Introduction
Highway engineering is an engineering discipline branching
from civil engineering that involves the planning, design,
construction, operation, and maintenance of roads, bridges,
and tunnels to ensure safe and effective transportation of
people and goods.
A highway pavement is a structure consisting of
superimposed layers of processed materials. The pavement
structure should be able to provide a surface of acceptable
riding quality, adequate skid resistance, favorable light
reflecting characteristics, and low noise pollution.
Rigid Pavement
Rigid pavements have sufficient flexural strength to transmit the
wheel load stresses to a wider area below. In rigid pavement, load
is distributed by the slab action, Rigid pavements are constructed
by Portland cement concrete (PCC) and should be analyzed by
plate theory instead of layer theory. Plate theory is a simplified
version of layer theory that assumes the concrete slab as a
medium thick plate which is plane before loading and to remain
plane after loading. Bending of the slab due to wheel load and
temperature variation and the resulting tensile and flexural
stress.
Factors Affecting Pavement
Performances :-
๏ถ Traffic- Contact pressure,
Wheel load, Axle configuration ,
Moving loads.
๏ถ Structural Model- Layer
elastic model.
๏ถ Material Characterization.
๏ถ Environmental Factors-
Temperature, Moisture.
Common Rigid Pavement Distresses
๏‚ง Spalling
๏‚ง Faulting
๏‚ง Cracking
๏‚ง Longitudinal cracks
๏‚ง Slab cracking
๏‚ง Durability โ€œDโ€
cracking
Common Rigid Pavement Distresses
๏‚ง Polished
Aggregates
๏‚ง Pop-outs
๏‚ง Blow Ups
๏‚ง Pumping and
water bleeding
๏‚ง Shrinkage
Cracking
Spalling at theJoint
Cracking, breaking or chipping of
joint/crack edges. Usually occurs
within about 0.6 m (2 ft.) of
joint/crack edge.
Loose debris on the pavement,
roughness, generally an indicator
of advanced joint/crack
deterioration.
Excessive stresses at the
joint/crack caused by infiltration of
incompressible materials and
subsequent expansion (can also
cause blowups).
Faulting
A difference in elevation across a joint
or crack usually associated with
undoweled JPCP. Usually the approach
slab is higher than the leave slab due to
pumping, the most common faulting
mechanism. Faulting is noticeable
when the average faulting in the
pavement section reaches about 2.5 mm
(0.1 inch). When the average faulting
reaches 4 mm (0.15 in), diamond
grinding or other rehabilitation
measures should be considered.
Faulting โ€“ looking in the opposite
direction of traffic flow.
Faulting close-up
LongitudinalCracking
Longitudinal cracks not
associated with corner
breaks or blowups that
extend across the entire slab.
Typically, these cracks
divide an individual slab
into two to four pieces.
Often referred to as โ€œpanel
crackingโ€.
CornerCracking
A crack that intersects the PCC
slab joints near the corner. โ€œNear
the cornerโ€ is typically defined as
within about 2 m (6 ft) or so. A
corner break extends through the
entire slab and is caused by high
corner stresses.
Severe corner stresses caused
by load repetitions combined with
a loss of support, poor load
transfer across the joint, curling
stresses and warping stresses.
DurabilityCracking
Series of closely spaced,
crescent-shaped cracks near
a joint, corner or crack. It is
caused by freeze-thaw
expansion of the large
aggregate within the PCC
slab. Durability cracking is
a general PCC distress and
is not unique to pavement
PCC.
Some roughness leads
to spalling and eventual slab
disintegration.
Polished Aggregate
Areas of pavement (either
PCC or HMA) where the portion
of aggregate extending above the
asphalt binder (in the case of
HMA) or cement paste (in the case
of PCC) is either very small or
there are no rough or angular
aggregate particles.
Repeated traffic
applications. Generally, as a
pavement ages the protruding
rough, angular particles become
polished. This can occur quicker if
the aggregate is susceptible to
abrasion or subject to
