SlideShare a Scribd company logo
1 of 90
“ A walk to power scenario in
           INDIA”


        By: Ankur Mahajan
        NITTTR, Chandigarh
INTRODUCTION
• From the time immemorial human race has survived, grown , flourished
  and prospered on the basis of energy produced , established and
  utilized .
• The invention of fire accidentally proved a major
  boost for early man to evolve into what we are today.
HISTORY
• The first demonstration of electric light in Calcutta was conducted on 24
  July 1879.
• The first hydroelectric installation in India was installed near a tea estate
  at Sidrapong for the Darjeeling Municipality in 1897.
• The first hydroelectric power station in j&k was established at mohra in
  baramulla by maharaja partap Singh in 1905.
• Company (B.E.S.T.) set up a generating station in 1905 to provide
  electricity for the tramway.
• The first electric train ran between Bombay's Victoria Terminus and Kurla
  along the Harbour Line.
First hydel power project at darjelling established in 1897
First electric train in INDIA
Electricity sector in INDIA
• The electricity sector in India had an installed capacity of
  205.34 Gigawatt (GW) as of June 2012, the world's fifth
  largest.
• Thermal power plants constitute 68% of the installed
  capacity, hydroelectric about 16% and rest being a
  combination of wind, small hydro, biomass, waste-to-
  electricity, and nuclear.
• India generated 855 BU (855 000 MU i.e. 855 TW) electricity
  during 2011-12 fiscal.
• In terms of fuel, coal-fired plants account for 56% of
  India's installed electricity capacity, compared to
  South Africa's 92%; China's 77%; and Australia's 76%.
  After coal, renewal hydropower accounts for 19%,
  renewable energy for 12% and natural gas for about
  9%.
• As of January 2012, one report found the per capita total
  consumption in India to be 778 kWh.
• India is the world's fourth largest energy consumer after
  United States, China and Russia .
TYPES OF ENERGY
 AND SCENARIO
       IN

           INDIA
There are two types of energy in
world on the basis of there sources
      and production cycles .
THERMAL POWER
   Thermal power plants convert energy rich fuel
  into electricity and heat. Possible fuels include
  coal, natural gas, petroleum products, agricultural
  waste and domestic trash / waste.
• Coal and lignite accounted for about 67% of
  India's installed capacity.
• India's electricity sector consumes about 80% of
  the coal produced in the country. A large part of
  Indian coal reserve is similar to Gondwana coal.
On average, the Indian power plants using
India's coal supply consume about 0.7 kg of coal
   to generate a kWh, whereas United States
thermal power plants consume about 0.45 kg of
                  coal per kWh.
Types
Thermal power plants can deploy a wide range of
  technologies. Some of the major technologies
  include:
• Steam cycle facilities (most commonly used for large
  utilities);
• Gas turbines (commonly used for moderate sized
  peaking facilities);
• Cogeneration and combined cycle facility (the
  combination of gas turbines or internal combustion
  engines with heat recovery systems); and
• Internal combustion engines (commonly used for
  small remote sites or stand-by power generation).
Vindhyachal is the largest thermal
power plant in india with capacity of
             3260 MW.
The installed capacity of Thermal Power in India, as of June
  30, 2011, was 115649.48 MW which is 65.34% of total
  installed capacity.
• Current installed base of Coal Based Thermal Power is
  96,743.38 MW which comes to 54.66% of total installed
  base.
• Current installed base of Gas Based Thermal Power is
  17,706.35 MW which is 10.00% of total installed capacity.
• Current installed base of Oil Based Thermal Power is
  1,199.75 MW which is 0.67% of total installed capacity.
• The state of Maharashtra is the largest producer of
  thermal power in the country.

• INDIA LACKS THE GOOD CALORIFIC VALUE COAL AND
  IMPORTS 30% demand from INDONESIA.
COALMINE AT
MADHYA PRADESH
NUCLEAR POWER
• India had 4.8 GW of installed electricity
  generation capacity using nuclear fuels
• India's Nuclear plants generated 32455
  million units or 3.75% of total electricity
  produced in India.
• India's nuclear power plant development
  began in 1964 by commissioning of two
  boiling water reactors at Tarapur.
Fission Reaction
Capacity
• India's share of nuclear power plant generation
  capacity is just 1.2% of worldwide nuclear power
  production capacity, making it the 15th largest
  nuclear power producer.
• Nuclear power provided 3% of the country's total
  electricity generation in 2011.
• India aims to supply 9% of it electricity needs
  with nuclear power by 2032.
• 2032. India's largest nuclear power plant project
  under implementation is at Jaitapur, Maharashtra
  in partnership with Areva, France.
BHABHA ATOMIC CENTRE
HYDRO-ELECTRIC POWER
• India is one of the pioneering countries in establishing
  hydro-electric power plants. The power plants at Darjeeling
  and Shimsha (Shivanasamudra) were established in 1898
  and 1902 respectively and are among the first in Asia.
• India is endowed with economically exploitable and viable
  hydro potential assessed to be about 84,000 MW at 60%
  load factor. In addition, 6,780 MW in terms of installed
  capacity from Small, Mini, and Micro Hydel schemes have
  been assessed. used form of renewable energy.

