Plane Handling and Aviance
Integration of Access Database
Presentation completed
by
Ahmed Usman
Contents
 Synopsis
 Current Position
 Problems with running two separate databases
 Proposed Integration-Solution 1
 Proposed Integration-Solution 2
 Timetable
 Appendix
 Risks and commentary on the Integration of the databases
 Summary of technical Issues arising on the Integration of databases
 Manning/contact details
Synopsis
 Current position
 2 Separate databases with separate T & C s in each database
[Plane Handling Limited [PHL] and Aviance T3 and T4[AVA]]
 Problems with running two separate databases
 Accuracy
 Transfer of employees
 Confusion with T & C
 Proposed Integration
 Single Platform i.e. single Integrated database
 Proposed Solution 1
 One Integrated database incorporating the terms and conditions of Plane Handling Limited [PHL] and Aviance [AVA] (if
bandwidth allows it)
 Proposed solution 2
 Separate database for Cargo and Ramp both incorporating the terms and condition of the PHL and AVA
 Timetable:-Pilot Version 31 March 2010, implementation date 6 May 2010
 Problem and Issues Arising
 Bandwidth
 Odd contracts
 Fields with monetary values as compared to hours
 Delay in rollout
Current Position
PHL Database
Radius Park
Grampian Payroll
System
PHL T & C’s
Newcastle
Backend
AVA T & C’s
AVA Database
T3 and T4
TRN
T3 T4
T3
CP
SP
RP
MANB549
Proposed Solution 1
PHL Database
Radius Park
Grampian Payroll
System
Newcastle
TRN
T4
Pay-26
Data extraction
Pay-31
Data
extraction
T3
CP
SP
RP
MAN
B549
Common rostering in
Ramp and PAX
Proposed Solution 2
PHL Database
Radius Park
Grampian Payroll
System
PHL T & C’s
+
AVA T & C’s
Newcastle
Backend
AVA Database
T3 and T4
TRN
T3 T4
T3
CP
SP
RP
MANB549
PHL T & C’s
+
AVA T & C’s
The databases are identical with same (combined T & C’s)
Common
rostering
in Ramp and
PAX
Timetable
Date Phase Action Plan
31 March 2010 First Pilot Version First version of Integrated database would
be installed at Ahmed and Peter’s terminal
at Radius Park for assessment and testing.
The results of the Pilot version would be
discussed with PG in early April and fedback
to Jim
20 April 2010 First Completed version ready for full
testing
[This version would incorporate
feedback from PG/AU and PD]
Full version to be installed at few selected
sites for testing and assessment
5 May 2010 Cut-off date To be managed by AU and PD
i.e. Ensure all 15 stations are fully aware of
it and have completed all final postings
6 May 2010 Implementation date to all the 15
stations
JS to install to all stations
This process is expected to take around 2-3
days
6 May 2010-1 June 2010 Training/Support AU and JS to train and support all the users
of the New integrated database
Risks and commentary on the integration
 Bandwidth
 Transfer of people from payroll 26 to 31
 Delay in rollout
 2 Extraction Payroll 31
Payroll 26
 Fields with Monetary Values as compared to hours on PHL
database
Summary of technical Issues Arising on the Integration of databases
 Odd contracts
 Integration of different contract types
and associated shift patterns
 Programming the weekly/monthly
payroll routines
 Importing current data correctly into the
new integrated database
 Current Reports
Airline Staff No Database fields
United 2 6
Eithad 22 4
Air India 48 Complications regarding the shift
patterns
Manning
Contact details Phone/Fax/email
Jim Slatter Programme designer/Support Mobile:-07770 987152
Ahmed Usman Financial Controller Mobile:-0754 5275991
Phone mainline:-020 8890 3708
Peter Daglish Payroll Administrator Phone mainline:- 020 8890 3708
Fax:-020 8931629
Kay Payroll Assistant/Support Phone mainline:-020 8890 3708
Fax:- 020 8931629

More Related Content

What's hot

Parallel & Distributed Computing
Parallel & Distributed ComputingParallel & Distributed Computing
Parallel & Distributed Computingrohit_ainapure
 
Customizable point of-interest queries in road networks
Customizable point of-interest queries in road networksCustomizable point of-interest queries in road networks
Customizable point of-interest queries in road networksieeepondy
 
