• We don’t just make recommendations on our systems, we work with you
through every step of the installation. We provide the hardware and software
you need, plus offer financing to make it happen. And because we
understand the value of partnership, we can easily collaborate with any third-
party developers or technology vendors you choose to customize your system
.
• Lowering costs. Going green. Improving people’s lives. Every organization
and household has unique goals. We figure out your energy strategy by
evaluating how you use energy and its effect on way of consumption.
• Gain energy independence by generating lower-cost, renewable solar energy
on site.
• In the next few slides we will navigate with you on the different options that
fit your particular needs.
www.harvest4energy.com 2
Energy Conservation
Energy is one of the largest overhead costs to any business and household, and can be a very
complicated landscape to navigate. Upgrading to efficient equipment but continuing to operate
in this fractured landscape is leaving money on the table.
Here are three steps you can take towards digitizing your building or home and creating an
intelligent energy environment.
1. Best in class LED not only saves you energy but can become the most ubiquitous
intelligently enabled edge device throughout your enterprise.
2. Install a net metering Photovoltaic system ready for the smart grid.
3. Collect and integrate new and existing data throughout your building. Current’s digital
energy management system runs on an industrial strength cloud platform as a single pane
of glass to see exactly where and when energy is being used in real time
3
www.harvest4energy.com
What is Net Metering?
Net – metering is a billing arrangement where consumers who generate electricity on their
residential premises with the use of Photovoltaic System may export the excess of this to the
Electric Utility Grid and use it to offset electricity imported from the Grid to the premise during
the applicable billing period.
In case that the consumption exceeds the production, then the consumer will be billed the
difference, while in the opposite case, the production surplus is transferred to be used in the
following (forthcoming) two-month billing period. The final clearing will be stated on the last bill
of the financial year (February-March). Any surplus may not be transferred to the next billing
year.
In cases of Residential Consumers, the metering may contain the electrical consumption of
Storage Heaters if its is requested.
The maximum power allowed per beneficiary according to the Governmental Scheme
pronounced is 5kWp.
4 www.harvest4energy.com
Application Process
Eligible Applicants
Right to apply has any Residential and Commercial Building.
These investments regard instalments of Photovoltaic (PV) Systems on the roof of licensed
domestic units (primary house) or buildings, in which local authorities are housed or on the
ground of the plot in which the aforementioned building is located.
In cases that the suggested installation place is of common use (e.g. blocks), then all owners
must declare that they agree for the installation at the premises.
Vulnerable Applicants
Any individual falling in the category of vulnerable consumers according to the relevant order of
the Ministry of Energy, Commerce, Industry and Tourism, or any recipient of the Single Parent
Families Subsidy with annual gross family income €39,000, who is also a permanent resident in
the domestic unit in which the Photovoltaic (PV) System is installed has the right to apply/is an
eligible applicant. In this case the applicant is funded €900 per kWp installed, with maximum
fund of €2,700 prior to submitting the relevant request and having obtained the permission by
the Cyprus Institute of Energy.
5
www.harvest4energy.com
Installation Requirements
Photovoltaic system installation requirements
The optimum installation parameters of a P/V system according to the geographic location of
Cyprus, is South oriented with inclination of 28ο-30ο. Any divergence from these parameters
affects the system output negatively resulting to the relevant divergence on the optimum
economic return.
The net area required for a P/V installation of 3kWp - 5kWp is approximately 25m² - 40m² if
installed in a tiled roof or approximately 45m² - 75m² if installed on a flat roof/terrace. The
installation is subject to the orders in force of the relevant House Planning Department.
Annual Energy Yield
The average annual energy yield of a Photovoltaic (PV) System with capacity of 5kWp, over a 20-
year period, reaches 8,300kWh, equivalent to €1,660 compensation in electricity bills, based on
the EAC residential tariff (€0,20/kWh).
6
www.harvest4energy.com
Life Expectancy and Warranty
7 www.harvest4energy.com
Photovoltaic (PV) System Life Expectancy
The useful life of such P/V system exceeds 20 years.
The Net Metering Contract with EAC is valid for 15 years for Residential Consumers and 10
years for Commercial Consumers.
Harvest 4 Energy Ltd provides manufacturers written warranty for the Photovoltaic (PV) System
delivered for every product and equipment used in the installation of the PV System.
Photovoltaic Modules or Solar Panels have a written 10-year warranty by the manufacturer that
the respective PV Module is free of material defects. Moreover manufacturers of PV Modules
provide a 25-year performance warranty guarantee on every module.
Solar inventers have a 5-year warranty by the manufacturer with extension right from 10 up to
20 years
Licensing Requirements
Licensing/Installation/Commissioning procedure
The applications should be submitted to the EAC, which is the Distribution System Operator.
(DSO).
Upon the submission of his application, the applicant should pay the fee for the meter
replacement. The current meter is replaced with a new one of bidirectional measurement
(capability of double recording) to record the power produced by the Photovoltaic (PV) System
which is Exported to the Grid , as well as the premises' energy consumption which is Imported
from the Grid.
EAC issues its approval/permission or its justified rejection of the application within seven (7)
working days. In case the application is rejected, only €200 + V.A.T out of the amount paid for
the replacement of the meter is returned to the applicant within twenty working days as of the
rejection day. The amount of fifty euro (€50) withheld reflects the administration cost of the
application by EAC.
8
www.harvest4energy.com
Licensing Requirements
9 www.harvest4energy.com
