The planning was started in 2011 until Now,The program design will included :Mining site-Coal cropping-Geo-morphology-Landmark and utility-Veracity-mining reconnaissance-Contouring-geology mapping-Hauling road and paving design-Bridges and underpass-Coal reserved and deposits determination-Loading point and port plan-legacy and government legality-people and socialization guaranteed-Draft survey-transshipment point ( 5 hours distances to Vessel anchorage position)-The other mining marketable coal deposits.Port impact and mining.Port construction and the alternatives.Total mining cash flow.Washing plant and environmental design through with the Bi-Environmental nature of Engineering.(Economical engineering)