SlideShare a Scribd company logo
1 of 61
1
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Webinar
TUNNEL LINERS, RELINES
& REHABILITATION
May, 2014
Patrick Biro, P.Eng.
Dave Groot
2
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
JOIN THE DISCUSSION
• During the session you can use this
button to ‘Raise Your Hand’ if you have a
question.
• If there are more questions than can be
answered during a session, the
Organizer may ask that you type in
questions in the ‘Question Log’ so that
they may be addressed later, via email.
3
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CPD CREDIT CERTIFICATES
• Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical
Informal
• Formal completion certificates are emailed within one week of attending
• Check your local guidelines if unsure of your requirements
Email Your Attendance List:
• Full Name
• Title
• Email
webinars@armtec.com
Will send certificate
4
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
YOUR HOSTS
Patrick Biro, P.Eng.
Business Development Engineer,
Western Canada
• Patrick completed his Bachelor’s Degree in
Civil Engineering at McMaster University in
April of 2001.
• Patrick has more than 10 years of
experience with the design of buried steel
structures.
• Patrick is currently one of Armtec’s regional
Business Development Engineers for
Western Canada .
5
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
YOUR HOSTS
Dave Groot
Senior Sales Representative,
Central Canada
• Dave has 20 years experience with Drainage
Products and 14 years as a Sales
Representative with Armtec’s Drainage
Solutions based in Ontario.
6
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
• 43 locations in Canada
• Approximately 2,000 employees
• Exceptional product range for:
Armtec is a leading global infrastructure
and construction materials company.
Rail & Road Infrastructure
Ports & Marine
Land Development
Mining & Energy
Forestry
Agriculture
7
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Bridge Materials
Drainage Solutions
and Water Treatment
Landscaping
Products
and Amenities
Noise Control
Road and
Highway Safety Soil Retention
Underground
and Utilities
Precast Concrete
Buildings and
Venues
Precast Concrete
Garages and
Parkades
8
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PRESENTATION OUTLINE
1. Trenchless concepts
• Tunneling
• Relining
2. Trenchless solutions by Armtec
• Structural plate
• Metal pipe
• Plastic pipe
• Spiral wound pipe
9
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Tunnel Liners, Relines & Rehabilitation
1. TRENCHLESS CONCEPTS
TRENCHLESS BY ARMTEC
10
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
• Trenchless construction is a subsurface installation that
does not require open cut excavation
• Trenchless technology can be used for:
1. New construction (tunneling)
2. Rehabilitation (relining)
TRENCHLESS BY ARMTEC
11
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
• Trenchless technology is a growing industry due to the
many benefits vs. open-cut excavations
• Aging infrastructure is also putting a demand on
replacement and rehabilitation of existing structures
• More than half of Canada’s infrastructure is
40+ yrs. old
• Almost a third of Canada’s municipal water
infrastructure is approaching its service life
TRENCHLESS BY ARMTEC
(FCM – 2007).
(Tarek et al.- 2003).
a
b
a
b
12
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Trenchless
TRENCHLESS CONCEPTS
Open Cut
TRENCHLESS BY ARMTEC
Vs.
13
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Trenchless
• Minimal to no traffic or
business disruption
• Reduced impact to local
environment
• Excavation & hauling material
not required
• Minor to no impact to road
surface
• Worker safety improved
• Trenchless is green
TRENCHLESS CONCEPTS
Open Cut
• Reduced or re-routed traffic;
disruption to local business
• Impact to local environment
(dust, silt, other contamination)
• Potentially high cost of
excavation, hauling
• Disturbed road surface affects
pavement quality
• Worker safety at greater risk
TRENCHLESS BY ARMTEC
Vs.
14
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
Trenchless is Green
TRENCHLESS BY ARMTEC
• Trenchless eliminates the
need of running excavation
equipment
• Trenchless eliminates the
need for moving and hauling
excavated material
• Overall reduction in
equipment/vehicle emissions
15
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
Tunneling
• Tunneling is a subsurface excavation commonly used for
new construction in mining & infrastructure applications
• Tunnels can be constructed using a wide variety of
trenchless technologies including:
• Steel liners
• Precast liners
• Sprayed concrete (shotcrete)
• Pipe jacking
TRENCHLESS BY ARMTEC
16
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
Tunneling
• Tunneling typically involves a staged excavation &
installation process:
1. Excavate tunnel as allowed per soil conditions
2. Install rings of liner
3. Pump grout between liner and excavated tunnel
Voids must be filled to perform as a structural liner
4. Repeat steps
• Geotechnical or tunneling engineer is required
• Contractor experienced in tunneling is recommended
TRENCHLESS BY ARMTEC
17
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
Tunneling
TRENCHLESS BY ARMTEC
Armtec Tunnel Liner Plate tunnel installations.
18
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
Tunneling
• Tunneling can also include vertical shaft construction
TRENCHLESS BY ARMTEC
Armtec Tunnel Liner Plate shaft installations.
19
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
Relining
• Relining is the installation of a new surface to an existing
structure to provide either a facial or structural
restoration
• Aging tunnels or culverts experiencing
cracking, spalling, or corrosion may require a new
surface to prevent further deterioration
• Deteriorated structures in danger of failing may require a
fully structural reline
TRENCHLESS BY ARMTEC
