Cost Economics For Solar Parks
Anmol Singh Jaggi
An Aerial View of Gujarat Solar Park
Contact: solar@gensol.in | Ph:+91 93270 16962
Infrastructure in a Solar Park
Contact: solar@gensol.in | Ph:+91 93270 16962
Land
Power
Evacuation
Water Supply
& Treatment
Common
Infrastructure
Roads
Security
Infrastructure in a Typical Solar Park
Contact: solar@gensol.in | Ph:+91 93270 16962
But, what are these worth to a
Project Developer?
How much should the developer
pay to get this infrastructure?
Land
Contact: solar@gensol.in | Ph:+91 93270 16962
Facilities provided in a Solar Park
•  Land on Lease
•  Land Leveling & Grading
What it means for a Project Developer
Area required per MW: 5 acres
Average Land Cost per Acre for Solar Projects: Rs. 5 Lacs
Average Cost for Leveling of Land per acre: Rs. 50,000
Cost saved per acre
Cost of Land + Leveling Rs. 5.50 Lacs
Power Evacuation
Contact: solar@gensol.in | Ph:+91 93270 16962
Facilities provided in a Solar Park
•  Transmission Line
•  Ready Substation for Evacuation of Power
What it means for a Project Developer
Assumed Capacity of Power Plant: 10 MW
Assumed Length of Transmission Line: 5 kms
Cost of Transmission Line per km (incl RoW): Rs 40 Lacs
Cost of Construction of Bay at Grid Substation: Rs 25 Lacs
Cost saved per acre
Cost of Transmission Line Rs 200 Lacs
Cost of Bay Rs 25 Lacs
Total Cost Rs 225 Lacs
Cost per MW Rs 22.5 Lacs
Cost per acre Rs 4.5 Lacs
Water Supply & Treatment
Contact: solar@gensol.in | Ph:+91 93270 16962
Facilities provided in a Solar Park
•  Treated Water Pipeline
•  Water Storage
•  Sewage Treatment
•  Proper Drainage around Plant Periphery
What it means for a Project Developer
Assumed Capacity of Power Plant: 10 MW
Cost of Good Quality RO Plant: Rs. 5 Lacs
Cost of Water Storage & Sewage Treatment: Rs. 2.5 Lacs
Cost of Construction of Drainage around Periphery: Rs. 20 Lacs
Cost saved per acre
Cost of Water Infrastructure: Rs 27.5 Lacs
Cost per MW Rs 2.75 Lacs
Cost per acre Rs 55,000
Common Infrastructure
Contact: solar@gensol.in | Ph:+91 93270 16962
Optional Facilities:
•  Helipad
•  Entrance
Facilities provided in a Solar Park
•  Telecom Network
•  Fire Station
•  Township
What it means for a Project Developer
Assumed Capacity of Power Plant: 10 MW
Cost on creating basic infrastructure for O&M Staff: Rs. 10 Lacs
Creating additional Fire Protection Infrastructure: Rs. 1.5 Lacs
Telecom Infrastructure: Rs. 1 Lac
Cost saved per acre
Cost of Common Facilities: Rs 12.5 Lacs
Cost per MW Rs 2.5 Lacs
Cost per acre Rs 50,000
Roads
Contact: solar@gensol.in | Ph:+91 93270 16962
Facilities provided in a Solar Park
Broad Access Roads upto and around the Site Boundary for easy
transport of equipment during and after construction.
What it means for a Project Developer
Typical Length of Access Roads: 1 km
Cost of Construction of good quality Access Road : Rs. 10 Lacs
•  at least 3 meter wide for transport of 40 ft containers
•  Includes the cost of Right of Way for Access Road
Cost saved per acre
Cost per MW Rs 1,00,000
Cost per acre Rs 20,000
Security
Contact: solar@gensol.in | Ph:+91 93270 16962
Facilities provided in a Solar Park
Wire Gauge Fencing around periphery (approximately 6 feet high)
Common Security Towers for the Park
What it means for a Project Developer
Assumed Capacity of Power Plant: 10 MW
Outside of Solar Park, boundary wall is preferred: Rs. 1500 per m
Approximate Length of boundary wall: 2.5 kms
Cost of Boundary Wall: Rs. 37.5 Lacs
Cost saved per acre
Cost per MW Rs 3.75 Lacs
Cost per acre Rs 75,000
Total Direct Cost Saving per Acre
Contact: solar@gensol.in | Ph:+91 93270 16962
Land Rs. 5.50 Lacs
Power Evacuation Rs. 4.50 Lacs
Water Supply & Treatment Rs.0.55 Lacs
Common Infrastructure Rs. 0.50 Lacs
Roads Rs. 0.20 Lacs
Security Rs. 0.75 Lacs
Total per acre saving Rs. 12.00 Lacs
Indirect Cost Saving per Acre
Contact: solar@gensol.in | Ph:+91 93270 16962
Considering, ready availability of the infrastructure, the project
construction period could be reduced from 6 months to 4 months.
Savings on account of 2 month reduction
Assumed Plant Capacity: 10 MW
Project Cost per MW: Rs 6.5 Crores
Total Project Cost: Rs. 65 Crores
Calculation of Interest During Construction (IDC) saved
Project Implementation Period reduced by: 2 months
Approximate Debt for Project: 70% = Rs. 45.5 Cr
Assumed Interest Rate: 12.5%
Approximate IDC Saved: (Rs. 45.5 Cr / 2) x 12.5% x (2 months / 12)
: Rs. 47.39 Lacs or Rs. 4.74 Lacs per MW
Approximate IDC saved per Acre: Rs. 1 Lac
Total Savings per Acre
Contact: solar@gensol.in | Ph:+91 93270 16962
Direct Savings Rs. 12.00 Lacs
Indirect Savings Rs. 1.00 Lacs
Total per acre savings Rs. 13.00 Lacs
