
Traffic enginering highway capacity and los presentation
ย 
Evaluation of level of service at chatikara, Mathura
Evaluation of level of service at chatikara, MathuraEvaluation of level of service at chatikara, Mathura
Evaluation of level of service at chatikara, Mathura
ย 
Highway capacity and level of service.pptx
Highway capacity and level of service.pptxHighway capacity and level of service.pptx
Highway capacity and level of service.pptx
ย 
Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)
ย 
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptxPLACK Sokhit_Traffic Impact assessment (TIA).pptx
PLACK Sokhit_Traffic Impact assessment (TIA).pptx
ย 
Urban streets
Urban streetsUrban streets
Urban streets
ย 
Capacity analysis Of Highways
Capacity analysis Of HighwaysCapacity analysis Of Highways
Capacity analysis Of Highways
ย 
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...Pedestrian and Bicycle facility planning for kochi city region, part 2  data ...
Pedestrian and Bicycle facility planning for kochi city region, part 2 data ...
ย 
Pedestrian level of service for crosswalks at urban intersections
Pedestrian level of service for crosswalks at urban intersectionsPedestrian level of service for crosswalks at urban intersections
Pedestrian level of service for crosswalks at urban intersections
ย 
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
ย 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planning
ย 
L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments
ย 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
ย 
paper 170
paper 170paper 170
paper 170
ย 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
ย 
IRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in NigeriaIRJET- Capacity and Level of Service for Highways Segments in Nigeria
IRJET- Capacity and Level of Service for Highways Segments in Nigeria
ย 

More from Md. Abdul Kader

Insatallation process of ERDAS IMAGINE 2014 with Crack
Insatallation process of ERDAS IMAGINE 2014 with CrackInsatallation process of ERDAS IMAGINE 2014 with Crack
Insatallation process of ERDAS IMAGINE 2014 with CrackMd. Abdul Kader
ย 
Stages/Process of Remote Sensing by Abdul Kader Muhammadi
Stages/Process of Remote Sensing by Abdul Kader MuhammadiStages/Process of Remote Sensing by Abdul Kader Muhammadi
Stages/Process of Remote Sensing by Abdul Kader MuhammadiMd. Abdul Kader
ย 
Subdivision Plan of A Residential Area
Subdivision Plan of A Residential AreaSubdivision Plan of A Residential Area
Subdivision Plan of A Residential AreaMd. Abdul Kader
ย 
Residential Areas of Chittagong, Bangladesh
Residential Areas of Chittagong, Bangladesh Residential Areas of Chittagong, Bangladesh
Residential Areas of Chittagong, Bangladesh Md. Abdul Kader
ย 
Urban Redevelopment
Urban RedevelopmentUrban Redevelopment
Urban RedevelopmentMd. Abdul Kader
ย 
Enjoy your life(Motivational) by Abdul Kader Muhammadi
Enjoy your life(Motivational) by Abdul Kader Muhammadi Enjoy your life(Motivational) by Abdul Kader Muhammadi
Enjoy your life(Motivational) by Abdul Kader Muhammadi Md. Abdul Kader
ย 
Enjoy your life by abdul kader
Enjoy your life by abdul kaderEnjoy your life by abdul kader
Enjoy your life by abdul kaderMd. Abdul Kader
ย 
Presentation on Tree, Shrub, Herb by Abdul Kader
Presentation on Tree, Shrub, Herb by Abdul KaderPresentation on Tree, Shrub, Herb by Abdul Kader
Presentation on Tree, Shrub, Herb by Abdul KaderMd. Abdul Kader
ย 
Mohenjodaro the famous ancient city for Town Planning
Mohenjodaro the famous ancient city for Town PlanningMohenjodaro the famous ancient city for Town Planning
Mohenjodaro the famous ancient city for Town PlanningMd. Abdul Kader
ย 

More from Md. Abdul Kader (9)

