SECTION B (SCALE 1:100)
CONCRETE BARRIER
5
1
FENCE / EARTH BOND
5
1
FENCE / EARTH BOND
EMBANKMENT EMBANKMENT
SECTION A (SCALE 1:100)
CONCRETE BARRIERCONCRETE BARRIER
5
1
FENCE / EARTH BOND
5
1
FENCE / EARTH BOND
EMBANKMENTEMBANKMENT
T115
50
R214
T200
P900
120
80
T117
50
T115
80
T115
50
T200
T115
50
NEWROAD
LAYOUTAHEAD
200m
100m
400m
T115 50
T200
-
A
-
A
-
B
-
B
T115
50
T208-R
T115
50
T115
50
T232
T239
100
m
R108-R
T232
T233
R108-R
WORKSEXIT
T233
T115
50
T113
T113
T113
T113
T301T301
T300
T302
R108-R
R108-R
T115
50
WORKSEXITWORKS
EXIT
MAIN CONTRACTOR:
PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS)
MINISTRY OF INTERIOR
HEAD OF PLANNING, SAFETY AND RADARS DIVISION (SIGNATURE)
TRAFFIC & PATROL DEPARTMENT
LOCATION PLAN
WAKRAH BYPASS ROAD EXW- P015
PROJECT CODE : P 015
CHECKED
DATE
DWG. NO.
DESIGNED
TITLE
DD APPROVAL
SCALE
STATUS
PROJECT
LOGO OR OFFICIAL STAMPASHGHAL TDP APPROVER LOGO OR OFFICIAL STAMP
APPROVER (SIGNATURE)
ASHGHAL TDP REVIEWER LOGO OR OFFICIAL STAMP
REVIEWER (SIGNATURE)
PROJECT MANAGEMENT CONSULTANT: LOGO OR OFFICIAL STAMP
REVIEWER (SIGNATURE AND STAMP)
GENERAL ENGINEERING CONSULTANT: LOGO OR OFFICIAL STAMP
PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS)
LOGO OR OFFICIAL STAMP
TRAFFIC DIVERSION PLAN APPROVALS GROUP COMMENTS
TRAFFIC POLICE DEPARTMENT COMMENTS
NOTES:
-CONCRETE BARRIER WITH FLASHING
LEGEND:
-SIGN POST / A FRAME
-TRAFFIC SIGN AND REFERENCE
BEACON AND REFLECTIVE TAPE
-PLASTIC WATER FILLED BARRICADE
@A1
REV. NO.
INFRASTRUCTURE AFFAIRS
PUBLIC WORKS AUTHORITY
P.O. BOX 22188
TEL: 44950055
FAX: 44950441
Client:
AM
TM
REV DATE DESCRIPTION
NUMBER
N
-WORK ZONE
TDP Designer:
LARSEN & TOUBRO LTD.
LOCATION
13/12/2015 AS SHOWN
N
See TDP Documents
CA
CA ISSUED FOR APPROVAL13/12/2015
-EXISTING ROAD
-PROPOSED DIVERSION
MATCHLINE"A"
MATCHLINE"A"
CONTINUEDONEXW-P015-0000-TM-LNT-SK-00002-011
N
SCALE 1:1000
Existing Mesaieed Road
Proposed Diversion
SCALE 1:1000
EXW-P015-0000-TM-LNT-SK-00002-010
TRAFFIC DIVERSION PLAN
PHASE 1 - STATIC WORKS
DURATION OF TRAFFIC DIVERSION WORKS
Static Works
START DATE: 24.12.2015
COMPLETION DATE: 21.04.2016
DESCRIPTION OF WORKS:
Static traffic diversion along Mesaieed road at
junction IC12 to create workzone to facilitate the
construction of the Wakra Bypass.
WZTMG LAYOUT NO: - TL-DC 12 (Modified)

More Related Content

Viewers also liked

Viewers also liked (10)

ECGS Module 16A
ECGS Module 16AECGS Module 16A
ECGS Module 16A
 
Über den Valentinstag.pdf
Über den Valentinstag.pdfÜber den Valentinstag.pdf
Über den Valentinstag.pdf
 
The Great Garden Escape
The Great Garden EscapeThe Great Garden Escape
The Great Garden Escape
 
Le Liban
Le LibanLe Liban
Le Liban
 
National Honor Society Letter
National Honor Society LetterNational Honor Society Letter
National Honor Society Letter
 