Peace of Mind Premium Rs. 2 Lacs
Premium you would want to give for peace of mind towards ease of
getting permissions & not having to go through the process of Land
Identification, Acquisition and Right of Way
For the Solar Park Developer
Estimates show that a 1000 MW Solar Park
costs around Rs. 600 Cr to build or Rs. 12 Lacs per acre
Considering a Project Developer willing to pay Rs. 15 Lacs per acre,
it is a win-win situation for both.
Contact: solar@gensol.in | Ph:+91 93270 16962
How is Gensol helping?
Cost of Construction Increasing Generation Customer Acquisition
Gensol boasts of being India’s
largest Solar Engineering
Advisory firm boasting of 1.3
GW of client base.
Gensol EPC has been able to
achieve the most competitive
prices in the industry because
of its engineering prowess.
Gensol has JV with Spain’s
Solarig with plants managed
across 6 countries for offering
truly world class Operation &
Maintenance services for Indian
Solar Power Plants.
India’s first solar marketplace
where you can order Solar
Energy Assessment Reports
and Solar Layouts online. Soon,
ezysolare will allow you to
upload roof data and order
installers and products online.
Contact: solar@gensol.in | Ph:+91 93270 16962
”“
About Gensol Consultants Pvt Ltd
Gensol, an ISO 9001:2008 certified company is a pioneer in
Solar Power Advisory and Project Execution. Gensol is an
advisor to 1000MW+ commissioned or under construction
Solar PV Projects and has a cumulative portfolio of more
than 1 MW of rooftop solar power plants under execution.
•  Solar Advisory & Project Execution
•  Carbon Advisory & Trading
•  Renewable Energy Certificate Advisory & Trading
•  Power Trading
360o Clean Energy Solutions:
About Gensol Consultants Pvt Ltd
Few Facts:
•  30+ Trained Team - all Graduates and Post Graduates in
Energy and Environment
•  800 MW+ Solar Power Projects under advisory
•  1 MW+ Solar Rooftop Projects under Execution
•  Recipient of multiple awards including BusinessWorld Hottest
Young Entrepreneur and Economic Times Power of Ideas.
Quoted In:
Business Dailies: Business Standard | Economic Times Business
Magazines: Business India | Forbes India
Industry Journals: Power Line | Energetica | EQ International
Empanelled With:
Ministry of New & Renewable Energy
ANERT, Kerala (10,000 solar rooftops program)
Central Bank of India, PTC Project Financial Services,
L&T Infra Finance & Other Banks
Solar Advisory & EPC Services
Owner’s Engineer:
As Owner's Engineer, we guide our clients or investors through the complete process of project feasibility, financial closure, bid process
management, vendor finalization and supervision of project execution up till successful project commissioning which meets our strict
quality criteria.
Lender’s Engineer:
Being consultants to some of the leading lending institutions in the country, we assess the key parameters impacting the returns from the
project like generation, cost and conditions of the EPC Contract, preparedness of Project Developer for execution etc.
Detailed Engineering and Vetting of Drawings:
Gensol Solar Division is staffed with experienced Electrical, Electronics, Mechanical and Civil Engineers who undertake detailed
engineering of Solar PV Power plants on behalf of EPC Contractors and vetting of drawings for Project Developers and investors.
Permits & Clearances:
It takes more than 32 permits and clearances from Nodal Agencies, District Authorities, Distribution and Transmission Companies etc.
Gensol has an experienced liasoning team well aware of process and people to acquire these permits in time and in sequence.
Detailed Project Report:
A Detailed Project Report is one of the most important documents to assess the feasibility of project and to get financial closure. Gensol
with its sector expertise and established standing in the renewable energy consultancy not only gives the most exhaustive analysis of the
project but also enjoys the confidence of industries, investors and banks alike.
Solar EPC Services
Gensol, being a channel partner of Ministry of New and Renewable Energy (MNRE) has attained amongst the highest
allocation of subsidies for the Solar Rooftop Projects on account of its superior engineering, standardized procurement and
quick execution. Gensol has executed projects in the range of 1 kW powerpacks to 400 kW single rooftop power plants.
”“
Experience Snapshot
Gensol is among the leading consultants to Project
Developers, Financial Institutions and Investors. Total
portfolio of Solar Power Projects commissioned or under
construction under advisory at Gensol is more than 800 MW.
•  33 MW – Sterling & Wilson, Rajasthan
