MODULE 6
WELL COMPLETION AND STIMULATION
COURSE CONTENTS
• What is Well Completion.
• Setting Production Casing.
• Installing the Tubing.
• Installing the Christmas Tree
• Types of Well Completion
• Factors Influencing Well Completion Selection
• Type of Flow
• Completion and Workover Fluids
• Perforating
• Well Stimulation
What is Well Completion?
• After careful interpretation and consideration on well
test data (coring, logging etc), a decision is made
whether to set production casing and complete the
well or to plug and abandon it.
• Decision to abandon is made when the well is not
capable to produce oil or gas in commercial
quantities.
• However, sometimes wells that were plugged and
abandoned at one time in the past may be reopened
and produced if the price of oil or gas has become
more favourable.
• “Completing a well” means installing equipment in
the well to allow a safe and controlled flow of
petroleum from the well.
What is Well Completion?
• A series of activities to prepare an oil well or a gas well,
so that the well can be flowed in a controlled manner. All
wells have to be completed.
• In addition to the casing that lines the wellbore (recall
Chapter 4), tubing and a system of flow valves must be
installed.
• Cannot operate alone - must joint effort with other sub-
disciplines such as production engineering and reservoir
engineering.
Setting Production Casing
• Production casing is
the final casing in a
well.
• The hole is drilled
beyond the producing
interval.
• Production casing is
set and cemented
through the pay zone.
• The casing and
cement actually seal
off the producing zone
Setting Production Casing
Installing the Tubing
• Tubing is run into the well
(smaller diameter compared to
production casing and
removable) to serve as a way
for oil or gas to flow to the
surface.
• Packer is attached to it just
near the bottom.
• Packer is placed at a depth just
above the producing interval.
• When the packer is expanded,
it grips the wall of the
production casing and forms a
seal between outside of tubing
and inside of casing
Installing the Christmas Tree
• A collection of valves called a
Christmas tree is installed on
the surface at the top of the
casing hanger.
• As the well’s production flows
up the tubing, it enters the
Christmas tree.
• So, the production can be
controlled by opening or
closing valves on the
Christmas tree.
Structure of Christmas Tree
Type of Well Completions
Open Hole Completions.
• Production casing to be
set above the zone of
interests.
Type of Well Completions
Liner Completions.
• A liner is install across the
pay zone.
• Can be divided into two:
Screen Liner and Perforated
Liner.
• Screen Liner: Casing is set
above the producing zone,
and an uncemented screen
and liner assembly is installed
across the pay zone
Type of Well Completions
Perforated Liner
Completion:
Casing is set above the
producing zone, and a liner
assembly is installed across
the pay zone and cemented in
place. The liner is then
perforated selectively for
production.
Type of Well Completions
Perforated Casing
Completions. Production
casing is cemented through
the producing zone and the
pay section is selectively
perforated.
Type of Well Completions
Tubingless or Reduced
Diameter Completions.
Production tubing is
cemented and perforated
for production.
Factors Influencing Well Completion
Selection
• Natural occurrences of the field, i.e. does it have a big
reserve to justify development?
• Potential of oil production and the planning of tertiary
recovery, i.e. do we need any artificial lift in the future?
• Limitations within the operation and the field, i.e. is the
oil field located at a remote area?
Type of Flow
• Three types of flow, namely casing flow, tubing and
annulus flow, and tubing flow.
• Casing Flow: Large flowrate. No tubing is required.
Used in Middle East.
• Tubing and Annulus Flow: Large flowrate. Flow
segregation.
• Tubing Flow: Used widely especially in Malaysia. Due to
safety. May use one tubing string or more.
Single Tubing Completion
Single string sequential completions.
• It is the simplest way of completing the well.
• In this method well is completed for single zone with single tubing.
Single string commingle completions.
• All the reservoirs available in a well are produced simultaneously
through single string.
• Should be avoided if possible to eliminate cross-flow phenomena.
• Monitoring of reservoir performance is extremely difficult.
Single string selective zone completion.
• Permits selective production, injection, testing, stimulation, and
isolation of various zones.
• Selectivity after completion is accomplished by opening and closing
sliding sleeves between the packers.
Multilateral Completion
• In these completions, multiple branches are drilled
from a single hole.
• It is used to improve productivity from closely spaced
target zones.
Land Offshore
Completion and Workover Fluids
• Is a fluid that placed against the producing formation
while conducting operations such as well killing, cleaning
out, hardware replacement, gravel packing, etc.
• Workover fluid is used when a Workover job is done on a
