SlideShare a Scribd company logo
1 of 24
Download to read offline
Industrialised Building System (IBS)
1. What is IBS?
2. Why IBS?
2.1 To our economy?
2.1 Job Opportunities?
3. Types of IBS?
4. Problem Faced by IBS
1
Industrialised Building System (IBS)

1. What is IBS?
“A construction technique in which
components are manufactured in a controlled
environment (on or off site), transported,
positioned and assembled into a structure
with minimal additional site works”

2
3
Industrialised Building System (IBS)

1.1 History of IBS
a) Concept IBS in not new and can be traced
back to as early 1624
b) In 1624, panellised timber houses were
shipped from England to the new settlement in
North America
c) 1851 Crystal Palace in Hyde Park, London
and 1889 Eiffel Tower, Paris
4
Industrialised Building System (IBS)
Crystal Palace, Hyde Park

During construction 1840

Picture taken in 1851
5
Industrialised Building System (IBS)
Eiffel Tower, Paris

During construction 1878

Picture taken in 1945
6
Industrialised Building System (IBS)

1.2 History of IBS in Malaysia
a) Concept IBS in Malaysia is not new
b) In 1966 the two pilot project started by using
IBS concept. Namely?
i) Pekeliling Flat, Kuala Lumpur
ii) The Rifle Range Flat, Penang
c) In 1981-1993 PKNS acquired pre-cast concrete
technology from Praton Haus International,
Germany to built housing project
7
Industrialised Building System (IBS)

1.2 History of IBS in Malaysia

KLCC

Pekeliling Flats

LRT Station

KL Tower

8
Industrialised Building System (IBS)

1.3 Characteristics of IBS
1.3.1 Five Characteristics of IBS are :
a) Industrial production of components though
prefabrication
b) Reduced labour during prefabrication of
components and site works
c) Modern design and manufacturing method
using CAD/CAM
d) Systematic Quality Control i.e ISO 9000
e) Open Building System i.e permitting hybrid
applications

9
Industrialised Building System (IBS)

2. Why IBS
Budget Speech 2005
“The Government is determined to ensure that
every Malaysian will have access to affordable
homes. During the period 1971-2003, the
Government constructed 490,000 units of low-cost
houses. The government intends to provide an
additional 100,000 units of affordable homes to be
implemented through the Industrialised Building
System (IBS).This system will ensure quality, save
cost, create a safer and cleaner working
environment as well as reduce the dependence of
foreign workers”

10
Industrialised Building System (IBS)

2.1 The Current Scenario of
Malaysian Construction Industry

This can contributes : Messy Sites, High Wastage,
Labour Intensive, Low Quality and Delays

11
Industrialised Building System (IBS)

2.2 Social Problems
a) Currently 75 foreign workers out of 100
construction workers
b) There are 318,000 foreign workers in Malaysian
Construction Industry
Let say one foreign worker gain RM400 pe rmonth;
RM400.00 x 12 months = RM5,000 per year,
318,000 x RM5,000 = RM 1.59 Billion per year
It shows the High outflow of Ringgit
12
Industrialised Building System (IBS)

2.3 Benefits
a)Reduction of site labour
b)Minimal Wastage
c) Less site material
d)Cleaner environment
e)Controlled quality
f) Neater and safer sites
g)Faster project completion
h)Lower total construction costs due to the above

13
Industrialised Building System (IBS)

2.4 Case Study

Parcel 5 & 6, Precinct 9

Parcel 4, Precinct 9

750 units (900 sqft)

520 units (1000 sqft)

Durations : 18 months

Durations : 18 months
14
Industrialised Building System (IBS)

3. Types of IBS
3.1 In general, the construction method can be
classified into 4 categories :
a) Conventional Method
b) Cast-in situ
c) Composite Method
d) Fully prefabricated

1st ASSIGNMENT

-Form a group which is consist
min of 5 members.
-Each group will elaborate what is
a), b), c) and d)
-Please attach pictures and
references to support your
finding.