Subsequent to the installation of the Photovoltaic (PV) System, an application should be
submitted to EAC for inspection and connection of the system with the utility Grid. EAC is
responsible to schedule the inspection and the connection within a time period not
exceeding 25 working days as of the submission day of the application for connection.
Applicants should have completed the installation, the inspection and the connection of the
Photovoltaic (PV) System to the Grid within 60 working days. In case that the installation,
inspection and connection of the Photovoltaic (PV) system to the Grid System are not completed
within the 60-day period set, then the approval obtained is no longer in force.
Licensing Requirements
Expenses / fees
The prospective producer / consumer upon his application submission pays a lump sum
of €250 + VAT, which is the administration cost of the application by EAC, the replacement cost
of the meter and the inspection and connection cost of the Distribution System.
The producer / consumer pays an annual fee to the Supplier of €47,23 + VAT per kWp, to offset
the belayed/deferred production and consumption of power in the house. These charges are
paid by the producer / consumer in six equal instalments and are included in the supplier's
invoice, i.e. €7,87 + VAT per kWp of the P/V system. This fee is subject to future variations
according to the rules and regulations published by the Cyprus Energy Regulatory Authority
(CERA).
Based on the Photovoltaic (PV) System's economic return expected, the payback period of the
initial investment is estimated to be 5 years.
10 www.harvest4energy.com
Documents required by the applicant
11
www.harvest4energy.com
Copy of the last 6 utility bills or copy of the statement of the last twelve-month electricity
consumption of the building, which is issued by EAC Customer Service Department.
Copy of a recent EAC utility bill, in the applicant's name, which regards the domestic unit in
which the P/V system will be installed.
Copy of the Title Deed of the building in which the P/V system will be installed (In case the title
has not been issued, a copy of the plot's ownership title and construction license should be
attached)
Building License
Owners' consent for installation in case the owners are more than one, or the owner is not the
applicant.
Copy of the Plot Layout Plan of the area in which the house is located.
Signed statement from the applicant that the domestic unit for which the application is
submitted is used as a permanent first house.
Permanent residence certification or six (6) recent EAC utility bills in the name of the applicant,
in case he is not a Cypriot national.
Proof that the applicant falls within the category of vulnerable consumers (applicable for
consumers that fall in Vulnerable categories and are eligible for incentives)
.
Option 1 – Net Metering – Stable PV System –Turn Key
Complete Photovoltaic System Solutions
12
Capacity Price Euro Vat 19% Total Cost
Euro
Yearly
Benefit
Euros
Break Even
Years
EAC Fees Financed
incl. EAC
Fees
Break Even
Years
3KWP 4200 378 4578 900 5.00 297.5 5264.08 5.8
4KWP 5300 1007 6307 1300 4.85 297.5 7172.00 5.5
5KWP 6300 1197 7497 2000 3.74 297.5 8394.16 4.2
Luxor Pnl. 238
Solar Edg. 476
www.harvest4energy.com
Important Note: The yearly benefit is based on current EAC charges and might change at any given time based on the kWp charges.
• The Euro 297.5, EAC Fee is the application fee charged for evaluation and inspection and its once off and is not included in the
price, except in the case of finance. In the above prices all systems are installed and inspected prior to delivery to client.
• The Luxor Solar panels and the Solar edge inverter are optional. Price is based on a 3kWp system.
• In case the roofs are gable based on ceramic tiles the brackets have an additional charge of Euro 200 + VAT for the 3kWp System.
Option 1 – Net Metering (Financed) Stable PV System –Turn Key
Complete Photovoltaic System Solutions
13
Capacity Price
Euro
Down
Payment
Balance
Financed
HP
Interest
Duration
2 Years
Year 1-2
Interest
Monthly
Payment
Year 1-2
Cost
Year 1-10
Benefit
3KWP 4578 1500 3078 5.5% 3416.58 338.58 142.36 1708.32 900
4KWP 6307 1600 4707 5.5% 5224.72 517.72 217.70 2612.40 1300
5KWP 7497 2500 4997 5.5% 5546.66 549.66 231.12 2773.44 2000
A B C D E F G H I J
www.harvest4energy.com
• The yearly cost is for year 1 and 2 only which is the repayment period.
• The yearly benefit over the life of the system is of a 10 year period which is under warranty. Additional extended warranty can be
purchased with the contract. Benefit in Column J is x 10 years. i.e. 5kWp multiplied by (J) is Euro 20,000. The value of the yearly
benefit is calculated based on EAC charges to consumers and might change without notice by EAC.
• If the owner of the system is a legal entity, the VAT return, finance costs and depreciation costs can be an accounting benefit and are
deductible.
• A once off 50 Euro charge is added for stamp duties on the Hire Purchase contract.
Net Metering Benefits – Illustration
Complete Photovoltaic System Solutions based on a 3 Kwp system with current rates.
14 www.harvest4energy.com
The calculated performance of a 3 Kwp installed capacity, far exceeds the 5000 kwh per year.
Net Metering Installation – Schematics
Complete Photovoltaic System Solutions
15
www.harvest4energy.com
Optional Battery StorageTypical Installation
System Components Inverter
16
www.harvest4energy.com
System Components Inverter
17
www.harvest4energy.com
Luxor Solar Panels - Indicative
18
www.harvest4energy.com
System Components Solar Panels Indicative
19
www.harvest4energy.com
System Components Mounting systems for illustration
20
www.harvest4energy.com
System Components and Options
21
www.harvest4energy.com
HARVEST IS SOCIAL!
• Stay up-to-date with H4E. “Like” us on Facebook!
Search for Harvest4energy, and check out all we’ve
got going on!
• Follow us on Twitter. We share the latest energy news
from around the country, @harvest4energy
• Follow us on Instagram and check out the photos
taken at H4E events, instagram.com/harvest4energy
• Follow us on Pinterest and pin ideas to use in your
classroom, Pinterest.com/harvest4energy
Exploring Solar – harvest4energy
www.harvest4energy.com
23www.harvest4energy.com
THANK YOU FOR YOUR ATTENTION
Harvest 4 Energy Ltd
21 Demosthenis Severis Avenue
Fourth Floor
Nicosia
1080
Cyprus
Mob: +357 99689961
avaroshiotis@harvest4energy.com
avaroshiotis@cyoilgas.org
THIS REPORT IS NOT TO BE PUBLISHED ON ANY PUBLIC DOMAIN
All Rights Reserved – Harvest 4 Energy Ltd 2013-2017