excessive studded wear and tear.
Polished PCC aggregate after 40 years
of wear.
Close up of polished Hot Mix Asphalt
aggregate
Popouts
Small pieces of PCC that break
loose from the surface leaving small
divots or pock marks. Pop outs
range from 25 โ€“ 100 mm (1 โ€“ 4
inches) in diameter and from 25 โ€“ 50
mm (1 โ€“ 2 inches) deep.
Pop outs usually occur as a
result of poor aggregate durability.
Poor durability can be a result of a
number of items such as:
๏‚ง Poor aggregate freeze-thaw
resistance.
๏‚ง Expansive aggregates.
๏‚ง Alkali-aggregate reactions.
Large pop outs.
Pop out close-up.
Blow-ups
A localized upward slab movement and shattering at a joint or crack. Usually
occurs in spring or summer and is the result of insufficient room for slab
expansion during hot weather.
During cold periods (e.g., winter) PCC slabs contract leaving wider
joint openings. If these openings become filled with incompressible material
(such as rocks or soil), subsequent PCC slab expansion during hot periods (e.g.,
spring, summer) may cause high compressive stresses. If these stresses are
great enough, the slabs may buckle and shatter to relieve the stresses. Blowup
can be accelerated by:
๏‚ง Joint Spalling (reduces slab contact area and provides incompressible
material to fill the joint/crack).
๏‚ง D-Cracking (weakens the slab near the joint/crack area).
๏‚ง Freeze-thaw damage (weakens the slab near the joint/crack area).
Pumping and Water Bleeding
Movement of material underneath the slab or ejection of material from
underneath the slab as a result of water pressure. Water accumulated
underneath a PCC slab will pressurize when the slab deflects under
load. This pressurized water can do one of the following:
๏‚ง Move about under the slab.
๏‚ง Move from underneath one slab to underneath an adjacent slab. This
type of movement leads to faulting.
๏‚ง Move out from underneath the slab to the pavement surface. This
results in a slow removal of base, sub-base and/or subgrade material
from underneath the slab resulting in decreased structural support.
Shrinkage Cracking
Hairline cracks formed during PCC setting and curing that are not
located at joints. Usually, they do not extend through the entire depth
of the slab. Shrinkage cracks are considered a distress if they occur in
an uncontrolled manner (e.g., at locations outside of contraction joints
in JPCP or too close together in CRCP).
Possible causes-
๏‚ง Contraction joints sawed too late.
๏‚ง Poor reinforcing steel design.
๏‚ง Improper curing technique.
๏‚ง High early strength PCC.
Maintenance And Rehabilitation
The combined effects of traffic loading and
the environment will cause every pavement, no matter
how well-designed/constructed to deteriorate over
time. Maintenance and rehabilitation are what we use
to slow down or reset this deterioration
process. Maintenance actions, such as crack
sealing, joint sealing, fog seals and patching help slow
the rate of deterioration by identifying and addressing
specific pavement deficiencies that contribute to overall
deterioration. Rehabilitation is the act of repairing
portions of an existing pavement to reset the
deterioration process. For instance, removing and
replacing the wearing course in a pavement provides
new wearing course material on which the deterioration
process begins anew.
This Module discusses the maintenance options
for HMA and PCC pavement.
Conclusion
Rigid Pavement Distress is a serious issue all over the
world, The distresses causes some serious problems at
wide range. Prevention of rigid pavement distress is a
challenge to the Engineers. Maintenance and
Rehabilitation is to be properly done to prevent the
distresses in rigid pavement.
References
โ€ข โ€œSlab Replacement Guidelines,โ€ Caltrans, January 2003
โ€ข โ€œDistress Identification Manual for the Long-Term Pavement
Performance Program,โ€ FHWA, June 2003
โ€ข http://www.pavementinteractive.org/
โ€ข https://www.google.co.in/search?q=rigid+pavement
Rigid pavement distress