• India is blessed with immense amount of hydro-electric
  potential and ranks 5th in terms of exploitable hydro-
  potential on global scenario
LARGEST MASONARY DAM IN THE WORLD


NAGARJUNA DAM IN KARNATKA
OVER KRISHNA RIVER
Solar energy
 India is bestowed with solar irradiation
  ranging from 4 to 7 kWh/square meter/day
  across the country, with western and southern
  regions having higher solar incidence.
 India is endowed with rich solar energy
  resource. India receives the highest global
  solar radiation on a horizontal surface.
 Government of India launched its Jawaharlal
  Nehru National Solar Mission.
• The first Indian solar thermal power project
  (2X50MW) is in progress in Phalodi Rajasthan.
• Land acquisition is a challenge to solar farm
  projects in India.
• exploring means to deploy solar capacity
  above their extensive irrigation canal projects,
  thereby harvesting solar energy while
  reducing the loss of irrigation water by solar
  evaporation.
Solar panels at gujarat
WIND ENERGY
o India has the fifth largest installed wind power
  capacity in the world.
WIND PLANT


• The largest wind power generating state was
  TAMIL NADU accounting for 30% of installed
  capacity, followed in decreasing order by
  Maharashtra, Gujarat, Karnataka, and
  Rajasthan.
• The state of Gujarat is estimated to have the
  maximum gross wind power potential in India,
  with a potential of 10.6 GW.
GEO-THERMAL ENERGY
• India's geothermal energy installed capacity is
  experimental. Commercial use is insignificant.
• India has about 340 hot springs spread over the
  country. Of this, 62 are distributed along the
  northwest Himalaya, in the States of Jammu and
  Kashmir, Himachal Pradesh and Uttarakhand.
• Andaman and Nicobar arc is the only place in
  India where volcanic activity geo-thermal energy
  is present.
India plans to set up its first geothermal
 power plant, with 2–5 MW capacity at
             Puga in ladakh.

•   Tattapani in Chhattisgarh
•   Puga in Jammu & Kashmir
•   Cambay Graben in Gujarat
•   Manikaran in Himachal Pradesh
•   Surajkund in Jharkhand
•   Chhumathang in Jammu & Kashmir
TIDAL WAVE ENERGY

• India is surrounded by sea on three sides, its
  potential to harness tidal energy is significant.
• The Gulf of Khambhat and the Gulf of Kutch
  on India's west coast where the maximum
  tidal range is 11 m and 8 m with average tidal
  range of 6.77 m and 5.23 m respectively AND
  4m is sufficient.
• Barrage technology could harvest about 8 GW
  from tidal energy in India, mostly in Gujarat.
• Potential along the Indian coast is between 5
  MW to 15 MW per meter, suggesting a
  theoretical maximum potential for electricity
  harvesting from India's 7500 kilometer coast
  line may be about 40 GW.
BIO-MASS POWER
• In this system biomass, bagasse, forestry and agro residue
  & agricultural wastes are used as fuel to produce electricity.

• In 2011, India started a new initiative with the aim to
  demonstrate medium size mixed feed biogas-fertilizer pilot
  plants. This technology aims for generation,
  purification/enrichment, bottling and piped distribution of
  biogas.
• India has additionally commissioned 158 projects under its
  Biogas based Distributed/Grid Power Generation
  programme, with a total installed capacity of about 2 MW.
• India has additionally commissioned 158 projects under its
  Biogas based Distributed/Grid Power Generation
  programme, with a total installed capacity of about 2 MW.
• India is rich in biomass and has a potential of 16,881MW
  (agro-residues and plantations), 5000MW (bagasse
  cogeneration) and 2700MW (energy recovery from waste).
• Biomass power generation in India is an industry that
  attracts investments of over INR 600 crores every year,
  generating more than 5000 million units of electricity and
  yearly employment of more than 10 million man-days in
  the RURAL areas.
Agro food for bio fuels
Jatropha plant seeds used as efficient
               bio fuel
TRANSMISSION AND DISTRIBUTION
• INDIA is a energy deficient state, with almost
  400 million people without electricity which
  equals the combined population of u. s .a and
  germany.
• The density of distribution is not equal and is
  unequal .Thus, to overcome this problem an
  interconnected grid system is used so that on
  the basis of demand ,supply could be
  managed and easily delivered to areas far
  away from generating units.
THERE ARE 5 GRIDS IN INDIA:
• 1. Northern Grid
• 2. Southern Grid ( not connected with other
  grids)
• 3. Western Grid
• 4 . Eastern Grid
• 5. North- Eastern Grid
TRANSMISSION SPAN

•   800 KV            •   173 CKM
•   550KV             •   636CKM
•   400KV             •   3198CKM
•   220KV             •   3024CKM

• TOTAL               • 7031CKM
TRANSMISSION AND DISTRIBUTION
             LOSSES
• Total distribution and transmission accounts for
  23% in INDIA.
• In DELHI losses are as high as 50%.
• The proliferation of Low Tension (L.T) distribution
  lines has led to a low load density (as measured
  by demand in MW divided by length of T& D
  system) and high ratio of LT to HT lines.
• Equal investment as to generation can reduce
  transmission and distribution losses.
• Flatten load curve prices
National grid at AGRA
RURAL ELECTRIFICATION
• Six decades after Independence, India’s villages
  are groping in the dark — literally.
• One-third rural areas have no electricity.
• Situation is particularly bad in india’s cow belt.
• Bihar-25%,jharkhand-43%, orissa- 45%, u.p- 38%.
• China on other hand way back in 1991 has 92%
  electricity in rural areas .
• Gujarat and goa has 100% rural electrification
  and himachal 98%.
Rajiv Gandhi Grameen Vidhyutikaran
   Yojana has not changed much .
ENERGY CONSERVATION
 INDIA’S per capita consumption is very low and 35%
  rural households are powerless but still india is
  energy deficient . Thus , one alternative is to
  preserve energy .
Conservation necessary?
Smart grid
• A smart grid is an electrical grid that uses
  information and communications technology
  to gather and act on information, such as
  information about the behaviors of suppliers
  and consumers, in an automated fashion to
  improve the efficiency, reliability, economics,
  and sustainability of the production and
  distribution of electricity.
One –watt initiative

