Emerson Eduardo Rodrigues - ENGINEERING STUDIES1 Rp 160540 signalling reducti...
Payroll Integration
1. Plane Handling and Aviance
Integration of Access Database
Presentation completed
by
Ahmed Usman
2. Contents
Synopsis
Current Position
Problems with running two separate databases
Proposed Integration-Solution 1
Proposed Integration-Solution 2
Timetable
Appendix
Risks and commentary on the Integration of the databases
Summary of technical Issues arising on the Integration of databases
Manning/contact details
3. Synopsis
Current position
2 Separate databases with separate T & C s in each database
[Plane Handling Limited [PHL] and Aviance T3 and T4[AVA]]
Problems with running two separate databases
Accuracy
Transfer of employees
Confusion with T & C
Proposed Integration
Single Platform i.e. single Integrated database
Proposed Solution 1
One Integrated database incorporating the terms and conditions of Plane Handling Limited [PHL] and Aviance [AVA] (if
bandwidth allows it)
Proposed solution 2
Separate database for Cargo and Ramp both incorporating the terms and condition of the PHL and AVA
Timetable:-Pilot Version 31 March 2010, implementation date 6 May 2010
Problem and Issues Arising
Bandwidth
Odd contracts
Fields with monetary values as compared to hours
Delay in rollout
4. Current Position
PHL Database
Radius Park
Grampian Payroll
System
PHL T & C’s
Newcastle
Backend
AVA T & C’s
AVA Database
T3 and T4
TRN
T3 T4
T3
CP
SP
RP
MANB549
5. Proposed Solution 1
PHL Database
Radius Park
Grampian Payroll
System
Newcastle
TRN
T4
Pay-26
Data extraction
Pay-31
Data
extraction
T3
CP
SP
RP
MAN
B549
Common rostering in
Ramp and PAX
6. Proposed Solution 2
PHL Database
Radius Park
Grampian Payroll
System
PHL T & C’s
+
AVA T & C’s
Newcastle
Backend
AVA Database
T3 and T4
TRN
T3 T4
T3
CP
SP
RP
MANB549
PHL T & C’s
+
AVA T & C’s
The databases are identical with same (combined T & C’s)
Common
rostering
in Ramp and
PAX
7. Timetable
Date Phase Action Plan
31 March 2010 First Pilot Version First version of Integrated database would
be installed at Ahmed and Peter’s terminal
at Radius Park for assessment and testing.
The results of the Pilot version would be
discussed with PG in early April and fedback
to Jim
20 April 2010 First Completed version ready for full
testing
[This version would incorporate
feedback from PG/AU and PD]
Full version to be installed at few selected
sites for testing and assessment
5 May 2010 Cut-off date To be managed by AU and PD
i.e. Ensure all 15 stations are fully aware of
it and have completed all final postings
6 May 2010 Implementation date to all the 15
stations
JS to install to all stations
This process is expected to take around 2-3
days
6 May 2010-1 June 2010 Training/Support AU and JS to train and support all the users
of the New integrated database
8. Risks and commentary on the integration
Bandwidth
Transfer of people from payroll 26 to 31
Delay in rollout
2 Extraction Payroll 31
Payroll 26
Fields with Monetary Values as compared to hours on PHL
database
9. Summary of technical Issues Arising on the Integration of databases
Odd contracts
Integration of different contract types
and associated shift patterns
Programming the weekly/monthly
payroll routines
Importing current data correctly into the
new integrated database
Current Reports
Airline Staff No Database fields
United 2 6
Eithad 22 4
Air India 48 Complications regarding the shift
patterns