SlideShare a Scribd company logo
1 of 55
The Brave New World of
Wireless Regulations
for Planners
American Planning Association
California Chapter, Orange Section
Tustin, California
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
About the Presenters
Robert C. May III
Partner
Telecom Law Firm, PC
6986 La Jolla Blvd, Ste. 204
La Jolla, CA 92037
Direct: (619) 272-6200
tripp@telecomlawfirm.com
practice focused on representing governments
and other landowners in wireless infrastructure
regulations and transactions.
co-author of California Local Governments
(League of CA Cities, CSAC, and SCAN NATOA)
comments and reply comments to FCC in the
2015 Infrastructure Order
SCAN NATOA member of the year 2014 for pro
bono advocacy in the 2015 Infrastructure Order
JD, University of San Diego School of Law
• Executive Editor, San Diego Law Review
• Executive Board, Moot Court
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
About the Presenters
• Admitted to Practice Law in California and New Mexico
- Practice areas: Telecom Law (Wireless & Broadband)
Telecom Site Leasing (governments and private landlords)
• Wireless advisor local governments (+1,700 planning cases)
• Radio Frequency and Broadband Telecom Engineer
• Expert witness in > 40 cases
• RF Emissions Safety Reviewer
- Co-author, co-editor of the FCC’s publication:
A Local Government Official's Guide to Transmitting
Antenna RF Emission Safety: Rules, Procedures, and
Practical Guidance
• FCC Licensee
- Top commercial radio-telephone, marine digital, ship
radar, and amateur licenses
• Member: IMLA, FCBA, NATOA, SCAN NATOA, SBE
• JD – Abraham Lincoln University School of Law, Los Angeles
• LL.M. IT/Telecom Law - Strathclyde University, Glasgow
• Doctor of Law and Policy (Student) – Northeastern University,
Boston
Jonathan L. Kramer
Founder/Partner
Telecom Law Firm, PC
2001 S. Barrington Ave.
Suite 306
Los Angeles, CA 90025
Direct: (310) 405-7333
kramer@telecomlawfirm.com
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Changes in Industry &
Technology Drive Deployment
• increased demand
• cord-cutters
• machine-2-machine / internet of things
• changes in how wireless is used
• signal coverage vs. signal capacity
• increased need for new sites w/ smaller coverage areas
• FCC spectrum auctions
• carriers acquire licenses to use new spectrum bands
• FCC requires carriers to “build-out” new spectrum
• mostly modifications, some new sites
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Signal Coverage vs. Capacity
Topic Dec. '13 Dec. '12 Dec. '08 Dec. '03 Dec. '98
Wireless Subscriber
Connections # of active
devices, including
smartphones, feature
phones, tablets, etc. Since
users may have more than
one wireless device, it is
not equal to individual
subscribers.
335.65M 326.48M 270.3M 158.7M 69.2M
Wireless Penetration
Equals # of active units
divided by the total U.S.
and territorial population
(Puerto Rico, Guam and the
U.S. Virgin Islands)
104.3% 102.2% 87.2% 53.6% 24.6%
Wireless-Only Households
% of U.S. households
39.4% 38.2% 20.2% 4.2% N/A
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Signal Coverage vs. Capacity
Basic Concept:
Initial goal (FCC Requirement):
Build-out for
Radio Frequency (RF) Coverage
End goal (never reached):
Building-out for
Call Handling Capacity
Cell area 1
Cell area 2
Cell area 1 Cell area 3
Cell area 4 6
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Planners’ Dilemma
• three basic rules
• always follow the federal and state laws
• always follow direction from PC and CC
• always follow your (potentially outdated) ordinance
you figure out how to reconcile the three basic rules
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Regulatory Framework
• Telecommunications Act [47 U.S.C. § 332(c)(7)]
• applies to all applications for “personal wireless services facilities”
• generally preserves local police powers, subject to certain
substantive and procedural limits
• Middle Class Tax Relief Act [47 U.S.C. § 1455(a)]
• applies to all “wireless” applications (broader)
• preempts local discretion over certain collocations and
modifications to existing wireless sites
• FCC Regulations
• interprets federal statutes; carries the force of law
• California State Law
• local rights-of-way management [CAL. PUB. UTILS. §§ 7901-7901.1]
• permit streamlining act [CAL. GOVT. CODE §§ 65920 et seq.]
• certain collocations [CAL. GOVT. CODE §§ 65850.6 et seq.]
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Prohibit or Effectively Prohibit
“The regulation of the placement, construction, and
modification of personal wireless service facilities by
any State or local government or instrumentality
thereof . . . shall not prohibit or have the effect of
prohibiting the provision of personal wireless
services.”
47 USC § 332(c)(7)(B)(i)(II)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Effective Prohibitions
can a single permit denial
“effectively prohibit” the provision
of personal wireless services?
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Significant Gap
• no “bright-line” test
• not all gaps are “significant” – depends on context
• coverage vs. capacity issues
• single provider rule
• only considers the applicant’s service
• existing coverage from competitors does not factor
• comment: is this test still relevant?
• difficult to prove, disprove or even understand
• expensive to litigate (battle of the experts)
• still need to prove least intrusive means regardless
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Least Intrusive Means
• local values set the standard
• the “least intrusive means” is the location and design
that most closely conforms to the local values that a
permit denial would serve
• example: zone height limit as a local value
• practical considerations may rule-out alternatives
• technical feasibility – alternative site must reasonably
meet the technical needs
• potential availability – applicant must be able to obtain
a lease to build the site
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
How to Find the
Least Intrusive Means
• process-based test (must actively participate)
• applicant shows prima facie case with alt. site analysis
• jurisdiction rebuts with potential alternatives
• applicant may rule-out alts. on practical grounds, but
not intrusiveness grounds
• process continues until jurisdiction cannot rebut or
applicant cannot rule-out
• tie goes to the jurisdiction
• between two technically feasible and potentially
available alternatives, jurisdiction’s preference prevails
• but still subject to other federal limitations . . .
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Unreasonable Discrimination
“The regulation of the placement, construction, and
modification of personal wireless service facilities by
any State or local government or instrumentality
thereof . . . shall not unreasonably discriminate
among providers of functionally equivalent
services.”
47 USC § 332(c)(7)(B)(i)(II)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
RF Regulations
“No State or local government or instrumentality
thereof may regulate the placement, construction,
and modification of personal wireless service
facilities on the basis of the environmental effects of
radio frequency emissions to the extent that such
facilities comply with the Commission’s regulations
concerning such emissions.”
47 USC § 332(c)(7)(B)(iv)
19
1
Measurable
increase in
temperature
50x Margin
FCC’s 100% General
Population Limit
Typical for
Carriers:
A Fraction 1%
Where does the FCC
set its standard?
20
1
What about the
adequacy of the
standards?
Didn’t the
government lie to us
about cigarettes?
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Written Decision
“Any decision by a State or local government or
instrumentality thereof to deny a request to place,
construct, or modify personal wireless service
facilities shall be in writing and supported by
substantial evidence contained in a written record.”
47 USC § 332(c)(7)(B)(iii)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Substantial Evidence
“Any decision by a State or local government or
instrumentality thereof to deny a request to place,
construct, or modify personal wireless service
facilities shall be in writing and supported by
substantial evidence contained in a written record.”
47 USC § 332(c)(7)(B)(iii)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Reasonable Time
“A State or local government or instrumentality
thereof shall act on any request for authorization to
place, construct, or modify personal wireless service
facilities within a reasonable period of time after
the request is duly filed with such government or
instrumentality, taking into account the nature and
scope of such request.”
47 USC § 332(c)(7)(B)(ii)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Basic Shot Clock Rules
• timeframes for review
section 332(c)(7)
• collocations  90 days
• all other requests  150 days
section 6409(a)  60 days
• tolling (pause the clock)
• incomplete notices
• mutual agreement
• remedies for failure to act
section 332(c)(7)  applicant may sue
section 6409(a)  permit “deemed granted”
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Incomplete Notices
• general rule
jurisdiction must specifically delineate incompleteness in a
written notice within the first 30 days
• publicly-stated rule
clock does not toll unless notice cites to a “publicly stated”
source (but not necessarily a codified requirement)
• one-bite rule
subsequent notices do not toll the clock for reasons not cited in
the first notice
• 10-day resubmittal review period
jurisdiction must deem resubmittal incomplete within 10 days
or resubmittal deemed sufficient
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Public Rights-of-Way
• telephone corporations’ statewide franchise
• California grants access to ROW [§ 7901]
• not compulsory access to poles
• reasonable time, place and manner control
• local jurisdictions manage the ROW [§ 7901.1]
• regulations applied on nondiscriminatory basis
• includes aesthetic regulations [Sprint v. PVE]
