ANIL KUMAR INABATHINI
Position:- Quantity Surveyor
E-mail: inabathinianilmar@gmail.com
Mobile: +91-9100980441,+91-9642391807
Key Experience:-
 Having more than 3 year’s professional experience in Quantity Surveying and
Procurement, Contract Management, Project Monitoring & Execution in India and
international.
 To study the contract documents such as conditions of contracts, special conditions of
contract, general specifications, and special specifications, correspondence with client
and consultant related contractual claims and EOT claims, To ensure the preparation
of measurements for various items as per standard mode and contract specifications
from site quantity surveyors to be submitted each month for the monthly evaluation,
Ensure the measurements of work to update the change control register time to time
for future reference of variations, Ensure the preparation risk registers from site
QS,Liaison with cost consultant for contractual issues like Preparation of pricing
analysis for variation item. Submission of variation claims and rate analysis and
finalization of the claim to get variation order. Submission of insurance claim and
settlement of the claim. Dealing with the contractual issues and letter correspondence
to it, Dealing with subcontract procurement, final certification of sub contractor bill as
per terms of subcontract agreements, Finalization of cash flows and compilation of
reports from projects assigned to the unit for finalizing the unit MIS reports,
Preparation of Budget, To ensure the preparation of quotations for the enquires
received from the other contractors or third party jobs.
 Diverse experience in finance, contracts, analysis, tender evaluation, negotiation and
finalization of subcontracts, budgeting, extension of time-issues, locating work scope
ambiguities and discrepancies in schedules, identification, negotiation and resolution
of claims.
 Preparation of bills of quantities and checking of the same and also doing quantity
measurements, rate analysis, quantity surveying and processing of invoices, examine
contractor’s claims and variation orders, prepare progress reports, getting levels and
measurements checked in all items of works at different stages for certifying payment,
assist in verification and certification of completed works, estimation, bill of
quantities, costing of works, project completion schedules. Also involved in
preparation and checking of invoices, monthly and fortnightly progress reports.
EDUCATIONAL QUALIFICATIONS:
● B. Tech(Civil) with77.12%:
In Bapatla Engineering College, (Affiliated by: A.N.U Guntur)
Bapatla,Guntur.
● Diploma In Civil Engineering Course with 88.20%:
D.A.Govt.Polytechnic,
Ongole, Andhra Pradesh.
EXPERIENCE:
● From July 2015 to Till to date in BSCPL-IL as a Junior Engineer ( Planning Engineer
Cum Quantity Surveyor).
Project Name:-Rehabilitation & Upgradation of NH-67 from km 695+000 to Km741+950
(Atmakur to Nellore Section ) to two lane with paved shoulder in the state of Andhra Pradesh
under through Engineering ,Procurement & Construction (EPC) Basis Contract.
Project Cost:-251.510 Crores
Client:- Govt. Andhrapradesh R&B (NHAI)
Consultant:- EGIS India Consulting Engineers PVT Ltd
EPC Contractor : BSCPL Infrastructure Limited
Roles & Responsibilities:
 Responsible for Checking of Interim payment certificate, Variation orders and
estimation of quantities, rate analysis, construction supervision and liaison with the
client, preparation of formats for progress monitoring, assist Project Manager in
evaluation of construction programme submitted by consultant, verification of the
BOQ estimate, issue of variation orders and verification of claims submitted by
contractor. Also responsible for progress monitoring and suggesting measures
required, controlling the project cost and time over-run, developing the Performa and
checking of methodology statement.
● From Oct 2013 July 2015 in BSCPL-IL as a Graduate Engineer Trainee Planning
Engineer Cum Quantity Surveyor.
Project Name:- : Four laning of Orissa Boarder –Aurang Section from 88/000 KM to
239/000 of NH-6 in the State of Chhattisgarh to be executed as BOT (Toll) on DBFOT
Pattern Under NHDP phase-IV
Project Cost:- 1020 Crores
Client:- NHAI
Concessionaire :BSCPL Aurang Tollway Limited
EPC Contractor: BSCPL Infrastructure Limited
Consultants:- Aarvee Associates Architects Engineers & Consultants Private Ltd
Roles & Responsibilities:
 Maintaining the Daily Progress Reports.
 Handling the Consultants and closing the RFI’s with particular status of work which
was said by the Site Engineers.
 Preparation of Rate Analysis
 Preparing of Monthly Progress reports.
 Update information will be given to my Superiors regarding my work.
Technical Software’s:
The following courses were well known by me:-
● Road Estimator
● STADD-PRO
● AUTOCAD
● Ms-Office
PERSONAL DETAILS:
Name : Anil Kumar Inabathini
Father’s Name : Nageswara Rao.I
Sex : Male
Date of Birth : 23-01-1986
Marial Status : Married
Nationality : Indian
Languages Known : English, Hindi and Telugu
Hobbies : Listening music, playing caroms.
DECLARATION:
I hereby state that the above mentioned information is true to the best of my knowledge and
bear the responsibility for the correctness of the above-mentioned particulars.
Date: (ANIL KUMAR INABATHINI)