well. In this discussion, it refers to the same completion
fluid.
• Workover fluid does not include well stimulation fluid,
fracturing fluid, cement slurry, etc.
Packer Fluids
• Placed above the topmost packer.
• Avoid using WBM as packer fluid.
• Must be chemically stable. Acceptable upper limit of
corrosivity is 5 mils per year. If possible, about 1 mil per
year.
• Two major criteria must be met by packer fluid:
• Limit settling of solids.
• Provide protection for corrosion or embrittlement.
Perforation
• Since the pay zone is sealed off by the production casing and
cement, perforations must be made in order for oil or gas to
flow into the wellbore.
• Hole made in the casing, cement, and formation, through
which formation fluids enter a wellbore. Usually several
perforation are made at a time
• Perforating incorporates shaped-charge explosives which
creating a jet of high-pressure, high-velocity liquid – jet
perforation.
• It can be overbalance or underbalance perforation, and
Wireline conveyed perforation (WCP) or tubing conveyed
perforation (TCP).
Perforation
• Perforating gun (WCP type) is lowered into the hole at the
depth where the oil or gas formation is found (A).
• After the gun is lined up properly, powerful explosive
charges are fired (B) from the control panel at the surface.
These explosives blast a hole in the steel casing and
cement, up to several feet out into the rock.
• Finally, the oil and gas fluids flow into the holes and up the
well to the surface (C).
Perforating Fluid
• Is a fluid that placed against the producing formation
during perforation.
• Ideally, fluid with no solids.
• Fluids to be considered:
• Salt water: Clean water poses no problem. When
overbalanced, may push charge debris into formation.
• Acetic acid: Excellent perforating fluid under most
conditions. The presence of H2S may magnify corrosion
problems.
• Nitrogen: Useful in low pressure formations, or when
associated with high rig time or swabbing costs, or when
a special test requires formation to be free from
contamination.
Wellhead Assembly
• Comprise x-mas
tree, casing head,
and tubing head.
Wellhead is
referred to casing
head and tubing
head.
• X-mas tree is
installed on top of
the wellhead.
• Tubing head in
located above the
casing head.
Well Stimulation
• Sometime, petroleum exists in a formation but is unable
to flow readily into the well because the formation has
very low permeability.
• Natural low permeability formation.
• Formation damage around the wellbore caused by
invasion of perforation fluid and charge debris.
• Acidizing or fracturing is a methods used to increase the
permeability near the wellbore
Acidizing
• If the formation is composed
of rocks that dissolve upon
being contacted by acid, such
as limestone or dolomite, then
a technique known as
acidizing may be required.
• Acidizing operation basically
consists of pumping from fifty
to thousands of gallons of acid
down the well.
• The acid travels down the
tubing, enters the
perforations, and contacts the
formation.
Acidizing
• Continued pumping forces the acid into the formation
where it produces channels.
• Channels will provide a way for the formation’s oil or gas
to enter the well through the perforations.
• The most common acid systems in use are:
Hydrochloric Acid: This is the most widely used acid in
treatments, with concentrations ranging between 7.5%
and 28%, the most common is 15%. It will dissolves
Calcium Carbonate (CaCO3), Dolomite (CaMgCO3),
Siderite (FeCO3), and Iron Oxide (Fe2O3).
Acidizing
• Mud Acid: This is a mixture of HCl and HF (hydrofluoric
acid) and is generally 12% HCl and 3% HF. It will
dissolve clay materials in the formation, along with
feldspars and quartz. The HF will react with Na, K, Ca
and Si in the clays to form insoluble precipitates, so it is
advisable to always preflush with HCl.
• Organic Acids: These are Acetic and Formic Acids.
They are slower acting than HCl, and are generally used
in high temperature wells and wells with high alloy
tubing to reduce corrosion rates.
• EDTA: This is Ethylene Diamine Tetra-Acetic Acid. It
dissolves carbonates and sulphates by chelating them. It
is more expensive than the other acids and the reaction
is slower.
Fracturing
• Fracturing is a process to increase the permeability of
reservoir rocks (eg sandstone) by pumping a special
blended fluid down the well and into the formation under
great pressure.
• Pumping continues until the downhole pressure
exceeding fracture pressure of the rocks, formation
literally cracks open (with opening between 0.25 – 0.5
inch).
• Meanwhile, sand or aluminium pellets are mixed into the
fracturing fluid. These materials are called proppants.
Fracturing
• The proppant enters the
fractures in the formation,
and, when pumping is
stopped and the pressure
decreased, the proppant
remains in the fractures
• Since the fractures try to
close back together after the
pressure on the well is
released, the proppant is
needed to hold fractures
open.
• These propped-open
fractures is permeable
enough to provide passages
for oil or gas to flow into the
well.
Fracturing