• interaction with Telecom Act
• cities cannot flat exclude carriers from ROW
• significant gap relevant only to whether a less-intrusive
alternative is technically feasible
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
 SMALL CELL
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
SMALL CELL 
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
NOT A
SMALL CELL 
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Section 6409(a)
(a) Facility modifications.
(1) In general. Notwithstanding section 704 of the Telecommunications Act of
1996 (Public Law 104-104) or any other provision of law, a State or local
government may not deny, and shall approve, any eligible facilities request for
a modification of an existing wireless tower or base station that does not
substantially change the physical dimensions of such tower or base station.
(2) Eligible facilities request. For purposes of this subsection, the term
“eligible facilities request” means any request for modification of an existing
wireless tower or base station that involves—
(A) collocation of new transmission equipment;
(B) removal of transmission equipment; or
(C) replacement of transmission equipment.
(3) Applicability of environmental laws. Nothing in paragraph (1) shall be
construed to relieve the Commission from the requirements of the National
Historic Preservation Act or the National Environmental Policy Act of 1969.
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Section 6409(a)
State and local governments “may not deny, and
shall approve” any “eligible facilities request” so long
as it does not “substantially change the physical
dimensions of the existing wireless tower or base
station.”
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Tower
“[A]ny structure built for the sole or primary
purpose of supporting any Commission-licensed or
authorized antennas and their associated facilities”
Test for Wireless Tower:
• intended solely or primarily to support
transmission equipment;
• does not need actual transmission equipment; and
• lawfully constructed (not necessarily permitted)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Tower
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Base Station
“[T]he equipment and non-tower supporting
structure at a fixed location that enable
Commission-licensed or authorized wireless
communications between user equipment and a
communications network.”
Test for Base Station:
• not a wireless tower;
• transmission equipment installed; and
• valid permit for wireless use
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Base Station
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Transmission Equipment
“[A]ny equipment that facilitates transmission for
any Commission-licensed or authorized wireless
communication service, including, but not limited
to, radio transceivers, antennas and other relevant
equipment associated with and necessary to their
operation, including coaxial or fiber-optic cable, and
regular and backup power supply.”
Otherwise known as . . . pretty much everything
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Substantial Change
• Limited to Six Criteria
• height, width, excavation, new cabinets, concealment and
permit compliance
• Thresholds Depend on Site Type/Location
• generally larger mods for towers on private property
• generally smaller mods for ROW and building sites
• Other Rules
• legal nonconforming sites available for modification
• carrier cannot replace entire support structure
• modification must comply with all safety codes
• excludes sites without all required permits or approvals
• cumulative limit on height increases, but not total mods
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Before you consider
granting a 6409(a)
request, go out and
blow about $16 on a
100’ measuring tape.
Then go visit the site
with a copy of all
permits in hand.
Potentially a really,
really good ROI.
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Concealment Elements
• Mod Cannot “Defeat” Existing Concealment
• no clear guidance on what “defeat” means
• applies only to sites with existing concealment
• Rules Do Not Preempt Concealment Conditions
• localities can still conditionally approve permits
• FCC preempts prior conditions in conflict with all
thresholds except concealment elements
• Impact on New Sites . . .
• should require concealment as a condition of approval
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Concealment Elements
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Remedies and Penalties
• New 60-Day Shot Clock
• clock begins when applicant files
• same tolling rules apply
• Permits “Deemed Granted” After Failure to Act
• no presumption like for other shot clocks
• applicant must file written notice with jurisdiction
• can build on day 61 after failure to act on day 60
• Judicial Remedies
• aggrieved parties (including local government) may sue
for injunctive or declaratory relief
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Section 6409(a) Applications
• jurisdictions can (and should) require one
• FCC limits application content
• may only require materials reasonably related to an
issue within scope of local review
• broad discretion over what materials to require to
illuminate an issue within local scope
• cannot require technical need or business case
demonstrations (i.e., no more propagation maps)
• does time limit apply to building/encroachment?
• maybe: FCC not clear, but suggested localities should
consider “simultaneous” review process
• does not include other agencies’ review (e.g., Costal)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Do Recent Changes
Require an Ordinance?
• legal considerations
• no explicit requirement in new regulations that jurisdictions
create new ordinance, but may implicitly preempt local
ordinances
• jurisdictions with no wireless regulations do not need an
ordinance at this time
• jurisdictions with comprehensive wireless regulations will
likely run into preemption issues
• practical considerations
• 60-day timeframe
• mandatory approvals
• limited criteria for review
• extremely new rules currently under judicial review
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
What Should a Section 6409(a)
Ordinance Contain?
• mechanism to segregate 6409(a) projects from
others governed under section 332(c)(7)
• plain-english definitions
• director-level approval/denial power
• authorization to create/update application
materials in a publicly-stated format
• exemptions from preempted provisions
• automatic conditions of approval
• appeals process (subject to federal timelines)
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
What Should a Section 6409(a)
Ordinance Leave Out?
• remedies
• do not codify federal or state-law at the local level
• detailed procedural requirements
• again, federal law applies whether codified at the local
level or not
• high margin for technical error (facial challenge), best
left to informal/internal guidance materials
• the word “shall” in most cases
• creates affirmative duties that could lead to a municipal
code violation in addition to a federal or state violation
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
“Model Ordinance”
• Technical / Legal Problems
• cements federal remedies and procedures in local code
• provisions just as obtuse as the CFRs
• typos and clerical errors
• Political / Legitimacy Problems
• US Conference of Mayors withdrew support
• NATOA, NLC and NaCo seem lukewarm at best
• regional chapters not enthusiastic
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
General Wireless
Ordinance Considerations
• delegate permit application authority
• consider appointments for application submittal
• include “safety valves”
• limited exceptions to prevent effective prohibitions
• place burden to prove applicability on the applicant
• consider development fee deposits rather than
reimbursement
• general reliance clauses
• anti-dumping clauses
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
General Wireless
Ordinance Considerations
• aesthetics
• remember that the code expresses “local values”
• create a roadmap for applicants: order preferences,
articulate guidelines
• do not attempt to control technologies (i.e., DAS)
• RF exposure compliance
• planned compliance reports
• post-construction compliance reports?
• include/exclude?
• HAM radio; government users; OTARD?
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
AB 57 (Quirk)
The people of the State of California do enact as follows:
Section 65964.1 is added to the Government Code to read:
(a) A colocation or siting application for a wireless telecommunications
facility, as defined in Section 65850.6, shall be deemed approved if both of the
following occur:
(1) The city or county fails to approve or disapprove the application within the
time periods established by the Federal Communications Commission in In re
Petition for Declaratory Ruling, 24 FCC Rcd. 13994 (2009).
(2) All public notices regarding the application have been provided consistent
with the public notice requirements for the application.
(b) The Legislature finds and declares that a wireless telecommunications
facility has a significant economic impact in California and is not a municipal
affair as that term is used in Section 5 of Article XI of the California
Constitution, but is a matter of statewide concern.
© 2015 Telecom Law Firm, PC
Not Legal Advice – Consult an Attorney
Orange County – APA
May 21, 2015
Abhorrently Bad (“AB”) 57
• bad policy
• FCC already rejected this proposal twice on the grounds
that some projects simply take longer than others
• will lead to a zero sum game; encourage bad behavior
• poorly drafted
• vague: incorporates federal timeframes by reference
• difference b/w “municipal affair” and “statewide
concern” – the statute doesn’t use correct terms
• potentially in conflict with Cal. Constitution
• could exclude due process notice requirements
• compare with Permit Streamlining Act

