THE VALUE OF BIM FOR LIFECYCLE MANAGEMENT IN CRITICAL FACILITIES WHEN
TIME, QUALITY & COST MATTER
Andy Fuhrman, IFMA Fellow – FUHRMAN CONSULTING

If you were doing space planning, CAD/CAFM back to the early 1990’s you may have used
boxes of floppy disks provided by Haworth, Herman Miller or Steelcase that contained 3D
CAD objects that you could insert into your 2D floor plans. By adjusting the view you could
see your modular furniture plan in three dimensions from different angles. We could also do
some basic rendering which we could either print out or do screen captures in order to share
the proposed design with the intended occupants who traditionally have a hard time
visualizing designs from floor plans, elevations and cut-sheets, often times signing off on
the project, only to be disappointed with the actual deliverable.

The 3D objects representing panels, work surfaces, storage task lighting, chairs and all the
miscellaneous components contained specification information such as part and model
number, size, color, voltage, etc., that could be extracted from the CAD plan to create a list
you could order from.

Another application way ahead of our industry’s ability to recognize its value and adopt its
concept was SimCity first released in 1989, going far beyond the single building model
concept by having gamers build and design a city. The player could mark land as being
zoned as commercial, industrial, or residential, add buildings, change the tax rate, build a
power grid, build transportation systems and take many other actions, in order to enhance
the city. Once able to construct buildings in a particular area, residents, known as Sims,
may choose to construct and upgrade houses, apartment blocks, light or heavy industrial
buildings, commercial buildings, hospitals, churches, and other structures. The Sims make
these choices based on such factors as traffic levels, adequate electrical power, crime levels,
and proximity to other types of buildings—for example, residential areas next to a power
plant will seldom appreciate to the highest grade of housing.

Also, the player may face disasters including flooding, tornadoes, fires, earthquakes and
attacks by monsters. In addition, monsters and tornadoes can trigger train crashes by
running into passing trains. Sounds like something Federal Emergency Management Agency
(FEMA) should have been using for Hurricane Katrina.

Leveraging these ideas just didn’t catch on in the real world of Facility Management and
Real Estate. Use gaming software developers for the professional world must have been too
far out of the norm for the Traditionalist and the Baby Boomer generations.

Meanwhile in the Construction industry where productivity improvements was headed in the
wrong direction compared with other industry types1, a few innovative construction, design
and software companies began testing and advancing the use and capabilities of 3D
software to minimize the risk associated with constructing a new building, which typically is
a one-off unique design, where you’re not really sure of the best sequence or fit-up of
construction, not to mention how the building will actually perform.


	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
1	
  http://www.aecbytes.com/buildingthefuture/2009/InnovativeTechnologies.html 	
  




	
                                                                                                                                                                                                                                 1	
  
These innovative, forward thinking AEC firms typically used their own funds for the Virtual
Design & Construction (VD&C) process as it was too new to get owners to pay. General
contractors, their subcontractors and engineering firms began creating their scope of work
using software that best fir their needs. Structural engineers and fabricators may have used
Tekla Structures, Bentley Structural Modeler or Revit Structures, while HVAC contractors
may have used CADduct, Duct Designer 3D, Bentley Building Mechanical or Revit MEP.
There are over 200 BIM related software products in the market being used in their specific
domain space.

Not only do these applications create 3D images, many of the Mechanical, Electrical and
Plumbing (MEP) and Structural applications are used in conjunction with computer
numerical control (CNC) machines, like laser, plasma and high pressure water cutters as
well as drills, lathes, grinders and pipe benders. These advanced technologies and processes
are used in creating the new breed of high performance aircraft and wild looking buildings
such as the ones designed by Frank Gehry2, where the only straight lines are the floors.