•  25 MW – Alex Astral Solar Power Ltd., Gujarat
•  20 MW – Essel Infraprojects, Maharashtra
•  20 MW – SolaireDirect, Punjab
•  17 MW – Sunrays Power Solutions, Rajasthan
•  15 MW – NALCO, Orissa
•  10 MW – Ghodawat Energy, Rajasthan
•  6.5 MW – Haryana Power Generation Corporation Ltd,
Haryana Govt Enterprise
•  5 MW – Alex Spectrum Radiation Pvt Ltd, Rajasthan
•  3 MW – Par Solar, Rajasthan
•  1.5 MW – Agarwal Infratech Ltd, Gujarat
•  350 kW – Mapro Foods Pvt Ltd, Maharashtra
Owner’s Engineer:
•  130 MW – Welspun MP Energy, Madhya Pradesh
•  50 MW – Welspun Energy Ltd, Rajasthan
•  25 MW – Sun Edison, Gujarat
•  20 MW – PLG Power, Gujarat
•  15 MW – MI Mysolar 24, Gujarat
•  15 MW – Dreisatz Mysolar 24, Gujarat
•  10 MW – Greeninfra Solar, Gujarat
•  10 MW – Millenium Synergy, Gujarat
•  6.5 MW – Sun Group, Gujarat
•  6 MW – Indiabulls Power, UP & Maharashtra
•  5 MW – ESP Urja, Gujarat
Lender’s Engineer:
•  20 MW – Client Confidential, Gujarat
•  12 MW – Lanco Solar, Andhra Pradesh
•  8.5 MW – Jain Irrigation, Maharashtra
•  5 MW – ABB Ltd, Gujarat
•  1 MW – L&T ECC Division, Rajasthan
Detailed Designing & Design Vetting
•  20 MW – Sai Sudhir Energy, Andhra Pradesh
•  10 MW – Sai Sudhir Energy, Karnataka
•  5 MW – Chemtrol Industries, Rajasthan
•  2 MW – Shri Bhagirathi Textiles Ltd, Maharashtra
•  15 MW – Boyance Infrastructure, Rajasthan
•  5 MW – Sattva Salarpuria Group, Karnataka
•  1 MW – NIT Hamirpur, Himachal Pradhesh
Feasibility Analysis & DPR:
Experience Snapshot
•  163 MW Grid Connected Gujarat
•  130 MW Grid Connected Madhya Pradesh
•  129 MW Grid Connected Rajasthan
•  55 MW Grid Connected Punjab
•  35 MW Grid Connected Maharashtra
•  18 MW Grid Connected Karnataka
•  15 MW Grid Connected Odisha
•  6.5 MW Grid Connected Haryana
•  2 MW Grid Connected Uttarakhand
•  2 MW Grid Connected Uttar Pradesh
•  1 MW Grid Connected Himachal Pradesh
•  300 kW Rooftop Grid tied Andhra Pradesh
•  100 kW Rooftop Grid tied Karnataka
•  92 kW Grid Tied & Off Grid Gujarat
•  Empanelled with ANERT, Kerala for 10,000 Rooftops
Solar Program
Advisory:
Execution:
”“
Gensol is among the forefront of Solar Rooftop execution
with more than 1 MW as its clientele ranging from 1 kW
power packs upto 400 kW single rooftop power plants.
Gensol: Engineering, Procurement & Construction
200 kW, IIT Kanpur, Uttar Pradesh
200 kW, VIT Andhra Pradesh 130 kW, NIMS Hospital, Kerala 100 kW, VVIT, Andhra Pradesh
100 kW, NCET Karnataka 5 kW, Raheja Residence, Delhi 1 kW, 70 systems, Kerala
About Gensol
Gensol Consultants, found in 2007 is India’s leading Advisory and System
Integrator for Solar PV Power Projects. Gensol is a channel partner to MNRE and
enjoys empanelment with most major Lending Institutions in India.
1,000+ MW 2,000+ kW
Gensol has an advisory portfolio of
more than 1 GW with every 5th
MW in
India developed with our expertise.
Being an MNRE Channel partner,
Gensol has executed more than 2
MW of Solar Rooftop Projects across
India.
Gensol is based out of Ahmedabad in
Gujarat but has operational solar
projects across 16 Indian States.
With a 40+ Employee Strength –
Gensol prides itself on having the
best technical talent in industry.
AWARDS
BusinessWorld – India’s largest
weekly business magazine awarded
Gensol with “Hottest Young
Entrepreneur” in 2009.
Economic Times – India’s largest
financial daily awarded Gensol in its
“Power of Ideas” series in 2010.
Gensol was the only non-UK based
firm to be nominated for Global
Consultancy of the Year at
BusinessGreen Leader Awards,
London in 2014.
Contact: solar@gensol.in | Ph:+91 93270 16962
Gensol Engineering Pvt Ltd | Gensol Consultants Pvt Ltd
Corporate Office
108, Pinnacle Business Park
Opp Royal Arcade, Prahladnagar
Ahmedabad, Gujarat
India - 380015
Email: solar@gensol.in
Website: www.gensol.in
Phone: +91 79 40068235
Mob: +91 93270 16962
Fax: +91 79 40068239
Twitter: gensol_tweets
Gensol is one of the leading consultants and system integrators for Solar Power Plants. We boast of a portfolio of over
1000 MW of Solar Photovoltaic Plants. Gensol is also a channel partner to Ministry of New & Renewable Energy and
installs kW scale Solar Rooftop systems on a turnkey basis with more than 1 MW of cumulative installations across the
country.
The information contained herein is of a general nature and is not intended to address the circumstances of any particular
individual or entity. Although we endeavor to provide accurate and timely information, there can be no guarantee that such
information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act on
such information without appropriate professional advice after a thorough examination of the particular situation.