20
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
Relining
• Culvert relines typically involve a sliplining process:
1. Slide coupled or pre-assembled pipe liner into the
existing pipe
2. Utilize bracing or blocking to hold structure into
place
3. Pump grout between new and existing structure
Voids must be filled to perform as a structural liner
• Flanged liner plates can be assembled in place*
TRENCHLESS BY ARMTEC
21
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
TRENCHLESS BY ARMTEC
Shop-installed screw-jacks used for bracing.Sliding CSP reline pipe into
place.
Relining
22
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS CONCEPTS
TRENCHLESS BY ARMTEC
Relining
Installation crew injecting grout through shop-installed grout
ports.
23
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Tunnel Liners, Relines & Rehabilitation
2. TRENCHLESS SOLUTIONS
TRENCHLESS BY ARMTEC
BY ARMTEC
24
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TRENCHLESS SOLUTIONS
TRENCHLESS BY ARMTEC
Pipe & Culvert Solutions
Open Cut – New or
Replacement
Trenchless
Tunneling – New
construction
Relining -
Rehabilitation
Tunnel Liner Plate
Various Armtec
pipe & culvert
solutions Structural Plate
CSP grouted liner
HDPE & PVC
grouted liner
Spiral-wound
25
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
PLASTIC
• BOSS 2000
• DuroMaxx
• A2 Liner Pipe
• Spiral Wound
• InnerFlow
TRENCHLESS SOLUTIONS
METAL
• Structural Plate
• Corrugated Steel Pipe
TRENCHLESS BY ARMTEC
26
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE
Multi-Plate
TRENCHLESS BY ARMTEC
Tunnel Liner Plate
Polymer-coated Multi-Plate reline of
existing Multi-Plate - before.
Aluminum Tunnel Liner Plate reline of
existing Multi-Plate - before.
27
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE
Multi-Plate
TRENCHLESS BY ARMTEC
Tunnel Liner Plate
Polymer-coated Multi-Plate reline of
existing Multi-Plate - after.
Aluminum Tunnel Liner Plate reline of
existing Multi-Plate - after.
28
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE
Multi-Plate
• Bolted corrugated plate
• Assembled outside & slip-lined
• Grouted in place
• Structural liner
• Reline drainage pipe, water
crossing structures
• Standard round, elliptical, arch
shapes
TRENCHLESS BY ARMTEC
Tunnel Liner Plate
• Bolted 2-flange liner plate
• Assembled from the inside
• Grouted in place
• Structural liner
• Reline drainage pipe & water
crossing structures
• New construction of tunnels
and shafts
• Wide variety of custom shapes
29
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE
Multi-Plate
TRENCHLESS BY ARMTEC
Tunnel Liner Plate
Multi-Plate being assembled outside of
existing structure, prior to sliplining.
Lift equipment inside Tunnel Liner Plate
structure during assembly.
30
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TUNNEL LINER PLATE
TRENCHLESS BY ARMTEC
2-Flanged liner – Armtec Tunnel
Liner Plate.
Pressure-grouting via shop-installed grout ports.
31
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TUNNEL LINER PLATE
TRENCHLESS BY ARMTEC
Liner plate being assembled inside existing
culvert.
View of bracing required for assembly &
grouting.
32
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
STRUCTURAL PLATE
• Galvanized steel
• Polymer-coated steel
• Aluminum
TRENCHLESS BY ARMTEC
Galvanized steel plate. Strata-CAT polymer-
coated steel plate.
Aluminum plate.
33
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TUNNEL LINER PLATE
• Custom shapes
• Open-bottom structures
TRENCHLESS BY ARMTEC
Facial reline of archway. Structural reline of CIP concrete
structure.
34
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TUNNEL LINER PLATE
• More custom shapes!
TRENCHLESS BY ARMTEC
35
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TUNNEL LINER PLATE
TRENCHLESS BY ARMTEC
Creek Reline; Huron County, ON
1900mm span TLP Arch
Design Challenges:
• Deteriorating structure with bend in it
• Hydraulic capacity
Solution:
• Tunnel Liner Plate reline
• 31 meters of 1900mm span x 900mm rise
• Shop-fabricated elbow included
Full Engineering Support:
• Full structural reline w/ grouting lift recommendations
Outcome:
• Tunnel Liner Plate selected for constructability
• 1200mm jacked pipe offsets loss in hydraulic capacity
36
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
TUNNEL LINER PLATE
TRENCHLESS BY ARMTEC
Creek Reline; Huron County, ON
TLP Arch
View from inside of Tunnel Liner Plate reline.
37
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CORRUGATED STEEL PIPE
Hel-Cor
TRENCHLESS BY ARMTEC
Ultra Flo
38
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CORRUGATED STEEL PIPE
Hel-Cor
• Corrugated steel
• Assembled outside & slip-lined
• Grouted in place
• Structural liner
• Reline drainage pipe
• Round & arched pipes
TRENCHLESS BY ARMTEC
Ultra Flo
• Spiral rib
• Assembled outside & slip-lined
• Grouted in place
• Structural liner
• Reline drainage pipe
• Round pipes
• Superior hydraulic properties
39
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
ULTRA FLO
• Available in 450-2600 mm dia.
• Smooth inner wall has improved
hydraulic properties
• Manning’s n = 0.013
(Comparable to concrete pipe)
Example:
• Reline existing 1200 mm CSP
with 1000 mm Ultra Flo
• Achieve 95% of existing flow
TRENCHLESS BY ARMTEC
View from inside of spiral rib pipe.
40
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
ULTRA FLO
TRENCHLESS BY ARMTEC
Triple Reline; North Vancouver, BC
1200mm dia. Ultra Flo
Design Challenges:
• Aging pipes in need of repair
• Open-cut excavation not possible
• Reduced hydraulic capacity
Solution:
• Ultra Flo reline
• 3 runs of 1200mm dia. pipe
• End treatments beveled
Outcome:
• Ultra Flow pipe selected for smooth inner wall
• Concrete ends beveled to improve hydraulics
• Minimized impact on hydraulic capacity
41
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
ULTRA FLO
TRENCHLESS BY ARMTEC
Triple Reline; North Vancouver, BC
1200mm dia. Ultra Flo