Whole Life Cost Modelling
Whole Life Cost ModellingWhole Life Cost Modelling
Whole Life Cost Modellingdaren.sdw
 
CCXG Workshop, February 2021, Sandro Federici
CCXG Workshop, February 2021, Sandro FedericiCCXG Workshop, February 2021, Sandro Federici
CCXG Workshop, February 2021, Sandro FedericiOECD Environment
 
Methodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgrid
Methodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgridMethodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgrid
Methodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgridSustainableEnergyAut
 
Container Terminal Management System
Container Terminal Management SystemContainer Terminal Management System
Container Terminal Management SystemAbdullah Al Noman
 
CCXG Workshop, February 2021, Roberta Cantinho
CCXG Workshop, February 2021, Roberta CantinhoCCXG Workshop, February 2021, Roberta Cantinho
CCXG Workshop, February 2021, Roberta CantinhoOECD Environment
 
Rural Payments Agency usage of Ordnance Survey data
Rural Payments Agency usage of Ordnance Survey dataRural Payments Agency usage of Ordnance Survey data
Rural Payments Agency usage of Ordnance Survey dataCAPIGI
 
CCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit GargCCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit GargOECD Environment
 

What's hot (12)

Parallel & Distributed Computing
Parallel & Distributed ComputingParallel & Distributed Computing
Parallel & Distributed Computing
 
IPMR Box 6
IPMR Box 6IPMR Box 6
IPMR Box 6
 
Customizable point of-interest queries in road networks
Customizable point of-interest queries in road networksCustomizable point of-interest queries in road networks
Customizable point of-interest queries in road networks
 
Dtcp demo2
Dtcp demo2Dtcp demo2
Dtcp demo2
 
Whole Life Cost Modelling
Whole Life Cost ModellingWhole Life Cost Modelling
Whole Life Cost Modelling
 
44 ocea lmco-ascari
44 ocea lmco-ascari44 ocea lmco-ascari
44 ocea lmco-ascari
 
CCXG Workshop, February 2021, Sandro Federici
CCXG Workshop, February 2021, Sandro FedericiCCXG Workshop, February 2021, Sandro Federici
CCXG Workshop, February 2021, Sandro Federici
 
Methodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgrid
Methodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgridMethodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgrid
Methodology for a Cost-Benefit Analysis of RES-E, Eoin clifford eirgrid
 
Container Terminal Management System
Container Terminal Management SystemContainer Terminal Management System
Container Terminal Management System
 
CCXG Workshop, February 2021, Roberta Cantinho
CCXG Workshop, February 2021, Roberta CantinhoCCXG Workshop, February 2021, Roberta Cantinho
CCXG Workshop, February 2021, Roberta Cantinho
 
Rural Payments Agency usage of Ordnance Survey data
Rural Payments Agency usage of Ordnance Survey dataRural Payments Agency usage of Ordnance Survey data
Rural Payments Agency usage of Ordnance Survey data
 
CCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit GargCCXG Workshop, February 2021, Amit Garg
CCXG Workshop, February 2021, Amit Garg
 

Viewers also liked (9)

Διονύσης Καψάλης~Μερες Αργίας
Διονύσης Καψάλης~Μερες ΑργίαςΔιονύσης Καψάλης~Μερες Αργίας
Διονύσης Καψάλης~Μερες Αργίας
 
August 2015 f4 Toolholders
August 2015 f4 ToolholdersAugust 2015 f4 Toolholders
August 2015 f4 Toolholders
 
politeianet_gr
politeianet_grpoliteianet_gr
politeianet_gr
 
παρουσίαση
παρουσίασηπαρουσίαση
παρουσίαση
 
Dijital PR
Dijital PRDijital PR
Dijital PR
 
2007 06-13 joeck jurata trójniki nn
2007 06-13 joeck jurata trójniki nn2007 06-13 joeck jurata trójniki nn
2007 06-13 joeck jurata trójniki nn
 
Informe PR Agencias 2017
Informe PR Agencias 2017Informe PR Agencias 2017
Informe PR Agencias 2017
 
State Colleges and Universities (SUC) Leveling
State Colleges and Universities (SUC) LevelingState Colleges and Universities (SUC) Leveling
State Colleges and Universities (SUC) Leveling
 