More Related Content

What's hot

Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Gensol Engineering Limited
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsGensol Engineering Limited
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Gensol Engineering Limited
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Gensol Engineering Limited
 
Solar power project
Solar power projectSolar power project
Solar power projectshazaan98
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravShubham Gaurav
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuidePrivate Consultants
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Engineering Limited
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 
solar-power-plant-ppt
 solar-power-plant-ppt solar-power-plant-ppt
solar-power-plant-pptArvind Nangare
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system worksHardik Parmar
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plantRusiru Sanjaya
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Managementfirstgreen
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateSaurabh Parihar
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Engineering Limited
 

What's hot (20)

Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Solar Power Plant Design and PV Syst
Solar Power Plant Design and PV SystSolar Power Plant Design and PV Syst
Solar Power Plant Design and PV Syst
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra
 
Solar power project
Solar power projectSolar power project
Solar power project
 
Rooftop PV System Shubham Gaurav
Rooftop PV System Shubham GauravRooftop PV System Shubham Gaurav
Rooftop PV System Shubham Gaurav
 
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s GuideUtility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
Utility-Scale Solar Photovoltaic Power Plants - A Project Developer’s Guide
 
Gensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality ManagementGensol Rooftop EPC - Steps & Quality Management
Gensol Rooftop EPC - Steps & Quality Management
 
roof top solar
roof top solarroof top solar
roof top solar
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
solar-power-plant-ppt
 solar-power-plant-ppt solar-power-plant-ppt
solar-power-plant-ppt
 
Presentation by MNRE on Solar Parks
Presentation by MNRE on Solar ParksPresentation by MNRE on Solar Parks
Presentation by MNRE on Solar Parks
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
How solar rooftop system works
How solar rooftop system worksHow solar rooftop system works
How solar rooftop system works
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plant
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
 

Viewers also liked

Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Gensol Engineering Limited
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantGensol Engineering Limited
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsGensol Engineering Limited
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaAkash Jauhari
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Gensol Engineering Limited
 
Project on Solar Energy
Project on Solar EnergyProject on Solar Energy
Project on Solar Energygagneeshkaur
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy pptshubhajit_b
 
Ensuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectiveEnsuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectivePuneet Jaggi
 
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power PlantTransmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power PlantGensol Engineering Limited
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Headway Solar
 
Solar Roof top Project proposal delhi
Solar Roof top Project proposal delhiSolar Roof top Project proposal delhi
Solar Roof top Project proposal delhiTarun Rathore
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentationAnjali Khandelwal
 

Viewers also liked (18)

Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India) Fact Sheet - Solar Net Metering Regulations (India)
Fact Sheet - Solar Net Metering Regulations (India)
 
Pre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power PlantPre-Commissioning Tests for AC Side of Solar Power Plant
Pre-Commissioning Tests for AC Side of Solar Power Plant
 
Drawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar ProjectsDrawings & Documents Required for Solar Projects
Drawings & Documents Required for Solar Projects
 
Phases of Construction - Solar Project
Phases of Construction - Solar ProjectPhases of Construction - Solar Project
Phases of Construction - Solar Project
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
 
Gensol Lender's Engineer Services
Gensol Lender's Engineer ServicesGensol Lender's Engineer Services
Gensol Lender's Engineer Services
 
Analysis of PVSyst Loss Diagram
Analysis of PVSyst Loss DiagramAnalysis of PVSyst Loss Diagram
Analysis of PVSyst Loss Diagram
 
Project on Solar Energy
Project on Solar EnergyProject on Solar Energy
Project on Solar Energy
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy ppt
 
Ensuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical PersepectiveEnsuring Profitability - A Practical Persepective
Ensuring Profitability - A Practical Persepective
 
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power PlantTransmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power Plant
 
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
Solar Power - Grid Connected Ground Mounted and Solar Rooftop and Metering Re...
 