More Related Content

What's hot

Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniquesvelMurugan260
 
Drilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingDrilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingJames Craig
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids MudM.T.H Group
 
Well stimulation - petroleum engineering
Well stimulation - petroleum engineeringWell stimulation - petroleum engineering
Well stimulation - petroleum engineeringRebaz Hamad
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERAndi Anriansyah
 
Formation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wellsFormation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wellsSaeed Fakhr Douzdouzani
 
Drilling fluid - Chapter 2
Drilling fluid  - Chapter 2Drilling fluid  - Chapter 2
Drilling fluid - Chapter 2Chairul Abdi
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationJames Craig
 
Well control
Well controlWell control
Well controlSaba Saif
 
Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)majeed talal
 
Sand Problem in Oil Wells
Sand Problem in Oil WellsSand Problem in Oil Wells
Sand Problem in Oil Wellsthe_duke7
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentationamrhaggag
 

What's hot (20)

Well completion techniques
Well completion techniquesWell completion techniques
Well completion techniques
 
Drilling Engineering - Primary Cementing
Drilling Engineering - Primary CementingDrilling Engineering - Primary Cementing
Drilling Engineering - Primary Cementing
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids Mud
 
Tubing string
Tubing stringTubing string
Tubing string
 
Well stimulation - petroleum engineering
Well stimulation - petroleum engineeringWell stimulation - petroleum engineering
Well stimulation - petroleum engineering
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
Cementation
CementationCementation
Cementation
 
workover presentation (1)
workover presentation (1)workover presentation (1)
workover presentation (1)
 
Well stimulation
Well stimulationWell stimulation
Well stimulation
 
Drilling fluid
Drilling fluidDrilling fluid
Drilling fluid
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Formation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wellsFormation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wells
 
Drilling fluid - Chapter 2
Drilling fluid  - Chapter 2Drilling fluid  - Chapter 2
Drilling fluid - Chapter 2
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 
Casing
CasingCasing
Casing
 
Well control
Well controlWell control
Well control
 
Drill stem test (mtm)
Drill stem test (mtm)Drill stem test (mtm)
Drill stem test (mtm)
 
Sand Problem in Oil Wells
Sand Problem in Oil WellsSand Problem in Oil Wells
Sand Problem in Oil Wells
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 

Viewers also liked

International Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingInternational Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingEaswaran Kanason
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbookram111eg
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guidelineEaswaran Kanason
 
Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4ROBERTO BATAHOY GAMALE JR
 
Assignment work
Assignment workAssignment work
Assignment workkkhodova
 
ARMACO STANDARD
ARMACO STANDARDARMACO STANDARD
ARMACO STANDARDIrfan Ali
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelinesEaswaran Kanason
 
Safety drilling slide show
Safety drilling slide showSafety drilling slide show
Safety drilling slide showCLIFFHORN65
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingEaswaran Kanason
 
Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Easwaran Kanason
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standardsJithu John
 
Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013Global CCS Institute
 
Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5ROBERTO BATAHOY GAMALE JR
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14fahadansari131
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
Saudi aramco presentation
Saudi aramco presentationSaudi aramco presentation
Saudi aramco presentationbukeivan
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Easwaran Kanason
 

