A B CA B CA B CA B C ofofofof BBBB M SM SM SM S
by
BAS Consultant & Engineer
Basic of Instrumentation
• Us our Body and its parts
• Our Body Reflexes
In BMS
INPUTS:- Sensors
Temperature (of room)
Humidity (of room)
Flow Rate (chilled Water)Flow Rate (chilled Water)
Pressure (of Fire Hydrant)
Level (of a Tank)
Run status (Pumps, Fans)
Temperature Sensors
– Sensing technologies
• Thermistor
– Accurate over limited
range
– Point type only
– Used for space
temperature
• Nickel Wire
– General purpose sensor
– Point or averaging type
– Used for space or duct
– Application Issues
• Mount inside thermal well for water
temperature
• Mount return air sensor away from
fresh air stream
• Mount space temperature sensor :
– At 1500 mm height
– On inside wall
– Away from direct sun or other
heat sources
• Ensure off-coil sensors are far
– Used for space or duct
• Platinum
– High accuracy / linearity
– Point type only
– Precision applications
• Ensure off-coil sensors are far
enough away from coil
• Outdoor air temperature sensors
require sunscreen
• Calibrate using precision resistor,
validate using digital thermometer
• Know mounting scope of
responsibility
Pressure Sensors
– Air Static Pressure
• Used to control VFD based on
VAV duct static
• Must be mounted in region of
laminar flow; five duct diameters
from restrictions
• Active sensor
– Water Static Pressure
• Used to monitor pressure at top of
sprinkler riser
• Commercial grade sensors can leak
– Water Differential Pressure
– Air Differential Pressure
• Used to calculate airflow from
velocity pressure
– PVELOCITY = PTOTAL - PSTATIC
– CFM = 4005 * AREA *
(PVELOCITY / K FACTOR)½
• Used in VAV boxes and air flow
monitoring stations
– Water Differential Pressure
• Used to control bypass valve or VFD
• When controlling bypass, best to
mount at last AHU
• Do not try to save costs by using
two static pressure sensors
• Calculation error of same magnitude
as signal may ocur.
Other Sensors
Waterflow
Mount in region of laminar
flow; five diameters from
restrictions
Many technologies:
Annubar
Paddlewheel
Carbon monoxide
Control car park ventilation fans
Carbon Dioxide
Used as indirect indicator of
indoor air quality
Paddlewheel
Electromagnetic
Turbine
Humidity
Used to measure the Relative
Humidity in air.
Some humidity sensors comes
with in built temperature
sensors also.
indoor air quality
Electrical Transducers
Current Transducers
Voltage Transducers
Lux Level Sensors
To measure the intensity of
light.
In BMS
OUTPUTS:- Control
Valves
VFD Speed Command
Air Dampers Actuators
ON-OFF Command (Fans,
Pumps, Boilers)
INPUTS & OUTPUTS
INPUTS e.g
Analouge (varying-reading)
AI
Temperature, Humidity, Water Flow , Air
Flow , Tank Level, Energy KW, Voltage,
Current, Pressure, pH, Conductivity
Digital (Binary-ON or OFF)
DI or BI
Status (on/off, airflow , run, open/close)
Alarm
TripTrip
OUTPUTS e.g
Analouge (varying-positioning)
AO
Fan Speed regulating (0 to 100%)
Chilled water valve control (0 to 100%)
Digital (Binary-ON or OFF)
DO or BO
Command (on/off, open/close)
I/O
Building management system relies on 4 types sensory information to make a control decision
Analog inputs : are used to read a variable measurement. Examples are temperature, humidity and
pressure sensor which could be thermistor, 4-20 mA, 0-10 volt or platinum resistance thermometer
(resistance temperature detector), or wireless sensors.
Digital input : indicates if a device is turned on or not. Some examples of a digital input would be , an airDigital input : indicates if a device is turned on or not. Some examples of a digital input would be , an air
flow switch, or a volt-free relay contact.
Analog output : controls the speed or position of a device, such as a variable frequency drive, a I-P
(current to pneumatics) transducer, or a valve or damper actuator. An example is a chilled water valve
opening up 25% to maintain a setpoint.
Digital outputs : are used to open and close relays and switches. An example would be to turn on the
parking lot lights when a photocell indicates it is dark outside.
A typical Mid Size Building may have 800 -2000 sensory points also known and I/O points.
A complex Building like an Airport may have more than 5000 points
DDC Controllers
Types of DDC controllers
Fixed function
Configurable
Text programmable
Graphic programmable
Point Definition
Ranging (linear, calculated,
Control Loops
Proportional plus integral control
commonly used
Other software routines used in