• The One Watt Initiative (or the proper One-
  Watt Initiative) is an energy-saving initiative
  by the International Energy Agency (IEA) to
  reduce standby power-use by any appliance to
  not more than one watt in 2010, and 0.5 watts
  in 2013, which has given rise to regulations in
  many countries and regions.
• It will reduce 1% of total co2 release.
Stand by power reduced to 1 watt.
PILFERAGE
• Kundi, (      )(      ) as known in some parts of India,
  is the criminal but widespread practice by common
  people of stealing electric power. It is a crime and
  punishable by heavy fines and, in some cases,
  imprisonment.
• The simplest process is to put a direct wire-connection
  to a main power route passing by a house or shop so
  that electricity can flow to the consumer without
  crossing the electric meter that is fixed by the State
  Electricity Board to calibrate the load the sub-total of
  your appliances is drawing .
• Insulating neutral can prevent power theft.
PASSIVE HOUSES
• They are actually energy efficient building by
  preventing cooling or heat losses in house.
• There are only 15000 to 20000 houses
  around world.
• It has been calculated that it reduces 20-155
  energy bills.
STAR – RATED APPLIANCES
• Energy Star (trademarked ENERGY STAR) is an
  international standard for energy efficient consumer
  products originated in the United States of America.
• Devices carrying the Energy Star service mark, such as
  computer products and peripherals, kitchen
  appliances, buildings and other products, generally use
  20%–30% less energy than required by federal
  standards.
• Energy Star qualified fluorescent lighting uses 75% less
  energy and lasts up to ten times longer than normal
  incandescent lights.
• Reduces cooling costs — LEDs produce very little heat.
ADVANTAGES
• Brightness is equal to or greater than existing lighting
  technologies (incandescent or fluorescent) and light is well
  distributed over the area lighted by the fixture.
• Light output remains constant over time, only decreasing
  towards the end of the rated lifetime (at least 35,000 hours
  or 12 years based on use of 8 hours per day).
• Excellent color quality. The shade of white light appears
  clear and consistent over time.
• Efficiency is as good as or better than fluorescent lighting.
• Light comes on instantly when turned on.
• No flicker when dimmed.
• No off-state power draw. The fixture does not use power
  when it is turned off, with the exception of external
  controls, whose power should not exceed 0.5 watts in the
  off state.
PRE-PAID ENERGY METERS
• With this, paying bills will no longer be a problem
  and one can just pay the bill with the click of the
  mouse.
• People had got worried due to increase in power
  bills, pre-paid power meter has come to their
  rescue.
• The meter comes with a unit called CIU or
  consumer interface unit. It keeps the consumers
  updated with the balance, hourly consumption
  and units used at any time of the day.
• For people who have bad memory and forget to
  recharge the prepaid meter, the CIU unit will raise
  an alarm thrice when the balance drops to 100.
IMPROVEMENT IN POWER QUALITY

•    Power shortage/quality thus leads to large scale use of Voltage
    Stabilizers, Inverters, Generators, UPS Systems, etc.
•   Such Electrical Equipments, which require unwanted investments, in turn
    not only lead to enhanced shortage in the overall situation but also
    cause air and soil pollution by burning of coal, diesel, etc.
•   Widespread use of lead-acid batteries in these equipments further
    causes pollution of soil and water Voltage Stabilizers don’t have
    efficiencies better than 80%. While a 1.5 Tr AC consumes 2 units; its
    stabilizer consumes 0.4 units; it even consumes power if left ON when
    AC is OFF.
•   Assuming we have 10 Million ACs in India; on account of stabilizers for
    ACs alone we lose around 4 million units, even during peak hours, which
    is double the power generated by many large generating stations.
•   Assuming an AC runs for 5 hours in a day, this means a loss of 20 million
    units per day.
• The average efficiency of the domestic inverters is
  50% and unlike fuel-based generators, inverters don’t
  generate power.
•
• There is an estimated 50 million inverters being used
  for domestic purposes each consuming say 250W/day
  or 0.25 units. The power drain by inverters is thus to
  the tune of 12.5 million units.
• Further, inverters use lead-acid batteries which
  severely pollute the environment.
• UPS systems being like inverters cause power
  wastage and pollution by use of lead-acid batteries.
• Diesel/Kerosene gensets not only cause pollution but also deplete
  scarce natural resources. Pumps/Motors consume roughly 20% of
  total electricity in India. An estimated 75% of this is consumed by
  the pumps for agricultural sector mainly for water/irrigation. The
  balance is for other motor applications.
• Most Indian pumps operate at 33% efficiency while motors have
  an average efficiency of 40%. These cause heavy loss of electrical
  energy.
• Taking usage of 4 units at 4 hours/day, the consumption in this
  category is over 250 million units/day and the estimated loss is
  160 million units /day.
• Pilferage (Power theft) in India is responsible for the
  disappearance of 29% of electricity generated.
• In energy terms this amounts to 613.87 million units/day
CONCLUSION
• INDIA HAS A VAST POTENTIAL TO BE THE
  ENERGY SURPULUS STATE DUE TO ITS
  ABUNDANT RESOURCES AND EASY
  AVAILABILITY, BUT IT NEEDS TO CUT ITS POWER
  LOSSES AND CONTROL OVER POPULATION
  WHICH LEDS TO OVERBURDEN ON ITS
  PRODUCTION.
• India has the reputation of having the highest
  distribution losses in the world with a figure of
  nearly 47%, ranking above Burma with 36 %
  losses and Bangladesh at 33 %.
• How do we bring these losses down and become
  an energy surplus Nation?
THE SOLUTION IS :
•   TO IMPLEMENT STRICT ANTI-PILFERAGE ACTS
•   TO USE SMART GRIDS
•   PROPER LOAD DISTRIBUTION
•   GOOD POWER FACTOR{QUALITY}, SO AS NOT TO USE TRANSFORMERS
    EXCESSIVELY
•   AVOID LARGELY SUBSIDISED POWER DISTRIBUTION FOR POLITICAL
    GIMMICKS
•   IMPROVE POWER IMPLEMENTATION POLICIES ( TO PREVENT LIKES OF
    DISASTAROUS INDUS WATER TREATY IN FUTURE)
•   ENCOURAGING NON-CONVENTIONAL POWER BOTH FOR PUBLIC AND
    GOVT. USE
•   STRICT USE OF POWER RATED DEVICES
•   GREEN CARBON RATED BUILDINGS AND LARGE SCALE USE TO BE
    ENCOURAGED
•   USE OF PREPAID POWER METERS AND OTHER ENERGY SAVING DEVICES
CONSERVE ENERGY BECAUSE ENERGY
   SAVED IS ENERGY GENERATED
ANKUR MAHAJAN
        NITTTR CHANDIGARH
 CONTACT: 7696371190/9797547426
 EMAIL: mahajanankur786@yahoo.in
URL: www.ankurmahajan786@ucoz.com