Full view of triple Ultra Flo reline.
42
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
CORRUGATED STEEL PIPE
• Galvanized steel
• Aluminized (Type 2) steel
• Polymer-laminated steel
(Hel-Cor only)
TRENCHLESS BY ARMTEC
Galvanized. Aluminized Type 2
(ALT2).
Trenchcoat polymer-
laminated.
43
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
HDPE & PVC
High Density Polyethylene (HDPE)
& Polyvinyl Chloride (PVC)
• Long service life (100+ yrs.)
• Highly immune to corrosion & resistant chemical attack
• pH range of 2 - 12
• Resistant to abrasion (HDPE is the best!)
• Lightweight (high strength-to-weight ratio)
TRENCHLESS BY ARMTEC
44
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
• Available in 100-900 mm dia.
• 6 m standard length
• Smooth inner wall
• Bell & gasket joints (75 kPa)
• Manning’s n = 0.012
BOSS 2000
• Corrugated HDPE pipe
• Slip line installation
• Reline small dia. storm sewer
& drainage pipe
TRENCHLESS BY ARMTEC
45
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
DUROMAXX
• Steel-reinforced HDPE pipe
• Galvanized steel ribs
completely encapsulated in
HDPE layer
• Available in 750-3000 mm dia.
• 4.27 m & 6.7 m std. lengths
• Smooth inner wall
• Bell & gasket joints (75 kPa)
up to 1800 mm dia.
• Welded joints (100 kPa)
available in larger diameters
• Manning’s n = 0.012
TRENCHLESS BY ARMTEC
46
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
DUROMAXX
• Slip line installation
• Low-profile ribs reduces OD
• Reline sanitary sewer, storm
sewer & drainage pipe
TRENCHLESS BY ARMTEC
47
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
DUROMAXX
TRENCHLESS BY ARMTEC
Simms Creek Reline; Campbell River, BC
3000mm SRPE
Design Challenges:
• Rapid installation
• Existing culvert condition
Solution:
• DuroMaxx Reline Pipe
• 26.2 meters In 3000mm diameter
Full Engineering Support:
• On-site installation support
Outcome:
• Materials RFP and engineering and financial
comparison review
• DuroMaxx Technology selected
48
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
DUROMAXX
TRENCHLESS BY ARMTEC
Simms Creek Reline; Campbell River, BC
3000mm SRPE
DuroMaxx pipe being slid into place.
49
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
A2 LINER PIPE
• Corrugated PVC liner pipe
• Similar benefits as with HDPE
• Slip line installation
• Very low-profile corrugation
minimizes OD
• Reline sanitary sewer & storm
sewer pipe
• Available in 300-900 mm dia.
• Available in 3 m & 6 m lengths*
TRENCHLESS BY ARMTEC
50
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
• STAB-JOINT water-tight
connections (75 kPa) – rated
for sanitary sewers
A2 LINER PIPE
TRENCHLESS BY ARMTEC
• Joints maintain constant inside
& outside diameter
51
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Example:
• Reline existing 1200 mm
CSP with 900 mm A2 Liner
• Achieve 103% of existing flow
A2 LINER PIPE
• Smooth inner wall
• Manning’s n = 0.009
• Ideal for maintaining hydraulic
capacity
TRENCHLESS BY ARMTEC
52
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
SPIRAL WOUND
• Spiral, machine wound trenchless pipe rehabilitation
• Winding machinery may be lowered into manholes & other
tight spaces
• Pipe is wound & fused in place, feeding into the existing pipe
TRENCHLESS BY ARMTEC
53
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
SPIRAL WOUND – SPR PE
• SPR PE, spiral wound steel-reinforced HDPE pipe liner
• All the benefits of steel-reinforced HDPE pipe (DuroMaxx)
• Can be installed in live flow conditions
TRENCHLESS BY ARMTEC
• Continuous welding
creates seamless pipe
• 750 - 3000 mm dia.
54
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
SPIRAL WOUND – SPR EX
• SPR EX, spiral wound, self-expanding PVC pipe liner
• Wound with an interlocking profile
• Expands in place against the ID of the existing pipe
• 150 – 900 mm dia.
TRENCHLESS BY ARMTEC
55
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
INNERFLOW
• Solid, smooth-wall HDPE pipe
• Male/female jointing system
• 200 – 1600 mm outside dia.
• Custom shapes & lengths (up to 15 m) available
TRENCHLESS BY ARMTEC
56
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
SELECTION CRITERIA
• Size & shape
• Hydraulics
• Durability
• Service life
• Abrasion
• Constructability
• Slip-lining
• Inside assembly
• Grouting
• Cost
TRENCHLESS BY ARMTEC
57
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Liner Type Material Service
Life*
Sizes (dia.) “n”
Tunnel Liner
Plate
Galv. steel
Aluminum
Polymer-coated steel
50 yrs.
75 yrs.
100 yrs.
1300 mm + 0.034
Ultra Flo Galv. steel
ALT2
50 yrs.
75 yrs.
450 – 2600 mm 0.013
Boss 2000 Corrugated HDPE 100 yrs. 100 – 900 mm 0.012
DuroMaxx Steel-reinforced HDPE 100 yrs. 750 – 3000 mm 0.012
A2 Liner Pipe Corrugated PVC 100 yrs. 300 – 900 mm 0.009
SPR HE Steel-reinforced HDPE 100 yrs. 750 – 3000 mm 0.010
SPR EX Spiral-wound PVC 100 yrs. 150 – 900 mm 0.010
InnerFlow Solid-wall HDPE 100 yrs. 200 – 1600 mm 0.009
TRENCHLESS COMPARISON
TRENCHLESS BY ARMTEC
*IN IDEAL SITE CONDITIONS.
58
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Stormwater Management
QUESTIONS?
STORMWATER MANAGEMENT
59
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
UPCOMING MONTHLY WEBINARS
Monthly Webinars for Armtec
Drainage Solutions:
www.armtec.com/webinars/
Upcoming:
May 15, 12pm EST | Insulated Precast
Wall Panels
Shane Sherar
Ebi Moradi, P. Eng
STORMWATER MANAGEMENT
60
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
Follow us on social media to learn more
about our company, projects and
people, while getting all the latest Armtec
and industry news.
Join Us on Social Media!
61
© 2013 Armtec Infrastructure Inc. • Confidential & Proprietary
For more information
CALL 1-877-5-ARMTEC OR
VISIT ARMTEC.COM
Follow us
Dave Groot
Senior Sales Representative
Armtec
T: (519) 763-2360
C: (519) 982-0721
dave.groot@armtec.com
Patrick Biro, P.Eng.
Business Development Engineer
Armtec
T: (604) 343-2740
C: (604) 365-2448
patrick.biro@armtec.com