local control logic
Minimum, maximum, average,
calculator, etc.
Psychometric calculations
Timing (delays, pulses, etc.)Ranging (linear, calculated,
polynomial)
Filtering (smoothing and
debounce)
Interlocks
Timing (delays, pulses, etc.)
Boolean and comparator
operators
Time clock and backup schedules
DDC physical
Control System
Sl.
No
IO Description AI DI AO DO FIELD DEVICE
1 AHU On/Off 0 0 0 1 AHU panel to accept 2A NO contact
2 AHU Run Status 0 1 0 0 Differential Pressure Switch across blower
3 AHU Auto/Manual Status 0 1 0 0 Pot . free contact @ AHU Panel
4 AHU filter Status 0 1 0 0 Differential Pressure Switch across filter
5 Return air temperature 1 0 0 0 Duct type temperature sensor
6 2 Way chilled water modulating valve control 0 0 1 0 2 way Modulating Valve
7 Chilled water return header flow rate 1 0 0 0 Flow meter
TOTAL 2 3 1 1
Basics of HVAC
Pot with water
Evaporation through the pores of Mud Pot makes the water inside cool
Purpose of HVAC
The main purpose of HVAC is to provide
the people working inside the building with
“CONDITIONED AIR” so that they will
have a comfortable and safe workhave a comfortable and safe work
environment.
What is Conditioned Air?
Conditioned Air” means that the air is clean
and Odor-Free, and the temperature,
humidity and movement of air are within
certain comfort range.certain comfort range.
Comfort Zone: (ASHRAErecommendation)
– – Temp : 22.7oC to 26.1oC
– – Relative Humidity : 50%
– – Air Velocity : 30 feet per minute
What is AHU?
• AHU is Air Handling Unit
Contains:–Fan, Cooling coil , Air Filter
Inputs to the Controller:
Outputs from the Controller:
What is a Chiller
• A heat exchanger using air, refrigerant, water and evaporation to transfer
heat (BTUs) to produce air conditioning (measured in tons).
• A chiller is comprised of an evaporator, compressor, condenser and
expansion valve system.
Cycle
Chiller Plant
Chiller Plant with BMS sensor
Chiller Plant Operation
Control Logic
Building Management System-: Begin with the basics
BMS – Building Management system
Building Automation system
A Building Management System (BMS)
is a blend of hardware & software basedis a blend of hardware & software based
control system installed in buildings to
control and monitor the building’s
mechanical, electrical & other utility
equipment
Building Services
Services Equipments
Mechanical system HVAC , Plumbing , Fire Fighting, STP
Electrical System Electrical DB’s/Lighting control & monitoring,
Generator set, UPS
Utility Lifts, Fire Alarm System, Security System, Public
address system
What is a Building Automation System?
A BMS system collects the operating information required for intelligent building
management.
It analyses the operation of the building systems by viewing all important
temperatures, humidities and equipment status.
Further to collection of these data, the BMS presents these data on the screen with
full color
• Automates some control strategies such as turning equipment On/Off according
to a time schedule – ensures energy savings
• Allows an operator sitting at the BMS work station to view key information about
the building – improves building operationsthe building – improves building operations
• Allows an operator sitting at the BMS work station to control some of the
equipment in the building – improves building operations allowing remote control
/ over-ride where necessary
• Maintains an audit trail of what happened and when it happened – improves
building management by means reporting and traceability
• Maintains historical data for selected information (like temperature, humidity
..etc) – improves building management by means reporting and traceability
• Alerts the operator at the BMS work station when readings fall outside of normal
range (i.e. breaker trips, temperature too warm, etc.) – improves building
management by having a faster reaction time to problems
• By doing the above and more a BMS system saves manpower, ensures productive
occupants (especially in an office environment), prolongs equipment life, and the
most important of all saves energy. diagrams (graphics) for the ease of
understanding.
BMS Protocols
BMS system manufacturer divided predominantly into two different
protocols, mentioned below-
• BACnet - A Data Communication Protocol for Building Automation and
Control Networks developed by ASHRAE. It gives freedom to client to
connect all BACnet compliant devices and ease in commissioning &
configuring.configuring.