3.2 Method b,c and d can be classified as non
conventional methods and all types of IBSs
are categorized under these three

15
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.3 The construction method can be classified
into 4 categories :

16
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4 Based on structural aspects, IBS can be
divided into five major types :
3.4.1 Type 1 : Pre-Cast Concrete Framing,
Panel and Box System
e.g: Pre-Cast Columns,
Beams, Slabs, Staircase,
Toilet

17
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.2 Type 2 : Steel Formwork Systems

e.g: Tunnel Formwork, Beam, Column
and slab moulding form
18
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.3 Type 3 : Steel Frame System

e.g: Steel Beam, columns, portal frames,
roof trusses
19
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.4 Type 4 : Prefabricate Timber Frame System

e.g: Timber frame, timber roof trusses
20
Industrialised Building System (IBS)

3. Types of IBS (cont’d)
3.4.5 Type 5 : Blockwork Systems

e.g: Interlocking concrete masonry unit (CMU),
lightweight concrete blocks
21
Industrialised Building System (IBS)

4. Problems Faced by IBS
a) Only 15% contractors using IBS, Why?
i) Lack of Expertise / Lack of Experience
ii) Cost

22
Industrialised Building System (IBS)

4. Problems Faced by IBS
4.1 Lack of Expertise / Lack of Experience
a) Lack of experience practicing/designing IBS
by the consultants/contractors/clients
b) Short of experience workers in the
manufacturing and installation works (most of them
are foreign workers)
c) Defect works by previous pre cast system (close
system)
d) QS lack of experience pricing the IBS projects
(most of them not pricing the total cost of project)

23
Industrialised Building System (IBS)

4. Problems Faced by IBS
4.2 Cost
a) Only 15% contractors using IBS, because the
low labour cost in this country is the root causes
b) Labour cost is cheap, so why IBS?

24

More Related Content

What's hot

Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report ForestedTiger
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsCarmen Chan
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...aarenneoone
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2Azizan Supardi
 
Building services report
Building services report Building services report
Building services report Soh Shing
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written ReportYap Xin
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
Building approval.ppt
Building approval.pptBuilding approval.ppt
Building approval.pptwan izzati
 

What's hot (20)

Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Building Technology PJT 1 Report
Building Technology PJT 1 Report Building Technology PJT 1 Report
Building Technology PJT 1 Report
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Ibs score
Ibs scoreIbs score
Ibs score
 
ibs 304
ibs 304ibs 304
ibs 304
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
BS Role
BS RoleBS Role
BS Role
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
Building services report
Building services report Building services report
Building services report
 
CT Assignment Written Report
CT Assignment Written ReportCT Assignment Written Report
CT Assignment Written Report
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
Building approval.ppt
Building approval.pptBuilding approval.ppt
Building approval.ppt
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 

Similar to Ibs part1

Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyQuinn Liew
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 ReportBolin Loong
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).pptMohd Zulhairi Mohd Noor
 
Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxAtulBhagwat6
 
MS Ibs in malaysia
MS Ibs in malaysiaMS Ibs in malaysia
MS Ibs in malaysiaEst
 
CSCM Ibs in malaysia
CSCM Ibs in malaysiaCSCM Ibs in malaysia
CSCM Ibs in malaysiaEst
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptxra1508
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressedWeng Chuan
 
Cicabloc india
Cicabloc indiaCicabloc india
Cicabloc indiacicabloc
 
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйөндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйЦ. Алтангэрэл
 
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1DavidJPCChai
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdfyenweizheng
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013engineeringwatch
 
Chap 2-literature-review (3)
Chap 2-literature-review (3)Chap 2-literature-review (3)
Chap 2-literature-review (3)Jessyca Than
 

Similar to Ibs part1 (20)

Building Technology : Industrialize Building Technology
Building Technology : Industrialize Building TechnologyBuilding Technology : Industrialize Building Technology
Building Technology : Industrialize Building Technology
 
Building Technology Project 1 Report
Building Technology Project 1 ReportBuilding Technology Project 1 Report
Building Technology Project 1 Report
 
Btech report
Btech reportBtech report
Btech report
 
230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt230033095-Industrialised-building-system (1).ppt
230033095-Industrialised-building-system (1).ppt
 
Modular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptxModular Coordination in buildings and construction.pptx
Modular Coordination in buildings and construction.pptx
 
MS Ibs in malaysia
MS Ibs in malaysiaMS Ibs in malaysia
MS Ibs in malaysia
 
CSCM Ibs in malaysia
CSCM Ibs in malaysiaCSCM Ibs in malaysia
CSCM Ibs in malaysia
 