Solar Roof top Project proposal delhi
Solar Roof top Project proposal delhiSolar Roof top Project proposal delhi
Solar Roof top Project proposal delhi
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
Solarig Gensol 'An Overview'
Solarig Gensol 'An Overview' Solarig Gensol 'An Overview'
Solarig Gensol 'An Overview'
 

Similar to Cost Economics For Solar Parks

Bidding for Profitability
Bidding for ProfitabilityBidding for Profitability
Bidding for ProfitabilityPuneet Jaggi
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdfsanjay vashishtha
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORRanbir Ghosh
 
SSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSatya Kumar DV
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy
 
Rohini Patil Profile
Rohini Patil ProfileRohini Patil Profile
Rohini Patil ProfileRohini PATIL
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar BusinessSetu Goyal
 
SSAEL Solar Projects- From Concept to Commissioning and over Project Life Span
SSAEL Solar Projects- From Concept to Commissioning and over Project Life SpanSSAEL Solar Projects- From Concept to Commissioning and over Project Life Span
SSAEL Solar Projects- From Concept to Commissioning and over Project Life SpanSatya Kumar DV
 
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Gensol Engineering Limited
 
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...KSSEM
 
Pakistan Solar Services Profile
Pakistan Solar Services ProfilePakistan Solar Services Profile
Pakistan Solar Services ProfileKhursheed Alam
 

Similar to Cost Economics For Solar Parks (20)

Bidding for Profitability
Bidding for ProfitabilityBidding for Profitability
Bidding for Profitability
 
L&T Solar
L&T SolarL&T Solar
L&T Solar
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdf
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTOR
 
SSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting services
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M Presentation
 
Rohini Patil Profile
Rohini Patil ProfileRohini Patil Profile
Rohini Patil Profile
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar Business
 
Solar Parks - SSAEL
Solar Parks - SSAELSolar Parks - SSAEL
Solar Parks - SSAEL
 
SSAEL Solar Projects- From Concept to Commissioning and over Project Life Span
SSAEL Solar Projects- From Concept to Commissioning and over Project Life SpanSSAEL Solar Projects- From Concept to Commissioning and over Project Life Span
SSAEL Solar Projects- From Concept to Commissioning and over Project Life Span
 
영문=10mw. fiji
영문=10mw. fiji영문=10mw. fiji
영문=10mw. fiji
 
Imagineering
ImagineeringImagineering
Imagineering
 
CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption
 
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
Solar Energy Corporation of India (SECI) Subsidy for Rooftop Solar Projects
 
Project management
Project managementProject management
Project management
 
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
 
Ilios Power Profile
Ilios Power ProfileIlios Power Profile
Ilios Power Profile
 
Roof top brochure
Roof top brochureRoof top brochure
Roof top brochure
 
Pakistan Solar Services Profile
Pakistan Solar Services ProfilePakistan Solar Services Profile
Pakistan Solar Services Profile
 

More from Gensol Engineering Limited

Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Gensol Engineering Limited
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Gensol Engineering Limited
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Gensol Engineering Limited
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Gensol Engineering Limited
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019Gensol Engineering Limited
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Gensol Engineering Limited
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Gensol Engineering Limited
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol Engineering Limited
 

More from Gensol Engineering Limited (20)

Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 
Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18Gensol's Lender Engineer Credentials - 20.03.18
Gensol's Lender Engineer Credentials - 20.03.18
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
 

Recently uploaded

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 

Recently uploaded (20)