• Lonworks -Lon Works is actually a family of products originally developed
by the Echelon Corporation. At the core of this technology is a proprietary
communications protocol called Lon Talk. Here one needs to buy license for
each individual controllers & devices. Commissioning requires software key
(dongle) all the time for commissioning & configuration.
• Modbus is developed by Modicon in 1979. It is used to establish master-
slave/client-server communication between intelligent devices. It is a de
facto standard, truly open and the most widely used network protocol in the
industrial environment and devices.
BMS System Architecture –
• IP- 1 Tier
Where all controllers are connected
to HMI on LAN.
RS 485 – 2Tier
Level1-: where all controllers are connected
to each other in daisy chain fashion & then
after they connect to router or gateway.
Level2-: When router or gateway is connected
to any HMI for monitoring & controlling.to any HMI for monitoring & controlling.
Building Automation System Software
Alarms
User Interface
and Password
Energy
Operations
Maintenance
Supervisory Controller (processing)
Operator Workstation (long term storage)
Operator Workstation
Where this feature resides
Control Logic
Demand Limiting
and Duty Cycling
Historical Data
Graphics
Scheduling
Supervisory Controller
DDC Controller
Supervisory Controller
Operator Workstation
Supervisory Controller
Supervisory Controller (processing)
Operator Workstation (long term storage)
BMS Typical BOQ-
It can be categorized in 3 broad categories-
1. BMS controllers, Softwares, POT(Portable Operator
Terminal),integration & PC.
2. Field Devices- It comprises different kind of sensors,
switches, actuators, Transmitters etcswitches, actuators, Transmitters etc
3. Cables & conduits
1. BMS controllers, Software's, POT
(Portable Operator Terminal), for integration & PC.
• Controllers selection can be done based on the IO (Input Output) requirements directly
just to match AI(Analog Input), AO(Analog Output), DI(Digital Input), DO(Digital
Output) in the layman’s language.
• Integration to collect the data from different devices.
2. Field Devices-
Comprises different kind of sensors, switches,
actuators, Transmitters
BMS
Areas
Category
Type
Sub-
Category
Application
AHU(Airside) Temperature(cum
Humidity/RH)
Sensor Room To know the actual Temp inside without cooling
Duct
To know flowing air Temp(& RH) inside duct for
supply & Return Air
Differential Pressure Across AHU Fan to check it is on or off physically,Differential Pressure
Switch Air
Across AHU Fan to check it is on or off physically,
across filter to check the status
Valve & Actuators Across cooling coil
Chillers, cooling
towers(Waterside)
Temperature(cum
Humidity/RH) Sensor Immersion
To Know water temperature from the chillers & to the
chillers
Outside To Know outside temp & RH
Differential Pressure
Switch Water
Across Pumps to check it is on or off physically, across
filter to check the status
Others
Level Transmitters Water To know the water level
Oil To know the oil level
CO2, CO sensor Room To know the air quality as in parking lot
3. Cable
It generally can be categorized in two different applications-:
• Signal/Control Cable: From different field devices to controllers &
from Controllers to field devices to control the equipments
• Communication Cable: cable between different controllers, routers
& gateways for the purpose of intercommunication between& gateways for the purpose of intercommunication between
controllers.
• Integration cable: cable required for monitoring of third party
devices.
Cable Selection
BMS
Areas Category Cable Type Application
AHU Duct, Room Temp sensor 2c x 1 sqmm shielded Passive Temp(2c) signals from sensor to controllers
Temp cum humidity sensor 4c x 1sqmm shielded
Passive Temperature(2c) & Active(2c-power) RH measurement
from sensor to controllers
DP Switch for Air 2c x 1 sqmm shielded Passive Temp(2c) signals from switch to controllers
AHU FAN VFD 2c x 1 sqmm shielded Run status
2c x 1 sqmm shielded On/off status
2c x 1 sqmm shielded Relay output for VFD On/OFF Operation
Valve & Actuator 5c x 1sqmm shielded Control & Power (3c power and command) & Monitor (2c)
Integration
BMS
Areas Category Cable Type Application
Integartion DG
2c x 1.5 sqmm twisted pair
shielded
Integration is only to collect data from different devices to monitor
& generate reports
UPS
2c x 1.5 sqmm twisted pair
shielded
Integration is only to collect data from different devices to monitor