More Related Content

What's hot

FirstNet: Recent Developments and Current Uncertainties for Local Governments
FirstNet: Recent Developments and Current Uncertainties for Local GovernmentsFirstNet: Recent Developments and Current Uncertainties for Local Governments
FirstNet: Recent Developments and Current Uncertainties for Local GovernmentsBest Best and Krieger LLP
 
Accelerating 4G LTE Buildout: Local Land Use Approval Issues
Accelerating 4G LTE Buildout: Local Land Use Approval IssuesAccelerating 4G LTE Buildout: Local Land Use Approval Issues
Accelerating 4G LTE Buildout: Local Land Use Approval IssuesBest Best and Krieger LLP
 
Mr Maxwell Hogan Lovells Net Neutrality
Mr Maxwell Hogan Lovells Net NeutralityMr Maxwell Hogan Lovells Net Neutrality
Mr Maxwell Hogan Lovells Net NeutralityIDATE DigiWorld
 
The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...
The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...
The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...Best Best and Krieger LLP
 
IP Transition and Net Neutrality: Why Local Governments Should Care
IP Transition and Net Neutrality:Why Local Governments Should CareIP Transition and Net Neutrality:Why Local Governments Should Care
IP Transition and Net Neutrality: Why Local Governments Should CareBest Best and Krieger LLP
 