Insatallation process of ERDAS IMAGINE 2014 with Crack
Insatallation process of ERDAS IMAGINE 2014 with CrackInsatallation process of ERDAS IMAGINE 2014 with Crack
Insatallation process of ERDAS IMAGINE 2014 with Crack
ย 
Stages/Process of Remote Sensing by Abdul Kader Muhammadi
Stages/Process of Remote Sensing by Abdul Kader MuhammadiStages/Process of Remote Sensing by Abdul Kader Muhammadi
Stages/Process of Remote Sensing by Abdul Kader Muhammadi
ย 
Subdivision Plan of A Residential Area
Subdivision Plan of A Residential AreaSubdivision Plan of A Residential Area
Subdivision Plan of A Residential Area
ย 
Residential Areas of Chittagong, Bangladesh
Residential Areas of Chittagong, Bangladesh Residential Areas of Chittagong, Bangladesh
Residential Areas of Chittagong, Bangladesh
ย 
Urban Redevelopment
Urban RedevelopmentUrban Redevelopment
Urban Redevelopment
ย 
Enjoy your life(Motivational) by Abdul Kader Muhammadi
Enjoy your life(Motivational) by Abdul Kader Muhammadi Enjoy your life(Motivational) by Abdul Kader Muhammadi
Enjoy your life(Motivational) by Abdul Kader Muhammadi
ย 
Enjoy your life by abdul kader
Enjoy your life by abdul kaderEnjoy your life by abdul kader
Enjoy your life by abdul kader
ย 
Presentation on Tree, Shrub, Herb by Abdul Kader
Presentation on Tree, Shrub, Herb by Abdul KaderPresentation on Tree, Shrub, Herb by Abdul Kader
Presentation on Tree, Shrub, Herb by Abdul Kader
ย 
Mohenjodaro the famous ancient city for Town Planning
Mohenjodaro the famous ancient city for Town PlanningMohenjodaro the famous ancient city for Town Planning
Mohenjodaro the famous ancient city for Town Planning
ย 

Recently uploaded

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoordharasingh5698
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
ย 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
ย 

Recently uploaded (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
ย 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 