More Related Content

What's hot

Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Amitava Nag
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables DirectiveLeonardo ENERGY
 
Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Gensol Engineering Limited
 
Session 14 market trends & business proposals
Session 14   market trends & business proposalsSession 14   market trends & business proposals
Session 14 market trends & business proposalsChirag Jain
 
Route Green - Solar Solutions
Route Green - Solar SolutionsRoute Green - Solar Solutions
Route Green - Solar SolutionsVipin Verma
 
Rooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net MeteringRooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net MeteringUday Doshi
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentivesChirag Jain
 
RECs – a market ready for take off
RECs – a market ready for take offRECs – a market ready for take off
RECs – a market ready for take offpManifold
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directivefernando nuño
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl finalPRIYANK JAIN
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business modelsChirag Jain
 
Net metering -- Vote Solar presentation by Susannah Churchill
Net metering -- Vote Solar presentation by Susannah ChurchillNet metering -- Vote Solar presentation by Susannah Churchill
Net metering -- Vote Solar presentation by Susannah ChurchillRosana Francescato
 

What's hot (20)

Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Levellised generic tariff
Levellised generic tariffLevellised generic tariff
Levellised generic tariff
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)Scope of solar generation in West Bengal (an Indian State)
Scope of solar generation in West Bengal (an Indian State)
 
The EU Renewables Directive
The EU Renewables DirectiveThe EU Renewables Directive
The EU Renewables Directive
 
Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India)
 
Session 14 market trends & business proposals
Session 14   market trends & business proposalsSession 14   market trends & business proposals
Session 14 market trends & business proposals
 
Route Green - Solar Solutions
Route Green - Solar SolutionsRoute Green - Solar Solutions
Route Green - Solar Solutions
 
Rooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net MeteringRooftop Solar & Benefits of Net Metering
Rooftop Solar & Benefits of Net Metering
 
Session 13 national policy & regulatory framework & available incentives
Session 13   national policy & regulatory framework & available incentivesSession 13   national policy & regulatory framework & available incentives
Session 13 national policy & regulatory framework & available incentives
 
RECs – a market ready for take off
RECs – a market ready for take offRECs – a market ready for take off
RECs – a market ready for take off
 
The Renewables EU Directive
The Renewables EU DirectiveThe Renewables EU Directive
The Renewables EU Directive
 
Solar ppa guvnl final
Solar ppa guvnl finalSolar ppa guvnl final
Solar ppa guvnl final
 
Session 09 spvrt business models
Session 09   spvrt business modelsSession 09   spvrt business models
Session 09 spvrt business models
 
Feed In Tariffs
Feed In TariffsFeed In Tariffs
Feed In Tariffs
 
Net metering -- Vote Solar presentation by Susannah Churchill
Net metering -- Vote Solar presentation by Susannah ChurchillNet metering -- Vote Solar presentation by Susannah Churchill
Net metering -- Vote Solar presentation by Susannah Churchill
 
Project solar
Project solar Project solar
Project solar
 
Abt meter
Abt meterAbt meter
Abt meter
 

Viewers also liked

Larnaca Port - Energy port
Larnaca Port - Energy portLarnaca Port - Energy port
Larnaca Port - Energy portAndy Varoshiotis
 
Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998
Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998
Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998Venkatesan 'Prasad' Sundararajan
 
Aradippou Environmental Study Presentation
Aradippou Environmental Study PresentationAradippou Environmental Study Presentation
Aradippou Environmental Study PresentationAndy Varoshiotis
 
CDAA Lunch & Learn: Trends and Opportunities in the O+G Industry
CDAA Lunch & Learn: Trends and Opportunities in the O+G IndustryCDAA Lunch & Learn: Trends and Opportunities in the O+G Industry
CDAA Lunch & Learn: Trends and Opportunities in the O+G IndustryPetroLMI
 
Halliburton Liquid mud plant at Larnaka port
Halliburton Liquid mud plant at Larnaka portHalliburton Liquid mud plant at Larnaka port
Halliburton Liquid mud plant at Larnaka portAndy Varoshiotis
 
Stanford University Energy Innovation and Emerging Technologies Certificate
Stanford University Energy Innovation and Emerging Technologies CertificateStanford University Energy Innovation and Emerging Technologies Certificate
Stanford University Energy Innovation and Emerging Technologies CertificateAndy Varoshiotis
 
Cyprus Oil & Gas 2nd Nat Gas June 20th to 21st 2013
Cyprus Oil & Gas  2nd Nat Gas June 20th to 21st 2013Cyprus Oil & Gas  2nd Nat Gas June 20th to 21st 2013
Cyprus Oil & Gas 2nd Nat Gas June 20th to 21st 2013Andy Varoshiotis
 