More Related Content

What's hot

Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsPath Marketing Inc.
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarCommunications Branding
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial GroupJill Reeves
 
Precast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecPrecast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecCommunications Branding
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionJill Reeves
 
Procedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing methodProcedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing methodeSAT Journals
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetankAdrian Frantescu
 
Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profilebassamnakfour
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochureAdrian Frantescu
 
Nebraska Precast Concrete Pavement
Nebraska Precast Concrete PavementNebraska Precast Concrete Pavement
Nebraska Precast Concrete PavementJill Reeves
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost constructionManisha Singh
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Communications Branding
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)AMSYSCO Inc.
 

What's hot (20)

Culvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & ApplicationsCulvert Design 201 Structural Design, Durability & Applications
Culvert Design 201 Structural Design, Durability & Applications
 
Armtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels WebinarArmtec Precast Insulated Wall Panels Webinar
Armtec Precast Insulated Wall Panels Webinar
 
Thrasher Commercial Group
Thrasher Commercial GroupThrasher Commercial Group
Thrasher Commercial Group
 
Precast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - ArmtecPrecast Prestressed Hollowcore Slabs Seminar - Armtec
Precast Prestressed Hollowcore Slabs Seminar - Armtec
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
PCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. ReconstructionPCC Pavement: Repair vs. Overlay vs. Reconstruction
PCC Pavement: Repair vs. Overlay vs. Reconstruction
 
Procedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing methodProcedure and construction of road under bridge by box pushing method
Procedure and construction of road under bridge by box pushing method
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetank
 
Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profile
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochure
 
Nebraska Precast Concrete Pavement
Nebraska Precast Concrete PavementNebraska Precast Concrete Pavement
Nebraska Precast Concrete Pavement
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 
Precast
PrecastPrecast
Precast
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Precast concrete structures
Precast concrete structuresPrecast concrete structures
Precast concrete structures
 
Pragati towers
Pragati towersPragati towers
Pragati towers
 
One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)One Museum Park West (Post-Tensioning case study)
One Museum Park West (Post-Tensioning case study)
 

Viewers also liked

Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Hamed Zarei
 
Top down construction
Top down constructionTop down construction
Top down constructionAmulya Kansal
 
Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessonscoen_van_der_vliet
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014richardbieniawski
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)Austrian Standards
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridgesSravan Kumar
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingHamed Zarei
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATMluisaam
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt1971995
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel liningMahesh Raj Bhatt
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessityShashank Gaurav
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringJunaida Wally
 

Viewers also liked (20)

Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
Tunnelling & underground design (Topic5-hard & weak rock tunnelling)
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Tunneling
Tunneling Tunneling
Tunneling
 
Shield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and LessonsShield Tail Deformations - Experiences, Mechanics and Lessons
Shield Tail Deformations - Experiences, Mechanics and Lessons
 
World Tunnel Conference 2014
World Tunnel Conference 2014World Tunnel Conference 2014
World Tunnel Conference 2014
 
New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)New Austrian Tunnelling Method (NATM)
New Austrian Tunnelling Method (NATM)
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Bridge 91 Design
Bridge 91 DesignBridge 91 Design
Bridge 91 Design
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
NATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in TunnelingNATM (New Austrian Tunneling Method ) in Tunneling
NATM (New Austrian Tunneling Method ) in Tunneling
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Casting yard
Casting yardCasting yard
Casting yard
 
Tunneling Construction - NATM
Tunneling Construction - NATMTunneling Construction - NATM
Tunneling Construction - NATM
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 
Dam PPT
Dam PPTDam PPT
Dam PPT
 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Ecg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineeringEcg533 rock-tunnel-engineering
Ecg533 rock-tunnel-engineering
 
Tunneling
Tunneling  Tunneling
Tunneling
 

Similar to Tunnel Liners, Relines and Rehabilitation

Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesCommunications Branding
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Agata Woźniak
 