Unit 2
Unit 2Unit 2
Unit 2
 
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
434773055-INDUSTRIALIZED-BUILDING-SYSTEM-IBS-pptx.pptx
 
Btech i compressed
Btech i compressedBtech i compressed
Btech i compressed
 
Cicabloc india
Cicabloc indiaCicabloc india
Cicabloc india
 
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүйөндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
өндөр барилгын бүтээц төлөвлөлт үзэж байгаа оюутнуудад хэрэгтэй байж магадгүй
 
Building Technology I Project 1
Building Technology I Project 1Building Technology I Project 1
Building Technology I Project 1
 
B tech final report pdf
 B tech final report pdf B tech final report pdf
B tech final report pdf
 
Unit 3
Unit 3Unit 3
Unit 3
 
The capital nomination 31-08-2013
The capital nomination   31-08-2013The capital nomination   31-08-2013
The capital nomination 31-08-2013
 
Ct3
Ct3Ct3
Ct3
 
Chap 2-literature-review (3)
Chap 2-literature-review (3)Chap 2-literature-review (3)
Chap 2-literature-review (3)
 
C0343011020
C0343011020C0343011020
C0343011020
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 

More from AnsherinaDelMundo

More from AnsherinaDelMundo (20)

Cambodia
Cambodia Cambodia
Cambodia
 
Roof trusses
Roof trussesRoof trusses
Roof trusses
 
Types roof trusses
Types roof trussesTypes roof trusses
Types roof trusses
 
Building utilities 2
Building utilities 2Building utilities 2
Building utilities 2
 
Aida requirements for level 2 hospital
Aida requirements for level 2 hospitalAida requirements for level 2 hospital
Aida requirements for level 2 hospital
 
Human factors and ergonomics and anthropometrics
Human factors and ergonomics and anthropometricsHuman factors and ergonomics and anthropometrics
Human factors and ergonomics and anthropometrics
 
mechanical transportation
mechanical transportationmechanical transportation
mechanical transportation
 
Avery brief history of lifts and escalators
Avery brief history of lifts and escalatorsAvery brief history of lifts and escalators
Avery brief history of lifts and escalators
 
vertical-transportation (mechanical)
vertical-transportation (mechanical)vertical-transportation (mechanical)
vertical-transportation (mechanical)
 
Module 1 1.2 space planning
Module 1  1.2 space planningModule 1  1.2 space planning
Module 1 1.2 space planning
 
Module 1 1.1 defining architecture
Module 1  1.1 defining architectureModule 1  1.1 defining architecture
Module 1 1.1 defining architecture
 
What is the color psychology
What is the color psychologyWhat is the color psychology
What is the color psychology
 
Architectural interior
Architectural interior Architectural interior
Architectural interior
 
Theory 3
Theory 3Theory 3
Theory 3
 
Tro arch pp
Tro arch ppTro arch pp
Tro arch pp
 
Tropical architecture
Tropical architectureTropical architecture
Tropical architecture
 
Tropical architecture 2
Tropical architecture 2Tropical architecture 2
Tropical architecture 2
 
Tropical architecture 2
Tropical architecture 2Tropical architecture 2
Tropical architecture 2
 
Passive Solar Design (tropical architecture)
Passive Solar Design (tropical architecture)Passive Solar Design (tropical architecture)
Passive Solar Design (tropical architecture)
 
Passive Cooling (tropical architecture)
Passive Cooling (tropical architecture)Passive Cooling (tropical architecture)
Passive Cooling (tropical architecture)
 

Recently uploaded

How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17Celine George
 
In - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxIn - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxAditiChauhan701637
 
How to Solve Singleton Error in the Odoo 17
How to Solve Singleton Error in the  Odoo 17How to Solve Singleton Error in the  Odoo 17
How to Solve Singleton Error in the Odoo 17Celine George
 
UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE
 
How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17Celine George
 
Presentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphPresentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphNetziValdelomar1
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...Nguyen Thanh Tu Collection
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.EnglishCEIPdeSigeiro
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...raviapr7
 
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptxPractical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptxKatherine Villaluna
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?TechSoup
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxraviapr7
 
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptxPISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptxEduSkills OECD
 