The main point you need to be aware of here is that AEC firms constructing new
buildings or retrofitting existing, where they’re using Building Information Models
(the updated term for VD&C), may not all be using one single product like Revit
and that all the associated electronic data and documentation doesn’t necessarily
exist in a single database or repository – at least on the majority of projects I’m
familiar with. This is an extremely important point if you’re thinking about integrating BIM
with your Integrated Workplace Management System (IWMS) and/or Computerized
Maintenance Management System (CMMS) and/or Electronic Document Management
System (EDMS). It is my understanding that some Gehry projects required all trades to use
CATIA and the single data repository model.


CRITICAL FACILITIES VS. OFFICE BUILDINGS
Health Care, Labs, High Tech R&D and Manufacturing, Data Centers and Communication
facilities are typically much more of a challenge and of greater risk to builders who have to
fit electrical and communication conduits, cable trays, process gas pipes, HVAC duct and
components along with fire sprinklers and plumbing between the structural elements of the
floor and roof above and the suspended ceiling and within the confines of walls.

Getting pumps, chillers, boilers, generators, electrical control panels, CRAC units, PDU’s,
server cabinets, battery racks and other critical infrastructure into a space where
maintenance personnel can maintain, repair and replace them tends to be a greater
challenge in critical facilities than in office buildings just because there so much more of it,
all fighting for a finite amount of space.

And because there’s so much more of it along with all the components used to power and
connect them, time which equals money - as does quality of workmanship which impacts
commissioning and total cost of ownership over the long term; BIM, IPD, Bar Code, RFID,
Lean Construction practices all have the ability to significantly impact total cost of ownership
as well as the really big ticket – which is cost avoidance of impacting occupant productivity
associated with down time, indoor air quality issues, poor lighting, noise, and other business
disruptions.


	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
2	
  http://en.wikipedia.org/wiki/Frank_Gehry 	
  




	
                                                                                                                                                                                                                                 2	
  
No doubt BIM can provide value for office buildings as well. Where I believe the most
significant value lies is in Energy modeling of the proposed building. This includes:
• A analyzing the suns impact on the orientation of the building, including the roof, shell,
    windows and floor (heat gain and loss);
•         Modeling and analyzing the HVAC system and airflow through the building with the
          proposed hardwall offices and modular furniture in place;
•         Modeling and analyzing day-lighting and the buildings lighting system.
Owners/Operators/FM’s need to start considering inserting requirements into their new
construction RFP’s and pay the smaller dollars for this work to avoid the higher cost of
operations over the long term.


WHY SHOULD OWNERS/OPERATORS/FACILITY MANAGERS CARE ABOUT BIM
DURING THE PLANNING, DESIGN & BUILD PHASE?
• You hire the AEC firms – they work for you.
• Using BIM helps them reduce overall cost of the job from traditional methods and can
  reduce delivery & occupancy time.
• If you want a BIM for FM operations, you need to find AEC firms who are experienced in
  creating and using one as a team that not only provides value during the design/build
  phase, but also during commissioning and handover for FM operations.
• By incorporating an Integrated Project Delivery (IPD) approach, your FM/RE team will
  have the opportunity to review the model design, equipment layout, fit and functionality
  prior to construction where changing electrons on a computer screen is far more cost
  effective than when the asset is actually installed.
Here are four case studies obtained from McGraw-Hill’s document ‘THE BUSINESS VALUE OF
BIM - GETTING BUILDING INFORMATION MODELING TO THE BOTTOM LINE3’


RESEARCH 2 - UNIVERSITY OF COLORADO – DENVER HEALTH SCIENCES CENTER
• GENERAL CONTRACTOR: Mortenson Construction
• PROJECT COST: $201 Million Project
• PROJECT SCOPE: 11 Floors - 540,000sf Bio-Medical Facility
• TECHNOLOGY: Used 3D & 4D BIM
• BUSINESS VALUE REALIZED
  • 74% Reduction in RFI’s during the Foundation phase
  • 47% Reduction in RFI’s during Steel Erection phase
  • Completed 2 months ahead of schedule & 6 months ahead of similar building
     for same client not using BIM
  • Mechanical Sub (U.S. Engineering) realized 50% reduction in labor and 50%
     reduction in schedule.