FCC Proposes New Rules On Local Wireless Siting
FCC Proposes New Rules On Local Wireless SitingFCC Proposes New Rules On Local Wireless Siting
FCC Proposes New Rules On Local Wireless SitingBest Best and Krieger LLP
 
TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013Patton Boggs LLP
 
What Issues are Building and How Do They Affect Local Governments
What Issues are Building and How Do They Affect Local GovernmentsWhat Issues are Building and How Do They Affect Local Governments
What Issues are Building and How Do They Affect Local GovernmentsBest Best and Krieger LLP
 
The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux
The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux
The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux Ryan Thurman
 
Cable Television Update 2015 – A Look at Federal Regulatory Developments
Cable Television Update 2015 – A Look at Federal Regulatory DevelopmentsCable Television Update 2015 – A Look at Federal Regulatory Developments
Cable Television Update 2015 – A Look at Federal Regulatory DevelopmentsMoss & Barnett
 
Privacy at the Handset: New FCC Rules?
Privacy at the Handset: New FCC Rules?Privacy at the Handset: New FCC Rules?
Privacy at the Handset: New FCC Rules?Christie Dudley
 
14.11.17 gongwer news service - colr legislation
14.11.17   gongwer news service - colr legislation14.11.17   gongwer news service - colr legislation
14.11.17 gongwer news service - colr legislationhmhollingsworth
 
How Your Community Can Respond to the Comcast - Time Warner Merger
How Your Community Can Respond to the Comcast - Time Warner MergerHow Your Community Can Respond to the Comcast - Time Warner Merger
How Your Community Can Respond to the Comcast - Time Warner MergerBest Best and Krieger LLP
 
Mac309 Net Neutrality 2008 9
Mac309 Net Neutrality 2008 9Mac309 Net Neutrality 2008 9
Mac309 Net Neutrality 2008 9Rob Jewitt
 
Sookman primetime presentation
Sookman primetime presentationSookman primetime presentation
Sookman primetime presentationbsookman
 

What's hot (20)

FirstNet: Recent Developments and Current Uncertainties for Local Governments
FirstNet: Recent Developments and Current Uncertainties for Local GovernmentsFirstNet: Recent Developments and Current Uncertainties for Local Governments
FirstNet: Recent Developments and Current Uncertainties for Local Governments
 
Accelerating 4G LTE Buildout: Local Land Use Approval Issues
Accelerating 4G LTE Buildout: Local Land Use Approval IssuesAccelerating 4G LTE Buildout: Local Land Use Approval Issues
Accelerating 4G LTE Buildout: Local Land Use Approval Issues
 
Developments in Wireless
Developments in WirelessDevelopments in Wireless
Developments in Wireless
 
Mr Maxwell Hogan Lovells Net Neutrality
Mr Maxwell Hogan Lovells Net NeutralityMr Maxwell Hogan Lovells Net Neutrality
Mr Maxwell Hogan Lovells Net Neutrality
 
The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...
The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...
The Wheeler Federal Communications Commission - 2014 Outlook on Congress and ...
 
Navigating the Internet Protocol Transition
Navigating the Internet Protocol TransitionNavigating the Internet Protocol Transition
Navigating the Internet Protocol Transition
 
IP Transition and Net Neutrality: Why Local Governments Should Care
IP Transition and Net Neutrality:Why Local Governments Should CareIP Transition and Net Neutrality:Why Local Governments Should Care
IP Transition and Net Neutrality: Why Local Governments Should Care
 
FCC Proposes New Rules On Local Wireless Siting
FCC Proposes New Rules On Local Wireless SitingFCC Proposes New Rules On Local Wireless Siting
FCC Proposes New Rules On Local Wireless Siting
 
Public Safety and Wireless Deployment
Public Safety and Wireless DeploymentPublic Safety and Wireless Deployment
Public Safety and Wireless Deployment
 
TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013TechComm Industry Update - February 26, 2013
TechComm Industry Update - February 26, 2013
 
Telecommunications Policy in an IP World
Telecommunications Policy in an IP WorldTelecommunications Policy in an IP World
Telecommunications Policy in an IP World
 
What Issues are Building and How Do They Affect Local Governments
What Issues are Building and How Do They Affect Local GovernmentsWhat Issues are Building and How Do They Affect Local Governments
What Issues are Building and How Do They Affect Local Governments
 
The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux
The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux
The State of the TCPA: Consent, Dialers, the FCC -- the Law is in Flux
 
Cable Television Update 2015 – A Look at Federal Regulatory Developments
Cable Television Update 2015 – A Look at Federal Regulatory DevelopmentsCable Television Update 2015 – A Look at Federal Regulatory Developments
Cable Television Update 2015 – A Look at Federal Regulatory Developments
 
Privacy at the Handset: New FCC Rules?
Privacy at the Handset: New FCC Rules?Privacy at the Handset: New FCC Rules?
Privacy at the Handset: New FCC Rules?
 
Policy Implications of the Digital Economy
Policy Implications of the Digital EconomyPolicy Implications of the Digital Economy
Policy Implications of the Digital Economy
 
14.11.17 gongwer news service - colr legislation
14.11.17   gongwer news service - colr legislation14.11.17   gongwer news service - colr legislation
14.11.17 gongwer news service - colr legislation
 
How Your Community Can Respond to the Comcast - Time Warner Merger
How Your Community Can Respond to the Comcast - Time Warner MergerHow Your Community Can Respond to the Comcast - Time Warner Merger
How Your Community Can Respond to the Comcast - Time Warner Merger
 
Mac309 Net Neutrality 2008 9
Mac309 Net Neutrality 2008 9Mac309 Net Neutrality 2008 9
Mac309 Net Neutrality 2008 9
 
Sookman primetime presentation
Sookman primetime presentationSookman primetime presentation
Sookman primetime presentation
 

Similar to The Brave New World of Wireless Regulations for Planners (2015)

Wireless in the Rights of Way and on Public Property
Wireless in the Rights of Way and on Public PropertyWireless in the Rights of Way and on Public Property
Wireless in the Rights of Way and on Public PropertyBest Best and Krieger LLP
 