& generate reports
VAV's
2c x 1.5 sqmm twisted pair
shielded
Integration is only to collect data from different devices to monitor
& generate reports
2c x 1.5 sqmm twisted pairIntegration is only to collect data from different devices to monitor
Electrical Panels
2c x 1.5 sqmm twisted pair
shielded
Integration is only to collect data from different devices to monitor
& generate reports
Chillers
2c x 1.5 sqmm twisted pair
shielded
Integration is only to collect data from different devices to monitor
& generate reports
Security & Fire Alarm
system
2c x 1.5 sqmm twisted pair
shielded
Integration is only to collect data from different devices to monitor
& generate reports
Elevator
2c x 1.5 sqmm twisted pair
shielded
Integration is only to collect data from different devices to monitor
& generate reports
BMS Design Aspects
Basic data required before you start system design:
1. Input / Output summary for all subsystems, which need to either monitor or control.
2. Selection of appropriate field devices.
3. All integration devices & respective point details which has to be monitored.
4. Signal & Communication cable route layout (at least tentative).
5. Panel (Enclosure for controllers) location, BMS PC location.
Steps to follow for designing-:
1. Select the suitable controllers required for the requirement.
2. Select the enclosure to mount those controllers, which includes power supply for controllers & other wirings for field device
connection.
3. Now start with the AHU designing which includes signal & control cabling requirement for different field device selection as
per the requirement.
4. A typical AHU generally requires following field devices-Temperature cum Humidity sensor (or only Temp) in return & supply
duct. Differential Pressure Switch (For Air) across the AHU Fan, Filter, Actuators for AHU Line.
5. A typical AHU will have following wiring connection- Connection to all Field devices, Connection to electrical panels as per
I/O, connection to VFD’s.
6. A typical Chiller side will have following field devices-Immersion type temperature sensor (for supply & return pipes),
Butterfly Valve & Actuator in each chiller supply, differential Pressure sensor across main supply & return .
7. A typical chiller will have connection to all field devices, chiller panels, Pump VFD’s.
BMS Commissioning Aspects –
Air Side Commissioning- It comprises individual commissioning of AHU (Air handling Unit), CSU
(Ceiling Suspended Unit), Fans & associated field devices.
• We need to measure each field devices value during AHU commissioning as first task to make
sure all field devices are working & then all points can be put in a logic.
Water side commissioning – It comprises individual commissioning of Water cooled chillers, Air
cooled chillers, Cooling towers, Primary pumps, Secondary pumps, VFD’s & associated field
devicesdevices
• We need to measure each field device value & other connected points value individually before
putting them into logic.
Integration of Air side & water side in a logic-This is to integrate all independent system in logic.
Which can work automatically based on the user defined parameters without any conflict of
individual system functionality.
BMS Commissioning Aspects
Integration of monitoring points-
• This is to collect all data in BMS system for the purpose of monitoring only.
• PICS details i.e mapping details to be taken from respective equipment supplier.
• Protocol significance for integration purpose-whenever we say one device supports Modbus over
RS485, here RS 485 signifies physical channel (cable type) & communication port while Modbus
signifies data pattern. Therefore all devices in a loop must support same protocol & configure to
the same.
• Cable used for integration is 2 core x 1.5 sqmm shielded• Cable used for integration is 2 core x 1.5 sqmm shielded
• All monitored devices have to be looped in daisy chain connection to RS-485 port. Devices can
support different communication over different protocols. We need to make sure whenever making
a loop all devices should support same communication & protocol type. for instance Modbus over
RS485.
Client User interface (UI)
• Client can change parameters as temperature & humidity from UI as per the comfort level & all
basic information can be viewed on the UI.
SNAPS OF INSTALLATION
PANEL
SCHEMATICS-AHU
SCHEMATICS-TFA
SCHEMATICS-SCRUBBER
Water Tank
EXHAUST FAN
CHILLER
CHW & CDW PUMPS
COOLING TOWER