Expert System - Artificial intelligence
Expert System - Artificial intelligenceExpert System - Artificial intelligence
Expert System - Artificial intelligence
 

Similar to Payroll Integration

Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...EMERSON EDUARDO RODRIGUES
 
R squared weekly-status_03012010[1]
R squared  weekly-status_03012010[1]R squared  weekly-status_03012010[1]
R squared weekly-status_03012010[1]Captainsamcox
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...EMERSON EDUARDO RODRIGUES
 
An Optimized-Throttled Algorithm for Distributing Load in Cloud Computing
An Optimized-Throttled Algorithm for Distributing Load in Cloud ComputingAn Optimized-Throttled Algorithm for Distributing Load in Cloud Computing
An Optimized-Throttled Algorithm for Distributing Load in Cloud ComputingIRJET Journal
 
SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...
SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...
SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...IAEME Publication
 
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...IAEME Publication
 
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...IAEME Publication
 
British American Tobacco GP Upgrade
British American Tobacco GP UpgradeBritish American Tobacco GP Upgrade
British American Tobacco GP UpgradeCedar Consulting
 
PMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanPMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanBruce Stephan
 
Project DescriptionThe new computer-controlled conveyor belt is .docx
Project DescriptionThe new computer-controlled conveyor belt is .docxProject DescriptionThe new computer-controlled conveyor belt is .docx
Project DescriptionThe new computer-controlled conveyor belt is .docxbriancrawford30935
 
best note.pptx
best note.pptxbest note.pptx
best note.pptxDejeneDay
 
A cloud computing scheduling and its evolutionary approaches
A cloud computing scheduling and its evolutionary approachesA cloud computing scheduling and its evolutionary approaches
A cloud computing scheduling and its evolutionary approachesnooriasukmaningtyas
 
WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15Lin Zhang, PhD
 
CCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary AwadCCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary AwadOECD Environment
 
General Performance Testing Overview
General Performance Testing OverviewGeneral Performance Testing Overview
General Performance Testing Overviewjsb1976
 
PGRR085_RIWG_Aug24.pdf
PGRR085_RIWG_Aug24.pdfPGRR085_RIWG_Aug24.pdf
PGRR085_RIWG_Aug24.pdfsmrasteg12
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...EMERSON EDUARDO RODRIGUES
 

Similar to Payroll Integration (20)

Database Implementation
Database ImplementationDatabase Implementation
Database Implementation
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160667 l2 new wid for l2 ...
 
R squared weekly-status_03012010[1]
R squared  weekly-status_03012010[1]R squared  weekly-status_03012010[1]
R squared weekly-status_03012010[1]
 
David Ferguson Resume
David Ferguson ResumeDavid Ferguson Resume
David Ferguson Resume
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160633 study on context a...
 
An Optimized-Throttled Algorithm for Distributing Load in Cloud Computing
An Optimized-Throttled Algorithm for Distributing Load in Cloud ComputingAn Optimized-Throttled Algorithm for Distributing Load in Cloud Computing
An Optimized-Throttled Algorithm for Distributing Load in Cloud Computing
 
SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...
SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...
SIMULATIVE ANALYSIS OF CHANNEL AND QoS AWARE SCHEDULER TO ENHANCE THE CAPACIT...
 
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
 
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
Simulative analysis of channel and qo s aware scheduler to enhance the capaci...
 
British American Tobacco GP Upgrade
British American Tobacco GP UpgradeBritish American Tobacco GP Upgrade
British American Tobacco GP Upgrade
 
PMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce StephanPMI Scheduling Conference 2016 Bruce Stephan
PMI Scheduling Conference 2016 Bruce Stephan
 
Project DescriptionThe new computer-controlled conveyor belt is .docx
Project DescriptionThe new computer-controlled conveyor belt is .docxProject DescriptionThe new computer-controlled conveyor belt is .docx
Project DescriptionThe new computer-controlled conveyor belt is .docx
 
best note.pptx
best note.pptxbest note.pptx
best note.pptx
 
A cloud computing scheduling and its evolutionary approaches
A cloud computing scheduling and its evolutionary approachesA cloud computing scheduling and its evolutionary approaches
A cloud computing scheduling and its evolutionary approaches
 
WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15WECC_JSIS_LSE_21sept15
WECC_JSIS_LSE_21sept15
 
Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
 
CCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary AwadCCXG Forum, March 2021, Mary Awad
CCXG Forum, March 2021, Mary Awad
 
General Performance Testing Overview
General Performance Testing OverviewGeneral Performance Testing Overview
General Performance Testing Overview
 
PGRR085_RIWG_Aug24.pdf
PGRR085_RIWG_Aug24.pdfPGRR085_RIWG_Aug24.pdf
PGRR085_RIWG_Aug24.pdf
 
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...
Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...
 