More Related Content

What's hot

Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveyinggeddolan
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorLY97
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purposeAbhijeet Bhosale
 
Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...thomassterling
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sumEst
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxmkyong1996
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)Jy Chong
 
Quantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningQuantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningGalala University
 
Civil Quantity Survey and Estimation
Civil Quantity Survey and EstimationCivil Quantity Survey and Estimation
Civil Quantity Survey and EstimationGide India
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying courseTalhaMalik58
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 meuxuanong
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)Js Cheok
 

What's hot (20)

Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
 
Raman Rezaei Infographic
Raman Rezaei InfographicRaman Rezaei Infographic
Raman Rezaei Infographic
 
Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...
 
M3 Lecture 11 provisional sum prime cost sum
M3 Lecture 11 provisional sum  prime cost sumM3 Lecture 11 provisional sum  prime cost sum
M3 Lecture 11 provisional sum prime cost sum
 
Ici magazine
Ici magazineIci magazine
Ici magazine
 
ICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptxICI ITD QS PROJECT 1 (1).pptx
ICI ITD QS PROJECT 1 (1).pptx
 
CV Durga Prasad Rao P
CV Durga Prasad Rao PCV Durga Prasad Rao P
CV Durga Prasad Rao P
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
Quantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningQuantity Surveying & Cost Planning
Quantity Surveying & Cost Planning
 
cp civil (1)
cp civil (1)cp civil (1)
cp civil (1)
 
Civil Quantity Survey and Estimation
Civil Quantity Survey and EstimationCivil Quantity Survey and Estimation
Civil Quantity Survey and Estimation
 
Quantity surveying course
Quantity surveying courseQuantity surveying course
Quantity surveying course
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Safnas_QS_Resume
Safnas_QS_ResumeSafnas_QS_Resume
Safnas_QS_Resume
 
jeremiah lukwesa kaluba
jeremiah lukwesa kalubajeremiah lukwesa kaluba
jeremiah lukwesa kaluba
 
Itd project one (a) 4 m
Itd project one (a) 4 mItd project one (a) 4 m
Itd project one (a) 4 m
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 

Viewers also liked (10)

Tiscar
TiscarTiscar
Tiscar
 
Projeto prnto para o blog
Projeto prnto para o blogProjeto prnto para o blog
Projeto prnto para o blog
 
Didactica
DidacticaDidactica
Didactica
 
Ms word
Ms wordMs word
Ms word
 
EduBlogs!
EduBlogs!EduBlogs!
EduBlogs!
 
Агрогенные аккумулятивные почвы
Агрогенные аккумулятивные почвыАгрогенные аккумулятивные почвы
Агрогенные аккумулятивные почвы
 
Agency
AgencyAgency
Agency
 
gokulresume60
gokulresume60gokulresume60
gokulresume60
 
Graffiti
Graffiti Graffiti
Graffiti
 
EDAD MODERNA
EDAD MODERNAEDAD MODERNA
EDAD MODERNA
 

Similar to Anil Resume (20)

Unnikrishnan_CV-
Unnikrishnan_CV-Unnikrishnan_CV-
Unnikrishnan_CV-
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
Resume
ResumeResume
Resume
 
RESUME.1
RESUME.1RESUME.1
RESUME.1
 
CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015CV SHIRISH 1-1-2015
CV SHIRISH 1-1-2015
 
C.V. as on Date
C.V. as on DateC.V. as on Date
C.V. as on Date
 
Resume Narenth Natarajan
Resume Narenth NatarajanResume Narenth Natarajan
Resume Narenth Natarajan
 
Curriculum Vitae (Muzzafar)
Curriculum Vitae (Muzzafar)Curriculum Vitae (Muzzafar)
Curriculum Vitae (Muzzafar)
 
Project Planning & Control Engineer
Project Planning & Control EngineerProject Planning & Control Engineer
Project Planning & Control Engineer
 
Ajay Latest CV
Ajay Latest CVAjay Latest CV
Ajay Latest CV
 
Anna Riyell A. de Lara (Quantity Surveyor) - (10.1.16)
Anna Riyell A. de Lara (Quantity Surveyor) - (10.1.16)Anna Riyell A. de Lara (Quantity Surveyor) - (10.1.16)
Anna Riyell A. de Lara (Quantity Surveyor) - (10.1.16)
 
111
111111
111
 
Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran H K 17-06-2016
Kiran H K 17-06-2016
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Resume
ResumeResume
Resume
 
madhu updated cv
madhu updated cvmadhu updated cv
madhu updated cv
 
Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
Subhash CV Dec 2016
Subhash CV Dec 2016Subhash CV Dec 2016
Subhash CV Dec 2016
 
Amol-KulkarniResume
Amol-KulkarniResumeAmol-KulkarniResume
Amol-KulkarniResume
 
Venkatesh- planning CV
Venkatesh- planning CVVenkatesh- planning CV
Venkatesh- planning CV
 