More Related Content

What's hot

Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in IndiaSandipan Chakraborty
 
Wind Turbine Generators
Wind Turbine GeneratorsWind Turbine Generators
Wind Turbine GeneratorsJasjot Singh
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costEklavya Sharma
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generationMaharishi Tiwari
 
Renewable energy grid integration
Renewable energy grid integrationRenewable energy grid integration
Renewable energy grid integrationRCREEE
 
Vehicle to grid technology
Vehicle to grid technologyVehicle to grid technology
Vehicle to grid technologyMD. Anamul Haque
 
Wind farm grid issues
Wind farm grid issuesWind farm grid issues
Wind farm grid issuesRohil Kumar
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in Indiamohkab1
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant Hussan Sheikh
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid SystemsSeminar Links
 
Current power scenario in india
Current power scenario in indiaCurrent power scenario in india
Current power scenario in indiaAneeshan Sain
 
Energy scenario
Energy scenarioEnergy scenario
Energy scenarioRahul Shah
 
Recent trends in electrical engineering
Recent trends in electrical engineeringRecent trends in electrical engineering
Recent trends in electrical engineeringRanjitKumar Parmar
 
Energy scenario in india
Energy scenario  in indiaEnergy scenario  in india
Energy scenario in indiarameshss
 
Base Load Plants and Peak Load Plant
Base Load Plants and Peak Load PlantBase Load Plants and Peak Load Plant
Base Load Plants and Peak Load PlantSatish Taji
 

What's hot (20)

Power Grid and development in India
Power Grid and development in IndiaPower Grid and development in India
Power Grid and development in India
 
Wind Turbine Generators
Wind Turbine GeneratorsWind Turbine Generators
Wind Turbine Generators
 
Input output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental costInput output , heat rate characteristics and Incremental cost
Input output , heat rate characteristics and Incremental cost
 
Wind Power in India
Wind Power in IndiaWind Power in India
Wind Power in India
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generation
 
Phasor Measurement Unit (PMU)
 Phasor Measurement Unit (PMU) Phasor Measurement Unit (PMU)
Phasor Measurement Unit (PMU)
 
Renewable energy grid integration
Renewable energy grid integrationRenewable energy grid integration
Renewable energy grid integration
 
Vehicle to grid technology
Vehicle to grid technologyVehicle to grid technology
Vehicle to grid technology
 
Demand side management: Demand response
Demand side management: Demand response Demand side management: Demand response
Demand side management: Demand response
 
Wind farm grid issues
Wind farm grid issuesWind farm grid issues
Wind farm grid issues
 
Power Sector Reform in India
Power Sector Reform in IndiaPower Sector Reform in India
Power Sector Reform in India
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid Systems
 
Indian energy scenario (2)
Indian energy scenario (2)Indian energy scenario (2)
Indian energy scenario (2)
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Current power scenario in india
Current power scenario in indiaCurrent power scenario in india
Current power scenario in india
 
Energy scenario
Energy scenarioEnergy scenario
Energy scenario
 
Recent trends in electrical engineering
Recent trends in electrical engineeringRecent trends in electrical engineering
Recent trends in electrical engineering
 
Energy scenario in india
Energy scenario  in indiaEnergy scenario  in india
Energy scenario in india
 
Base Load Plants and Peak Load Plant
Base Load Plants and Peak Load PlantBase Load Plants and Peak Load Plant
Base Load Plants and Peak Load Plant
 

Similar to Power scenario in india

“ A walk to power scenario in INDIA”
“ A walk to power scenario in INDIA”“ A walk to power scenario in INDIA”
“ A walk to power scenario in INDIA”DHIRENDRA SHUKLA
 
power sector in india
power sector in india power sector in india
power sector in india Kumar Gaurav
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in IndiaRavijesh Kumar
 
power sector in india 2014
power sector in india 2014power sector in india 2014
power sector in india 2014Kumar Gaurav
 
Renewable energy : POTENTIAL and UTILIZATION IN INDIA
Renewable energy : POTENTIAL and UTILIZATION IN INDIARenewable energy : POTENTIAL and UTILIZATION IN INDIA
Renewable energy : POTENTIAL and UTILIZATION IN INDIAdhruvinpatel223187
 
ALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTS
ALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTSALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTS
ALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTSAkansha Ganguly
 
Renewable energy engineering (ala)
Renewable energy engineering (ala)Renewable energy engineering (ala)
Renewable energy engineering (ala)Sonal Upadhyay
 
Production and reserves of conventional sources in india
Production and reserves of conventional sources in indiaProduction and reserves of conventional sources in india
Production and reserves of conventional sources in indiaAnurag Srivastava
 
DATA ON ENERGY PRODUCTION.pptx
DATA ON ENERGY PRODUCTION.pptxDATA ON ENERGY PRODUCTION.pptx
DATA ON ENERGY PRODUCTION.pptxConfigminds
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Anirudh Sharma
 
Energy resources subject enrichment activity
Energy resources subject enrichment activityEnergy resources subject enrichment activity
Energy resources subject enrichment activityVaibhavShinde93
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORANKUR MAHESHWARI
 