8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 

Cost Economics For Solar Parks

  • 1. Cost Economics For Solar Parks Anmol Singh Jaggi
  • 2. An Aerial View of Gujarat Solar Park Contact: solar@gensol.in | Ph:+91 93270 16962
  • 3. Infrastructure in a Solar Park Contact: solar@gensol.in | Ph:+91 93270 16962 Land Power Evacuation Water Supply & Treatment Common Infrastructure Roads Security
  • 4. Infrastructure in a Typical Solar Park Contact: solar@gensol.in | Ph:+91 93270 16962 But, what are these worth to a Project Developer? How much should the developer pay to get this infrastructure?
  • 5. Land Contact: solar@gensol.in | Ph:+91 93270 16962 Facilities provided in a Solar Park •  Land on Lease •  Land Leveling & Grading What it means for a Project Developer Area required per MW: 5 acres Average Land Cost per Acre for Solar Projects: Rs. 5 Lacs Average Cost for Leveling of Land per acre: Rs. 50,000 Cost saved per acre Cost of Land + Leveling Rs. 5.50 Lacs
  • 6. Power Evacuation Contact: solar@gensol.in | Ph:+91 93270 16962 Facilities provided in a Solar Park •  Transmission Line •  Ready Substation for Evacuation of Power What it means for a Project Developer Assumed Capacity of Power Plant: 10 MW Assumed Length of Transmission Line: 5 kms Cost of Transmission Line per km (incl RoW): Rs 40 Lacs Cost of Construction of Bay at Grid Substation: Rs 25 Lacs Cost saved per acre Cost of Transmission Line Rs 200 Lacs Cost of Bay Rs 25 Lacs Total Cost Rs 225 Lacs Cost per MW Rs 22.5 Lacs Cost per acre Rs 4.5 Lacs
  • 7. Water Supply & Treatment Contact: solar@gensol.in | Ph:+91 93270 16962 Facilities provided in a Solar Park •  Treated Water Pipeline •  Water Storage •  Sewage Treatment •  Proper Drainage around Plant Periphery What it means for a Project Developer Assumed Capacity of Power Plant: 10 MW Cost of Good Quality RO Plant: Rs. 5 Lacs Cost of Water Storage & Sewage Treatment: Rs. 2.5 Lacs Cost of Construction of Drainage around Periphery: Rs. 20 Lacs Cost saved per acre Cost of Water Infrastructure: Rs 27.5 Lacs Cost per MW Rs 2.75 Lacs Cost per acre Rs 55,000
  • 8. Common Infrastructure Contact: solar@gensol.in | Ph:+91 93270 16962 Optional Facilities: •  Helipad •  Entrance Facilities provided in a Solar Park •  Telecom Network •  Fire Station •  Township What it means for a Project Developer Assumed Capacity of Power Plant: 10 MW Cost on creating basic infrastructure for O&M Staff: Rs. 10 Lacs Creating additional Fire Protection Infrastructure: Rs. 1.5 Lacs Telecom Infrastructure: Rs. 1 Lac Cost saved per acre Cost of Common Facilities: Rs 12.5 Lacs Cost per MW Rs 2.5 Lacs Cost per acre Rs 50,000
  • 9. Roads Contact: solar@gensol.in | Ph:+91 93270 16962 Facilities provided in a Solar Park Broad Access Roads upto and around the Site Boundary for easy transport of equipment during and after construction. What it means for a Project Developer Typical Length of Access Roads: 1 km Cost of Construction of good quality Access Road : Rs. 10 Lacs •  at least 3 meter wide for transport of 40 ft containers •  Includes the cost of Right of Way for Access Road Cost saved per acre Cost per MW Rs 1,00,000 Cost per acre Rs 20,000
  • 10. Security Contact: solar@gensol.in | Ph:+91 93270 16962 Facilities provided in a Solar Park Wire Gauge Fencing around periphery (approximately 6 feet high) Common Security Towers for the Park What it means for a Project Developer Assumed Capacity of Power Plant: 10 MW Outside of Solar Park, boundary wall is preferred: Rs. 1500 per m Approximate Length of boundary wall: 2.5 kms Cost of Boundary Wall: Rs. 37.5 Lacs Cost saved per acre Cost per MW Rs 3.75 Lacs Cost per acre Rs 75,000
  • 11. Total Direct Cost Saving per Acre Contact: solar@gensol.in | Ph:+91 93270 16962 Land Rs. 5.50 Lacs Power Evacuation Rs. 4.50 Lacs Water Supply & Treatment Rs.0.55 Lacs Common Infrastructure Rs. 0.50 Lacs Roads Rs. 0.20 Lacs Security Rs. 0.75 Lacs Total per acre saving Rs. 12.00 Lacs
  • 12. Indirect Cost Saving per Acre Contact: solar@gensol.in | Ph:+91 93270 16962 Considering, ready availability of the infrastructure, the project construction period could be reduced from 6 months to 4 months. Savings on account of 2 month reduction Assumed Plant Capacity: 10 MW Project Cost per MW: Rs 6.5 Crores Total Project Cost: Rs. 65 Crores Calculation of Interest During Construction (IDC) saved Project Implementation Period reduced by: 2 months Approximate Debt for Project: 70% = Rs. 45.5 Cr Assumed Interest Rate: 12.5% Approximate IDC Saved: (Rs. 45.5 Cr / 2) x 12.5% x (2 months / 12) : Rs. 47.39 Lacs or Rs. 4.74 Lacs per MW Approximate IDC saved per Acre: Rs. 1 Lac