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining Agata Woźniak
 
Innovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage ProjectsInnovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage ProjectsCommunications Branding
 
Armtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design ReviewArmtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design ReviewCommunications Branding
 
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Communications Branding
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction BrochureRICHARD GORDON
 
Tubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdfTubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdfDongyuanWang1
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiDr K M SONI
 
Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageGirish Damle
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication TowersTowerpeople
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewThe Howard Group Inc.
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvikCem Sayar
 
Nsa1214 unistrut metal framing
Nsa1214 unistrut metal framingNsa1214 unistrut metal framing
Nsa1214 unistrut metal framingMichael Hoff
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final WebFaris Alwan
 

Similar to Tunnel Liners, Relines and Rehabilitation (20)

Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best PracticesWebinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
Webinar: Storm Sewer & Culvert Solutions: Applications & Best Practices
 
Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions Corrugated Steel Bridge and Tunnel Solutions
Corrugated Steel Bridge and Tunnel Solutions
 
Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining Big Digs - Site Development & Underground Solutions for Mining
Big Digs - Site Development & Underground Solutions for Mining
 
Innovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage ProjectsInnovative Solutions for Challenging Drainage Projects
Innovative Solutions for Challenging Drainage Projects
 
Armtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design ReviewArmtec Engineering's Top Picks - Case Studies and Design Review
Armtec Engineering's Top Picks - Case Studies and Design Review
 
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
 
Unistrut Construction Brochure
Unistrut Construction BrochureUnistrut Construction Brochure
Unistrut Construction Brochure
 
Tubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdfTubular Rivet Foundation (Part 1) .pdf
Tubular Rivet Foundation (Part 1) .pdf
 
Company brochure
Company brochureCompany brochure
Company brochure
 
New materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in MumbaiNew materials and technologies used in some buildings in Mumbai
New materials and technologies used in some buildings in Mumbai
 
STEVEN cv
STEVEN cvSTEVEN cv
STEVEN cv
 
Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 Page
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication Towers
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product Overview
 
Introduction to djuvik
Introduction to djuvikIntroduction to djuvik
Introduction to djuvik
 
Nsa1214 unistrut metal framing
Nsa1214 unistrut metal framingNsa1214 unistrut metal framing
Nsa1214 unistrut metal framing
 
Exeed Precast Brochure Final Web
Exeed Precast Brochure Final WebExeed Precast Brochure Final Web
Exeed Precast Brochure Final Web
 
OPT brouchure N
OPT brouchure NOPT brouchure N
OPT brouchure N
 
TYPES OF FORMWORK AND THEIR APPLICATION.
TYPES OF FORMWORK AND THEIR APPLICATION. TYPES OF FORMWORK AND THEIR APPLICATION.
TYPES OF FORMWORK AND THEIR APPLICATION.
 

More from Communications Branding

Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentCommunications Branding
 
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016Communications Branding
 
Linear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsLinear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsCommunications Branding
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Communications Branding
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsCommunications Branding
 
Transportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationTransportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationCommunications Branding
 
Stormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecStormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecCommunications Branding
 
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Communications Branding
 

More from Communications Branding (8)

Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
 
Linear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain ApplicationsLinear Surface Drainage 101: Trench Drain Applications
Linear Surface Drainage 101: Trench Drain Applications
 
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
Urbanization and Extreme Weather Effects: How Stormwater Detention, Retention...
 
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & ApplicationsKeep it Flowing! Culvert Design 20: Design, Durability & Applications
Keep it Flowing! Culvert Design 20: Design, Durability & Applications
 
Transportation & Environmental Noise Mitigation
Transportation & Environmental Noise MitigationTransportation & Environmental Noise Mitigation
Transportation & Environmental Noise Mitigation
 
Stormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - ArmtecStormwater Management Technical Seminar - Armtec
Stormwater Management Technical Seminar - Armtec
 
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd. Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
Sound Barrier Walls: Design, Usage and Specifications Part 2 - Armtec Ltd.
 

Recently uploaded

Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 

Recently uploaded (20)

Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 

Tunnel Liners, Relines and Rehabilitation

  • 1. 1 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Webinar TUNNEL LINERS, RELINES & REHABILITATION May, 2014 Patrick Biro, P.Eng. Dave Groot
  • 2. 2 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary JOIN THE DISCUSSION • During the session you can use this button to ‘Raise Your Hand’ if you have a question. • If there are more questions than can be answered during a session, the Organizer may ask that you type in questions in the ‘Question Log’ so that they may be addressed later, via email.
  • 3. 3 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CPD CREDIT CERTIFICATES • Qualifies in Most Jurisdictions in Canada & USA for 1 Hour Technical Informal • Formal completion certificates are emailed within one week of attending • Check your local guidelines if unsure of your requirements Email Your Attendance List: • Full Name • Title • Email webinars@armtec.com Will send certificate
  • 4. 4 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary YOUR HOSTS Patrick Biro, P.Eng. Business Development Engineer, Western Canada • Patrick completed his Bachelor’s Degree in Civil Engineering at McMaster University in April of 2001. • Patrick has more than 10 years of experience with the design of buried steel structures. • Patrick is currently one of Armtec’s regional Business Development Engineers for Western Canada .
  • 5. 5 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary YOUR HOSTS Dave Groot Senior Sales Representative, Central Canada • Dave has 20 years experience with Drainage Products and 14 years as a Sales Representative with Armtec’s Drainage Solutions based in Ontario.
  • 6. 6 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary • 43 locations in Canada • Approximately 2,000 employees • Exceptional product range for: Armtec is a leading global infrastructure and construction materials company. Rail & Road Infrastructure Ports & Marine Land Development Mining & Energy Forestry Agriculture
  • 7. 7 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Bridge Materials Drainage Solutions and Water Treatment Landscaping Products and Amenities Noise Control Road and Highway Safety Soil Retention Underground and Utilities Precast Concrete Buildings and Venues Precast Concrete Garages and Parkades
  • 8. 8 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PRESENTATION OUTLINE 1. Trenchless concepts • Tunneling • Relining 2. Trenchless solutions by Armtec • Structural plate • Metal pipe • Plastic pipe • Spiral wound pipe
  • 9. 9 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Tunnel Liners, Relines & Rehabilitation 1. TRENCHLESS CONCEPTS TRENCHLESS BY ARMTEC
  • 10. 10 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS • Trenchless construction is a subsurface installation that does not require open cut excavation • Trenchless technology can be used for: 1. New construction (tunneling) 2. Rehabilitation (relining) TRENCHLESS BY ARMTEC
  • 11. 11 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS • Trenchless technology is a growing industry due to the many benefits vs. open-cut excavations • Aging infrastructure is also putting a demand on replacement and rehabilitation of existing structures • More than half of Canada’s infrastructure is 40+ yrs. old • Almost a third of Canada’s municipal water infrastructure is approaching its service life TRENCHLESS BY ARMTEC (FCM – 2007). (Tarek et al.- 2003). a b a b
  • 12. 12 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Trenchless TRENCHLESS CONCEPTS Open Cut TRENCHLESS BY ARMTEC Vs.
  • 13. 13 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Trenchless • Minimal to no traffic or business disruption • Reduced impact to local environment • Excavation & hauling material not required • Minor to no impact to road surface • Worker safety improved • Trenchless is green TRENCHLESS CONCEPTS Open Cut • Reduced or re-routed traffic; disruption to local business • Impact to local environment (dust, silt, other contamination) • Potentially high cost of excavation, hauling • Disturbed road surface affects pavement quality • Worker safety at greater risk TRENCHLESS BY ARMTEC Vs.
  • 14. 14 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS Trenchless is Green TRENCHLESS BY ARMTEC • Trenchless eliminates the need of running excavation equipment • Trenchless eliminates the need for moving and hauling excavated material • Overall reduction in equipment/vehicle emissions
  • 15. 15 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS Tunneling • Tunneling is a subsurface excavation commonly used for new construction in mining & infrastructure applications • Tunnels can be constructed using a wide variety of trenchless technologies including: • Steel liners • Precast liners • Sprayed concrete (shotcrete) • Pipe jacking TRENCHLESS BY ARMTEC
  • 16. 16 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS Tunneling • Tunneling typically involves a staged excavation & installation process: 1. Excavate tunnel as allowed per soil conditions 2. Install rings of liner 3. Pump grout between liner and excavated tunnel Voids must be filled to perform as a structural liner 4. Repeat steps • Geotechnical or tunneling engineer is required • Contractor experienced in tunneling is recommended TRENCHLESS BY ARMTEC
  • 17. 17 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS Tunneling TRENCHLESS BY ARMTEC Armtec Tunnel Liner Plate tunnel installations.
  • 18. 18 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS Tunneling • Tunneling can also include vertical shaft construction TRENCHLESS BY ARMTEC Armtec Tunnel Liner Plate shaft installations.
  • 19. 19 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS Relining • Relining is the installation of a new surface to an existing structure to provide either a facial or structural restoration • Aging tunnels or culverts experiencing cracking, spalling, or corrosion may require a new surface to prevent further deterioration • Deteriorated structures in danger of failing may require a fully structural reline TRENCHLESS BY ARMTEC