Cyprus Oil & Gas Association 5 December
Cyprus Oil & Gas Association 5 December Cyprus Oil & Gas Association 5 December
Cyprus Oil & Gas Association 5 December Andy Varoshiotis
 
Harvard University The energy implications of a nuclear deal between the p51 ...
Harvard University The energy implications of a nuclear deal between the p51 ...Harvard University The energy implications of a nuclear deal between the p51 ...
Harvard University The energy implications of a nuclear deal between the p51 ...Andy Varoshiotis
 
Radioactive & Other Material Cyprus
Radioactive & Other Material CyprusRadioactive & Other Material Cyprus
Radioactive & Other Material CyprusAndy Varoshiotis
 
Fidel Castro Khrushchev correspondence
Fidel Castro Khrushchev correspondenceFidel Castro Khrushchev correspondence
Fidel Castro Khrushchev correspondenceAndy Varoshiotis
 
Levant Basin Neil Hodgson Spectrum Presentation
Levant Basin  Neil Hodgson Spectrum PresentationLevant Basin  Neil Hodgson Spectrum Presentation
Levant Basin Neil Hodgson Spectrum PresentationAndy Varoshiotis
 
Harvest 4 Energy Fundamentals Dec 2014 EU
Harvest 4 Energy Fundamentals Dec 2014 EUHarvest 4 Energy Fundamentals Dec 2014 EU
Harvest 4 Energy Fundamentals Dec 2014 EUAndy Varoshiotis
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field TripEni
 

Viewers also liked (20)

Larnaca Port - Energy port
Larnaca Port - Energy portLarnaca Port - Energy port
Larnaca Port - Energy port
 
Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998
Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998
Smart Cards - Enablers of Electronic Commerce_DeloitteConsultingVS1998
 
Stanford Engineering - Energy Innovation Certificate VPS
Stanford Engineering - Energy Innovation Certificate VPSStanford Engineering - Energy Innovation Certificate VPS
Stanford Engineering - Energy Innovation Certificate VPS
 
26012014 simerini
26012014 simerini26012014 simerini
26012014 simerini
 
Aradippou Environmental Study Presentation
Aradippou Environmental Study PresentationAradippou Environmental Study Presentation
Aradippou Environmental Study Presentation
 
CDAA Lunch & Learn: Trends and Opportunities in the O+G Industry
CDAA Lunch & Learn: Trends and Opportunities in the O+G IndustryCDAA Lunch & Learn: Trends and Opportunities in the O+G Industry
CDAA Lunch & Learn: Trends and Opportunities in the O+G Industry
 
Halliburton Liquid mud plant at Larnaka port
Halliburton Liquid mud plant at Larnaka portHalliburton Liquid mud plant at Larnaka port
Halliburton Liquid mud plant at Larnaka port
 
Stanford University Energy Innovation and Emerging Technologies Certificate
Stanford University Energy Innovation and Emerging Technologies CertificateStanford University Energy Innovation and Emerging Technologies Certificate
Stanford University Energy Innovation and Emerging Technologies Certificate
 
Harvest 4 Energy Ltd
Harvest 4 Energy LtdHarvest 4 Energy Ltd
Harvest 4 Energy Ltd
 
Cyprus Oil & Gas 2nd Nat Gas June 20th to 21st 2013
Cyprus Oil & Gas  2nd Nat Gas June 20th to 21st 2013Cyprus Oil & Gas  2nd Nat Gas June 20th to 21st 2013
Cyprus Oil & Gas 2nd Nat Gas June 20th to 21st 2013
 
Cyprus Oil & Gas Association 5 December
Cyprus Oil & Gas Association 5 December Cyprus Oil & Gas Association 5 December
Cyprus Oil & Gas Association 5 December
 
Harvard University The energy implications of a nuclear deal between the p51 ...
Harvard University The energy implications of a nuclear deal between the p51 ...Harvard University The energy implications of a nuclear deal between the p51 ...
Harvard University The energy implications of a nuclear deal between the p51 ...
 
Radioactive & Other Material Cyprus
Radioactive & Other Material CyprusRadioactive & Other Material Cyprus
Radioactive & Other Material Cyprus
 
Exploration Process Data
Exploration Process DataExploration Process Data
Exploration Process Data
 
Fidel Castro Khrushchev correspondence
Fidel Castro Khrushchev correspondenceFidel Castro Khrushchev correspondence
Fidel Castro Khrushchev correspondence
 
Nsp brochure
Nsp brochureNsp brochure
Nsp brochure
 
Levant Basin Neil Hodgson Spectrum Presentation
Levant Basin  Neil Hodgson Spectrum PresentationLevant Basin  Neil Hodgson Spectrum Presentation
Levant Basin Neil Hodgson Spectrum Presentation
 
Idive guide to_diving
Idive guide to_divingIdive guide to_diving
Idive guide to_diving
 
Harvest 4 Energy Fundamentals Dec 2014 EU
Harvest 4 Energy Fundamentals Dec 2014 EUHarvest 4 Energy Fundamentals Dec 2014 EU
Harvest 4 Energy Fundamentals Dec 2014 EU
 
Goliat Field Trip
Goliat Field TripGoliat Field Trip
Goliat Field Trip
 

Similar to Solar PV Net meetering explained

Grid connected Solar Rooftop
Grid connected Solar Rooftop Grid connected Solar Rooftop
Grid connected Solar Rooftop medors
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureSALMAN SAEED
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAbdul Haseeb
 
SaoBacDau Service BU3 Introduction
SaoBacDau Service BU3  IntroductionSaoBacDau Service BU3  Introduction
SaoBacDau Service BU3 IntroductionBuiXuanNgoc2
 