TEXAS A&M HEALTH SCIENCE CENTER
• GENERAL CONTRACTOR: Satterfield & Pontikes
• PROJECT COST: $103.5 Million
• PROJECT SCOPE: Two buildings
   • 128,000sf Health Professions Education Building

	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
3	
  http://images.autodesk.com/adsk/files/final_2009_bim_smartmarket_report.pdf 	
  




	
                                                                                                                                                                                                                                 3	
  
•   127,500sf Medical Research & Education Building
       •   GC invested $250,000 of their own money to build a BIM model prior to the bid. They
           were awarded the bid and were $10 Million lower than the next bidder

SUTTER HEALTH MEDICAL CENTER CASTRO VALLEY
• GENERAL CONTRACTOR: DPR Construction
• PROJECT COST: $320 Million
• PROJECT SCOPE: 130-bed, acute care hospital, 230,000sf
• Integrated Project Delivery (IPD): The team is using an 11-party Integrated Form of
  Agreement (IFOA) contract.
• $1.2 Million savings in Actual Cost vs. Budget
• Shaved 2.25 years off Design & Permit process
• EXPECTED COMPLETION: 2013

U.S. DEPARTMENT OF ENERGY
• ARCHITECT CH2M-HILL
• PROJECT COST: $100 Million
• PROJECT SCOPE: 45,000sf High Explosives Pressing Facility
   • Blast resistant concrete
   • Extensive process piping
   • Eight separate electrical systems
• BIM model uncovered over 500 serious design problems
• Independent Cost Estimators calculated $10 million savings using BIM


WHAT’S NEXT?
IFMA members have taken the initiative to launch the BIM Lifecycle Operations Community
of Practice (BIMLO COP) to collaborate on and establish Best Practices and gather Lessons
Learned on the use of technology, processes and policies for the built environment,
primarily pertaining to BIM, which is evolving quickly incorporating live – real time data
from Building Automation and Management Systems (BAS/BMS), connecting with
IWMS/CMMS, EDMS, Geographic Information Systems (GIS), local weather data providers
and 3rd party cloud based real estate data.

IFMA’s BIMLO COP Vision Statement:
To assist the Facility Management professional deliver optimal operating performance of the
built environment and its occupants

Misison Statement:
To collaborate with other AEC non-profit organizations to develop BIM related best practices
and case studies used to educate IFMA members, enhancing the knowledge and value of the
Facility Manager

You’re welcome and encouraged to participate with other industry professionals of various
levels in both our public facing social media portal on LinkedIn at
http://www.linkedin.com/groups/IFMA-Building-Information-Modeling-BIM-4552551 as well
as our IFMA Members Only website which you can access at
http://www.ifma.org/communities/bim/




	
                                                                                           4	
  
BIM RELATED RESOURCES
• buildingSMARTalliance
   http://www.buildingsmartalliance.org
•      U.S. General Services Administration: 3D-4D Building Information Modeling
       http://www.gsa.gov/portal/category/21062
•      GSA Bim Guide For Facility Management
       http://www.gsa.gov/graphics/pbs/BIM_Guide_Series_Facility_Management.pdf
•      Construction Operations Building Information Exchange (COBie)
       www.wbdg.org/resources/cobie.php
•      IFMA http://www.ifma.org/resources/bim/
•      U.S. Army Corps Of Engineers CAD-BIM Center
       https://cadbim.usace.army.mil/%5C
•      The International Institute For Sustainable Laboratories (I2SL)
       http://www.i2sl.org/working/labfm.html
•      Stanford University Center For Integrated Facility Engineering (CIFE)
       http://cife.stanford.edu/publications



For more information, contact Andy Fuhrman, IFMA Fellow – FUHRMAN CONSULTING
andy.fuhrman.799@gmail.com




	
                                                                                 5	
  

More Related Content

What's hot

Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for OwnersDLT Solutions
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
 
Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...nibtedu
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif
 
BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3Clive Walsh
 
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014Protectionandmanagement
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Servicestheaecassociates1
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
Detailed definition of bim abbreviation
Detailed definition of bim abbreviationDetailed definition of bim abbreviation
Detailed definition of bim abbreviationOmar Selim
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated designAnkit Singhai
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 

What's hot (18)

Implementing BIM for Owners
Implementing BIM for OwnersImplementing BIM for Owners
Implementing BIM for Owners
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 
Bimarabia1en
Bimarabia1enBimarabia1en
Bimarabia1en
 
Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 
Mhc prefabrication modularization_smr_2011
Mhc prefabrication modularization_smr_2011Mhc prefabrication modularization_smr_2011
Mhc prefabrication modularization_smr_2011
 
Application of BIM
Application of BIMApplication of BIM
Application of BIM
 
BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3
 
BIM for Project Managers
BIM for Project ManagersBIM for Project Managers
BIM for Project Managers
 
BIM Report 3
BIM Report 3BIM Report 3
BIM Report 3
 
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Services
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
Detailed definition of bim abbreviation
Detailed definition of bim abbreviationDetailed definition of bim abbreviation
Detailed definition of bim abbreviation
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated design
 
A gentle introduction to BIM
A gentle introduction to BIMA gentle introduction to BIM
A gentle introduction to BIM
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 

Viewers also liked

Social learning circle
Social learning circleSocial learning circle
Social learning circleArie Wels
 
ISA Corporate Presentation
ISA Corporate PresentationISA Corporate Presentation
ISA Corporate PresentationPrashant Gandhi
 
比較の表し方(1)
比較の表し方(1)比較の表し方(1)
比較の表し方(1)shingokeihoku
 
比較の表し方(2)
比較の表し方(2)比較の表し方(2)
比較の表し方(2)shingokeihoku
 
Qualicum engagement.novpptx
Qualicum   engagement.novpptxQualicum   engagement.novpptx
Qualicum engagement.novpptxFaye Brownlie
 
Visita biblioteca municipal 2013
Visita biblioteca municipal 2013Visita biblioteca municipal 2013
Visita biblioteca municipal 2013XXX XXX
 
Hul cream report why-ratings_are_far_lower
Hul cream report why-ratings_are_far_lowerHul cream report why-ratings_are_far_lower
Hul cream report why-ratings_are_far_lowerJAYARAMAN IYER
 
Quesnel.Adolescent Literacy.Feb 2016
Quesnel.Adolescent Literacy.Feb 2016Quesnel.Adolescent Literacy.Feb 2016
Quesnel.Adolescent Literacy.Feb 2016Faye Brownlie
 
isd314-06-association-mining
isd314-06-association-miningisd314-06-association-mining
isd314-06-association-miningAnung Ariwibowo
 
ikd312-05-kalkulus-relasional
ikd312-05-kalkulus-relasionalikd312-05-kalkulus-relasional
ikd312-05-kalkulus-relasionalAnung Ariwibowo
 
Focus 1 - construirea unui software functional, utilizabil si intuitiv
Focus 1 - construirea unui software functional, utilizabil si intuitivFocus 1 - construirea unui software functional, utilizabil si intuitiv
Focus 1 - construirea unui software functional, utilizabil si intuitivValentin Bora
 

Viewers also liked (20)

Social learning circle
Social learning circleSocial learning circle
Social learning circle
 
ISA Corporate Presentation
ISA Corporate PresentationISA Corporate Presentation
ISA Corporate Presentation
 
Sph 106 Ch 14
Sph 106 Ch 14Sph 106 Ch 14
Sph 106 Ch 14
 
Sph 106 Ch 17
Sph 106 Ch 17Sph 106 Ch 17
Sph 106 Ch 17
 
比較の表し方(1)
比較の表し方(1)比較の表し方(1)
比較の表し方(1)
 
Verb Ser Estar
Verb Ser EstarVerb Ser Estar
Verb Ser Estar
 
7fevrier2009
7fevrier20097fevrier2009
7fevrier2009
 
比較の表し方(2)
比較の表し方(2)比較の表し方(2)
比較の表し方(2)
 