  • 20. 20 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS Relining • Culvert relines typically involve a sliplining process: 1. Slide coupled or pre-assembled pipe liner into the existing pipe 2. Utilize bracing or blocking to hold structure into place 3. Pump grout between new and existing structure Voids must be filled to perform as a structural liner • Flanged liner plates can be assembled in place* TRENCHLESS BY ARMTEC
  • 21. 21 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS TRENCHLESS BY ARMTEC Shop-installed screw-jacks used for bracing.Sliding CSP reline pipe into place. Relining
  • 22. 22 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS CONCEPTS TRENCHLESS BY ARMTEC Relining Installation crew injecting grout through shop-installed grout ports.
  • 23. 23 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Tunnel Liners, Relines & Rehabilitation 2. TRENCHLESS SOLUTIONS TRENCHLESS BY ARMTEC BY ARMTEC
  • 24. 24 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TRENCHLESS SOLUTIONS TRENCHLESS BY ARMTEC Pipe & Culvert Solutions Open Cut – New or Replacement Trenchless Tunneling – New construction Relining - Rehabilitation Tunnel Liner Plate Various Armtec pipe & culvert solutions Structural Plate CSP grouted liner HDPE & PVC grouted liner Spiral-wound
  • 25. 25 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary PLASTIC • BOSS 2000 • DuroMaxx • A2 Liner Pipe • Spiral Wound • InnerFlow TRENCHLESS SOLUTIONS METAL • Structural Plate • Corrugated Steel Pipe TRENCHLESS BY ARMTEC
  • 26. 26 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE Multi-Plate TRENCHLESS BY ARMTEC Tunnel Liner Plate Polymer-coated Multi-Plate reline of existing Multi-Plate - before. Aluminum Tunnel Liner Plate reline of existing Multi-Plate - before.
  • 27. 27 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE Multi-Plate TRENCHLESS BY ARMTEC Tunnel Liner Plate Polymer-coated Multi-Plate reline of existing Multi-Plate - after. Aluminum Tunnel Liner Plate reline of existing Multi-Plate - after.
  • 28. 28 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE Multi-Plate • Bolted corrugated plate • Assembled outside & slip-lined • Grouted in place • Structural liner • Reline drainage pipe, water crossing structures • Standard round, elliptical, arch shapes TRENCHLESS BY ARMTEC Tunnel Liner Plate • Bolted 2-flange liner plate • Assembled from the inside • Grouted in place • Structural liner • Reline drainage pipe & water crossing structures • New construction of tunnels and shafts • Wide variety of custom shapes
  • 29. 29 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE Multi-Plate TRENCHLESS BY ARMTEC Tunnel Liner Plate Multi-Plate being assembled outside of existing structure, prior to sliplining. Lift equipment inside Tunnel Liner Plate structure during assembly.
  • 30. 30 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TUNNEL LINER PLATE TRENCHLESS BY ARMTEC 2-Flanged liner – Armtec Tunnel Liner Plate. Pressure-grouting via shop-installed grout ports.
  • 31. 31 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TUNNEL LINER PLATE TRENCHLESS BY ARMTEC Liner plate being assembled inside existing culvert. View of bracing required for assembly & grouting.
  • 32. 32 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary STRUCTURAL PLATE • Galvanized steel • Polymer-coated steel • Aluminum TRENCHLESS BY ARMTEC Galvanized steel plate. Strata-CAT polymer- coated steel plate. Aluminum plate.
  • 33. 33 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TUNNEL LINER PLATE • Custom shapes • Open-bottom structures TRENCHLESS BY ARMTEC Facial reline of archway. Structural reline of CIP concrete structure.
  • 34. 34 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TUNNEL LINER PLATE • More custom shapes! TRENCHLESS BY ARMTEC
  • 35. 35 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TUNNEL LINER PLATE TRENCHLESS BY ARMTEC Creek Reline; Huron County, ON 1900mm span TLP Arch Design Challenges: • Deteriorating structure with bend in it • Hydraulic capacity Solution: • Tunnel Liner Plate reline • 31 meters of 1900mm span x 900mm rise • Shop-fabricated elbow included Full Engineering Support: • Full structural reline w/ grouting lift recommendations Outcome: • Tunnel Liner Plate selected for constructability • 1200mm jacked pipe offsets loss in hydraulic capacity
  • 36. 36 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary TUNNEL LINER PLATE TRENCHLESS BY ARMTEC Creek Reline; Huron County, ON TLP Arch View from inside of Tunnel Liner Plate reline.
  • 37. 37 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CORRUGATED STEEL PIPE Hel-Cor TRENCHLESS BY ARMTEC Ultra Flo
  • 38. 38 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CORRUGATED STEEL PIPE Hel-Cor • Corrugated steel • Assembled outside & slip-lined • Grouted in place • Structural liner • Reline drainage pipe • Round & arched pipes TRENCHLESS BY ARMTEC Ultra Flo • Spiral rib • Assembled outside & slip-lined • Grouted in place • Structural liner • Reline drainage pipe • Round pipes • Superior hydraulic properties
  • 39. 39 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary ULTRA FLO • Available in 450-2600 mm dia. • Smooth inner wall has improved hydraulic properties • Manning’s n = 0.013 (Comparable to concrete pipe) Example: • Reline existing 1200 mm CSP with 1000 mm Ultra Flo • Achieve 95% of existing flow TRENCHLESS BY ARMTEC View from inside of spiral rib pipe.
  • 40. 40 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary ULTRA FLO TRENCHLESS BY ARMTEC Triple Reline; North Vancouver, BC 1200mm dia. Ultra Flo Design Challenges: • Aging pipes in need of repair • Open-cut excavation not possible • Reduced hydraulic capacity Solution: • Ultra Flo reline • 3 runs of 1200mm dia. pipe • End treatments beveled Outcome: • Ultra Flow pipe selected for smooth inner wall • Concrete ends beveled to improve hydraulics • Minimized impact on hydraulic capacity
  • 41. 41 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary ULTRA FLO TRENCHLESS BY ARMTEC Triple Reline; North Vancouver, BC 1200mm dia. Ultra Flo Full view of triple Ultra Flo reline.