More Related Content

What's hot

Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
HARITSEHRAWAT
ย 

What's hot (20)

Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
ย 
Design of flexible pavement
Design of flexible pavementDesign of flexible pavement
Design of flexible pavement
ย 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
ย 
First 20 year road plan /nagpur road plan
First  20 year road plan /nagpur road planFirst  20 year road plan /nagpur road plan
First 20 year road plan /nagpur road plan
ย 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
ย 
Importance of highway maintenance
Importance of highway maintenanceImportance of highway maintenance
Importance of highway maintenance
ย 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
ย 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
ย 
Construction of rigid pavement
Construction of rigid pavementConstruction of rigid pavement
Construction of rigid pavement
ย 
Flexible pavement presentation
Flexible pavement presentationFlexible pavement presentation
Flexible pavement presentation
ย 
Highway And traffic Engineering
Highway And traffic EngineeringHighway And traffic Engineering
Highway And traffic Engineering
ย 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
ย 
Dense Bituminous macadam
Dense Bituminous macadamDense Bituminous macadam
Dense Bituminous macadam
ย 
Soil stabilisation (1)
Soil stabilisation (1)Soil stabilisation (1)
Soil stabilisation (1)
ย 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
ย 
BITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPTBITUMINOUS PAVING MIXES PPT
BITUMINOUS PAVING MIXES PPT
ย 
Embankment
EmbankmentEmbankment
Embankment
ย 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
ย 
Project report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash GargProject report file on construction of flexible pavement by Harshit Prakash Garg
Project report file on construction of flexible pavement by Harshit Prakash Garg
ย 
Dowel bars, tie bars and their design
Dowel bars, tie bars and their designDowel bars, tie bars and their design
Dowel bars, tie bars and their design
ย 

Similar to Rigid pavement distress

Types of crack-Amit Payal
Types of crack-Amit PayalTypes of crack-Amit Payal
Types of crack-Amit Payal
AMIT PAYAL
ย 
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptxTYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
rathankumar1213
ย 
Assignment concrete pavement distresses
Assignment concrete pavement distressesAssignment concrete pavement distresses
Assignment concrete pavement distresses
Shuhaib Mohammed
ย 

Similar to Rigid pavement distress (20)

rigid pavement distress
rigid pavement distressrigid pavement distress
rigid pavement distress
ย 
Pdce
PdcePdce
Pdce
ย 
highway maintenance and evaluation
highway maintenance and evaluation highway maintenance and evaluation
highway maintenance and evaluation
ย 
Highway Failure & their Maintenance Final Project.pptx
Highway Failure & their Maintenance Final Project.pptxHighway Failure & their Maintenance Final Project.pptx
Highway Failure & their Maintenance Final Project.pptx
ย 
rigid pavement stresses.pptx
rigid pavement stresses.pptxrigid pavement stresses.pptx
rigid pavement stresses.pptx
ย 
Ishfaq Rashid.pptx
Ishfaq Rashid.pptxIshfaq Rashid.pptx
Ishfaq Rashid.pptx
ย 
Presentation distress of rigid pavement.pptx
Presentationdistress of rigid pavement.pptxPresentationdistress of rigid pavement.pptx
Presentation distress of rigid pavement.pptx
ย 
Types of crack-Amit Payal
Types of crack-Amit PayalTypes of crack-Amit Payal
Types of crack-Amit Payal
ย 
Flexible pavement failure
Flexible pavement failureFlexible pavement failure
Flexible pavement failure
ย 
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptxTYPES OF JOINTS- SEMINAR PRESENTATION.pptx
TYPES OF JOINTS- SEMINAR PRESENTATION.pptx
ย 
Deterioration of concrete by Sharif Ullah Khan Wazir
Deterioration of concrete by Sharif Ullah Khan WazirDeterioration of concrete by Sharif Ullah Khan Wazir
Deterioration of concrete by Sharif Ullah Khan Wazir
ย 
Strength assessment techniques
Strength assessment techniquesStrength assessment techniques
Strength assessment techniques
ย 
pile wall
pile wallpile wall
pile wall
ย 
Freeze and Thaw and Seismicity Geotechnical presentation
Freeze and Thaw and Seismicity Geotechnical presentationFreeze and Thaw and Seismicity Geotechnical presentation
Freeze and Thaw and Seismicity Geotechnical presentation
ย 
Assignment concrete pavement distresses
Assignment concrete pavement distressesAssignment concrete pavement distresses
Assignment concrete pavement distresses
ย 
Ground improvement technic and repair procedures.pdf
Ground improvement technic and repair procedures.pdfGround improvement technic and repair procedures.pdf
Ground improvement technic and repair procedures.pdf
ย 
Failures in flexible and rigid pavement
Failures in flexible and rigid pavementFailures in flexible and rigid pavement
Failures in flexible and rigid pavement
ย 
Distress in Pavement Full.pptx
Distress in Pavement Full.pptxDistress in Pavement Full.pptx
Distress in Pavement Full.pptx
ย 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
ย 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
ย 

More from Ankit Sarkar (7)