Internet Law 2014 - Presentation at CalBar IP Institute
Internet Law 2014 - Presentation at CalBar IP InstituteInternet Law 2014 - Presentation at CalBar IP Institute
Internet Law 2014 - Presentation at CalBar IP InstituteInternet Law Center
 
The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...
The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...
The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...Gigabit City Summit
 
Local Government Revenues in a Broadband World: Rights-of-Way Compensation
Local Government Revenues in a Broadband World: Rights-of-Way CompensationLocal Government Revenues in a Broadband World: Rights-of-Way Compensation
Local Government Revenues in a Broadband World: Rights-of-Way CompensationBest Best and Krieger LLP
 
Cellphone Tower Regulation: Maximizing Revenue While Protecting Local Interests
Cellphone Tower Regulation: Maximizing Revenue While Protecting Local InterestsCellphone Tower Regulation: Maximizing Revenue While Protecting Local Interests
Cellphone Tower Regulation: Maximizing Revenue While Protecting Local InterestsBest Best and Krieger LLP
 
How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...
How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...
How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...Meyers Nave
 
No Dialtone: The End of the Public Switched Telephone Network
No Dialtone: The End of the Public Switched Telephone Network No Dialtone: The End of the Public Switched Telephone Network
No Dialtone: The End of the Public Switched Telephone Network Kevin Werbach
 
A Basic Communications Law Primer for Elected Officials
A Basic Communications Law Primer for Elected Officials  A Basic Communications Law Primer for Elected Officials
A Basic Communications Law Primer for Elected Officials Best Best and Krieger LLP
 
NET NEUTRALITY
NET NEUTRALITYNET NEUTRALITY
NET NEUTRALITYMavis Osei
 
Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...
Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...
Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...KC Digital Drive
 
Final presentation New Media Ethics
Final presentation New Media EthicsFinal presentation New Media Ethics
Final presentation New Media EthicsTeichka Muñoz
 
Cable Regulation in an Evolving IP World
Cable Regulation in an Evolving IP WorldCable Regulation in an Evolving IP World
Cable Regulation in an Evolving IP WorldMoss & Barnett
 
CPI Comcast article April 2014
CPI Comcast article April 2014CPI Comcast article April 2014
CPI Comcast article April 2014Anant Raut
 
The battle over net neutrality
The battle over net neutralityThe battle over net neutrality
The battle over net neutralityniz73
 
Wireless Siting: The Issue that Won't Go Away and Grows in Complexity
Wireless Siting: The Issue that Won't Go Away and Grows in ComplexityWireless Siting: The Issue that Won't Go Away and Grows in Complexity
Wireless Siting: The Issue that Won't Go Away and Grows in ComplexityBest Best and Krieger LLP
 
Privacy & The Smart Grid (Susanlyon Chtlj01292010)
Privacy & The Smart Grid (Susanlyon   Chtlj01292010)Privacy & The Smart Grid (Susanlyon   Chtlj01292010)
Privacy & The Smart Grid (Susanlyon Chtlj01292010)Susan Lyon-Hintze
 
NEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docx
NEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docxNEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docx
NEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docxcurwenmichaela
 
RF Radiation: Smart Meters and Other Developing Problems
RF Radiation: Smart Meters and Other Developing ProblemsRF Radiation: Smart Meters and Other Developing Problems
RF Radiation: Smart Meters and Other Developing ProblemsBest Best and Krieger LLP
 

Similar to The Brave New World of Wireless Regulations for Planners (2015) (20)

Wireless in the Rights of Way and on Public Property
Wireless in the Rights of Way and on Public PropertyWireless in the Rights of Way and on Public Property
Wireless in the Rights of Way and on Public Property
 
Internet Law 2014 - Presentation at CalBar IP Institute
Internet Law 2014 - Presentation at CalBar IP InstituteInternet Law 2014 - Presentation at CalBar IP Institute
Internet Law 2014 - Presentation at CalBar IP Institute
 
The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...
The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...
The Truth about Wired and Wireless: Key Legal and Regulatory Issues by Sean S...
 
Local Government Revenues in a Broadband World: Rights-of-Way Compensation
Local Government Revenues in a Broadband World: Rights-of-Way CompensationLocal Government Revenues in a Broadband World: Rights-of-Way Compensation
Local Government Revenues in a Broadband World: Rights-of-Way Compensation
 
Cellphone Tower Regulation: Maximizing Revenue While Protecting Local Interests
Cellphone Tower Regulation: Maximizing Revenue While Protecting Local InterestsCellphone Tower Regulation: Maximizing Revenue While Protecting Local Interests
Cellphone Tower Regulation: Maximizing Revenue While Protecting Local Interests
 
How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...
How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...
How Do Municipalities Comply with the FCC’s New Rule on Small Cell Wireless D...
 
No Dialtone: The End of the Public Switched Telephone Network
No Dialtone: The End of the Public Switched Telephone Network No Dialtone: The End of the Public Switched Telephone Network
No Dialtone: The End of the Public Switched Telephone Network
 
A Basic Communications Law Primer for Elected Officials
A Basic Communications Law Primer for Elected Officials  A Basic Communications Law Primer for Elected Officials
A Basic Communications Law Primer for Elected Officials
 
Update on Wireless Facilities Siting Issues
Update on Wireless Facilities Siting IssuesUpdate on Wireless Facilities Siting Issues
Update on Wireless Facilities Siting Issues
 
NET NEUTRALITY
NET NEUTRALITYNET NEUTRALITY
NET NEUTRALITY
 
Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...
Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...
Jim Baller: Seven Important Next Steps for Gigabit Communities (Gigabit City ...
 