Newjersey solar pres
Newjersey solar presNewjersey solar pres
Newjersey solar presmarzan
 
roof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptxroof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptxsonu1811
 
Ev apartment consultation 5th aug 2021
Ev apartment consultation 5th aug 2021Ev apartment consultation 5th aug 2021
Ev apartment consultation 5th aug 2021SustainableEnergyAut
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Headway Solar
 
Community Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketCommunity Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketScottMadden, Inc.
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008ZAINI ABDUL WAHAB
 
Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Jay Ranvir
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Dr. Oliver Massmann
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Spark Network
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfJose Morales
 
Micro Generation And Selling Your Power
Micro Generation And Selling Your PowerMicro Generation And Selling Your Power
Micro Generation And Selling Your PowerStephen Rowley
 
Review permen 19 th 2016
Review permen 19 th 2016Review permen 19 th 2016
Review permen 19 th 2016Budi Supomo
 
Distribution open access Maharashtra
Distribution open access  MaharashtraDistribution open access  Maharashtra
Distribution open access MaharashtraJay Ranvir
 
July 2015 NEWS LETTER-HEG
July 2015 NEWS LETTER-HEGJuly 2015 NEWS LETTER-HEG
July 2015 NEWS LETTER-HEGRichard Rankin
 
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in VietnamDecision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in VietnamDo Tuan Phong
 

Similar to Solar PV Net meetering explained (20)

Grid connected Solar Rooftop
Grid connected Solar Rooftop Grid connected Solar Rooftop
Grid connected Solar Rooftop
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reforms
 
SaoBacDau Service BU3 Introduction
SaoBacDau Service BU3  IntroductionSaoBacDau Service BU3  Introduction
SaoBacDau Service BU3 Introduction
 
Newjersey solar pres
Newjersey solar presNewjersey solar pres
Newjersey solar pres
 
roof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptxroof top solar for net metering and gross metering.pptx
roof top solar for net metering and gross metering.pptx
 
Ev apartment consultation 5th aug 2021
Ev apartment consultation 5th aug 2021Ev apartment consultation 5th aug 2021
Ev apartment consultation 5th aug 2021
 
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
Policy on Net Metering for Grid Interactive Roof-Top Solar Photo Voltaic Powe...
 
Community Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth MarketCommunity Solar: Overview of an Emerging Growth Market
Community Solar: Overview of an Emerging Growth Market
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008
 
Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)
 
Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)Feed in-tariff regulations and getting wind power projects done (en)
Feed in-tariff regulations and getting wind power projects done (en)
 
Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013Gujarat Wind Power Policy 2013
Gujarat Wind Power Policy 2013
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdf
 
Micro Generation And Selling Your Power
Micro Generation And Selling Your PowerMicro Generation And Selling Your Power
Micro Generation And Selling Your Power
 
Review permen 19 th 2016
Review permen 19 th 2016Review permen 19 th 2016
Review permen 19 th 2016
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Distribution open access Maharashtra
Distribution open access  MaharashtraDistribution open access  Maharashtra
Distribution open access Maharashtra
 
July 2015 NEWS LETTER-HEG
July 2015 NEWS LETTER-HEGJuly 2015 NEWS LETTER-HEG
July 2015 NEWS LETTER-HEG
 
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in VietnamDecision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
Decision 13/2020/QD-TTg FIT2 of Solar Power Project in Vietnam
 

More from Andy Varoshiotis

Covid 19 DAN recommendations for Dive Centers
Covid 19 DAN recommendations for Dive CentersCovid 19 DAN recommendations for Dive Centers
Covid 19 DAN recommendations for Dive CentersAndy Varoshiotis
 
Scuba Diving Ear Equlization
Scuba Diving Ear Equlization Scuba Diving Ear Equlization
Scuba Diving Ear Equlization Andy Varoshiotis
 
Solarus Powercollectors Technical Brochure
Solarus Powercollectors Technical BrochureSolarus Powercollectors Technical Brochure
Solarus Powercollectors Technical BrochureAndy Varoshiotis
 
Solarus thermal-heating-system
Solarus thermal-heating-systemSolarus thermal-heating-system
Solarus thermal-heating-systemAndy Varoshiotis
 
Cyprus Oil & Gas Association May 2017
Cyprus Oil & Gas Association May 2017Cyprus Oil & Gas Association May 2017
Cyprus Oil & Gas Association May 2017Andy Varoshiotis
 
Cyprus Oil & Gas Association AGM agenda official
Cyprus Oil & Gas Association AGM agenda officialCyprus Oil & Gas Association AGM agenda official
Cyprus Oil & Gas Association AGM agenda officialAndy Varoshiotis
 
Power for all, Renewable Energy Declaration and statement
Power for all, Renewable Energy Declaration and statement Power for all, Renewable Energy Declaration and statement
Power for all, Renewable Energy Declaration and statement Andy Varoshiotis
 
Emergency FIrst Responder Presentation I Dive
Emergency FIrst Responder Presentation I Dive Emergency FIrst Responder Presentation I Dive
Emergency FIrst Responder Presentation I Dive Andy Varoshiotis
 
I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa
I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa
I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa Andy Varoshiotis
 
Harvard University Preventing nuclear terrorism
Harvard University Preventing nuclear terrorism Harvard University Preventing nuclear terrorism
Harvard University Preventing nuclear terrorism Andy Varoshiotis
 
Irena cyprus roadmap report
Irena cyprus roadmap reportIrena cyprus roadmap report
Irena cyprus roadmap reportAndy Varoshiotis
 