More Related Content

What's hot

Building management system (bms)
Building management system (bms)Building management system (bms)
Building management system (bms)AHMED NADIM JILANI
 
Fundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation SystemsFundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation SystemsLiving Online
 
VARIABLE REFRIGERANT FLOW(VRF) ppt
VARIABLE REFRIGERANT FLOW(VRF)  pptVARIABLE REFRIGERANT FLOW(VRF)  ppt
VARIABLE REFRIGERANT FLOW(VRF) pptEzhil Raj s
 
Building management-system power point
Building management-system power pointBuilding management-system power point
Building management-system power pointazharbang
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm SystemsJ.T.A.JONES
 
Blue star package units
Blue star package unitsBlue star package units
Blue star package unitsKumar Ramaiah
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management SystemsKhaled Ali
 
Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systemsmichaeljmack
 
Intro to basic fire alarm technology
Intro to basic fire alarm technologyIntro to basic fire alarm technology
Intro to basic fire alarm technologyArman Nasar
 
Building Management System-CPD - Part 1.pdf
Building Management System-CPD - Part 1.pdfBuilding Management System-CPD - Part 1.pdf
Building Management System-CPD - Part 1.pdfSilva104866
 
FIRE ALARM SYSTEM
FIRE ALARM SYSTEM FIRE ALARM SYSTEM
FIRE ALARM SYSTEM Sebin James
 

What's hot (20)

Building management system (bms)
Building management system (bms)Building management system (bms)
Building management system (bms)
 
Fundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation SystemsFundamentals of Practical Building Automation Systems
Fundamentals of Practical Building Automation Systems
 
Bms system
Bms  systemBms  system
Bms system
 
CHILLER PLANT MANAGER
CHILLER PLANT MANAGERCHILLER PLANT MANAGER
CHILLER PLANT MANAGER
 
scada VS bms
scada VS bmsscada VS bms
scada VS bms
 
VARIABLE REFRIGERANT FLOW(VRF) ppt
VARIABLE REFRIGERANT FLOW(VRF)  pptVARIABLE REFRIGERANT FLOW(VRF)  ppt
VARIABLE REFRIGERANT FLOW(VRF) ppt
 
Building management-system power point
Building management-system power pointBuilding management-system power point
Building management-system power point
 
HVAC Fundamentals
HVAC  FundamentalsHVAC  Fundamentals
HVAC Fundamentals
 
Bms overview
Bms overviewBms overview
Bms overview
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm Systems
 
Intelligent buildings
Intelligent buildingsIntelligent buildings
Intelligent buildings
 
Fire alarm systems
Fire alarm systemsFire alarm systems
Fire alarm systems
 
HVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air ConditioningHVAC Basic Concepts of Air Conditioning
HVAC Basic Concepts of Air Conditioning
 
Blue star package units
Blue star package unitsBlue star package units
Blue star package units
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
 
Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systems
 
Intro to basic fire alarm technology
Intro to basic fire alarm technologyIntro to basic fire alarm technology
Intro to basic fire alarm technology
 
Building Management System-CPD - Part 1.pdf
Building Management System-CPD - Part 1.pdfBuilding Management System-CPD - Part 1.pdf
Building Management System-CPD - Part 1.pdf
 
FIRE ALARM SYSTEM
FIRE ALARM SYSTEM FIRE ALARM SYSTEM
FIRE ALARM SYSTEM
 
Module (1.3) types of ac units-hvac-apex
Module (1.3) types of ac units-hvac-apexModule (1.3) types of ac units-hvac-apex
Module (1.3) types of ac units-hvac-apex
 

Viewers also liked

Building automation & controls
Building automation & controlsBuilding automation & controls
Building automation & controlsIllinois ASHRAE
 
Home and building automation systems
Home and building automation systemsHome and building automation systems
Home and building automation systemsDario Bonino
 
Scada and power system automation
Scada and power system automationScada and power system automation
Scada and power system automationShubham Kapoor
 
Matematica discreta fasciculo_1_v7
Matematica discreta fasciculo_1_v7Matematica discreta fasciculo_1_v7
Matematica discreta fasciculo_1_v7CLEAN LOURENÇO
 
Trg trc003-en refrigeration cycle
Trg trc003-en refrigeration cycleTrg trc003-en refrigeration cycle
Trg trc003-en refrigeration cycleVoVi Phap Danh
 
HVAC Service Class
HVAC Service ClassHVAC Service Class
HVAC Service Classadadams
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsSynergy Airflow and Ventilation
 
Hvac course
Hvac courseHvac course
Hvac coursehvactrg1
 
Trg trc017-en hvac system control
Trg trc017-en hvac system controlTrg trc017-en hvac system control
Trg trc017-en hvac system controlVoVi Phap Danh
 
Hvac controls operation and maintenance 3rd edition g. w. gupton
Hvac controls operation and maintenance   3rd edition g. w. guptonHvac controls operation and maintenance   3rd edition g. w. gupton
Hvac controls operation and maintenance 3rd edition g. w. guptonronald59
 
HVAC Control Systems
HVAC Control SystemsHVAC Control Systems
HVAC Control Systemsacshvac
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manualbhattbhai
 
Instalația de aer comprimat
Instalația de aer comprimatInstalația de aer comprimat
Instalația de aer comprimatAlex Alexutzuu
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulashvactrg1
 

Viewers also liked (20)

Class 43 direct digital and supervisory control
Class 43   direct digital and supervisory controlClass 43   direct digital and supervisory control
Class 43 direct digital and supervisory control
 
Building automation & controls
Building automation & controlsBuilding automation & controls
Building automation & controls
 