Final presentation New Media Ethics
Final presentation New Media EthicsFinal presentation New Media Ethics
Final presentation New Media Ethics
 
Cable Regulation in an Evolving IP World
Cable Regulation in an Evolving IP WorldCable Regulation in an Evolving IP World
Cable Regulation in an Evolving IP World
 
CPI Comcast article April 2014
CPI Comcast article April 2014CPI Comcast article April 2014
CPI Comcast article April 2014
 
The battle over net neutrality
The battle over net neutralityThe battle over net neutrality
The battle over net neutrality
 
The battle over net neutrality
The battle over net neutralityThe battle over net neutrality
The battle over net neutrality
 
Wireless Siting: The Issue that Won't Go Away and Grows in Complexity
Wireless Siting: The Issue that Won't Go Away and Grows in ComplexityWireless Siting: The Issue that Won't Go Away and Grows in Complexity
Wireless Siting: The Issue that Won't Go Away and Grows in Complexity
 
Privacy & The Smart Grid (Susanlyon Chtlj01292010)
Privacy & The Smart Grid (Susanlyon   Chtlj01292010)Privacy & The Smart Grid (Susanlyon   Chtlj01292010)
Privacy & The Smart Grid (Susanlyon Chtlj01292010)
 
NEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docx
NEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docxNEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docx
NEWSWHAT’S NEW NOWWhy 2015 May Be the Year We Solve Ne.docx
 
RF Radiation: Smart Meters and Other Developing Problems
RF Radiation: Smart Meters and Other Developing ProblemsRF Radiation: Smart Meters and Other Developing Problems
RF Radiation: Smart Meters and Other Developing Problems
 

Recently uploaded

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesZilliz
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embeddingZilliz
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 

Recently uploaded (20)

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Vector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector DatabasesVector Databases 101 - An introduction to the world of Vector Databases
Vector Databases 101 - An introduction to the world of Vector Databases
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Training state-of-the-art general text embedding
Training state-of-the-art general text embeddingTraining state-of-the-art general text embedding
Training state-of-the-art general text embedding
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 

The Brave New World of Wireless Regulations for Planners (2015)