Corporate Law in built Environment presentation
Corporate Law in built Environment presentationCorporate Law in built Environment presentation
Corporate Law in built Environment presentation
ย 
Voltas turnaround strategy management case
Voltas turnaround strategy management caseVoltas turnaround strategy management case
Voltas turnaround strategy management case
ย 
VCF RRTS Future city part 2 TOD RRTS ppt
VCF RRTS Future city part 2 TOD RRTS pptVCF RRTS Future city part 2 TOD RRTS ppt
VCF RRTS Future city part 2 TOD RRTS ppt
ย 
Leadership qualities in built environment.pptx
Leadership qualities in built environment.pptxLeadership qualities in built environment.pptx
Leadership qualities in built environment.pptx
ย 
Sustainable develpoment
Sustainable develpomentSustainable develpoment
Sustainable develpoment
ย 
Nuclear Energy
Nuclear EnergyNuclear Energy
Nuclear Energy
ย 
Ozone layer depletion
Ozone layer depletionOzone layer depletion
Ozone layer depletion
ย 

Recently uploaded

Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 

Recently uploaded (20)

Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
ย 
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort ServiceCall Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
Call Girls in Ramesh Nagar Delhi ๐Ÿ’ฏ Call Us ๐Ÿ”9953056974 ๐Ÿ” Escort Service
ย 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
ย 