  • 13. Total Savings per Acre Contact: solar@gensol.in | Ph:+91 93270 16962 Direct Savings Rs. 12.00 Lacs Indirect Savings Rs. 1.00 Lacs Total per acre savings Rs. 13.00 Lacs Peace of Mind Premium Rs. 2 Lacs Premium you would want to give for peace of mind towards ease of getting permissions & not having to go through the process of Land Identification, Acquisition and Right of Way
  • 14. For the Solar Park Developer Estimates show that a 1000 MW Solar Park costs around Rs. 600 Cr to build or Rs. 12 Lacs per acre Considering a Project Developer willing to pay Rs. 15 Lacs per acre, it is a win-win situation for both. Contact: solar@gensol.in | Ph:+91 93270 16962
  • 15. How is Gensol helping? Cost of Construction Increasing Generation Customer Acquisition Gensol boasts of being India’s largest Solar Engineering Advisory firm boasting of 1.3 GW of client base. Gensol EPC has been able to achieve the most competitive prices in the industry because of its engineering prowess. Gensol has JV with Spain’s Solarig with plants managed across 6 countries for offering truly world class Operation & Maintenance services for Indian Solar Power Plants. India’s first solar marketplace where you can order Solar Energy Assessment Reports and Solar Layouts online. Soon, ezysolare will allow you to upload roof data and order installers and products online. Contact: solar@gensol.in | Ph:+91 93270 16962
  • 16. ”“ About Gensol Consultants Pvt Ltd Gensol, an ISO 9001:2008 certified company is a pioneer in Solar Power Advisory and Project Execution. Gensol is an advisor to 1000MW+ commissioned or under construction Solar PV Projects and has a cumulative portfolio of more than 1 MW of rooftop solar power plants under execution. •  Solar Advisory & Project Execution •  Carbon Advisory & Trading •  Renewable Energy Certificate Advisory & Trading •  Power Trading 360o Clean Energy Solutions:
  • 17. About Gensol Consultants Pvt Ltd Few Facts: •  30+ Trained Team - all Graduates and Post Graduates in Energy and Environment •  800 MW+ Solar Power Projects under advisory •  1 MW+ Solar Rooftop Projects under Execution •  Recipient of multiple awards including BusinessWorld Hottest Young Entrepreneur and Economic Times Power of Ideas. Quoted In: Business Dailies: Business Standard | Economic Times Business Magazines: Business India | Forbes India Industry Journals: Power Line | Energetica | EQ International Empanelled With: Ministry of New & Renewable Energy ANERT, Kerala (10,000 solar rooftops program) Central Bank of India, PTC Project Financial Services, L&T Infra Finance & Other Banks
  • 18. Solar Advisory & EPC Services Owner’s Engineer: As Owner's Engineer, we guide our clients or investors through the complete process of project feasibility, financial closure, bid process management, vendor finalization and supervision of project execution up till successful project commissioning which meets our strict quality criteria. Lender’s Engineer: Being consultants to some of the leading lending institutions in the country, we assess the key parameters impacting the returns from the project like generation, cost and conditions of the EPC Contract, preparedness of Project Developer for execution etc. Detailed Engineering and Vetting of Drawings: Gensol Solar Division is staffed with experienced Electrical, Electronics, Mechanical and Civil Engineers who undertake detailed engineering of Solar PV Power plants on behalf of EPC Contractors and vetting of drawings for Project Developers and investors. Permits & Clearances: It takes more than 32 permits and clearances from Nodal Agencies, District Authorities, Distribution and Transmission Companies etc. Gensol has an experienced liasoning team well aware of process and people to acquire these permits in time and in sequence. Detailed Project Report: A Detailed Project Report is one of the most important documents to assess the feasibility of project and to get financial closure. Gensol with its sector expertise and established standing in the renewable energy consultancy not only gives the most exhaustive analysis of the project but also enjoys the confidence of industries, investors and banks alike. Solar EPC Services Gensol, being a channel partner of Ministry of New and Renewable Energy (MNRE) has attained amongst the highest allocation of subsidies for the Solar Rooftop Projects on account of its superior engineering, standardized procurement and quick execution. Gensol has executed projects in the range of 1 kW powerpacks to 400 kW single rooftop power plants.