SPH 107 Ch 1
SPH 107 Ch 1SPH 107 Ch 1
SPH 107 Ch 1
 
Qualicum engagement.novpptx
Qualicum   engagement.novpptxQualicum   engagement.novpptx
Qualicum engagement.novpptx
 
Visita biblioteca municipal 2013
Visita biblioteca municipal 2013Visita biblioteca municipal 2013
Visita biblioteca municipal 2013
 
비토리 Faq
비토리 Faq비토리 Faq
비토리 Faq
 
Hul cream report why-ratings_are_far_lower
Hul cream report why-ratings_are_far_lowerHul cream report why-ratings_are_far_lower
Hul cream report why-ratings_are_far_lower
 
Quesnel.Adolescent Literacy.Feb 2016
Quesnel.Adolescent Literacy.Feb 2016Quesnel.Adolescent Literacy.Feb 2016
Quesnel.Adolescent Literacy.Feb 2016
 
isd314-06-association-mining
isd314-06-association-miningisd314-06-association-mining
isd314-06-association-mining
 
ikd312-05-kalkulus-relasional
ikd312-05-kalkulus-relasionalikd312-05-kalkulus-relasional
ikd312-05-kalkulus-relasional
 
ikd312-02-three-schema
ikd312-02-three-schemaikd312-02-three-schema
ikd312-02-three-schema
 
OpenSplice Cache
OpenSplice CacheOpenSplice Cache
OpenSplice Cache
 
Revamp
RevampRevamp
Revamp
 
Focus 1 - construirea unui software functional, utilizabil si intuitiv
Focus 1 - construirea unui software functional, utilizabil si intuitivFocus 1 - construirea unui software functional, utilizabil si intuitiv
Focus 1 - construirea unui software functional, utilizabil si intuitiv
 

Similar to White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities When Time Quality & Cost Matter Fuhrman

Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Rob Madill
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnicsRob Madill
 
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)Bram Mommers
 
ERP in Construction industry
ERP in Construction industryERP in Construction industry
ERP in Construction industryZainab Jamal
 
Building Simulation, Its Role, Softwares & Their Limitations
Building Simulation, Its Role, Softwares & Their LimitationsBuilding Simulation, Its Role, Softwares & Their Limitations
Building Simulation, Its Role, Softwares & Their LimitationsPrasad Thanthratey
 
Microsoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for ConstructionMicrosoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for ConstructionDWP Information Architects Inc.
 
Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Ian Fairlie
 
Electrical Designer Resume
Electrical Designer ResumeElectrical Designer Resume
Electrical Designer Resumerobert brown
 
THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,
THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,
THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,nibtedu
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...IRJET Journal
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM UTHM
 
bim and project controls
 bim and project controls bim and project controls
bim and project controlsOmar Selim
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET Journal
 
Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...nibtedu
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
Blog top 5 reasons construction document management delivers winning projects...
Blog top 5 reasons construction document management delivers winning projects...Blog top 5 reasons construction document management delivers winning projects...
Blog top 5 reasons construction document management delivers winning projects...iFieldsmart Technologies
 

Similar to White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities When Time Quality & Cost Matter Fuhrman (20)

3dplantpaybacks
3dplantpaybacks3dplantpaybacks
3dplantpaybacks
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnics
 
EcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle EastEcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle East
 
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
 
Resume 2020
Resume 2020Resume 2020
Resume 2020
 
ERP in Construction industry
ERP in Construction industryERP in Construction industry
ERP in Construction industry
 
Building Simulation, Its Role, Softwares & Their Limitations
Building Simulation, Its Role, Softwares & Their LimitationsBuilding Simulation, Its Role, Softwares & Their Limitations
Building Simulation, Its Role, Softwares & Their Limitations
 
Microsoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for ConstructionMicrosoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for Construction
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
 
Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08
 
Electrical Designer Resume
Electrical Designer ResumeElectrical Designer Resume
Electrical Designer Resume
 
THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,
THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,
THE ENGINEERING & CONSTRUCTION SECTOR GETS BIGGER BY THE DAY,
 
Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...Improve the Productivity of Building Construction Project using Clash detecti...
Improve the Productivity of Building Construction Project using Clash detecti...
 