Power scenario of india
Power scenario of indiaPower scenario of india
Power scenario of indiaAnimesh1714013
 
ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...
ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...
ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...Shubham Prasad
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Anirudh Sharma
 
Module-1_renewable energy sources introduction.pptx
Module-1_renewable energy sources introduction.pptxModule-1_renewable energy sources introduction.pptx
Module-1_renewable energy sources introduction.pptxkaranam vasudha
 
Conventional energy and non conventional sources of energy in india
Conventional energy and non conventional sources of energy in indiaConventional energy and non conventional sources of energy in india
Conventional energy and non conventional sources of energy in indiaswapoo371
 

Similar to Power scenario in india (20)

“ A walk to power scenario in INDIA”
“ A walk to power scenario in INDIA”“ A walk to power scenario in INDIA”
“ A walk to power scenario in INDIA”
 
power sector in india
power sector in india power sector in india
power sector in india
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in India
 
power sector in india 2014
power sector in india 2014power sector in india 2014
power sector in india 2014
 
Renewable energy : POTENTIAL and UTILIZATION IN INDIA
Renewable energy : POTENTIAL and UTILIZATION IN INDIARenewable energy : POTENTIAL and UTILIZATION IN INDIA
Renewable energy : POTENTIAL and UTILIZATION IN INDIA
 
ALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTS
ALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTSALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTS
ALTERNATIVE ENERGY SOURCES AND FUTURE PROSPECTS
 
Renewable energy engineering (ala)
Renewable energy engineering (ala)Renewable energy engineering (ala)
Renewable energy engineering (ala)
 
Production and reserves of conventional sources in india
Production and reserves of conventional sources in indiaProduction and reserves of conventional sources in india
Production and reserves of conventional sources in india
 
Power Plant Technology
Power Plant TechnologyPower Plant Technology
Power Plant Technology
 
DATA ON ENERGY PRODUCTION.pptx
DATA ON ENERGY PRODUCTION.pptxDATA ON ENERGY PRODUCTION.pptx
DATA ON ENERGY PRODUCTION.pptx
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
 
Energy resources subject enrichment activity
Energy resources subject enrichment activityEnergy resources subject enrichment activity
Energy resources subject enrichment activity
 
Restructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTORRestructuring and deregulation of INDIAN POWER SECTOR
Restructuring and deregulation of INDIAN POWER SECTOR
 
Vamshi tech ppt
Vamshi tech pptVamshi tech ppt
Vamshi tech ppt
 
Power scenario of india
Power scenario of indiaPower scenario of india
Power scenario of india
 
ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...
ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...
ENERGY RRSOURCES,Compare Gujarat and Chhattisgarh on the basis of their Energ...
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
 
Module-1_renewable energy sources introduction.pptx
Module-1_renewable energy sources introduction.pptxModule-1_renewable energy sources introduction.pptx
Module-1_renewable energy sources introduction.pptx
 
Conventional energy and non conventional sources of energy in india
Conventional energy and non conventional sources of energy in indiaConventional energy and non conventional sources of energy in india
Conventional energy and non conventional sources of energy in india
 
Energy sector
Energy sectorEnergy sector
Energy sector
 

More from Ankur Mahajan

Magneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhdMagneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhdAnkur Mahajan
 
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...Ankur Mahajan
 
LOW SPEED WIND TURBINE
LOW SPEED WIND TURBINELOW SPEED WIND TURBINE
LOW SPEED WIND TURBINEAnkur Mahajan
 
Microcontroller 8051 and its interfacing
Microcontroller 8051 and its interfacingMicrocontroller 8051 and its interfacing
Microcontroller 8051 and its interfacingAnkur Mahajan
 
fuzzy logic application
fuzzy logic applicationfuzzy logic application
fuzzy logic applicationAnkur Mahajan
 
Operational parameters of switching devices
Operational parameters of switching devicesOperational parameters of switching devices
Operational parameters of switching devicesAnkur Mahajan
 
Thermal power plant
Thermal power plant Thermal power plant
Thermal power plant Ankur Mahajan
 
controlled rectifiers
controlled rectifierscontrolled rectifiers
controlled rectifiersAnkur Mahajan
 

More from Ankur Mahajan (14)

Pumps
PumpsPumps
Pumps
 
Train lighting
Train lightingTrain lighting
Train lighting
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Lhb ac buffet car
Lhb ac buffet carLhb ac buffet car
Lhb ac buffet car
 
Magneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhdMagneto hydro-dynamic-power-generation-mhd
Magneto hydro-dynamic-power-generation-mhd
 
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
SELECTION OF MATERIAL HANDLING SYSTEM USING MULTI CRITERIA DECISION TECHNIQUE...
 
Pees copy
Pees   copyPees   copy
Pees copy
 
LOW SPEED WIND TURBINE
LOW SPEED WIND TURBINELOW SPEED WIND TURBINE
LOW SPEED WIND TURBINE
 
Microcontroller 8051 and its interfacing
Microcontroller 8051 and its interfacingMicrocontroller 8051 and its interfacing
Microcontroller 8051 and its interfacing
 
Facts glanzmann
Facts glanzmannFacts glanzmann
Facts glanzmann
 
fuzzy logic application
fuzzy logic applicationfuzzy logic application
fuzzy logic application
 
Operational parameters of switching devices
Operational parameters of switching devicesOperational parameters of switching devices
Operational parameters of switching devices
 
Thermal power plant
Thermal power plant Thermal power plant
Thermal power plant
 
controlled rectifiers
controlled rectifierscontrolled rectifiers
controlled rectifiers
 

Recently uploaded

Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleCeline George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 

Recently uploaded (20)

Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Multi Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP ModuleMulti Domain Alias In the Odoo 17 ERP Module
Multi Domain Alias In the Odoo 17 ERP Module
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 