Harvard University Maugeri Global oil 2016
Harvard University Maugeri Global oil 2016Harvard University Maugeri Global oil 2016
Harvard University Maugeri Global oil 2016Andy Varoshiotis
 
Meep (aradippou) Environmental Study
Meep (aradippou) Environmental StudyMeep (aradippou) Environmental Study
Meep (aradippou) Environmental StudyAndy Varoshiotis
 
Drilling grade-barite-the-global-outlook-im-mag-january-2015
Drilling grade-barite-the-global-outlook-im-mag-january-2015Drilling grade-barite-the-global-outlook-im-mag-january-2015
Drilling grade-barite-the-global-outlook-im-mag-january-2015Andy Varoshiotis
 
Barite used in Drilling Fluids
Barite used in Drilling FluidsBarite used in Drilling Fluids
Barite used in Drilling FluidsAndy Varoshiotis
 
GE Small Scale Lng solutions
GE Small Scale  Lng solutionsGE Small Scale  Lng solutions
GE Small Scale Lng solutionsAndy Varoshiotis
 
Petronas floating lng satu
Petronas floating lng satuPetronas floating lng satu
Petronas floating lng satuAndy Varoshiotis
 

More from Andy Varoshiotis (20)

Covid 19 DAN recommendations for Dive Centers
Covid 19 DAN recommendations for Dive CentersCovid 19 DAN recommendations for Dive Centers
Covid 19 DAN recommendations for Dive Centers
 
Scuba Diving Ear Equlization
Scuba Diving Ear Equlization Scuba Diving Ear Equlization
Scuba Diving Ear Equlization
 
Solarus Powercollectors Technical Brochure
Solarus Powercollectors Technical BrochureSolarus Powercollectors Technical Brochure
Solarus Powercollectors Technical Brochure
 
Solarus thermal-heating-system
Solarus thermal-heating-systemSolarus thermal-heating-system
Solarus thermal-heating-system
 
Solarus Brochure 2017
Solarus Brochure 2017Solarus Brochure 2017
Solarus Brochure 2017
 
Cyprus Oil & Gas Association May 2017
Cyprus Oil & Gas Association May 2017Cyprus Oil & Gas Association May 2017
Cyprus Oil & Gas Association May 2017
 
COGA sponsorship pack agm
COGA sponsorship pack agmCOGA sponsorship pack agm
COGA sponsorship pack agm
 
Cyprus Oil & Gas Association AGM agenda official
Cyprus Oil & Gas Association AGM agenda officialCyprus Oil & Gas Association AGM agenda official
Cyprus Oil & Gas Association AGM agenda official
 
Power for all, Renewable Energy Declaration and statement
Power for all, Renewable Energy Declaration and statement Power for all, Renewable Energy Declaration and statement
Power for all, Renewable Energy Declaration and statement
 
Emergency FIrst Responder Presentation I Dive
Emergency FIrst Responder Presentation I Dive Emergency FIrst Responder Presentation I Dive
Emergency FIrst Responder Presentation I Dive
 
I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa
I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa
I Dive Tec Rec Centers Plc, Scuba Diving Protaras - Ayia Napa
 
Harvard University Preventing nuclear terrorism
Harvard University Preventing nuclear terrorism Harvard University Preventing nuclear terrorism
Harvard University Preventing nuclear terrorism
 
Irena cyprus roadmap report
Irena cyprus roadmap reportIrena cyprus roadmap report
Irena cyprus roadmap report
 
Harvard University Maugeri Global oil 2016
Harvard University Maugeri Global oil 2016Harvard University Maugeri Global oil 2016
Harvard University Maugeri Global oil 2016
 
Meep (aradippou) Environmental Study
Meep (aradippou) Environmental StudyMeep (aradippou) Environmental Study
Meep (aradippou) Environmental Study
 
Barit year book
Barit year bookBarit year book
Barit year book
 
Drilling grade-barite-the-global-outlook-im-mag-january-2015
Drilling grade-barite-the-global-outlook-im-mag-january-2015Drilling grade-barite-the-global-outlook-im-mag-january-2015
Drilling grade-barite-the-global-outlook-im-mag-january-2015
 
Barite used in Drilling Fluids
Barite used in Drilling FluidsBarite used in Drilling Fluids
Barite used in Drilling Fluids
 
GE Small Scale Lng solutions
GE Small Scale  Lng solutionsGE Small Scale  Lng solutions
GE Small Scale Lng solutions
 
Petronas floating lng satu
Petronas floating lng satuPetronas floating lng satu
Petronas floating lng satu
 

Recently uploaded

CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 

Recently uploaded (20)

CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 

Solar PV Net meetering explained

  • 1. Harvest 4 EnergyRenewable Energy Division Business and Domestic Energy Solutions • Solar Photovoltaic (PV) Systems • System Costs and Options • Net Metering • Application Process • Installation Requirements • Licencing Requirements • Easy Financing Solutions www.harvest4energy.com 2017
  • 2. Harvest 4 Energy Solutions • We don’t just make recommendations on our systems, we work with you through every step of the installation. We provide the hardware and software you need, plus offer financing to make it happen. And because we understand the value of partnership, we can easily collaborate with any third- party developers or technology vendors you choose to customize your system . • Lowering costs. Going green. Improving people’s lives. Every organization and household has unique goals. We figure out your energy strategy by evaluating how you use energy and its effect on way of consumption. • Gain energy independence by generating lower-cost, renewable solar energy on site. • In the next few slides we will navigate with you on the different options that fit your particular needs. www.harvest4energy.com 2
  • 3. Energy Conservation Energy is one of the largest overhead costs to any business and household, and can be a very complicated landscape to navigate. Upgrading to efficient equipment but continuing to operate in this fractured landscape is leaving money on the table. Here are three steps you can take towards digitizing your building or home and creating an intelligent energy environment. 1. Best in class LED not only saves you energy but can become the most ubiquitous intelligently enabled edge device throughout your enterprise. 2. Install a net metering Photovoltaic system ready for the smart grid. 3. Collect and integrate new and existing data throughout your building. Current’s digital energy management system runs on an industrial strength cloud platform as a single pane of glass to see exactly where and when energy is being used in real time 3 www.harvest4energy.com
  • 4. What is Net Metering? Net – metering is a billing arrangement where consumers who generate electricity on their residential premises with the use of Photovoltaic System may export the excess of this to the Electric Utility Grid and use it to offset electricity imported from the Grid to the premise during the applicable billing period. In case that the consumption exceeds the production, then the consumer will be billed the difference, while in the opposite case, the production surplus is transferred to be used in the following (forthcoming) two-month billing period. The final clearing will be stated on the last bill of the financial year (February-March). Any surplus may not be transferred to the next billing year. In cases of Residential Consumers, the metering may contain the electrical consumption of Storage Heaters if its is requested. The maximum power allowed per beneficiary according to the Governmental Scheme pronounced is 5kWp. 4 www.harvest4energy.com
  • 5. Application Process Eligible Applicants Right to apply has any Residential and Commercial Building. These investments regard instalments of Photovoltaic (PV) Systems on the roof of licensed domestic units (primary house) or buildings, in which local authorities are housed or on the ground of the plot in which the aforementioned building is located. In cases that the suggested installation place is of common use (e.g. blocks), then all owners must declare that they agree for the installation at the premises. Vulnerable Applicants Any individual falling in the category of vulnerable consumers according to the relevant order of the Ministry of Energy, Commerce, Industry and Tourism, or any recipient of the Single Parent Families Subsidy with annual gross family income €39,000, who is also a permanent resident in the domestic unit in which the Photovoltaic (PV) System is installed has the right to apply/is an eligible applicant. In this case the applicant is funded €900 per kWp installed, with maximum fund of €2,700 prior to submitting the relevant request and having obtained the permission by the Cyprus Institute of Energy. 5 www.harvest4energy.com
  • 6. Installation Requirements Photovoltaic system installation requirements The optimum installation parameters of a P/V system according to the geographic location of Cyprus, is South oriented with inclination of 28ο-30ο. Any divergence from these parameters affects the system output negatively resulting to the relevant divergence on the optimum economic return. The net area required for a P/V installation of 3kWp - 5kWp is approximately 25m² - 40m² if installed in a tiled roof or approximately 45m² - 75m² if installed on a flat roof/terrace. The installation is subject to the orders in force of the relevant House Planning Department. Annual Energy Yield The average annual energy yield of a Photovoltaic (PV) System with capacity of 5kWp, over a 20- year period, reaches 8,300kWh, equivalent to €1,660 compensation in electricity bills, based on the EAC residential tariff (€0,20/kWh). 6 www.harvest4energy.com
  • 7. Life Expectancy and Warranty 7 www.harvest4energy.com Photovoltaic (PV) System Life Expectancy The useful life of such P/V system exceeds 20 years. The Net Metering Contract with EAC is valid for 15 years for Residential Consumers and 10 years for Commercial Consumers. Harvest 4 Energy Ltd provides manufacturers written warranty for the Photovoltaic (PV) System delivered for every product and equipment used in the installation of the PV System. Photovoltaic Modules or Solar Panels have a written 10-year warranty by the manufacturer that the respective PV Module is free of material defects. Moreover manufacturers of PV Modules provide a 25-year performance warranty guarantee on every module. Solar inventers have a 5-year warranty by the manufacturer with extension right from 10 up to 20 years
  • 8. Licensing Requirements Licensing/Installation/Commissioning procedure The applications should be submitted to the EAC, which is the Distribution System Operator. (DSO). Upon the submission of his application, the applicant should pay the fee for the meter replacement. The current meter is replaced with a new one of bidirectional measurement (capability of double recording) to record the power produced by the Photovoltaic (PV) System which is Exported to the Grid , as well as the premises' energy consumption which is Imported from the Grid. EAC issues its approval/permission or its justified rejection of the application within seven (7) working days. In case the application is rejected, only €200 + V.A.T out of the amount paid for the replacement of the meter is returned to the applicant within twenty working days as of the rejection day. The amount of fifty euro (€50) withheld reflects the administration cost of the application by EAC. 8 www.harvest4energy.com