Brochure BIM
Brochure BIM Brochure BIM
Brochure BIM
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
 
Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
Blog top 5 reasons construction document management delivers winning projects...
Blog top 5 reasons construction document management delivers winning projects...Blog top 5 reasons construction document management delivers winning projects...
Blog top 5 reasons construction document management delivers winning projects...
 

White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities When Time Quality & Cost Matter Fuhrman

  • 1. IFMA WORLD WORKPLACE 2012 SESSION 6.11 THE VALUE OF BIM FOR LIFECYCLE MANAGEMENT IN CRITICAL FACILITIES WHEN TIME, QUALITY & COST MATTER Andy Fuhrman, IFMA Fellow – FUHRMAN CONSULTING If you were doing space planning, CAD/CAFM back to the early 1990’s you may have used boxes of floppy disks provided by Haworth, Herman Miller or Steelcase that contained 3D CAD objects that you could insert into your 2D floor plans. By adjusting the view you could see your modular furniture plan in three dimensions from different angles. We could also do some basic rendering which we could either print out or do screen captures in order to share the proposed design with the intended occupants who traditionally have a hard time visualizing designs from floor plans, elevations and cut-sheets, often times signing off on the project, only to be disappointed with the actual deliverable. The 3D objects representing panels, work surfaces, storage task lighting, chairs and all the miscellaneous components contained specification information such as part and model number, size, color, voltage, etc., that could be extracted from the CAD plan to create a list you could order from. Another application way ahead of our industry’s ability to recognize its value and adopt its concept was SimCity first released in 1989, going far beyond the single building model concept by having gamers build and design a city. The player could mark land as being zoned as commercial, industrial, or residential, add buildings, change the tax rate, build a power grid, build transportation systems and take many other actions, in order to enhance the city. Once able to construct buildings in a particular area, residents, known as Sims, may choose to construct and upgrade houses, apartment blocks, light or heavy industrial buildings, commercial buildings, hospitals, churches, and other structures. The Sims make these choices based on such factors as traffic levels, adequate electrical power, crime levels, and proximity to other types of buildings—for example, residential areas next to a power plant will seldom appreciate to the highest grade of housing. Also, the player may face disasters including flooding, tornadoes, fires, earthquakes and attacks by monsters. In addition, monsters and tornadoes can trigger train crashes by running into passing trains. Sounds like something Federal Emergency Management Agency (FEMA) should have been using for Hurricane Katrina. Leveraging these ideas just didn’t catch on in the real world of Facility Management and Real Estate. Use gaming software developers for the professional world must have been too far out of the norm for the Traditionalist and the Baby Boomer generations. Meanwhile in the Construction industry where productivity improvements was headed in the wrong direction compared with other industry types1, a few innovative construction, design and software companies began testing and advancing the use and capabilities of 3D software to minimize the risk associated with constructing a new building, which typically is a one-off unique design, where you’re not really sure of the best sequence or fit-up of construction, not to mention how the building will actually perform.                                                                                                                 1  http://www.aecbytes.com/buildingthefuture/2009/InnovativeTechnologies.html     1  