Power scenario in india

  • 1. “ A walk to power scenario in INDIA” By: Ankur Mahajan NITTTR, Chandigarh
  • 2. INTRODUCTION • From the time immemorial human race has survived, grown , flourished and prospered on the basis of energy produced , established and utilized .
  • 3. • The invention of fire accidentally proved a major boost for early man to evolve into what we are today.
  • 4. HISTORY • The first demonstration of electric light in Calcutta was conducted on 24 July 1879. • The first hydroelectric installation in India was installed near a tea estate at Sidrapong for the Darjeeling Municipality in 1897. • The first hydroelectric power station in j&k was established at mohra in baramulla by maharaja partap Singh in 1905. • Company (B.E.S.T.) set up a generating station in 1905 to provide electricity for the tramway. • The first electric train ran between Bombay's Victoria Terminus and Kurla along the Harbour Line.
  • 5. First hydel power project at darjelling established in 1897
  • 7. Electricity sector in INDIA • The electricity sector in India had an installed capacity of 205.34 Gigawatt (GW) as of June 2012, the world's fifth largest. • Thermal power plants constitute 68% of the installed capacity, hydroelectric about 16% and rest being a combination of wind, small hydro, biomass, waste-to- electricity, and nuclear. • India generated 855 BU (855 000 MU i.e. 855 TW) electricity during 2011-12 fiscal.
  • 8.
  • 9.
  • 10. • In terms of fuel, coal-fired plants account for 56% of India's installed electricity capacity, compared to South Africa's 92%; China's 77%; and Australia's 76%. After coal, renewal hydropower accounts for 19%, renewable energy for 12% and natural gas for about 9%. • As of January 2012, one report found the per capita total consumption in India to be 778 kWh. • India is the world's fourth largest energy consumer after United States, China and Russia .
  • 11. TYPES OF ENERGY AND SCENARIO IN INDIA
  • 12. There are two types of energy in world on the basis of there sources and production cycles .
  • 13. THERMAL POWER  Thermal power plants convert energy rich fuel into electricity and heat. Possible fuels include coal, natural gas, petroleum products, agricultural waste and domestic trash / waste. • Coal and lignite accounted for about 67% of India's installed capacity. • India's electricity sector consumes about 80% of the coal produced in the country. A large part of Indian coal reserve is similar to Gondwana coal.
  • 14. On average, the Indian power plants using India's coal supply consume about 0.7 kg of coal to generate a kWh, whereas United States thermal power plants consume about 0.45 kg of coal per kWh.
  • 15. Types Thermal power plants can deploy a wide range of technologies. Some of the major technologies include: • Steam cycle facilities (most commonly used for large utilities); • Gas turbines (commonly used for moderate sized peaking facilities); • Cogeneration and combined cycle facility (the combination of gas turbines or internal combustion engines with heat recovery systems); and • Internal combustion engines (commonly used for small remote sites or stand-by power generation).
  • 16. Vindhyachal is the largest thermal power plant in india with capacity of 3260 MW.
  • 17. The installed capacity of Thermal Power in India, as of June 30, 2011, was 115649.48 MW which is 65.34% of total installed capacity. • Current installed base of Coal Based Thermal Power is 96,743.38 MW which comes to 54.66% of total installed base. • Current installed base of Gas Based Thermal Power is 17,706.35 MW which is 10.00% of total installed capacity. • Current installed base of Oil Based Thermal Power is 1,199.75 MW which is 0.67% of total installed capacity. • The state of Maharashtra is the largest producer of thermal power in the country. • INDIA LACKS THE GOOD CALORIFIC VALUE COAL AND IMPORTS 30% demand from INDONESIA.
  • 19.
  • 20. NUCLEAR POWER • India had 4.8 GW of installed electricity generation capacity using nuclear fuels • India's Nuclear plants generated 32455 million units or 3.75% of total electricity produced in India. • India's nuclear power plant development began in 1964 by commissioning of two boiling water reactors at Tarapur.
  • 22.
  • 23. Capacity • India's share of nuclear power plant generation capacity is just 1.2% of worldwide nuclear power production capacity, making it the 15th largest nuclear power producer. • Nuclear power provided 3% of the country's total electricity generation in 2011. • India aims to supply 9% of it electricity needs with nuclear power by 2032. • 2032. India's largest nuclear power plant project under implementation is at Jaitapur, Maharashtra in partnership with Areva, France.
  • 25.
  • 26. HYDRO-ELECTRIC POWER • India is one of the pioneering countries in establishing hydro-electric power plants. The power plants at Darjeeling and Shimsha (Shivanasamudra) were established in 1898 and 1902 respectively and are among the first in Asia. • India is endowed with economically exploitable and viable hydro potential assessed to be about 84,000 MW at 60% load factor. In addition, 6,780 MW in terms of installed capacity from Small, Mini, and Micro Hydel schemes have been assessed. used form of renewable energy. • India is blessed with immense amount of hydro-electric potential and ranks 5th in terms of exploitable hydro- potential on global scenario
  • 27.
  • 28. LARGEST MASONARY DAM IN THE WORLD NAGARJUNA DAM IN KARNATKA OVER KRISHNA RIVER
  • 29.
  • 31.  India is bestowed with solar irradiation ranging from 4 to 7 kWh/square meter/day across the country, with western and southern regions having higher solar incidence.  India is endowed with rich solar energy resource. India receives the highest global solar radiation on a horizontal surface.  Government of India launched its Jawaharlal Nehru National Solar Mission.
  • 32. • The first Indian solar thermal power project (2X50MW) is in progress in Phalodi Rajasthan. • Land acquisition is a challenge to solar farm projects in India. • exploring means to deploy solar capacity above their extensive irrigation canal projects, thereby harvesting solar energy while reducing the loss of irrigation water by solar evaporation.
