Opti-Purge®
FAST INFLATION
PURGE SYSTEM
MOST EFFECTIVE
AND EFFICIENT
SOLUTION FOR
LARGER PIPE SIZES
MADE IN THE USA
About
• The Opti-Purge Inflatable Purging System increases productivity when welding large
diameter pipes 48″ to 84″ (1219 mm to 2133 mm) of various materials including stainless
steel, titanium, nickel and several other metals and alloys.
• The unique one-piece design of Opti-Purge consists of two outer rings and a hollow
connector. The unit is easily and quickly inflated to create an impermeable seal within the
pipe wall. The hollow connector dramatically reduces the amount of inert gas needed to
purge the weld zone, saving both time and money. The exterior of the hollow connector
consists of high heat resistant material that can be exposed to temperatures up to 1004°F
(540°C).
• A reflective strip on the hollow connector conveniently indicates the center of the Opti-Purge,
allowing for fast and accurate alignment of the system.
• The Opti-Purge is the ideal solution for welding large pipe rapidly, requiring minimal
preparation for maximum results.
• Click here to know more on other welding consumables: http://www.aquasolwelding.com/
Features and Benefits
Inflatable Structure
• Flexible, lightweight structure
• Inflated rings create an impermeable, air tight seal on pipe wall
• Re-usable, long-lasting solution for purging multiple pipes of the same
diameter
High Heat Resistant Hollow Connector
• High heat resistant, durable exterior fabric can be exposed to temperatures
up to 1004°F (540°C) to accommodate heat affected zone (HAZ)
• Supportive rods extend down length of hollow connector to maintain
structural integrity
• Complete with luminescent indicator for accurate alignment with root gap
Proprietary Relief Valve
•Factory pre-set relief valves allow for precise flow rates while minimizing set-up time and reducing
gas consumption
•Aids in maintenance of optimum seal on pipe wall
•Prevents risk of over inflation
Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses)
Multiple inlet/exhaust ports for faster, more efficient purging
Separate Connections:
BLUE – Inflation of unit
Initial function is to inflate the unit by allowing gas to flow into the internal tubing system. Then it
proceeds to flood the weld zone with noble gas.
BLACK – Increase Gas Distribution Within Weld Zone
Designed to expedite purging, the secondary (BLACK) purge hose is used to flood the weld zone
with inert gas and evacuate oxygen at a faster rate.
WHITE – Exhaust Connection
Connect this hose to an Oxygen Monitor, such as Aquasol’s PRO OX®-100 that obtains readings down
to 100 PPM (0.01%), for continuous or spot monitoring of oxygen in the weld zone
Pull Loops
Strong pull loops can be connected to a rope or chain to insert or remove the Opti-Purge
Moderate tension should be applied on pull-wires to prevent sagging of the harness during
installation and operation
Click on Fast Inflation Purge System to more on the product.
How Opti-Purge Works
1. Using the pull loops, position Opti-Purge in the pipe so that the reflective, glow tape portion in the center of
the unit is aligned with the root gap
2. Connect inert gas lines to the BLUE and BLACK hoses
BLUE gas hose is required to inflate the purge bladders
BLACK gas hose is optional to expedite the purging process
3. Turn the gas supply on to inflate the unit and purge the weld zone
Recommended Flow Rate for Purging:
150 CFH (70 LPM)
4. Once a tight seal has been achieved, commence welding while maintaining flow rate
5. After the weld is complete, turn off the gas supply to deflate the unit. Once the
heat zone has sufficiently cooled, remove Opti-Purge from the pipe. Be sure to disconnect
all gas lines and monitoring equipment.
6. Clean Opti-Purge and store in area away from hazardous and sharp objects

More Related Content

Viewers also liked

Viewers also liked (10)

How to start_a_startup_for_abc
How to start_a_startup_for_abcHow to start_a_startup_for_abc
How to start_a_startup_for_abc
 
Towards Engaged Cities: Technology and Civic Drivers in the US
Towards Engaged Cities: Technology and Civic Drivers in the USTowards Engaged Cities: Technology and Civic Drivers in the US
Towards Engaged Cities: Technology and Civic Drivers in the US
 
Ifupdown2: Network Interface Manager
Ifupdown2: Network Interface ManagerIfupdown2: Network Interface Manager
Ifupdown2: Network Interface Manager
 
Demystifying Networking Webinar Series- Routing on the Host
Demystifying Networking Webinar Series- Routing on the HostDemystifying Networking Webinar Series- Routing on the Host
Demystifying Networking Webinar Series- Routing on the Host
 