Home and building automation systems
Home and building automation systemsHome and building automation systems
Home and building automation systems
 
Scada and power system automation
Scada and power system automationScada and power system automation
Scada and power system automation
 
Intelligent Buildings
Intelligent BuildingsIntelligent Buildings
Intelligent Buildings
 
Class 41 final control elements - control valves
Class 41   final control elements - control valvesClass 41   final control elements - control valves
Class 41 final control elements - control valves
 
Scada ppt
Scada  pptScada  ppt
Scada ppt
 
Matematica discreta fasciculo_1_v7
Matematica discreta fasciculo_1_v7Matematica discreta fasciculo_1_v7
Matematica discreta fasciculo_1_v7
 
Trg trc003-en refrigeration cycle
Trg trc003-en refrigeration cycleTrg trc003-en refrigeration cycle
Trg trc003-en refrigeration cycle
 
HVAC Service Class
HVAC Service ClassHVAC Service Class
HVAC Service Class
 
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC SystemsStep 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
Step 4 - Properly Sized, Designed, Installed, and Commissioned HVAC Systems
 
Hvac systems
Hvac systemsHvac systems
Hvac systems
 
Hvac course
Hvac courseHvac course
Hvac course
 
Trg trc017-en hvac system control
Trg trc017-en hvac system controlTrg trc017-en hvac system control
Trg trc017-en hvac system control
 
SCADA
SCADASCADA
SCADA
 
Hvac controls operation and maintenance 3rd edition g. w. gupton
Hvac controls operation and maintenance   3rd edition g. w. guptonHvac controls operation and maintenance   3rd edition g. w. gupton
Hvac controls operation and maintenance 3rd edition g. w. gupton
 
HVAC Control Systems
HVAC Control SystemsHVAC Control Systems
HVAC Control Systems
 
21 hvac design manual
21 hvac design manual21 hvac design manual
21 hvac design manual
 
Instalația de aer comprimat
Instalația de aer comprimatInstalația de aer comprimat
Instalația de aer comprimat
 
Hvac formulas
Hvac formulasHvac formulas
Hvac formulas
 

Similar to Bms system basic

Ecs presentation ver1 anil kumar miet pmp
Ecs presentation ver1 anil kumar miet pmpEcs presentation ver1 anil kumar miet pmp
Ecs presentation ver1 anil kumar miet pmpanil103
 
Introduction to Instrumentation.pptx
Introduction to Instrumentation.pptxIntroduction to Instrumentation.pptx
Introduction to Instrumentation.pptxBLalMughal
 
Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)Beeteco
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfSmritiGarg21
 
Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014
Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014
Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014Sheikh Imran
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxsurangagw
 
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014Sheikh Imran
 
Components of Control Loops and ISA.pptx
Components of Control Loops and ISA.pptxComponents of Control Loops and ISA.pptx
Components of Control Loops and ISA.pptxsarkmank1
 
Intelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulatorsIntelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulatorsSelvam Sethurathinam
 
Session 04 - Instruments - Introduction
Session 04 - Instruments - IntroductionSession 04 - Instruments - Introduction
Session 04 - Instruments - IntroductionVidyaIA
 
Cem 350 control systems 9 2016
Cem 350 control systems 9 2016Cem 350 control systems 9 2016
Cem 350 control systems 9 2016miresmaeil
 
VAV Controls_NEP 2017_Rev1.pptx
VAV Controls_NEP 2017_Rev1.pptxVAV Controls_NEP 2017_Rev1.pptx
VAV Controls_NEP 2017_Rev1.pptxKartikPrabhakar2
 
Instruments - Introduction
Instruments - IntroductionInstruments - Introduction
Instruments - IntroductionPranavAutomation
 
Siemens Terminal Box Controller (APOGEE Automation System )
Siemens Terminal Box Controller (APOGEE Automation System )Siemens Terminal Box Controller (APOGEE Automation System )
Siemens Terminal Box Controller (APOGEE Automation System )CONTROLS & SYSTEMS
 

Similar to Bms system basic (20)

ABC of BMS.pdf
ABC of BMS.pdfABC of BMS.pdf
ABC of BMS.pdf
 
C&i systems
C&i systemsC&i systems
C&i systems
 
Ecs presentation ver1 anil kumar miet pmp
Ecs presentation ver1 anil kumar miet pmpEcs presentation ver1 anil kumar miet pmp
Ecs presentation ver1 anil kumar miet pmp
 