Viewers also liked (19)

International Oil & Gas Executive Development Training
International Oil & Gas Executive Development TrainingInternational Oil & Gas Executive Development Training
International Oil & Gas Executive Development Training
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppe
 
Petronas drilling operations guideline
Petronas drilling operations guidelinePetronas drilling operations guideline
Petronas drilling operations guideline
 
Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4Saudi Aramco Materials System Specifications (SAMSS) 4
Saudi Aramco Materials System Specifications (SAMSS) 4
 
Assignment work
Assignment workAssignment work
Assignment work
 
ARMACO STANDARD
ARMACO STANDARDARMACO STANDARD
ARMACO STANDARD
 
Petronas exploration guidelines
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
 
Safety drilling slide show
Safety drilling slide showSafety drilling slide show
Safety drilling slide show
 
Petronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgetingPetronas procedures and guidelines for planning and budgeting
Petronas procedures and guidelines for planning and budgeting
 
Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015Guidelines for small fields development and operations 2015
Guidelines for small fields development and operations 2015
 
Saudi aramco standards
Saudi aramco standardsSaudi aramco standards
Saudi aramco standards
 
Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013Saudi Aramco Carbon Management - May 2013
Saudi Aramco Carbon Management - May 2013
 
Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5Saudi Aramco Engineering Procedures (SAEP) 5
Saudi Aramco Engineering Procedures (SAEP) 5
 
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14Safety handbook Saudi Aramco  BY Muhammad Fahad Ansari  12IEEM14
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
ExxonMobil
ExxonMobilExxonMobil
ExxonMobil
 
Saudi aramco presentation
Saudi aramco presentationSaudi aramco presentation
Saudi aramco presentation
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 

Similar to Fundamentals of Petroleum Engineering Module 6

Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdfTinaMarey
 
Inspection Static.pdf
Inspection Static.pdfInspection Static.pdf
Inspection Static.pdfMuhammadAn3
 
Chapter 1.pptx ghghghghghghghghghghghhgh
Chapter 1.pptx ghghghghghghghghghghghhghChapter 1.pptx ghghghghghghghghghghghhgh
Chapter 1.pptx ghghghghghghghghghghghhghSauravBhattacharjee12
 
Episode 44 : Flow Behavior of Granular Materials and Powders Part III
Episode 44 :  Flow Behavior of Granular Materials and PowdersPart IIIEpisode 44 :  Flow Behavior of Granular Materials and PowdersPart III
Episode 44 : Flow Behavior of Granular Materials and Powders Part IIISAJJAD KHUDHUR ABBAS
 
Petroleum Cycle.pdf
Petroleum Cycle.pdfPetroleum Cycle.pdf
Petroleum Cycle.pdfALANMARTIN95
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
basicdesignofafermenter.pptx
basicdesignofafermenter.pptxbasicdesignofafermenter.pptx
basicdesignofafermenter.pptxJasonWillardM
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfAZLANAiyub
 
Treatment of water
Treatment of waterTreatment of water
Treatment of waterdhavalsshah
 
sewer appurtenance
sewer appurtenance  sewer appurtenance
sewer appurtenance Hansa katare
 
Chapter 10 Well Completion.pdf
Chapter 10 Well Completion.pdfChapter 10 Well Completion.pdf
Chapter 10 Well Completion.pdfAgungRizky22
 
Introduction to Drilling Engineering
Introduction to Drilling EngineeringIntroduction to Drilling Engineering
Introduction to Drilling EngineeringM.T.H Group
 
underwater construction
underwater constructionunderwater construction
underwater constructionYasir Hashmi
 

Similar to Fundamentals of Petroleum Engineering Module 6 (20)

WELL COMPLETIONS.pptx
WELL COMPLETIONS.pptxWELL COMPLETIONS.pptx
WELL COMPLETIONS.pptx
 
Chapter_6-OCW.pdf
Chapter_6-OCW.pdfChapter_6-OCW.pdf
Chapter_6-OCW.pdf
 
Chapter_6hdhdvd-OCW.pdf
Chapter_6hdhdvd-OCW.pdfChapter_6hdhdvd-OCW.pdf
Chapter_6hdhdvd-OCW.pdf
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Oil production
Oil productionOil production
Oil production
 