  • 42. 42 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary CORRUGATED STEEL PIPE • Galvanized steel • Aluminized (Type 2) steel • Polymer-laminated steel (Hel-Cor only) TRENCHLESS BY ARMTEC Galvanized. Aluminized Type 2 (ALT2). Trenchcoat polymer- laminated.
  • 43. 43 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary HDPE & PVC High Density Polyethylene (HDPE) & Polyvinyl Chloride (PVC) • Long service life (100+ yrs.) • Highly immune to corrosion & resistant chemical attack • pH range of 2 - 12 • Resistant to abrasion (HDPE is the best!) • Lightweight (high strength-to-weight ratio) TRENCHLESS BY ARMTEC
  • 44. 44 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary • Available in 100-900 mm dia. • 6 m standard length • Smooth inner wall • Bell & gasket joints (75 kPa) • Manning’s n = 0.012 BOSS 2000 • Corrugated HDPE pipe • Slip line installation • Reline small dia. storm sewer & drainage pipe TRENCHLESS BY ARMTEC
  • 45. 45 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary DUROMAXX • Steel-reinforced HDPE pipe • Galvanized steel ribs completely encapsulated in HDPE layer • Available in 750-3000 mm dia. • 4.27 m & 6.7 m std. lengths • Smooth inner wall • Bell & gasket joints (75 kPa) up to 1800 mm dia. • Welded joints (100 kPa) available in larger diameters • Manning’s n = 0.012 TRENCHLESS BY ARMTEC
  • 46. 46 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary DUROMAXX • Slip line installation • Low-profile ribs reduces OD • Reline sanitary sewer, storm sewer & drainage pipe TRENCHLESS BY ARMTEC
  • 47. 47 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary DUROMAXX TRENCHLESS BY ARMTEC Simms Creek Reline; Campbell River, BC 3000mm SRPE Design Challenges: • Rapid installation • Existing culvert condition Solution: • DuroMaxx Reline Pipe • 26.2 meters In 3000mm diameter Full Engineering Support: • On-site installation support Outcome: • Materials RFP and engineering and financial comparison review • DuroMaxx Technology selected
  • 48. 48 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary DUROMAXX TRENCHLESS BY ARMTEC Simms Creek Reline; Campbell River, BC 3000mm SRPE DuroMaxx pipe being slid into place.
  • 49. 49 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary A2 LINER PIPE • Corrugated PVC liner pipe • Similar benefits as with HDPE • Slip line installation • Very low-profile corrugation minimizes OD • Reline sanitary sewer & storm sewer pipe • Available in 300-900 mm dia. • Available in 3 m & 6 m lengths* TRENCHLESS BY ARMTEC
  • 50. 50 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary • STAB-JOINT water-tight connections (75 kPa) – rated for sanitary sewers A2 LINER PIPE TRENCHLESS BY ARMTEC • Joints maintain constant inside & outside diameter
  • 51. 51 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Example: • Reline existing 1200 mm CSP with 900 mm A2 Liner • Achieve 103% of existing flow A2 LINER PIPE • Smooth inner wall • Manning’s n = 0.009 • Ideal for maintaining hydraulic capacity TRENCHLESS BY ARMTEC
  • 52. 52 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary SPIRAL WOUND • Spiral, machine wound trenchless pipe rehabilitation • Winding machinery may be lowered into manholes & other tight spaces • Pipe is wound & fused in place, feeding into the existing pipe TRENCHLESS BY ARMTEC
  • 53. 53 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary SPIRAL WOUND – SPR PE • SPR PE, spiral wound steel-reinforced HDPE pipe liner • All the benefits of steel-reinforced HDPE pipe (DuroMaxx) • Can be installed in live flow conditions TRENCHLESS BY ARMTEC • Continuous welding creates seamless pipe • 750 - 3000 mm dia.
  • 54. 54 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary SPIRAL WOUND – SPR EX • SPR EX, spiral wound, self-expanding PVC pipe liner • Wound with an interlocking profile • Expands in place against the ID of the existing pipe • 150 – 900 mm dia. TRENCHLESS BY ARMTEC
  • 55. 55 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary INNERFLOW • Solid, smooth-wall HDPE pipe • Male/female jointing system • 200 – 1600 mm outside dia. • Custom shapes & lengths (up to 15 m) available TRENCHLESS BY ARMTEC
  • 56. 56 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary SELECTION CRITERIA • Size & shape • Hydraulics • Durability • Service life • Abrasion • Constructability • Slip-lining • Inside assembly • Grouting • Cost TRENCHLESS BY ARMTEC
  • 57. 57 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Liner Type Material Service Life* Sizes (dia.) “n” Tunnel Liner Plate Galv. steel Aluminum Polymer-coated steel 50 yrs. 75 yrs. 100 yrs. 1300 mm + 0.034 Ultra Flo Galv. steel ALT2 50 yrs. 75 yrs. 450 – 2600 mm 0.013 Boss 2000 Corrugated HDPE 100 yrs. 100 – 900 mm 0.012 DuroMaxx Steel-reinforced HDPE 100 yrs. 750 – 3000 mm 0.012 A2 Liner Pipe Corrugated PVC 100 yrs. 300 – 900 mm 0.009 SPR HE Steel-reinforced HDPE 100 yrs. 750 – 3000 mm 0.010 SPR EX Spiral-wound PVC 100 yrs. 150 – 900 mm 0.010 InnerFlow Solid-wall HDPE 100 yrs. 200 – 1600 mm 0.009 TRENCHLESS COMPARISON TRENCHLESS BY ARMTEC *IN IDEAL SITE CONDITIONS.
  • 58. 58 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Stormwater Management QUESTIONS? STORMWATER MANAGEMENT
  • 59. 59 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary UPCOMING MONTHLY WEBINARS Monthly Webinars for Armtec Drainage Solutions: www.armtec.com/webinars/ Upcoming: May 15, 12pm EST | Insulated Precast Wall Panels Shane Sherar Ebi Moradi, P. Eng STORMWATER MANAGEMENT
  • 60. 60 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary Follow us on social media to learn more about our company, projects and people, while getting all the latest Armtec and industry news. Join Us on Social Media!
  • 61. 61 © 2013 Armtec Infrastructure Inc. • Confidential & Proprietary For more information CALL 1-877-5-ARMTEC OR VISIT ARMTEC.COM Follow us Dave Groot Senior Sales Representative Armtec T: (519) 763-2360 C: (519) 982-0721 dave.groot@armtec.com Patrick Biro, P.Eng. Business Development Engineer Armtec T: (604) 343-2740 C: (604) 365-2448 patrick.biro@armtec.com