  • 33. Solar panels at gujarat
  • 34.
  • 35.
  • 36. WIND ENERGY o India has the fifth largest installed wind power capacity in the world.
  • 37. WIND PLANT • The largest wind power generating state was TAMIL NADU accounting for 30% of installed capacity, followed in decreasing order by Maharashtra, Gujarat, Karnataka, and Rajasthan. • The state of Gujarat is estimated to have the maximum gross wind power potential in India, with a potential of 10.6 GW.
  • 38.
  • 39. GEO-THERMAL ENERGY • India's geothermal energy installed capacity is experimental. Commercial use is insignificant. • India has about 340 hot springs spread over the country. Of this, 62 are distributed along the northwest Himalaya, in the States of Jammu and Kashmir, Himachal Pradesh and Uttarakhand. • Andaman and Nicobar arc is the only place in India where volcanic activity geo-thermal energy is present.
  • 40.
  • 41.
  • 42. India plans to set up its first geothermal power plant, with 2–5 MW capacity at Puga in ladakh. • Tattapani in Chhattisgarh • Puga in Jammu & Kashmir • Cambay Graben in Gujarat • Manikaran in Himachal Pradesh • Surajkund in Jharkhand • Chhumathang in Jammu & Kashmir
  • 43.
  • 44.
  • 45. TIDAL WAVE ENERGY • India is surrounded by sea on three sides, its potential to harness tidal energy is significant. • The Gulf of Khambhat and the Gulf of Kutch on India's west coast where the maximum tidal range is 11 m and 8 m with average tidal range of 6.77 m and 5.23 m respectively AND 4m is sufficient. • Barrage technology could harvest about 8 GW from tidal energy in India, mostly in Gujarat.
  • 46.
  • 47. • Potential along the Indian coast is between 5 MW to 15 MW per meter, suggesting a theoretical maximum potential for electricity harvesting from India's 7500 kilometer coast line may be about 40 GW.
  • 48. BIO-MASS POWER • In this system biomass, bagasse, forestry and agro residue & agricultural wastes are used as fuel to produce electricity. • In 2011, India started a new initiative with the aim to demonstrate medium size mixed feed biogas-fertilizer pilot plants. This technology aims for generation, purification/enrichment, bottling and piped distribution of biogas. • India has additionally commissioned 158 projects under its Biogas based Distributed/Grid Power Generation programme, with a total installed capacity of about 2 MW.
  • 49.
  • 50. • India has additionally commissioned 158 projects under its Biogas based Distributed/Grid Power Generation programme, with a total installed capacity of about 2 MW. • India is rich in biomass and has a potential of 16,881MW (agro-residues and plantations), 5000MW (bagasse cogeneration) and 2700MW (energy recovery from waste). • Biomass power generation in India is an industry that attracts investments of over INR 600 crores every year, generating more than 5000 million units of electricity and yearly employment of more than 10 million man-days in the RURAL areas.
  • 51. Agro food for bio fuels
  • 52. Jatropha plant seeds used as efficient bio fuel
  • 53. TRANSMISSION AND DISTRIBUTION • INDIA is a energy deficient state, with almost 400 million people without electricity which equals the combined population of u. s .a and germany. • The density of distribution is not equal and is unequal .Thus, to overcome this problem an interconnected grid system is used so that on the basis of demand ,supply could be managed and easily delivered to areas far away from generating units.
  • 54. THERE ARE 5 GRIDS IN INDIA: • 1. Northern Grid • 2. Southern Grid ( not connected with other grids) • 3. Western Grid • 4 . Eastern Grid • 5. North- Eastern Grid
  • 55.
  • 56. TRANSMISSION SPAN • 800 KV • 173 CKM • 550KV • 636CKM • 400KV • 3198CKM • 220KV • 3024CKM • TOTAL • 7031CKM
  • 57. TRANSMISSION AND DISTRIBUTION LOSSES • Total distribution and transmission accounts for 23% in INDIA. • In DELHI losses are as high as 50%. • The proliferation of Low Tension (L.T) distribution lines has led to a low load density (as measured by demand in MW divided by length of T& D system) and high ratio of LT to HT lines. • Equal investment as to generation can reduce transmission and distribution losses. • Flatten load curve prices
  • 58.
  • 59.
  • 60.
  • 62. RURAL ELECTRIFICATION • Six decades after Independence, India’s villages are groping in the dark — literally. • One-third rural areas have no electricity. • Situation is particularly bad in india’s cow belt. • Bihar-25%,jharkhand-43%, orissa- 45%, u.p- 38%. • China on other hand way back in 1991 has 92% electricity in rural areas . • Gujarat and goa has 100% rural electrification and himachal 98%.
  • 63.
  • 64. Rajiv Gandhi Grameen Vidhyutikaran Yojana has not changed much .
  • 65. ENERGY CONSERVATION  INDIA’S per capita consumption is very low and 35% rural households are powerless but still india is energy deficient . Thus , one alternative is to preserve energy .
  • 67.
  • 68. Smart grid • A smart grid is an electrical grid that uses information and communications technology to gather and act on information, such as information about the behaviors of suppliers and consumers, in an automated fashion to improve the efficiency, reliability, economics, and sustainability of the production and distribution of electricity.
  • 69.
  • 70. One –watt initiative • The One Watt Initiative (or the proper One- Watt Initiative) is an energy-saving initiative by the International Energy Agency (IEA) to reduce standby power-use by any appliance to not more than one watt in 2010, and 0.5 watts in 2013, which has given rise to regulations in many countries and regions. • It will reduce 1% of total co2 release.
  • 71. Stand by power reduced to 1 watt.