  • 2. These innovative, forward thinking AEC firms typically used their own funds for the Virtual Design & Construction (VD&C) process as it was too new to get owners to pay. General contractors, their subcontractors and engineering firms began creating their scope of work using software that best fir their needs. Structural engineers and fabricators may have used Tekla Structures, Bentley Structural Modeler or Revit Structures, while HVAC contractors may have used CADduct, Duct Designer 3D, Bentley Building Mechanical or Revit MEP. There are over 200 BIM related software products in the market being used in their specific domain space. Not only do these applications create 3D images, many of the Mechanical, Electrical and Plumbing (MEP) and Structural applications are used in conjunction with computer numerical control (CNC) machines, like laser, plasma and high pressure water cutters as well as drills, lathes, grinders and pipe benders. These advanced technologies and processes are used in creating the new breed of high performance aircraft and wild looking buildings such as the ones designed by Frank Gehry2, where the only straight lines are the floors. The main point you need to be aware of here is that AEC firms constructing new buildings or retrofitting existing, where they’re using Building Information Models (the updated term for VD&C), may not all be using one single product like Revit and that all the associated electronic data and documentation doesn’t necessarily exist in a single database or repository – at least on the majority of projects I’m familiar with. This is an extremely important point if you’re thinking about integrating BIM with your Integrated Workplace Management System (IWMS) and/or Computerized Maintenance Management System (CMMS) and/or Electronic Document Management System (EDMS). It is my understanding that some Gehry projects required all trades to use CATIA and the single data repository model. CRITICAL FACILITIES VS. OFFICE BUILDINGS Health Care, Labs, High Tech R&D and Manufacturing, Data Centers and Communication facilities are typically much more of a challenge and of greater risk to builders who have to fit electrical and communication conduits, cable trays, process gas pipes, HVAC duct and components along with fire sprinklers and plumbing between the structural elements of the floor and roof above and the suspended ceiling and within the confines of walls. Getting pumps, chillers, boilers, generators, electrical control panels, CRAC units, PDU’s, server cabinets, battery racks and other critical infrastructure into a space where maintenance personnel can maintain, repair and replace them tends to be a greater challenge in critical facilities than in office buildings just because there so much more of it, all fighting for a finite amount of space. And because there’s so much more of it along with all the components used to power and connect them, time which equals money - as does quality of workmanship which impacts commissioning and total cost of ownership over the long term; BIM, IPD, Bar Code, RFID, Lean Construction practices all have the ability to significantly impact total cost of ownership as well as the really big ticket – which is cost avoidance of impacting occupant productivity associated with down time, indoor air quality issues, poor lighting, noise, and other business disruptions.                                                                                                                 2  http://en.wikipedia.org/wiki/Frank_Gehry     2  
  • 3. No doubt BIM can provide value for office buildings as well. Where I believe the most significant value lies is in Energy modeling of the proposed building. This includes: • A analyzing the suns impact on the orientation of the building, including the roof, shell, windows and floor (heat gain and loss); • Modeling and analyzing the HVAC system and airflow through the building with the proposed hardwall offices and modular furniture in place; • Modeling and analyzing day-lighting and the buildings lighting system. Owners/Operators/FM’s need to start considering inserting requirements into their new construction RFP’s and pay the smaller dollars for this work to avoid the higher cost of operations over the long term. WHY SHOULD OWNERS/OPERATORS/FACILITY MANAGERS CARE ABOUT BIM DURING THE PLANNING, DESIGN & BUILD PHASE? • You hire the AEC firms – they work for you. • Using BIM helps them reduce overall cost of the job from traditional methods and can reduce delivery & occupancy time. • If you want a BIM for FM operations, you need to find AEC firms who are experienced in creating and using one as a team that not only provides value during the design/build phase, but also during commissioning and handover for FM operations. • By incorporating an Integrated Project Delivery (IPD) approach, your FM/RE team will have the