Rigid pavement distress

  • 1. RIGID PAVEMENT DISTRESS NAME- ARCHA BHATTACHARJEE ROLL NUMBER- 16501313004 DEPARTMENT OF CIVIL ENGINEERING C.I.E.M Under guidance of Professor- Sk. Sohel Islam
  • 2. Introduction Highway engineering is an engineering discipline branching from civil engineering that involves the planning, design, construction, operation, and maintenance of roads, bridges, and tunnels to ensure safe and effective transportation of people and goods. A highway pavement is a structure consisting of superimposed layers of processed materials. The pavement structure should be able to provide a surface of acceptable riding quality, adequate skid resistance, favorable light reflecting characteristics, and low noise pollution.
  • 3. Rigid Pavement Rigid pavements have sufficient flexural strength to transmit the wheel load stresses to a wider area below. In rigid pavement, load is distributed by the slab action, Rigid pavements are constructed by Portland cement concrete (PCC) and should be analyzed by plate theory instead of layer theory. Plate theory is a simplified version of layer theory that assumes the concrete slab as a medium thick plate which is plane before loading and to remain plane after loading. Bending of the slab due to wheel load and temperature variation and the resulting tensile and flexural stress.
  • 4. Factors Affecting Pavement Performances :- ๏ถ Traffic- Contact pressure, Wheel load, Axle configuration , Moving loads. ๏ถ Structural Model- Layer elastic model. ๏ถ Material Characterization. ๏ถ Environmental Factors- Temperature, Moisture.
  • 5. Common Rigid Pavement Distresses ๏‚ง Spalling ๏‚ง Faulting ๏‚ง Cracking ๏‚ง Longitudinal cracks ๏‚ง Slab cracking ๏‚ง Durability โ€œDโ€ cracking
  • 6. Common Rigid Pavement Distresses ๏‚ง Polished Aggregates ๏‚ง Pop-outs ๏‚ง Blow Ups ๏‚ง Pumping and water bleeding ๏‚ง Shrinkage Cracking
  • 7. Spalling at theJoint Cracking, breaking or chipping of joint/crack edges. Usually occurs within about 0.6 m (2 ft.) of joint/crack edge. Loose debris on the pavement, roughness, generally an indicator of advanced joint/crack deterioration. Excessive stresses at the joint/crack caused by infiltration of incompressible materials and subsequent expansion (can also cause blowups).
  • 8. Faulting A difference in elevation across a joint or crack usually associated with undoweled JPCP. Usually the approach slab is higher than the leave slab due to pumping, the most common faulting mechanism. Faulting is noticeable when the average faulting in the pavement section reaches about 2.5 mm (0.1 inch). When the average faulting reaches 4 mm (0.15 in), diamond grinding or other rehabilitation measures should be considered. Faulting โ€“ looking in the opposite direction of traffic flow. Faulting close-up
  • 9. LongitudinalCracking Longitudinal cracks not associated with corner breaks or blowups that extend across the entire slab. Typically, these cracks divide an individual slab into two to four pieces. Often referred to as โ€œpanel crackingโ€.
  • 10. CornerCracking A crack that intersects the PCC slab joints near the corner. โ€œNear the cornerโ€ is typically defined as within about 2 m (6 ft) or so. A corner break extends through the entire slab and is caused by high corner stresses. Severe corner stresses caused by load repetitions combined with a loss of support, poor load transfer across the joint, curling stresses and warping stresses.
  • 11. DurabilityCracking Series of closely spaced, crescent-shaped cracks near a joint, corner or crack. It is caused by freeze-thaw expansion of the large aggregate within the PCC slab. Durability cracking is a general PCC distress and is not unique to pavement PCC. Some roughness leads to spalling and eventual slab disintegration.
  • 12. Polished Aggregate Areas of pavement (either PCC or HMA) where the portion of aggregate extending above the asphalt binder (in the case of HMA) or cement paste (in the case of PCC) is either very small or there are no rough or angular aggregate particles. Repeated traffic applications. Generally, as a pavement ages the protruding rough, angular particles become polished. This can occur quicker if the aggregate is susceptible to abrasion or subject to excessive studded wear and tear. Polished PCC aggregate after 40 years of wear. Close up of polished Hot Mix Asphalt aggregate
  • 13. Popouts Small pieces of PCC that break loose from the surface leaving small divots or pock marks. Pop outs range from 25 โ€“ 100 mm (1 โ€“ 4 inches) in diameter and from 25 โ€“ 50 mm (1 โ€“ 2 inches) deep. Pop outs usually occur as a result of poor aggregate durability. Poor durability can be a result of a number of items such as: ๏‚ง Poor aggregate freeze-thaw resistance. ๏‚ง Expansive aggregates. ๏‚ง Alkali-aggregate reactions. Large pop outs. Pop out close-up.
  • 14. Blow-ups A localized upward slab movement and shattering at a joint or crack. Usually occurs in spring or summer and is the result of insufficient room for slab expansion during hot weather. During cold periods (e.g., winter) PCC slabs contract leaving wider joint openings. If these openings become filled with incompressible material (such as rocks or soil), subsequent PCC slab expansion during hot periods (e.g., spring, summer) may cause high compressive stresses. If these stresses are great enough, the slabs may buckle and shatter to relieve the stresses. Blowup can be accelerated by: ๏‚ง Joint Spalling (reduces slab contact area and provides incompressible material to fill the joint/crack). ๏‚ง D-Cracking (weakens the slab near the joint/crack area). ๏‚ง Freeze-thaw damage (weakens the slab near the joint/crack area).
  • 15. Pumping and Water Bleeding Movement of material underneath the slab or ejection of material from underneath the slab as a result of water pressure. Water accumulated underneath a PCC slab will pressurize when the slab deflects under load. This pressurized water can do one of the following: ๏‚ง Move about under the slab. ๏‚ง Move from underneath one slab to underneath an adjacent slab. This type of movement leads to faulting. ๏‚ง Move out from underneath the slab to the pavement surface. This results in a slow removal of base, sub-base and/or subgrade material from underneath the slab resulting in decreased structural support.
  • 16. Shrinkage Cracking Hairline cracks formed during PCC setting and curing that are not located at joints. Usually, they do not extend through the entire depth of the slab. Shrinkage cracks are considered a distress if they occur in an uncontrolled manner (e.g., at locations outside of contraction joints in JPCP or too close together in CRCP). Possible causes- ๏‚ง Contraction joints sawed too late. ๏‚ง Poor reinforcing steel design. ๏‚ง Improper curing technique. ๏‚ง High early strength PCC.
  • 17. Maintenance And Rehabilitation The combined effects of traffic loading and the environment will cause every pavement, no matter how well-designed/constructed to deteriorate over time. Maintenance and rehabilitation are what we use to slow down or reset this deterioration process. Maintenance actions, such as crack sealing, joint sealing, fog seals and patching help slow the rate of deterioration by identifying and addressing specific pavement deficiencies that contribute to overall deterioration. Rehabilitation is the act of repairing portions of an existing pavement to reset the deterioration process. For instance, removing and replacing the wearing course in a pavement provides new wearing course material on which the deterioration process begins anew. This Module discusses the maintenance options for HMA and PCC pavement.
  • 18. Conclusion Rigid Pavement Distress is a serious issue all over the world, The distresses causes some serious problems at wide range. Prevention of rigid pavement distress is a challenge to the Engineers. Maintenance and Rehabilitation is to be properly done to prevent the distresses in rigid pavement.