  • 9. Licensing Requirements 9 www.harvest4energy.com Subsequent to the installation of the Photovoltaic (PV) System, an application should be submitted to EAC for inspection and connection of the system with the utility Grid. EAC is responsible to schedule the inspection and the connection within a time period not exceeding 25 working days as of the submission day of the application for connection. Applicants should have completed the installation, the inspection and the connection of the Photovoltaic (PV) System to the Grid within 60 working days. In case that the installation, inspection and connection of the Photovoltaic (PV) system to the Grid System are not completed within the 60-day period set, then the approval obtained is no longer in force.
  • 10. Licensing Requirements Expenses / fees The prospective producer / consumer upon his application submission pays a lump sum of €250 + VAT, which is the administration cost of the application by EAC, the replacement cost of the meter and the inspection and connection cost of the Distribution System. The producer / consumer pays an annual fee to the Supplier of €47,23 + VAT per kWp, to offset the belayed/deferred production and consumption of power in the house. These charges are paid by the producer / consumer in six equal instalments and are included in the supplier's invoice, i.e. €7,87 + VAT per kWp of the P/V system. This fee is subject to future variations according to the rules and regulations published by the Cyprus Energy Regulatory Authority (CERA). Based on the Photovoltaic (PV) System's economic return expected, the payback period of the initial investment is estimated to be 5 years. 10 www.harvest4energy.com
  • 11. Documents required by the applicant 11 www.harvest4energy.com Copy of the last 6 utility bills or copy of the statement of the last twelve-month electricity consumption of the building, which is issued by EAC Customer Service Department. Copy of a recent EAC utility bill, in the applicant's name, which regards the domestic unit in which the P/V system will be installed. Copy of the Title Deed of the building in which the P/V system will be installed (In case the title has not been issued, a copy of the plot's ownership title and construction license should be attached) Building License Owners' consent for installation in case the owners are more than one, or the owner is not the applicant. Copy of the Plot Layout Plan of the area in which the house is located. Signed statement from the applicant that the domestic unit for which the application is submitted is used as a permanent first house. Permanent residence certification or six (6) recent EAC utility bills in the name of the applicant, in case he is not a Cypriot national. Proof that the applicant falls within the category of vulnerable consumers (applicable for consumers that fall in Vulnerable categories and are eligible for incentives) .
  • 12. Option 1 – Net Metering – Stable PV System –Turn Key Complete Photovoltaic System Solutions 12 Capacity Price Euro Vat 19% Total Cost Euro Yearly Benefit Euros Break Even Years EAC Fees Financed incl. EAC Fees Break Even Years 3KWP 4200 378 4578 900 5.00 297.5 5264.08 5.8 4KWP 5300 1007 6307 1300 4.85 297.5 7172.00 5.5 5KWP 6300 1197 7497 2000 3.74 297.5 8394.16 4.2 Luxor Pnl. 238 Solar Edg. 476 www.harvest4energy.com Important Note: The yearly benefit is based on current EAC charges and might change at any given time based on the kWp charges. • The Euro 297.5, EAC Fee is the application fee charged for evaluation and inspection and its once off and is not included in the price, except in the case of finance. In the above prices all systems are installed and inspected prior to delivery to client. • The Luxor Solar panels and the Solar edge inverter are optional. Price is based on a 3kWp system. • In case the roofs are gable based on ceramic tiles the brackets have an additional charge of Euro 200 + VAT for the 3kWp System.
  • 13. Option 1 – Net Metering (Financed) Stable PV System –Turn Key Complete Photovoltaic System Solutions 13 Capacity Price Euro Down Payment Balance Financed HP Interest Duration 2 Years Year 1-2 Interest Monthly Payment Year 1-2 Cost Year 1-10 Benefit 3KWP 4578 1500 3078 5.5% 3416.58 338.58 142.36 1708.32 900 4KWP 6307 1600 4707 5.5% 5224.72 517.72 217.70 2612.40 1300 5KWP 7497 2500 4997 5.5% 5546.66 549.66 231.12 2773.44 2000 A B C D E F G H I J www.harvest4energy.com • The yearly cost is for year 1 and 2 only which is the repayment period. • The yearly benefit over the life of the system is of a 10 year period which is under warranty. Additional extended warranty can be purchased with the contract. Benefit in Column J is x 10 years. i.e. 5kWp multiplied by (J) is Euro 20,000. The value of the yearly benefit is calculated based on EAC charges to consumers and might change without notice by EAC. • If the owner of the system is a legal entity, the VAT return, finance costs and depreciation costs can be an accounting benefit and are deductible. • A once off 50 Euro charge is added for stamp duties on the Hire Purchase contract.
  • 14. Net Metering Benefits – Illustration Complete Photovoltaic System Solutions based on a 3 Kwp system with current rates. 14 www.harvest4energy.com The calculated performance of a 3 Kwp installed capacity, far exceeds the 5000 kwh per year.
  • 15. Net Metering Installation – Schematics Complete Photovoltaic System Solutions 15 www.harvest4energy.com Optional Battery StorageTypical Installation
  • 18. Luxor Solar Panels - Indicative 18 www.harvest4energy.com
  • 19. System Components Solar Panels Indicative 19 www.harvest4energy.com
  • 20. System Components Mounting systems for illustration 20 www.harvest4energy.com
  • 21. System Components and Options 21 www.harvest4energy.com
  • 22. HARVEST IS SOCIAL! • Stay up-to-date with H4E. “Like” us on Facebook! Search for Harvest4energy, and check out all we’ve got going on! • Follow us on Twitter. We share the latest energy news from around the country, @harvest4energy • Follow us on Instagram and check out the photos taken at H4E events, instagram.com/harvest4energy • Follow us on Pinterest and pin ideas to use in your classroom, Pinterest.com/harvest4energy Exploring Solar – harvest4energy www.harvest4energy.com
  • 23. 23www.harvest4energy.com THANK YOU FOR YOUR ATTENTION Harvest 4 Energy Ltd 21 Demosthenis Severis Avenue Fourth Floor Nicosia 1080 Cyprus Mob: +357 99689961 avaroshiotis@harvest4energy.com avaroshiotis@cyoilgas.org THIS REPORT IS NOT TO BE PUBLISHED ON ANY PUBLIC DOMAIN All Rights Reserved – Harvest 4 Energy Ltd 2013-2017