opportunity to review the model design, equipment layout, fit and functionality prior to construction where changing electrons on a computer screen is far more cost effective than when the asset is actually installed. Here are four case studies obtained from McGraw-Hill’s document ‘THE BUSINESS VALUE OF BIM - GETTING BUILDING INFORMATION MODELING TO THE BOTTOM LINE3’ RESEARCH 2 - UNIVERSITY OF COLORADO – DENVER HEALTH SCIENCES CENTER • GENERAL CONTRACTOR: Mortenson Construction • PROJECT COST: $201 Million Project • PROJECT SCOPE: 11 Floors - 540,000sf Bio-Medical Facility • TECHNOLOGY: Used 3D & 4D BIM • BUSINESS VALUE REALIZED • 74% Reduction in RFI’s during the Foundation phase • 47% Reduction in RFI’s during Steel Erection phase • Completed 2 months ahead of schedule & 6 months ahead of similar building for same client not using BIM • Mechanical Sub (U.S. Engineering) realized 50% reduction in labor and 50% reduction in schedule. TEXAS A&M HEALTH SCIENCE CENTER • GENERAL CONTRACTOR: Satterfield & Pontikes • PROJECT COST: $103.5 Million • PROJECT SCOPE: Two buildings • 128,000sf Health Professions Education Building                                                                                                                 3  http://images.autodesk.com/adsk/files/final_2009_bim_smartmarket_report.pdf     3  
  • 4. 127,500sf Medical Research & Education Building • GC invested $250,000 of their own money to build a BIM model prior to the bid. They were awarded the bid and were $10 Million lower than the next bidder SUTTER HEALTH MEDICAL CENTER CASTRO VALLEY • GENERAL CONTRACTOR: DPR Construction • PROJECT COST: $320 Million • PROJECT SCOPE: 130-bed, acute care hospital, 230,000sf • Integrated Project Delivery (IPD): The team is using an 11-party Integrated Form of Agreement (IFOA) contract. • $1.2 Million savings in Actual Cost vs. Budget • Shaved 2.25 years off Design & Permit process • EXPECTED COMPLETION: 2013 U.S. DEPARTMENT OF ENERGY • ARCHITECT CH2M-HILL • PROJECT COST: $100 Million • PROJECT SCOPE: 45,000sf High Explosives Pressing Facility • Blast resistant concrete • Extensive process piping • Eight separate electrical systems • BIM model uncovered over 500 serious design problems • Independent Cost Estimators calculated $10 million savings using BIM WHAT’S NEXT? IFMA members have taken the initiative to launch the BIM Lifecycle Operations Community of Practice (BIMLO COP) to collaborate on and establish Best Practices and gather Lessons Learned on the use of technology, processes and policies for the built environment, primarily pertaining to BIM, which is evolving quickly incorporating live – real time data from Building Automation and Management Systems (BAS/BMS), connecting with IWMS/CMMS, EDMS, Geographic Information Systems (GIS), local weather data providers and 3rd party cloud based real estate data. IFMA’s BIMLO COP Vision Statement: To assist the Facility Management professional deliver optimal operating performance of the built environment and its occupants Misison Statement: To collaborate with other AEC non-profit organizations to develop BIM related best practices and case studies used to educate IFMA members, enhancing the knowledge and value of the Facility Manager You’re welcome and encouraged to participate with other industry professionals of various levels in both our public facing social media portal on LinkedIn at http://www.linkedin.com/groups/IFMA-Building-Information-Modeling-BIM-4552551 as well as our IFMA Members Only website which you can access at http://www.ifma.org/communities/bim/   4  
  • 5. BIM RELATED RESOURCES • buildingSMARTalliance http://www.buildingsmartalliance.org • U.S. General Services Administration: 3D-4D Building Information Modeling http://www.gsa.gov/portal/category/21062 • GSA Bim Guide For Facility Management http://www.gsa.gov/graphics/pbs/BIM_Guide_Series_Facility_Management.pdf • Construction Operations Building Information Exchange (COBie) www.wbdg.org/resources/cobie.php • IFMA http://www.ifma.org/resources/bim/ • U.S. Army Corps Of Engineers CAD-BIM Center https://cadbim.usace.army.mil/%5C • The International Institute For Sustainable Laboratories (I2SL) http://www.i2sl.org/working/labfm.html • Stanford University Center For Integrated Facility Engineering (CIFE) http://cife.stanford.edu/publications For more information, contact Andy Fuhrman, IFMA Fellow – FUHRMAN CONSULTING andy.fuhrman.799@gmail.com   5