Reversing malware analysis training part3 windows pefile formatbasics
Reversing malware analysis training part3 windows pefile formatbasicsReversing malware analysis training part3 windows pefile formatbasics
Reversing malware analysis training part3 windows pefile formatbasics
 
Diversifying your income
Diversifying your incomeDiversifying your income
Diversifying your income
 
TOP 300 największych najemców centrów handlowych w Polsce
TOP 300 największych najemców centrów handlowych w PolsceTOP 300 największych najemców centrów handlowych w Polsce
TOP 300 największych najemców centrów handlowych w Polsce
 
Aadhar card
Aadhar cardAadhar card
Aadhar card
 
Lista 320 firm z branży piekarniczo cukierniczej
Lista 320 firm z branży piekarniczo cukierniczejLista 320 firm z branży piekarniczo cukierniczej
Lista 320 firm z branży piekarniczo cukierniczej
 
Data center network architectures v1.3
Data center network architectures v1.3Data center network architectures v1.3
Data center network architectures v1.3
 

Recently uploaded

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

Welding Tape - EZ Zone from Aquasol Welding

  • 1. Opti-Purge® FAST INFLATION PURGE SYSTEM MOST EFFECTIVE AND EFFICIENT SOLUTION FOR LARGER PIPE SIZES MADE IN THE USA
  • 2. About • The Opti-Purge Inflatable Purging System increases productivity when welding large diameter pipes 48″ to 84″ (1219 mm to 2133 mm) of various materials including stainless steel, titanium, nickel and several other metals and alloys. • The unique one-piece design of Opti-Purge consists of two outer rings and a hollow connector. The unit is easily and quickly inflated to create an impermeable seal within the pipe wall. The hollow connector dramatically reduces the amount of inert gas needed to purge the weld zone, saving both time and money. The exterior of the hollow connector consists of high heat resistant material that can be exposed to temperatures up to 1004°F (540°C).
  • 3. • A reflective strip on the hollow connector conveniently indicates the center of the Opti-Purge, allowing for fast and accurate alignment of the system. • The Opti-Purge is the ideal solution for welding large pipe rapidly, requiring minimal preparation for maximum results. • Click here to know more on other welding consumables: http://www.aquasolwelding.com/
  • 4. Features and Benefits Inflatable Structure • Flexible, lightweight structure • Inflated rings create an impermeable, air tight seal on pipe wall • Re-usable, long-lasting solution for purging multiple pipes of the same diameter High Heat Resistant Hollow Connector • High heat resistant, durable exterior fabric can be exposed to temperatures up to 1004°F (540°C) to accommodate heat affected zone (HAZ) • Supportive rods extend down length of hollow connector to maintain structural integrity • Complete with luminescent indicator for accurate alignment with root gap
  • 5. Proprietary Relief Valve •Factory pre-set relief valves allow for precise flow rates while minimizing set-up time and reducing gas consumption •Aids in maintenance of optimum seal on pipe wall •Prevents risk of over inflation Tri-Flow Inner Tubing System (BLUE, BLACK & WHITE Hoses) Multiple inlet/exhaust ports for faster, more efficient purging Separate Connections: BLUE – Inflation of unit Initial function is to inflate the unit by allowing gas to flow into the internal tubing system. Then it proceeds to flood the weld zone with noble gas. BLACK – Increase Gas Distribution Within Weld Zone Designed to expedite purging, the secondary (BLACK) purge hose is used to flood the weld zone with inert gas and evacuate oxygen at a faster rate.
  • 6. WHITE – Exhaust Connection Connect this hose to an Oxygen Monitor, such as Aquasol’s PRO OX®-100 that obtains readings down to 100 PPM (0.01%), for continuous or spot monitoring of oxygen in the weld zone Pull Loops Strong pull loops can be connected to a rope or chain to insert or remove the Opti-Purge Moderate tension should be applied on pull-wires to prevent sagging of the harness during installation and operation Click on Fast Inflation Purge System to more on the product.
  • 7. How Opti-Purge Works 1. Using the pull loops, position Opti-Purge in the pipe so that the reflective, glow tape portion in the center of the unit is aligned with the root gap 2. Connect inert gas lines to the BLUE and BLACK hoses BLUE gas hose is required to inflate the purge bladders BLACK gas hose is optional to expedite the purging process 3. Turn the gas supply on to inflate the unit and purge the weld zone Recommended Flow Rate for Purging: 150 CFH (70 LPM) 4. Once a tight seal has been achieved, commence welding while maintaining flow rate 5. After the weld is complete, turn off the gas supply to deflate the unit. Once the heat zone has sufficiently cooled, remove Opti-Purge from the pipe. Be sure to disconnect all gas lines and monitoring equipment. 6. Clean Opti-Purge and store in area away from hazardous and sharp objects