Gatekeeper par Guillaume Faure
Gatekeeper par Guillaume FaureGatekeeper par Guillaume Faure
Gatekeeper par Guillaume Faure
 
Lacoste brand analyses presentation full N final
Lacoste brand analyses presentation full N finalLacoste brand analyses presentation full N final
Lacoste brand analyses presentation full N final
 
Fastlane snapshot presentation
Fastlane snapshot presentationFastlane snapshot presentation
Fastlane snapshot presentation
 
Safari app extensions cleared up by Sanaa Squalli
Safari app extensions cleared up by Sanaa SqualliSafari app extensions cleared up by Sanaa Squalli
Safari app extensions cleared up by Sanaa Squalli
 
Introduction to IE
Introduction to IEIntroduction to IE
Introduction to IE
 

IC-12, Phase-1 Static Diversion layout (1 off 2)

  • 1. SECTION B (SCALE 1:100) CONCRETE BARRIER 5 1 FENCE / EARTH BOND 5 1 FENCE / EARTH BOND EMBANKMENT EMBANKMENT SECTION A (SCALE 1:100) CONCRETE BARRIERCONCRETE BARRIER 5 1 FENCE / EARTH BOND 5 1 FENCE / EARTH BOND EMBANKMENTEMBANKMENT T115 50 R214 T200 P900 120 80 T117 50 T115 80 T115 50 T200 T115 50 NEWROAD LAYOUTAHEAD 200m 100m 400m T115 50 T200 - A - A - B - B T115 50 T208-R T115 50 T115 50 T232 T239 100 m R108-R T232 T233 R108-R WORKSEXIT T233 T115 50 T113 T113 T113 T113 T301T301 T300 T302 R108-R R108-R T115 50 WORKSEXITWORKS EXIT MAIN CONTRACTOR: PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS) MINISTRY OF INTERIOR HEAD OF PLANNING, SAFETY AND RADARS DIVISION (SIGNATURE) TRAFFIC & PATROL DEPARTMENT LOCATION PLAN WAKRAH BYPASS ROAD EXW- P015 PROJECT CODE : P 015 CHECKED DATE DWG. NO. DESIGNED TITLE DD APPROVAL SCALE STATUS PROJECT LOGO OR OFFICIAL STAMPASHGHAL TDP APPROVER LOGO OR OFFICIAL STAMP APPROVER (SIGNATURE) ASHGHAL TDP REVIEWER LOGO OR OFFICIAL STAMP REVIEWER (SIGNATURE) PROJECT MANAGEMENT CONSULTANT: LOGO OR OFFICIAL STAMP REVIEWER (SIGNATURE AND STAMP) GENERAL ENGINEERING CONSULTANT: LOGO OR OFFICIAL STAMP PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS) LOGO OR OFFICIAL STAMP TRAFFIC DIVERSION PLAN APPROVALS GROUP COMMENTS TRAFFIC POLICE DEPARTMENT COMMENTS NOTES: -CONCRETE BARRIER WITH FLASHING LEGEND: -SIGN POST / A FRAME -TRAFFIC SIGN AND REFERENCE BEACON AND REFLECTIVE TAPE -PLASTIC WATER FILLED BARRICADE @A1 REV. NO. INFRASTRUCTURE AFFAIRS PUBLIC WORKS AUTHORITY P.O. BOX 22188 TEL: 44950055 FAX: 44950441 Client: AM TM REV DATE DESCRIPTION NUMBER N -WORK ZONE TDP Designer: LARSEN & TOUBRO LTD. LOCATION 13/12/2015 AS SHOWN N See TDP Documents CA CA ISSUED FOR APPROVAL13/12/2015 -EXISTING ROAD -PROPOSED DIVERSION MATCHLINE"A" MATCHLINE"A" CONTINUEDONEXW-P015-0000-TM-LNT-SK-00002-011 N SCALE 1:1000 Existing Mesaieed Road Proposed Diversion SCALE 1:1000 EXW-P015-0000-TM-LNT-SK-00002-010 TRAFFIC DIVERSION PLAN PHASE 1 - STATIC WORKS DURATION OF TRAFFIC DIVERSION WORKS Static Works START DATE: 24.12.2015 COMPLETION DATE: 21.04.2016 DESCRIPTION OF WORKS: Static traffic diversion along Mesaieed road at junction IC12 to create workzone to facilitate the construction of the Wakra Bypass. WZTMG LAYOUT NO: - TL-DC 12 (Modified)