  • 1. The Brave New World of Wireless Regulations for Planners American Planning Association California Chapter, Orange Section Tustin, California May 21, 2015
  • 2. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 About the Presenters Robert C. May III Partner Telecom Law Firm, PC 6986 La Jolla Blvd, Ste. 204 La Jolla, CA 92037 Direct: (619) 272-6200 tripp@telecomlawfirm.com practice focused on representing governments and other landowners in wireless infrastructure regulations and transactions. co-author of California Local Governments (League of CA Cities, CSAC, and SCAN NATOA) comments and reply comments to FCC in the 2015 Infrastructure Order SCAN NATOA member of the year 2014 for pro bono advocacy in the 2015 Infrastructure Order JD, University of San Diego School of Law • Executive Editor, San Diego Law Review • Executive Board, Moot Court
  • 3. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 About the Presenters • Admitted to Practice Law in California and New Mexico - Practice areas: Telecom Law (Wireless & Broadband) Telecom Site Leasing (governments and private landlords) • Wireless advisor local governments (+1,700 planning cases) • Radio Frequency and Broadband Telecom Engineer • Expert witness in > 40 cases • RF Emissions Safety Reviewer - Co-author, co-editor of the FCC’s publication: A Local Government Official's Guide to Transmitting Antenna RF Emission Safety: Rules, Procedures, and Practical Guidance • FCC Licensee - Top commercial radio-telephone, marine digital, ship radar, and amateur licenses • Member: IMLA, FCBA, NATOA, SCAN NATOA, SBE • JD – Abraham Lincoln University School of Law, Los Angeles • LL.M. IT/Telecom Law - Strathclyde University, Glasgow • Doctor of Law and Policy (Student) – Northeastern University, Boston Jonathan L. Kramer Founder/Partner Telecom Law Firm, PC 2001 S. Barrington Ave. Suite 306 Los Angeles, CA 90025 Direct: (310) 405-7333 kramer@telecomlawfirm.com
  • 4. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Changes in Industry & Technology Drive Deployment • increased demand • cord-cutters • machine-2-machine / internet of things • changes in how wireless is used • signal coverage vs. signal capacity • increased need for new sites w/ smaller coverage areas • FCC spectrum auctions • carriers acquire licenses to use new spectrum bands • FCC requires carriers to “build-out” new spectrum • mostly modifications, some new sites
  • 5. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Signal Coverage vs. Capacity Topic Dec. '13 Dec. '12 Dec. '08 Dec. '03 Dec. '98 Wireless Subscriber Connections # of active devices, including smartphones, feature phones, tablets, etc. Since users may have more than one wireless device, it is not equal to individual subscribers. 335.65M 326.48M 270.3M 158.7M 69.2M Wireless Penetration Equals # of active units divided by the total U.S. and territorial population (Puerto Rico, Guam and the U.S. Virgin Islands) 104.3% 102.2% 87.2% 53.6% 24.6% Wireless-Only Households % of U.S. households 39.4% 38.2% 20.2% 4.2% N/A
  • 6. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Signal Coverage vs. Capacity Basic Concept: Initial goal (FCC Requirement): Build-out for Radio Frequency (RF) Coverage End goal (never reached): Building-out for Call Handling Capacity Cell area 1 Cell area 2 Cell area 1 Cell area 3 Cell area 4 6
  • 7. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Planners’ Dilemma • three basic rules • always follow the federal and state laws • always follow direction from PC and CC • always follow your (potentially outdated) ordinance you figure out how to reconcile the three basic rules
  • 8. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Regulatory Framework • Telecommunications Act [47 U.S.C. § 332(c)(7)] • applies to all applications for “personal wireless services facilities” • generally preserves local police powers, subject to certain substantive and procedural limits • Middle Class Tax Relief Act [47 U.S.C. § 1455(a)] • applies to all “wireless” applications (broader) • preempts local discretion over certain collocations and modifications to existing wireless sites • FCC Regulations • interprets federal statutes; carries the force of law • California State Law • local rights-of-way management [CAL. PUB. UTILS. §§ 7901-7901.1] • permit streamlining act [CAL. GOVT. CODE §§ 65920 et seq.] • certain collocations [CAL. GOVT. CODE §§ 65850.6 et seq.]
  • 9. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Prohibit or Effectively Prohibit “The regulation of the placement, construction, and modification of personal wireless service facilities by any State or local government or instrumentality thereof . . . shall not prohibit or have the effect of prohibiting the provision of personal wireless services.” 47 USC § 332(c)(7)(B)(i)(II)
  • 10. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Effective Prohibitions can a single permit denial “effectively prohibit” the provision of personal wireless services?
  • 11. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Significant Gap • no “bright-line” test • not all gaps are “significant” – depends on context • coverage vs. capacity issues • single provider rule • only considers the applicant’s service • existing coverage from competitors does not factor • comment: is this test still relevant? • difficult to prove, disprove or even understand • expensive to litigate (battle of the experts) • still need to prove least intrusive means regardless
  • 12. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Least Intrusive Means • local values set the standard • the “least intrusive means” is the location and design that most closely conforms to the local values that a permit denial would serve • example: zone height limit as a local value • practical considerations may rule-out alternatives • technical feasibility – alternative site must reasonably meet the technical needs • potential availability – applicant must be able to obtain a lease to build the site
  • 13. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 14. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 15. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 16. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 How to Find the Least Intrusive Means • process-based test (must actively participate) • applicant shows prima facie case with alt. site analysis • jurisdiction rebuts with potential alternatives • applicant may rule-out alts. on practical grounds, but not intrusiveness grounds • process continues until jurisdiction cannot rebut or applicant cannot rule-out • tie goes to the jurisdiction • between two technically feasible and potentially available alternatives, jurisdiction’s preference prevails • but still subject to other federal limitations . . .
  • 17. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Unreasonable Discrimination “The regulation of the placement, construction, and modification of personal wireless service facilities by any State or local government or instrumentality thereof . . . shall not unreasonably discriminate among providers of functionally equivalent services.” 47 USC § 332(c)(7)(B)(i)(II)
  • 18. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 RF Regulations “No State or local government or instrumentality thereof may regulate the placement, construction, and modification of personal wireless service facilities on the basis of the environmental effects of radio frequency emissions to the extent that such facilities comply with the Commission’s regulations concerning such emissions.” 47 USC § 332(c)(7)(B)(iv)
  • 19. 19 1 Measurable increase in temperature 50x Margin FCC’s 100% General Population Limit Typical for Carriers: A Fraction 1% Where does the FCC set its standard?
  • 20. 20 1 What about the adequacy of the standards? Didn’t the government lie to us about cigarettes?
  • 21. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Written Decision “Any decision by a State or local government or instrumentality thereof to deny a request to place, construct, or modify personal wireless service facilities shall be in writing and supported by substantial evidence contained in a written record.” 47 USC § 332(c)(7)(B)(iii)
  • 22. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Substantial Evidence “Any decision by a State or local government or instrumentality thereof to deny a request to place, construct, or modify personal wireless service facilities shall be in writing and supported by substantial evidence contained in a written record.” 47 USC § 332(c)(7)(B)(iii)
  • 23. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Reasonable Time “A State or local government or instrumentality thereof shall act on any request for authorization to place, construct, or modify personal wireless service facilities within a reasonable period of time after the request is duly filed with such government or instrumentality, taking into account the nature and scope of such request.” 47 USC § 332(c)(7)(B)(ii)
  • 24. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Basic Shot Clock Rules • timeframes for review section 332(c)(7) • collocations  90 days • all other requests  150 days section 6409(a)  60 days • tolling (pause the clock) • incomplete notices • mutual agreement • remedies for failure to act section 332(c)(7)  applicant may sue section 6409(a)  permit “deemed granted”
  • 25. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Incomplete Notices • general rule jurisdiction must specifically delineate incompleteness in a written notice within the first 30 days • publicly-stated rule clock does not toll unless notice cites to a “publicly stated” source (but not necessarily a codified requirement) • one-bite rule subsequent notices do not toll the clock for reasons not cited in the first notice • 10-day resubmittal review period jurisdiction must deem resubmittal incomplete within 10 days or resubmittal deemed sufficient
  • 26. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Public Rights-of-Way • telephone corporations’ statewide franchise • California grants access to ROW [§ 7901] • not compulsory access to poles • reasonable time, place and manner control • local jurisdictions manage the ROW [§ 7901.1] • regulations applied on nondiscriminatory basis • includes aesthetic regulations [Sprint v. PVE] • interaction with Telecom Act • cities cannot flat exclude carriers from ROW • significant gap relevant only to whether a less-intrusive alternative is technically feasible
