2. Safe harbor statement
The following is intended to outline our general product direction. It is intended for information
purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any
material, code, or functionality, and should not be relied upon in making purchasing decisions. The
development, release, timing, and pricing of any features or functionality described for Oracleās
products may change and remains at the sole discretion of Oracle Corporation.
28. Secondary failure consideration can influence
which node survives. Secondary failure
consideration will be enhanced successively.
30
Smarter Eviction with Node Weighting
A fallback scheme
is applied if considerations do not
lead to an actionable outcome.
Public network card failure.Public network card failure.
35. During planned shutdown
ā¢ Distribute Resource Masters before
shutdown
ā¢ Distribution before shutdown does not
require any recovery on the surviving
instances
ā¢ Effectively reduces the time spent on
reconfiguration during planned outages
to zero
ā¢ During unplanned outages
ā¢ Rolling Windows to reduce impact
of reconfiguration
ā¢ During runtime
ā¢ Smart DRM
Zero Downtime for Planned outages
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
B BB B
M MM M
M MM M
M MM M
M MM M
M MM M
M MM M
M MM M
M MM M
Global Resource Directory
B Buffer M MasterB M