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfMaximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfTechSoup
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxheathfieldcps1
 
Ultra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptxUltra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptxDr. Asif Anas
 
How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17Celine George
 
How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17Celine George
 

Recently uploaded (20)

How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17How to Show Error_Warning Messages in Odoo 17
How to Show Error_Warning Messages in Odoo 17
 
In - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptxIn - Vivo and In - Vitro Correlation.pptx
In - Vivo and In - Vitro Correlation.pptx
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 
How to Solve Singleton Error in the Odoo 17
How to Solve Singleton Error in the  Odoo 17How to Solve Singleton Error in the  Odoo 17
How to Solve Singleton Error in the Odoo 17
 
UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024UKCGE Parental Leave Discussion March 2024
UKCGE Parental Leave Discussion March 2024
 
How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17How to Make a Field read-only in Odoo 17
How to Make a Field read-only in Odoo 17
 
Presentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a ParagraphPresentation on the Basics of Writing. Writing a Paragraph
Presentation on the Basics of Writing. Writing a Paragraph
 
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
CHUYÊN ĐỀ DẠY THÊM TIẾNG ANH LỚP 11 - GLOBAL SUCCESS - NĂM HỌC 2023-2024 - HK...
 
Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.Easter in the USA presentation by Chloe.
Easter in the USA presentation by Chloe.
 
Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...Patient Counselling. Definition of patient counseling; steps involved in pati...
Patient Counselling. Definition of patient counseling; steps involved in pati...
 
Finals of Kant get Marx 2.0 : a general politics quiz
Finals of Kant get Marx 2.0 : a general politics quizFinals of Kant get Marx 2.0 : a general politics quiz
Finals of Kant get Marx 2.0 : a general politics quiz
 
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptxPractical Research 1: Lesson 8 Writing the Thesis Statement.pptx
Practical Research 1: Lesson 8 Writing the Thesis Statement.pptx
 
What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?What is the Future of QuickBooks DeskTop?
What is the Future of QuickBooks DeskTop?
 
Prescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptxPrescribed medication order and communication skills.pptx
Prescribed medication order and communication skills.pptx
 
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptxPISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
PISA-VET launch_El Iza Mohamedou_19 March 2024.pptx
 
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdfMaximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
Maximizing Impact_ Nonprofit Website Planning, Budgeting, and Design.pdf
 
The basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptxThe basics of sentences session 10pptx.pptx
The basics of sentences session 10pptx.pptx
 
Ultra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptxUltra structure and life cycle of Plasmodium.pptx
Ultra structure and life cycle of Plasmodium.pptx
 
How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17How to Add a many2many Relational Field in Odoo 17
How to Add a many2many Relational Field in Odoo 17
 
How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17How to Add Existing Field in One2Many Tree View in Odoo 17
How to Add Existing Field in One2Many Tree View in Odoo 17
 