  • 27. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 28. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015  SMALL CELL
  • 29. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 SMALL CELL 
  • 30. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 NOT A SMALL CELL 
  • 31. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 32. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Section 6409(a) (a) Facility modifications. (1) In general. Notwithstanding section 704 of the Telecommunications Act of 1996 (Public Law 104-104) or any other provision of law, a State or local government may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station. (2) Eligible facilities request. For purposes of this subsection, the term “eligible facilities request” means any request for modification of an existing wireless tower or base station that involves— (A) collocation of new transmission equipment; (B) removal of transmission equipment; or (C) replacement of transmission equipment. (3) Applicability of environmental laws. Nothing in paragraph (1) shall be construed to relieve the Commission from the requirements of the National Historic Preservation Act or the National Environmental Policy Act of 1969.
  • 33. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Section 6409(a) State and local governments “may not deny, and shall approve” any “eligible facilities request” so long as it does not “substantially change the physical dimensions of the existing wireless tower or base station.”
  • 34. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Tower “[A]ny structure built for the sole or primary purpose of supporting any Commission-licensed or authorized antennas and their associated facilities” Test for Wireless Tower: • intended solely or primarily to support transmission equipment; • does not need actual transmission equipment; and • lawfully constructed (not necessarily permitted)
  • 35. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Tower
  • 36. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Base Station “[T]he equipment and non-tower supporting structure at a fixed location that enable Commission-licensed or authorized wireless communications between user equipment and a communications network.” Test for Base Station: • not a wireless tower; • transmission equipment installed; and • valid permit for wireless use
  • 37. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Base Station
  • 38. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Transmission Equipment “[A]ny equipment that facilitates transmission for any Commission-licensed or authorized wireless communication service, including, but not limited to, radio transceivers, antennas and other relevant equipment associated with and necessary to their operation, including coaxial or fiber-optic cable, and regular and backup power supply.” Otherwise known as . . . pretty much everything
  • 39. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Substantial Change • Limited to Six Criteria • height, width, excavation, new cabinets, concealment and permit compliance • Thresholds Depend on Site Type/Location • generally larger mods for towers on private property • generally smaller mods for ROW and building sites • Other Rules • legal nonconforming sites available for modification • carrier cannot replace entire support structure • modification must comply with all safety codes • excludes sites without all required permits or approvals • cumulative limit on height increases, but not total mods
  • 40. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Before you consider granting a 6409(a) request, go out and blow about $16 on a 100’ measuring tape. Then go visit the site with a copy of all permits in hand. Potentially a really, really good ROI.
  • 41. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Concealment Elements • Mod Cannot “Defeat” Existing Concealment • no clear guidance on what “defeat” means • applies only to sites with existing concealment • Rules Do Not Preempt Concealment Conditions • localities can still conditionally approve permits • FCC preempts prior conditions in conflict with all thresholds except concealment elements • Impact on New Sites . . . • should require concealment as a condition of approval
  • 42. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Concealment Elements
  • 43. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 44. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 45. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015
  • 46. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Remedies and Penalties • New 60-Day Shot Clock • clock begins when applicant files • same tolling rules apply • Permits “Deemed Granted” After Failure to Act • no presumption like for other shot clocks • applicant must file written notice with jurisdiction • can build on day 61 after failure to act on day 60 • Judicial Remedies • aggrieved parties (including local government) may sue for injunctive or declaratory relief
  • 47. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Section 6409(a) Applications • jurisdictions can (and should) require one • FCC limits application content • may only require materials reasonably related to an issue within scope of local review • broad discretion over what materials to require to illuminate an issue within local scope • cannot require technical need or business case demonstrations (i.e., no more propagation maps) • does time limit apply to building/encroachment? • maybe: FCC not clear, but suggested localities should consider “simultaneous” review process • does not include other agencies’ review (e.g., Costal)
  • 48. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Do Recent Changes Require an Ordinance? • legal considerations • no explicit requirement in new regulations that jurisdictions create new ordinance, but may implicitly preempt local ordinances • jurisdictions with no wireless regulations do not need an ordinance at this time • jurisdictions with comprehensive wireless regulations will likely run into preemption issues • practical considerations • 60-day timeframe • mandatory approvals • limited criteria for review • extremely new rules currently under judicial review
  • 49. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 What Should a Section 6409(a) Ordinance Contain? • mechanism to segregate 6409(a) projects from others governed under section 332(c)(7) • plain-english definitions • director-level approval/denial power • authorization to create/update application materials in a publicly-stated format • exemptions from preempted provisions • automatic conditions of approval • appeals process (subject to federal timelines)
  • 50. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 What Should a Section 6409(a) Ordinance Leave Out? • remedies • do not codify federal or state-law at the local level • detailed procedural requirements • again, federal law applies whether codified at the local level or not • high margin for technical error (facial challenge), best left to informal/internal guidance materials • the word “shall” in most cases • creates affirmative duties that could lead to a municipal code violation in addition to a federal or state violation
  • 51. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 “Model Ordinance” • Technical / Legal Problems • cements federal remedies and procedures in local code • provisions just as obtuse as the CFRs • typos and clerical errors • Political / Legitimacy Problems • US Conference of Mayors withdrew support • NATOA, NLC and NaCo seem lukewarm at best • regional chapters not enthusiastic
  • 52. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 General Wireless Ordinance Considerations • delegate permit application authority • consider appointments for application submittal • include “safety valves” • limited exceptions to prevent effective prohibitions • place burden to prove applicability on the applicant • consider development fee deposits rather than reimbursement • general reliance clauses • anti-dumping clauses
  • 53. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 General Wireless Ordinance Considerations • aesthetics • remember that the code expresses “local values” • create a roadmap for applicants: order preferences, articulate guidelines • do not attempt to control technologies (i.e., DAS) • RF exposure compliance • planned compliance reports • post-construction compliance reports? • include/exclude? • HAM radio; government users; OTARD?
  • 54. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 AB 57 (Quirk) The people of the State of California do enact as follows: Section 65964.1 is added to the Government Code to read: (a) A colocation or siting application for a wireless telecommunications facility, as defined in Section 65850.6, shall be deemed approved if both of the following occur: (1) The city or county fails to approve or disapprove the application within the time periods established by the Federal Communications Commission in In re Petition for Declaratory Ruling, 24 FCC Rcd. 13994 (2009). (2) All public notices regarding the application have been provided consistent with the public notice requirements for the application. (b) The Legislature finds and declares that a wireless telecommunications facility has a significant economic impact in California and is not a municipal affair as that term is used in Section 5 of Article XI of the California Constitution, but is a matter of statewide concern.
  • 55. © 2015 Telecom Law Firm, PC Not Legal Advice – Consult an Attorney Orange County – APA May 21, 2015 Abhorrently Bad (“AB”) 57 • bad policy • FCC already rejected this proposal twice on the grounds that some projects simply take longer than others • will lead to a zero sum game; encourage bad behavior • poorly drafted • vague: incorporates federal timeframes by reference • difference b/w “municipal affair” and “statewide concern” – the statute doesn’t use correct terms • potentially in conflict with Cal. Constitution • could exclude due process notice requirements • compare with Permit Streamlining Act