Well completion
Well completionWell completion
Well completion
 
Inspection Static.pdf
Inspection Static.pdfInspection Static.pdf
Inspection Static.pdf
 
Chapter 1.pptx ghghghghghghghghghghghhgh
Chapter 1.pptx ghghghghghghghghghghghhghChapter 1.pptx ghghghghghghghghghghghhgh
Chapter 1.pptx ghghghghghghghghghghghhgh
 
Episode 44 : Flow Behavior of Granular Materials and Powders Part III
Episode 44 :  Flow Behavior of Granular Materials and PowdersPart IIIEpisode 44 :  Flow Behavior of Granular Materials and PowdersPart III
Episode 44 : Flow Behavior of Granular Materials and Powders Part III
 
Petroleum Cycle.pdf
Petroleum Cycle.pdfPetroleum Cycle.pdf
Petroleum Cycle.pdf
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
Casing design
Casing designCasing design
Casing design
 
basicdesignofafermenter.pptx
basicdesignofafermenter.pptxbasicdesignofafermenter.pptx
basicdesignofafermenter.pptx
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 
Treatment of water
Treatment of waterTreatment of water
Treatment of water
 
sewer appurtenance
sewer appurtenance  sewer appurtenance
sewer appurtenance
 
Chapter 10 Well Completion.pdf
Chapter 10 Well Completion.pdfChapter 10 Well Completion.pdf
Chapter 10 Well Completion.pdf
 
Introduction to Drilling Engineering
Introduction to Drilling EngineeringIntroduction to Drilling Engineering
Introduction to Drilling Engineering
 
underwater construction
underwater constructionunderwater construction
underwater construction
 

More from Aijaz Ali Mooro

Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2Aijaz Ali Mooro
 
Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1Aijaz Ali Mooro
 
MSExcel useful formulas tutorial
MSExcel useful formulas tutorialMSExcel useful formulas tutorial
MSExcel useful formulas tutorialAijaz Ali Mooro
 
MS Excel 2010 training module
MS Excel 2010 training moduleMS Excel 2010 training module
MS Excel 2010 training moduleAijaz Ali Mooro
 
Fluidization and Fluidized Beds
Fluidization and Fluidized BedsFluidization and Fluidized Beds
Fluidization and Fluidized BedsAijaz Ali Mooro
 
Basic Electrical Equipment module-1
Basic Electrical Equipment module-1Basic Electrical Equipment module-1
Basic Electrical Equipment module-1Aijaz Ali Mooro
 

More from Aijaz Ali Mooro (7)

Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2Fundamentals of Petroleum Engineering Module 2
Fundamentals of Petroleum Engineering Module 2
 
Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1Fundamentals of Petroleum Engineering Module-1
Fundamentals of Petroleum Engineering Module-1
 
MSExcel useful formulas tutorial
MSExcel useful formulas tutorialMSExcel useful formulas tutorial
MSExcel useful formulas tutorial
 
MS Excel 2010 training module
MS Excel 2010 training moduleMS Excel 2010 training module
MS Excel 2010 training module
 
Fluidization and Fluidized Beds
Fluidization and Fluidized BedsFluidization and Fluidized Beds
Fluidization and Fluidized Beds
 
Boiler Feed Water
Boiler Feed WaterBoiler Feed Water
Boiler Feed Water
 
Basic Electrical Equipment module-1
Basic Electrical Equipment module-1Basic Electrical Equipment module-1
Basic Electrical Equipment module-1
 

Recently uploaded

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Fundamentals of Petroleum Engineering Module 6