Anil Resume

  • 1. RESUME ANIL KUMAR INABATHINI Position:- Quantity Surveyor E-mail: inabathinianilmar@gmail.com Mobile: +91-9100980441,+91-9642391807 Key Experience:-  Having more than 3 year’s professional experience in Quantity Surveying and Procurement, Contract Management, Project Monitoring & Execution in India and international.  To study the contract documents such as conditions of contracts, special conditions of contract, general specifications, and special specifications, correspondence with client and consultant related contractual claims and EOT claims, To ensure the preparation of measurements for various items as per standard mode and contract specifications from site quantity surveyors to be submitted each month for the monthly evaluation, Ensure the measurements of work to update the change control register time to time for future reference of variations, Ensure the preparation risk registers from site QS,Liaison with cost consultant for contractual issues like Preparation of pricing analysis for variation item. Submission of variation claims and rate analysis and finalization of the claim to get variation order. Submission of insurance claim and settlement of the claim. Dealing with the contractual issues and letter correspondence to it, Dealing with subcontract procurement, final certification of sub contractor bill as per terms of subcontract agreements, Finalization of cash flows and compilation of reports from projects assigned to the unit for finalizing the unit MIS reports, Preparation of Budget, To ensure the preparation of quotations for the enquires received from the other contractors or third party jobs.  Diverse experience in finance, contracts, analysis, tender evaluation, negotiation and finalization of subcontracts, budgeting, extension of time-issues, locating work scope ambiguities and discrepancies in schedules, identification, negotiation and resolution of claims.  Preparation of bills of quantities and checking of the same and also doing quantity measurements, rate analysis, quantity surveying and processing of invoices, examine contractor’s claims and variation orders, prepare progress reports, getting levels and measurements checked in all items of works at different stages for certifying payment, assist in verification and certification of completed works, estimation, bill of quantities, costing of works, project completion schedules. Also involved in preparation and checking of invoices, monthly and fortnightly progress reports. EDUCATIONAL QUALIFICATIONS: ● B. Tech(Civil) with77.12%: In Bapatla Engineering College, (Affiliated by: A.N.U Guntur) Bapatla,Guntur. ● Diploma In Civil Engineering Course with 88.20%: D.A.Govt.Polytechnic, Ongole, Andhra Pradesh.
  • 2. EXPERIENCE: ● From July 2015 to Till to date in BSCPL-IL as a Junior Engineer ( Planning Engineer Cum Quantity Surveyor). Project Name:-Rehabilitation & Upgradation of NH-67 from km 695+000 to Km741+950 (Atmakur to Nellore Section ) to two lane with paved shoulder in the state of Andhra Pradesh under through Engineering ,Procurement & Construction (EPC) Basis Contract. Project Cost:-251.510 Crores Client:- Govt. Andhrapradesh R&B (NHAI) Consultant:- EGIS India Consulting Engineers PVT Ltd EPC Contractor : BSCPL Infrastructure Limited Roles & Responsibilities:  Responsible for Checking of Interim payment certificate, Variation orders and estimation of quantities, rate analysis, construction supervision and liaison with the client, preparation of formats for progress monitoring, assist Project Manager in evaluation of construction programme submitted by consultant, verification of the BOQ estimate, issue of variation orders and verification of claims submitted by contractor. Also responsible for progress monitoring and suggesting measures required, controlling the project cost and time over-run, developing the Performa and checking of methodology statement. ● From Oct 2013 July 2015 in BSCPL-IL as a Graduate Engineer Trainee Planning Engineer Cum Quantity Surveyor. Project Name:- : Four laning of Orissa Boarder –Aurang Section from 88/000 KM to 239/000 of NH-6 in the State of Chhattisgarh to be executed as BOT (Toll) on DBFOT Pattern Under NHDP phase-IV Project Cost:- 1020 Crores Client:- NHAI Concessionaire :BSCPL Aurang Tollway Limited EPC Contractor: BSCPL Infrastructure Limited Consultants:- Aarvee Associates Architects Engineers & Consultants Private Ltd Roles & Responsibilities:  Maintaining the Daily Progress Reports.  Handling the Consultants and closing the RFI’s with particular status of work which was said by the Site Engineers.  Preparation of Rate Analysis  Preparing of Monthly Progress reports.  Update information will be given to my Superiors regarding my work. Technical Software’s: The following courses were well known by me:- ● Road Estimator ● STADD-PRO ● AUTOCAD
  • 3. ● Ms-Office PERSONAL DETAILS: Name : Anil Kumar Inabathini Father’s Name : Nageswara Rao.I Sex : Male Date of Birth : 23-01-1986 Marial Status : Married Nationality : Indian Languages Known : English, Hindi and Telugu Hobbies : Listening music, playing caroms. DECLARATION: I hereby state that the above mentioned information is true to the best of my knowledge and bear the responsibility for the correctness of the above-mentioned particulars. Date: (ANIL KUMAR INABATHINI)