Payroll Integration

  • 1. Plane Handling and Aviance Integration of Access Database Presentation completed by Ahmed Usman
  • 2. Contents  Synopsis  Current Position  Problems with running two separate databases  Proposed Integration-Solution 1  Proposed Integration-Solution 2  Timetable  Appendix  Risks and commentary on the Integration of the databases  Summary of technical Issues arising on the Integration of databases  Manning/contact details
  • 3. Synopsis  Current position  2 Separate databases with separate T & C s in each database [Plane Handling Limited [PHL] and Aviance T3 and T4[AVA]]  Problems with running two separate databases  Accuracy  Transfer of employees  Confusion with T & C  Proposed Integration  Single Platform i.e. single Integrated database  Proposed Solution 1  One Integrated database incorporating the terms and conditions of Plane Handling Limited [PHL] and Aviance [AVA] (if bandwidth allows it)  Proposed solution 2  Separate database for Cargo and Ramp both incorporating the terms and condition of the PHL and AVA  Timetable:-Pilot Version 31 March 2010, implementation date 6 May 2010  Problem and Issues Arising  Bandwidth  Odd contracts  Fields with monetary values as compared to hours  Delay in rollout
  • 4. Current Position PHL Database Radius Park Grampian Payroll System PHL T & C’s Newcastle Backend AVA T & C’s AVA Database T3 and T4 TRN T3 T4 T3 CP SP RP MANB549
  • 5. Proposed Solution 1 PHL Database Radius Park Grampian Payroll System Newcastle TRN T4 Pay-26 Data extraction Pay-31 Data extraction T3 CP SP RP MAN B549 Common rostering in Ramp and PAX
  • 6. Proposed Solution 2 PHL Database Radius Park Grampian Payroll System PHL T & C’s + AVA T & C’s Newcastle Backend AVA Database T3 and T4 TRN T3 T4 T3 CP SP RP MANB549 PHL T & C’s + AVA T & C’s The databases are identical with same (combined T & C’s) Common rostering in Ramp and PAX
  • 7. Timetable Date Phase Action Plan 31 March 2010 First Pilot Version First version of Integrated database would be installed at Ahmed and Peter’s terminal at Radius Park for assessment and testing. The results of the Pilot version would be discussed with PG in early April and fedback to Jim 20 April 2010 First Completed version ready for full testing [This version would incorporate feedback from PG/AU and PD] Full version to be installed at few selected sites for testing and assessment 5 May 2010 Cut-off date To be managed by AU and PD i.e. Ensure all 15 stations are fully aware of it and have completed all final postings 6 May 2010 Implementation date to all the 15 stations JS to install to all stations This process is expected to take around 2-3 days 6 May 2010-1 June 2010 Training/Support AU and JS to train and support all the users of the New integrated database
  • 8. Risks and commentary on the integration  Bandwidth  Transfer of people from payroll 26 to 31  Delay in rollout  2 Extraction Payroll 31 Payroll 26  Fields with Monetary Values as compared to hours on PHL database
  • 9. Summary of technical Issues Arising on the Integration of databases  Odd contracts  Integration of different contract types and associated shift patterns  Programming the weekly/monthly payroll routines  Importing current data correctly into the new integrated database  Current Reports Airline Staff No Database fields United 2 6 Eithad 22 4 Air India 48 Complications regarding the shift patterns
  • 10. Manning Contact details Phone/Fax/email Jim Slatter Programme designer/Support Mobile:-07770 987152 Ahmed Usman Financial Controller Mobile:-0754 5275991 Phone mainline:-020 8890 3708 Peter Daglish Payroll Administrator Phone mainline:- 020 8890 3708 Fax:-020 8931629 Kay Payroll Assistant/Support Phone mainline:-020 8890 3708 Fax:- 020 8931629