  • 1. MODULE 6 WELL COMPLETION AND STIMULATION
  • 2. COURSE CONTENTS • What is Well Completion. • Setting Production Casing. • Installing the Tubing. • Installing the Christmas Tree • Types of Well Completion • Factors Influencing Well Completion Selection • Type of Flow • Completion and Workover Fluids • Perforating • Well Stimulation
  • 3. What is Well Completion? • After careful interpretation and consideration on well test data (coring, logging etc), a decision is made whether to set production casing and complete the well or to plug and abandon it. • Decision to abandon is made when the well is not capable to produce oil or gas in commercial quantities. • However, sometimes wells that were plugged and abandoned at one time in the past may be reopened and produced if the price of oil or gas has become more favourable. • “Completing a well” means installing equipment in the well to allow a safe and controlled flow of petroleum from the well.
  • 4. What is Well Completion? • A series of activities to prepare an oil well or a gas well, so that the well can be flowed in a controlled manner. All wells have to be completed. • In addition to the casing that lines the wellbore (recall Chapter 4), tubing and a system of flow valves must be installed. • Cannot operate alone - must joint effort with other sub- disciplines such as production engineering and reservoir engineering.
  • 5. Setting Production Casing • Production casing is the final casing in a well. • The hole is drilled beyond the producing interval. • Production casing is set and cemented through the pay zone. • The casing and cement actually seal off the producing zone
  • 7. Installing the Tubing • Tubing is run into the well (smaller diameter compared to production casing and removable) to serve as a way for oil or gas to flow to the surface. • Packer is attached to it just near the bottom. • Packer is placed at a depth just above the producing interval. • When the packer is expanded, it grips the wall of the production casing and forms a seal between outside of tubing and inside of casing
  • 8. Installing the Christmas Tree • A collection of valves called a Christmas tree is installed on the surface at the top of the casing hanger. • As the well’s production flows up the tubing, it enters the Christmas tree. • So, the production can be controlled by opening or closing valves on the Christmas tree.
  • 10. Type of Well Completions Open Hole Completions. • Production casing to be set above the zone of interests.
  • 11. Type of Well Completions Liner Completions. • A liner is install across the pay zone. • Can be divided into two: Screen Liner and Perforated Liner. • Screen Liner: Casing is set above the producing zone, and an uncemented screen and liner assembly is installed across the pay zone
  • 12. Type of Well Completions Perforated Liner Completion: Casing is set above the producing zone, and a liner assembly is installed across the pay zone and cemented in place. The liner is then perforated selectively for production.
  • 13. Type of Well Completions Perforated Casing Completions. Production casing is cemented through the producing zone and the pay section is selectively perforated.
  • 14. Type of Well Completions Tubingless or Reduced Diameter Completions. Production tubing is cemented and perforated for production.
  • 15. Factors Influencing Well Completion Selection • Natural occurrences of the field, i.e. does it have a big reserve to justify development? • Potential of oil production and the planning of tertiary recovery, i.e. do we need any artificial lift in the future? • Limitations within the operation and the field, i.e. is the oil field located at a remote area?
  • 16. Type of Flow • Three types of flow, namely casing flow, tubing and annulus flow, and tubing flow. • Casing Flow: Large flowrate. No tubing is required. Used in Middle East. • Tubing and Annulus Flow: Large flowrate. Flow segregation. • Tubing Flow: Used widely especially in Malaysia. Due to safety. May use one tubing string or more.
  • 17. Single Tubing Completion Single string sequential completions. • It is the simplest way of completing the well. • In this method well is completed for single zone with single tubing. Single string commingle completions. • All the reservoirs available in a well are produced simultaneously through single string. • Should be avoided if possible to eliminate cross-flow phenomena. • Monitoring of reservoir performance is extremely difficult. Single string selective zone completion. • Permits selective production, injection, testing, stimulation, and isolation of various zones. • Selectivity after completion is accomplished by opening and closing sliding sleeves between the packers.
  • 18. Multilateral Completion • In these completions, multiple branches are drilled from a single hole. • It is used to improve productivity from closely spaced target zones. Land Offshore
  • 19. Completion and Workover Fluids • Is a fluid that placed against the producing formation while conducting operations such as well killing, cleaning out, hardware replacement, gravel packing, etc. • Workover fluid is used when a Workover job is done on a well. In this discussion, it refers to the same completion fluid. • Workover fluid does not include well stimulation fluid, fracturing fluid, cement slurry, etc.