  • 19. ”“ Experience Snapshot Gensol is among the leading consultants to Project Developers, Financial Institutions and Investors. Total portfolio of Solar Power Projects commissioned or under construction under advisory at Gensol is more than 800 MW. •  33 MW – Sterling & Wilson, Rajasthan •  25 MW – Alex Astral Solar Power Ltd., Gujarat •  20 MW – Essel Infraprojects, Maharashtra •  20 MW – SolaireDirect, Punjab •  17 MW – Sunrays Power Solutions, Rajasthan •  15 MW – NALCO, Orissa •  10 MW – Ghodawat Energy, Rajasthan •  6.5 MW – Haryana Power Generation Corporation Ltd, Haryana Govt Enterprise •  5 MW – Alex Spectrum Radiation Pvt Ltd, Rajasthan •  3 MW – Par Solar, Rajasthan •  1.5 MW – Agarwal Infratech Ltd, Gujarat •  350 kW – Mapro Foods Pvt Ltd, Maharashtra Owner’s Engineer: •  130 MW – Welspun MP Energy, Madhya Pradesh •  50 MW – Welspun Energy Ltd, Rajasthan •  25 MW – Sun Edison, Gujarat •  20 MW – PLG Power, Gujarat •  15 MW – MI Mysolar 24, Gujarat •  15 MW – Dreisatz Mysolar 24, Gujarat •  10 MW – Greeninfra Solar, Gujarat •  10 MW – Millenium Synergy, Gujarat •  6.5 MW – Sun Group, Gujarat •  6 MW – Indiabulls Power, UP & Maharashtra •  5 MW – ESP Urja, Gujarat Lender’s Engineer: •  20 MW – Client Confidential, Gujarat •  12 MW – Lanco Solar, Andhra Pradesh •  8.5 MW – Jain Irrigation, Maharashtra •  5 MW – ABB Ltd, Gujarat •  1 MW – L&T ECC Division, Rajasthan Detailed Designing & Design Vetting •  20 MW – Sai Sudhir Energy, Andhra Pradesh •  10 MW – Sai Sudhir Energy, Karnataka •  5 MW – Chemtrol Industries, Rajasthan •  2 MW – Shri Bhagirathi Textiles Ltd, Maharashtra •  15 MW – Boyance Infrastructure, Rajasthan •  5 MW – Sattva Salarpuria Group, Karnataka •  1 MW – NIT Hamirpur, Himachal Pradhesh Feasibility Analysis & DPR:
  • 20. Experience Snapshot •  163 MW Grid Connected Gujarat •  130 MW Grid Connected Madhya Pradesh •  129 MW Grid Connected Rajasthan •  55 MW Grid Connected Punjab •  35 MW Grid Connected Maharashtra •  18 MW Grid Connected Karnataka •  15 MW Grid Connected Odisha •  6.5 MW Grid Connected Haryana •  2 MW Grid Connected Uttarakhand •  2 MW Grid Connected Uttar Pradesh •  1 MW Grid Connected Himachal Pradesh •  300 kW Rooftop Grid tied Andhra Pradesh •  100 kW Rooftop Grid tied Karnataka •  92 kW Grid Tied & Off Grid Gujarat •  Empanelled with ANERT, Kerala for 10,000 Rooftops Solar Program Advisory: Execution: ”“ Gensol is among the forefront of Solar Rooftop execution with more than 1 MW as its clientele ranging from 1 kW power packs upto 400 kW single rooftop power plants.
  • 21. Gensol: Engineering, Procurement & Construction 200 kW, IIT Kanpur, Uttar Pradesh 200 kW, VIT Andhra Pradesh 130 kW, NIMS Hospital, Kerala 100 kW, VVIT, Andhra Pradesh 100 kW, NCET Karnataka 5 kW, Raheja Residence, Delhi 1 kW, 70 systems, Kerala
  • 22. About Gensol Gensol Consultants, found in 2007 is India’s leading Advisory and System Integrator for Solar PV Power Projects. Gensol is a channel partner to MNRE and enjoys empanelment with most major Lending Institutions in India. 1,000+ MW 2,000+ kW Gensol has an advisory portfolio of more than 1 GW with every 5th MW in India developed with our expertise. Being an MNRE Channel partner, Gensol has executed more than 2 MW of Solar Rooftop Projects across India. Gensol is based out of Ahmedabad in Gujarat but has operational solar projects across 16 Indian States. With a 40+ Employee Strength – Gensol prides itself on having the best technical talent in industry. AWARDS BusinessWorld – India’s largest weekly business magazine awarded Gensol with “Hottest Young Entrepreneur” in 2009. Economic Times – India’s largest financial daily awarded Gensol in its “Power of Ideas” series in 2010. Gensol was the only non-UK based firm to be nominated for Global Consultancy of the Year at BusinessGreen Leader Awards, London in 2014. Contact: solar@gensol.in | Ph:+91 93270 16962
  • 23. Gensol Engineering Pvt Ltd | Gensol Consultants Pvt Ltd Corporate Office 108, Pinnacle Business Park Opp Royal Arcade, Prahladnagar Ahmedabad, Gujarat India - 380015 Email: solar@gensol.in Website: www.gensol.in Phone: +91 79 40068235 Mob: +91 93270 16962 Fax: +91 79 40068239 Twitter: gensol_tweets Gensol is one of the leading consultants and system integrators for Solar Power Plants. We boast of a portfolio of over 1000 MW of Solar Photovoltaic Plants. Gensol is also a channel partner to Ministry of New & Renewable Energy and installs kW scale Solar Rooftop systems on a turnkey basis with more than 1 MW of cumulative installations across the country. The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavor to provide accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act on such information without appropriate professional advice after a thorough examination of the particular situation.