Level of Service(LOS) of a road with Calculation Method

  • 1.
  • 2. Submitted By: Student ID: 1405006, 1405012 Submitted To: Md. Rabiul Islam Assistant Professor, Department of Urban and Regional Planning Md. Shah Jalal Mishuk Lecturer, Department of Urban and Regional Planning Course No. URP 342 Course Title: Traffic and Transportation Studio Department of Urban and Regional Planning Chittagong University of Engineering and Technology
  • 3. LEVEL OF SERVICE Level of service (LOS) is a qualitative measure used to relate the quality of traffic service. LOS is used to analyze highways by categorizing traffic flow and assigning quality levels of traffic based on performance measure like speed, density, delay etc. Source: Kadiyali. 2010 Source: Highway Capacity Manual, 1994 Fig 1.2 V/C Ratio & LOS VOLUME/CAPACITY RATIO LOS A LOS B LOS F LOS E LOS D LOS C Fig 1.1 Level of Service A to F
  • 4. CLASSIFICATION OF LEVEL OF SERVICE ๏ฑThe parameter which is used to measure LOS are: a)Density b)Delay c)Speed ๏ฑMost important classification of transportation facilities from the engineering perspective is based on the continuity of flow, that is a) uninterrupted flow and b) interrupted flow ๏ฑClassification is also possible basing on intersections. such as: a) Signalized and b) unsignalized
  • 5. CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ LOS FOR A BASIC FREEWAY SEGMENT LOS Vehicles per km per lane Velocity v/c (veh/km/lane) (Km/hr) A 0-7 120 0.35 B 7-11 120 0.55 C 11-16 114 0.77 D 16-22 99 0.92 E 22-28 85 1.0 F > 28 < 85 > 1.0 LOS FOR AN INTERSECTION LOS Control Delay Delay sec/veh (signalised) sec/veh (unsignalised) A โ‰ค 10 โ‰ค 10 B 10-20 10-15 C 20-35 15-25 D 35-55 25-35 E 55-80 35-50 F > 80 > 50
  • 6. CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ
  • 7. โ–LOS A: โ–ช Traffic flows or above the posted speed โ–ช complete mobility between lanes. โ–ช average spacing between vehicles is about 550 ft(167 m) or 27 car lengths. โ–ช Motorists have a high-level of physical and psychological comfort. โ–ช generally occurs late at night in urban areas and frequently in rural areas. โ–LOS B: โ–ช reasonably free flow. โ–ช traffic stream is slightly restricted than LOS A. โ–ช The lowest average vehicle spacing is about 330 ft(100 m) or 16 car lengths. โ–ช Motorists still have a high level of physical and psychological comfort. CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ LOS A LOS B
  • 8. โ– LOS C: โ–ช stable flow, at or near free flow. โ–ช lane changes require more driver awareness. โ–ช Minimum vehicle spacing is about 220 ft(67 m) or 11 car lengths. โ–ช Most experienced drivers are comfortable โ–ช Posted speed is maintained. โ–ช This is the target LOS for some urban and most rural highways. โ– LOS D: โ–ช approaching unstable flow. โ–ช Freedom to maneuver within the traffic stream is much more limited โ–ช driver comfort levels decrease. Vehicles are spaced about 160 ft(50m) or 8 car lengths. โ–ช Minor incidents i.e. a busy shopping corridor in the middle of a weekday, or a functional urban highway during commuting hours. โ–ช It is a common goal for urban streets during peak hours. โ–ช attaining LOS C would require prohibitive cost and societal impact in bypass roads and lane additions. CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ LOS D LOS C
  • 9. โ– LOS E: โ–ช Unstable flow, operating at capacity. โ–ช Flow becomes irregular and speed varies rapidly โ–ช Speeds rarely reach the posted limit. โ–ช Vehicle spacing is about 6 car lengths, but speeds are still at or above 50 mi/h(80 km/h). โ–ช Any incident will create serious delays. โ–ช Drivers' level of comfort become poor. โ–ช This is a common standard in larger urban areas, where some roadway congestion is inevitable. โ– LOS F: โ–ช Forced or breakdown flow. Every vehicle moves in lockstep with the vehicle in front of it. โ–ช Travel time cannot be predicted. โ–ช A road in a constant traffic jam is at this los, because los is an average or typical service rather than a constant state. โ–ช For example, a highway might be at los d for the am peak hour. CLASSIFICATION OF LEVEL OF SERVICEโ€ฆ LOS E LOS F
  • 10. Factors Affecting Capacity and Level of Service 1. Roadway Factors i. Laneway Width ii. Lateral Clearance iii. Shoulders iv. Surface Condition v. Alignment vi. Grades 2. Traffic Factors 3. Speed and Travel Time 4. Freedom to Travel with Desired Speed 5. Driving Comfort and Convenience 6. Operating Cost
  • 11. Factors Affecting Capacity and Level of ServiceLOS in other Transportation Network Elements Performance of other transportation network elements can also be communicated by LOS. Among them are: 1. Two-lane roadways 2. Multilane roadways 3. Open freeway segments 4. Freeway entrances (merges), exits (diverges), and weaving lanes 5. Bicycle facilities (measure of effectiveness: events per hour; 6. Bicyclist or overtaking a bicyclist traveling in the same direction) 7. Pedestrian facilities (HCM measure of effectiveness: pedestrians per unit area)
  • 12. LOS for Different Types of Transportation Networks LOS Operating Speed (in K.P.H) P.C.U(passenger Car Units) A 100 700 B 95 1100 C 90 1550 D 75 1850 E 50-6-0 2000 F 50 Urban Streets: LOS Travel Speed (in K.P.H) Volume/Capacit y Ratio A 80 0.60 B 40 0.70 C 30 0.80 D 25 0.90 E 25 .95 F 15 >1 Two-Lane Rural Highways: LOS Operating Speed (in K.P.H) Service Volumes Per hour A 100 420 B 90 750 C 80 1200 D 60 1800 E 50 2800 F <50 2000 LOS Operating Speed (In K.P.H) Service Volumes Per hour A 100 650 B 90 1000 C 75 1300 D 60 1600 E 50 2000 F <50 Freeways in Rural Areas : Multi-Lane Rural Highways:
  • 13. Calculation Methods: Capacity is analyzed for each lane group entering the intersection. The capacity for each lane group is Ci = Si (gi / C) where Ci = capacity for a lane group I, Si = saturation flow rate for lane group I, gi/C = effective green time over cycle time ratio Although the capacity for the intersection as a whole can not be defined, a composite v/c ratio can be defined by summing the v/c ratio for the critical lane group. This is the critical v/c ratio, designated as Xc. This can be calculated from the equation Xc = S (v/s) ci [C/(C-L)] Where, Xc = critical v/c ratio for the intersection S (v/s)ci =summation of the flow ratios for all critical lane groups I where v = demand volume and s = saturation flow for each critical lane group C = cycle length (use maximum acceptable) L = total lost time per cycle
  • 14. References: Kadiyali, L. (2010). Traffic Engineering And Transportation Planning . New Delhi: Khanna Publishers. Rao, T. V. (2007). Capacity and Level of Service. In Introduction to Transportation Engineering. A Policy on Geometric Design of Highway and Streets. Washington DC: AASTHO, 1994. Highway Capacity Manual. Washington DC: Transportation Research Board, 2000. Final congestion management program for 2005, Retrieved from http://ccag.ca.gov/wp-content/uploads/2014/07/cmp_2005_Appendix_B.pdf