  • 20. Packer Fluids • Placed above the topmost packer. • Avoid using WBM as packer fluid. • Must be chemically stable. Acceptable upper limit of corrosivity is 5 mils per year. If possible, about 1 mil per year. • Two major criteria must be met by packer fluid: • Limit settling of solids. • Provide protection for corrosion or embrittlement.
  • 21. Perforation • Since the pay zone is sealed off by the production casing and cement, perforations must be made in order for oil or gas to flow into the wellbore. • Hole made in the casing, cement, and formation, through which formation fluids enter a wellbore. Usually several perforation are made at a time • Perforating incorporates shaped-charge explosives which creating a jet of high-pressure, high-velocity liquid – jet perforation. • It can be overbalance or underbalance perforation, and Wireline conveyed perforation (WCP) or tubing conveyed perforation (TCP).
  • 22. Perforation • Perforating gun (WCP type) is lowered into the hole at the depth where the oil or gas formation is found (A). • After the gun is lined up properly, powerful explosive charges are fired (B) from the control panel at the surface. These explosives blast a hole in the steel casing and cement, up to several feet out into the rock. • Finally, the oil and gas fluids flow into the holes and up the well to the surface (C).
  • 23. Perforating Fluid • Is a fluid that placed against the producing formation during perforation. • Ideally, fluid with no solids. • Fluids to be considered: • Salt water: Clean water poses no problem. When overbalanced, may push charge debris into formation. • Acetic acid: Excellent perforating fluid under most conditions. The presence of H2S may magnify corrosion problems. • Nitrogen: Useful in low pressure formations, or when associated with high rig time or swabbing costs, or when a special test requires formation to be free from contamination.
  • 24. Wellhead Assembly • Comprise x-mas tree, casing head, and tubing head. Wellhead is referred to casing head and tubing head. • X-mas tree is installed on top of the wellhead. • Tubing head in located above the casing head.
  • 25. Well Stimulation • Sometime, petroleum exists in a formation but is unable to flow readily into the well because the formation has very low permeability. • Natural low permeability formation. • Formation damage around the wellbore caused by invasion of perforation fluid and charge debris. • Acidizing or fracturing is a methods used to increase the permeability near the wellbore
  • 26. Acidizing • If the formation is composed of rocks that dissolve upon being contacted by acid, such as limestone or dolomite, then a technique known as acidizing may be required. • Acidizing operation basically consists of pumping from fifty to thousands of gallons of acid down the well. • The acid travels down the tubing, enters the perforations, and contacts the formation.
  • 27. Acidizing • Continued pumping forces the acid into the formation where it produces channels. • Channels will provide a way for the formation’s oil or gas to enter the well through the perforations. • The most common acid systems in use are: Hydrochloric Acid: This is the most widely used acid in treatments, with concentrations ranging between 7.5% and 28%, the most common is 15%. It will dissolves Calcium Carbonate (CaCO3), Dolomite (CaMgCO3), Siderite (FeCO3), and Iron Oxide (Fe2O3).
  • 28. Acidizing • Mud Acid: This is a mixture of HCl and HF (hydrofluoric acid) and is generally 12% HCl and 3% HF. It will dissolve clay materials in the formation, along with feldspars and quartz. The HF will react with Na, K, Ca and Si in the clays to form insoluble precipitates, so it is advisable to always preflush with HCl. • Organic Acids: These are Acetic and Formic Acids. They are slower acting than HCl, and are generally used in high temperature wells and wells with high alloy tubing to reduce corrosion rates. • EDTA: This is Ethylene Diamine Tetra-Acetic Acid. It dissolves carbonates and sulphates by chelating them. It is more expensive than the other acids and the reaction is slower.
  • 29. Fracturing • Fracturing is a process to increase the permeability of reservoir rocks (eg sandstone) by pumping a special blended fluid down the well and into the formation under great pressure. • Pumping continues until the downhole pressure exceeding fracture pressure of the rocks, formation literally cracks open (with opening between 0.25 – 0.5 inch). • Meanwhile, sand or aluminium pellets are mixed into the fracturing fluid. These materials are called proppants.
  • 30. Fracturing • The proppant enters the fractures in the formation, and, when pumping is stopped and the pressure decreased, the proppant remains in the fractures • Since the fractures try to close back together after the pressure on the well is released, the proppant is needed to hold fractures open. • These propped-open fractures is permeable enough to provide passages for oil or gas to flow into the well.