  • 72. PILFERAGE • Kundi, ( )( ) as known in some parts of India, is the criminal but widespread practice by common people of stealing electric power. It is a crime and punishable by heavy fines and, in some cases, imprisonment. • The simplest process is to put a direct wire-connection to a main power route passing by a house or shop so that electricity can flow to the consumer without crossing the electric meter that is fixed by the State Electricity Board to calibrate the load the sub-total of your appliances is drawing . • Insulating neutral can prevent power theft.
  • 73.
  • 74. PASSIVE HOUSES • They are actually energy efficient building by preventing cooling or heat losses in house. • There are only 15000 to 20000 houses around world. • It has been calculated that it reduces 20-155 energy bills.
  • 75.
  • 76. STAR – RATED APPLIANCES • Energy Star (trademarked ENERGY STAR) is an international standard for energy efficient consumer products originated in the United States of America. • Devices carrying the Energy Star service mark, such as computer products and peripherals, kitchen appliances, buildings and other products, generally use 20%–30% less energy than required by federal standards. • Energy Star qualified fluorescent lighting uses 75% less energy and lasts up to ten times longer than normal incandescent lights. • Reduces cooling costs — LEDs produce very little heat.
  • 77.
  • 78. ADVANTAGES • Brightness is equal to or greater than existing lighting technologies (incandescent or fluorescent) and light is well distributed over the area lighted by the fixture. • Light output remains constant over time, only decreasing towards the end of the rated lifetime (at least 35,000 hours or 12 years based on use of 8 hours per day). • Excellent color quality. The shade of white light appears clear and consistent over time. • Efficiency is as good as or better than fluorescent lighting. • Light comes on instantly when turned on. • No flicker when dimmed. • No off-state power draw. The fixture does not use power when it is turned off, with the exception of external controls, whose power should not exceed 0.5 watts in the off state.
  • 79. PRE-PAID ENERGY METERS • With this, paying bills will no longer be a problem and one can just pay the bill with the click of the mouse. • People had got worried due to increase in power bills, pre-paid power meter has come to their rescue. • The meter comes with a unit called CIU or consumer interface unit. It keeps the consumers updated with the balance, hourly consumption and units used at any time of the day. • For people who have bad memory and forget to recharge the prepaid meter, the CIU unit will raise an alarm thrice when the balance drops to 100.
  • 80.
  • 81. IMPROVEMENT IN POWER QUALITY • Power shortage/quality thus leads to large scale use of Voltage Stabilizers, Inverters, Generators, UPS Systems, etc. • Such Electrical Equipments, which require unwanted investments, in turn not only lead to enhanced shortage in the overall situation but also cause air and soil pollution by burning of coal, diesel, etc. • Widespread use of lead-acid batteries in these equipments further causes pollution of soil and water Voltage Stabilizers don’t have efficiencies better than 80%. While a 1.5 Tr AC consumes 2 units; its stabilizer consumes 0.4 units; it even consumes power if left ON when AC is OFF. • Assuming we have 10 Million ACs in India; on account of stabilizers for ACs alone we lose around 4 million units, even during peak hours, which is double the power generated by many large generating stations. • Assuming an AC runs for 5 hours in a day, this means a loss of 20 million units per day.
  • 82. • The average efficiency of the domestic inverters is 50% and unlike fuel-based generators, inverters don’t generate power. • • There is an estimated 50 million inverters being used for domestic purposes each consuming say 250W/day or 0.25 units. The power drain by inverters is thus to the tune of 12.5 million units. • Further, inverters use lead-acid batteries which severely pollute the environment. • UPS systems being like inverters cause power wastage and pollution by use of lead-acid batteries.
  • 83. • Diesel/Kerosene gensets not only cause pollution but also deplete scarce natural resources. Pumps/Motors consume roughly 20% of total electricity in India. An estimated 75% of this is consumed by the pumps for agricultural sector mainly for water/irrigation. The balance is for other motor applications. • Most Indian pumps operate at 33% efficiency while motors have an average efficiency of 40%. These cause heavy loss of electrical energy. • Taking usage of 4 units at 4 hours/day, the consumption in this category is over 250 million units/day and the estimated loss is 160 million units /day. • Pilferage (Power theft) in India is responsible for the disappearance of 29% of electricity generated. • In energy terms this amounts to 613.87 million units/day
  • 84.
  • 85.
  • 86. CONCLUSION • INDIA HAS A VAST POTENTIAL TO BE THE ENERGY SURPULUS STATE DUE TO ITS ABUNDANT RESOURCES AND EASY AVAILABILITY, BUT IT NEEDS TO CUT ITS POWER LOSSES AND CONTROL OVER POPULATION WHICH LEDS TO OVERBURDEN ON ITS PRODUCTION. • India has the reputation of having the highest distribution losses in the world with a figure of nearly 47%, ranking above Burma with 36 % losses and Bangladesh at 33 %. • How do we bring these losses down and become an energy surplus Nation?
  • 87. THE SOLUTION IS : • TO IMPLEMENT STRICT ANTI-PILFERAGE ACTS • TO USE SMART GRIDS • PROPER LOAD DISTRIBUTION • GOOD POWER FACTOR{QUALITY}, SO AS NOT TO USE TRANSFORMERS EXCESSIVELY • AVOID LARGELY SUBSIDISED POWER DISTRIBUTION FOR POLITICAL GIMMICKS • IMPROVE POWER IMPLEMENTATION POLICIES ( TO PREVENT LIKES OF DISASTAROUS INDUS WATER TREATY IN FUTURE) • ENCOURAGING NON-CONVENTIONAL POWER BOTH FOR PUBLIC AND GOVT. USE • STRICT USE OF POWER RATED DEVICES • GREEN CARBON RATED BUILDINGS AND LARGE SCALE USE TO BE ENCOURAGED • USE OF PREPAID POWER METERS AND OTHER ENERGY SAVING DEVICES
  • 88. CONSERVE ENERGY BECAUSE ENERGY SAVED IS ENERGY GENERATED
  • 89.
  • 90. ANKUR MAHAJAN NITTTR CHANDIGARH CONTACT: 7696371190/9797547426 EMAIL: mahajanankur786@yahoo.in URL: www.ankurmahajan786@ucoz.com