Ibs part1

  • 1. Industrialised Building System (IBS) 1. What is IBS? 2. Why IBS? 2.1 To our economy? 2.1 Job Opportunities? 3. Types of IBS? 4. Problem Faced by IBS 1
  • 2. Industrialised Building System (IBS) 1. What is IBS? “A construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site works” 2
  • 3. 3
  • 4. Industrialised Building System (IBS) 1.1 History of IBS a) Concept IBS in not new and can be traced back to as early 1624 b) In 1624, panellised timber houses were shipped from England to the new settlement in North America c) 1851 Crystal Palace in Hyde Park, London and 1889 Eiffel Tower, Paris 4
  • 5. Industrialised Building System (IBS) Crystal Palace, Hyde Park During construction 1840 Picture taken in 1851 5
  • 6. Industrialised Building System (IBS) Eiffel Tower, Paris During construction 1878 Picture taken in 1945 6
  • 7. Industrialised Building System (IBS) 1.2 History of IBS in Malaysia a) Concept IBS in Malaysia is not new b) In 1966 the two pilot project started by using IBS concept. Namely? i) Pekeliling Flat, Kuala Lumpur ii) The Rifle Range Flat, Penang c) In 1981-1993 PKNS acquired pre-cast concrete technology from Praton Haus International, Germany to built housing project 7
  • 8. Industrialised Building System (IBS) 1.2 History of IBS in Malaysia KLCC Pekeliling Flats LRT Station KL Tower 8
  • 9. Industrialised Building System (IBS) 1.3 Characteristics of IBS 1.3.1 Five Characteristics of IBS are : a) Industrial production of components though prefabrication b) Reduced labour during prefabrication of components and site works c) Modern design and manufacturing method using CAD/CAM d) Systematic Quality Control i.e ISO 9000 e) Open Building System i.e permitting hybrid applications 9
  • 10. Industrialised Building System (IBS) 2. Why IBS Budget Speech 2005 “The Government is determined to ensure that every Malaysian will have access to affordable homes. During the period 1971-2003, the Government constructed 490,000 units of low-cost houses. The government intends to provide an additional 100,000 units of affordable homes to be implemented through the Industrialised Building System (IBS).This system will ensure quality, save cost, create a safer and cleaner working environment as well as reduce the dependence of foreign workers” 10
  • 11. Industrialised Building System (IBS) 2.1 The Current Scenario of Malaysian Construction Industry This can contributes : Messy Sites, High Wastage, Labour Intensive, Low Quality and Delays 11
  • 12. Industrialised Building System (IBS) 2.2 Social Problems a) Currently 75 foreign workers out of 100 construction workers b) There are 318,000 foreign workers in Malaysian Construction Industry Let say one foreign worker gain RM400 pe rmonth; RM400.00 x 12 months = RM5,000 per year, 318,000 x RM5,000 = RM 1.59 Billion per year It shows the High outflow of Ringgit 12
  • 13. Industrialised Building System (IBS) 2.3 Benefits a)Reduction of site labour b)Minimal Wastage c) Less site material d)Cleaner environment e)Controlled quality f) Neater and safer sites g)Faster project completion h)Lower total construction costs due to the above 13
  • 14. Industrialised Building System (IBS) 2.4 Case Study Parcel 5 & 6, Precinct 9 Parcel 4, Precinct 9 750 units (900 sqft) 520 units (1000 sqft) Durations : 18 months Durations : 18 months 14
  • 15. Industrialised Building System (IBS) 3. Types of IBS 3.1 In general, the construction method can be classified into 4 categories : a) Conventional Method b) Cast-in situ c) Composite Method d) Fully prefabricated 1st ASSIGNMENT -Form a group which is consist min of 5 members. -Each group will elaborate what is a), b), c) and d) -Please attach pictures and references to support your finding. 3.2 Method b,c and d can be classified as non conventional methods and all types of IBSs are categorized under these three 15
  • 16. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.3 The construction method can be classified into 4 categories : 16
  • 17. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4 Based on structural aspects, IBS can be divided into five major types : 3.4.1 Type 1 : Pre-Cast Concrete Framing, Panel and Box System e.g: Pre-Cast Columns, Beams, Slabs, Staircase, Toilet 17
  • 18. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.2 Type 2 : Steel Formwork Systems e.g: Tunnel Formwork, Beam, Column and slab moulding form 18
  • 19. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.3 Type 3 : Steel Frame System e.g: Steel Beam, columns, portal frames, roof trusses 19
  • 20. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.4 Type 4 : Prefabricate Timber Frame System e.g: Timber frame, timber roof trusses 20
  • 21. Industrialised Building System (IBS) 3. Types of IBS (cont’d) 3.4.5 Type 5 : Blockwork Systems e.g: Interlocking concrete masonry unit (CMU), lightweight concrete blocks 21
  • 22. Industrialised Building System (IBS) 4. Problems Faced by IBS a) Only 15% contractors using IBS, Why? i) Lack of Expertise / Lack of Experience ii) Cost 22
  • 23. Industrialised Building System (IBS) 4. Problems Faced by IBS 4.1 Lack of Expertise / Lack of Experience a) Lack of experience practicing/designing IBS by the consultants/contractors/clients b) Short of experience workers in the manufacturing and installation works (most of them are foreign workers) c) Defect works by previous pre cast system (close system) d) QS lack of experience pricing the IBS projects (most of them not pricing the total cost of project) 23
  • 24. Industrialised Building System (IBS) 4. Problems Faced by IBS 4.2 Cost a) Only 15% contractors using IBS, because the low labour cost in this country is the root causes b) Labour cost is cheap, so why IBS? 24

Editor's Notes

  1. {}