DCS
DCSDCS
DCS
 
Introduction to Instrumentation.pptx
Introduction to Instrumentation.pptxIntroduction to Instrumentation.pptx
Introduction to Instrumentation.pptx
 
Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)Catalog Biến tần Frenic-HVAC (Fuji Electric)
Catalog Biến tần Frenic-HVAC (Fuji Electric)
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
 
Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014
Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014
Amiri Guard Starter panels Presentation Rev-1 Dt16-11-2014
 
Lecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptxLecture+9+-+SCADA+Systems.pptx
Lecture+9+-+SCADA+Systems.pptx
 
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
Diwan Annexure Starter panels Presentation Rev-1 Dt16-11-2014
 
Components of Control Loops and ISA.pptx
Components of Control Loops and ISA.pptxComponents of Control Loops and ISA.pptx
Components of Control Loops and ISA.pptx
 
Intelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulatorsIntelligent instrumentation and power plant simulators
Intelligent instrumentation and power plant simulators
 
Session 04 - Instruments - Introduction
Session 04 - Instruments - IntroductionSession 04 - Instruments - Introduction
Session 04 - Instruments - Introduction
 
Cem 350 control systems 9 2016
Cem 350 control systems 9 2016Cem 350 control systems 9 2016
Cem 350 control systems 9 2016
 
VAV Controls_NEP 2017_Rev1.pptx
VAV Controls_NEP 2017_Rev1.pptxVAV Controls_NEP 2017_Rev1.pptx
VAV Controls_NEP 2017_Rev1.pptx
 
Instruments - Introduction
Instruments - IntroductionInstruments - Introduction
Instruments - Introduction
 
Siemens Terminal Box Controller (APOGEE Automation System )
Siemens Terminal Box Controller (APOGEE Automation System )Siemens Terminal Box Controller (APOGEE Automation System )
Siemens Terminal Box Controller (APOGEE Automation System )
 
350619 634044039582135000
350619 634044039582135000350619 634044039582135000
350619 634044039582135000
 
SCADA PPT.pdf
SCADA PPT.pdfSCADA PPT.pdf
SCADA PPT.pdf
 
CONCEPT OF SCADA.pdf
CONCEPT OF SCADA.pdfCONCEPT OF SCADA.pdf
CONCEPT OF SCADA.pdf
 

Recently uploaded

Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 

Recently uploaded (20)

Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 

Bms system basic

  • 1. A B CA B CA B CA B C ofofofof BBBB M SM SM SM S by BAS Consultant & Engineer
  • 2. Basic of Instrumentation • Us our Body and its parts • Our Body Reflexes
  • 3. In BMS INPUTS:- Sensors Temperature (of room) Humidity (of room) Flow Rate (chilled Water)Flow Rate (chilled Water) Pressure (of Fire Hydrant) Level (of a Tank) Run status (Pumps, Fans)
  • 4. Temperature Sensors – Sensing technologies • Thermistor – Accurate over limited range – Point type only – Used for space temperature • Nickel Wire – General purpose sensor – Point or averaging type – Used for space or duct – Application Issues • Mount inside thermal well for water temperature • Mount return air sensor away from fresh air stream • Mount space temperature sensor : – At 1500 mm height – On inside wall – Away from direct sun or other heat sources • Ensure off-coil sensors are far – Used for space or duct • Platinum – High accuracy / linearity – Point type only – Precision applications • Ensure off-coil sensors are far enough away from coil • Outdoor air temperature sensors require sunscreen • Calibrate using precision resistor, validate using digital thermometer • Know mounting scope of responsibility
  • 5. Pressure Sensors – Air Static Pressure • Used to control VFD based on VAV duct static • Must be mounted in region of laminar flow; five duct diameters from restrictions • Active sensor – Water Static Pressure • Used to monitor pressure at top of sprinkler riser • Commercial grade sensors can leak – Water Differential Pressure – Air Differential Pressure • Used to calculate airflow from velocity pressure – PVELOCITY = PTOTAL - PSTATIC – CFM = 4005 * AREA * (PVELOCITY / K FACTOR)½ • Used in VAV boxes and air flow monitoring stations – Water Differential Pressure • Used to control bypass valve or VFD • When controlling bypass, best to mount at last AHU • Do not try to save costs by using two static pressure sensors • Calculation error of same magnitude as signal may ocur.
  • 6. Other Sensors Waterflow Mount in region of laminar flow; five diameters from restrictions Many technologies: Annubar Paddlewheel Carbon monoxide Control car park ventilation fans Carbon Dioxide Used as indirect indicator of indoor air quality Paddlewheel Electromagnetic Turbine Humidity Used to measure the Relative Humidity in air. Some humidity sensors comes with in built temperature sensors also. indoor air quality Electrical Transducers Current Transducers Voltage Transducers Lux Level Sensors To measure the intensity of light.
  • 7. In BMS OUTPUTS:- Control Valves VFD Speed Command Air Dampers Actuators ON-OFF Command (Fans, Pumps, Boilers)
  • 8. INPUTS & OUTPUTS INPUTS e.g Analouge (varying-reading) AI Temperature, Humidity, Water Flow , Air Flow , Tank Level, Energy KW, Voltage, Current, Pressure, pH, Conductivity Digital (Binary-ON or OFF) DI or BI Status (on/off, airflow , run, open/close) Alarm TripTrip OUTPUTS e.g Analouge (varying-positioning) AO Fan Speed regulating (0 to 100%) Chilled water valve control (0 to 100%) Digital (Binary-ON or OFF) DO or BO Command (on/off, open/close)
  • 9. I/O Building management system relies on 4 types sensory information to make a control decision Analog inputs : are used to read a variable measurement. Examples are temperature, humidity and pressure sensor which could be thermistor, 4-20 mA, 0-10 volt or platinum resistance thermometer (resistance temperature detector), or wireless sensors. Digital input : indicates if a device is turned on or not. Some examples of a digital input would be , an airDigital input : indicates if a device is turned on or not. Some examples of a digital input would be , an air flow switch, or a volt-free relay contact. Analog output : controls the speed or position of a device, such as a variable frequency drive, a I-P (current to pneumatics) transducer, or a valve or damper actuator. An example is a chilled water valve opening up 25% to maintain a setpoint. Digital outputs : are used to open and close relays and switches. An example would be to turn on the parking lot lights when a photocell indicates it is dark outside. A typical Mid Size Building may have 800 -2000 sensory points also known and I/O points. A complex Building like an Airport may have more than 5000 points
  • 10. DDC Controllers Types of DDC controllers Fixed function Configurable Text programmable Graphic programmable Point Definition Ranging (linear, calculated, Control Loops Proportional plus integral control commonly used Other software routines used in local control logic Minimum, maximum, average, calculator, etc. Psychometric calculations Timing (delays, pulses, etc.)Ranging (linear, calculated, polynomial) Filtering (smoothing and debounce) Interlocks Timing (delays, pulses, etc.) Boolean and comparator operators Time clock and backup schedules
  • 13. Sl. No IO Description AI DI AO DO FIELD DEVICE 1 AHU On/Off 0 0 0 1 AHU panel to accept 2A NO contact 2 AHU Run Status 0 1 0 0 Differential Pressure Switch across blower 3 AHU Auto/Manual Status 0 1 0 0 Pot . free contact @ AHU Panel 4 AHU filter Status 0 1 0 0 Differential Pressure Switch across filter 5 Return air temperature 1 0 0 0 Duct type temperature sensor 6 2 Way chilled water modulating valve control 0 0 1 0 2 way Modulating Valve 7 Chilled water return header flow rate 1 0 0 0 Flow meter TOTAL 2 3 1 1
  • 14. Basics of HVAC Pot with water Evaporation through the pores of Mud Pot makes the water inside cool
  • 15. Purpose of HVAC The main purpose of HVAC is to provide the people working inside the building with “CONDITIONED AIR” so that they will have a comfortable and safe workhave a comfortable and safe work environment.
  • 16. What is Conditioned Air? Conditioned Air” means that the air is clean and Odor-Free, and the temperature, humidity and movement of air are within certain comfort range.certain comfort range. Comfort Zone: (ASHRAErecommendation) – – Temp : 22.7oC to 26.1oC – – Relative Humidity : 50% – – Air Velocity : 30 feet per minute
  • 17. What is AHU? • AHU is Air Handling Unit Contains:–Fan, Cooling coil , Air Filter
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. Inputs to the Controller:
  • 24. Outputs from the Controller:
  • 25. What is a Chiller • A heat exchanger using air, refrigerant, water and evaporation to transfer heat (BTUs) to produce air conditioning (measured in tons). • A chiller is comprised of an evaporator, compressor, condenser and expansion valve system.
  • 26. Cycle
  • 27.
  • 28.
  • 29.
  • 31. Chiller Plant with BMS sensor
  • 34. Building Management System-: Begin with the basics BMS – Building Management system Building Automation system A Building Management System (BMS) is a blend of hardware & software basedis a blend of hardware & software based control system installed in buildings to control and monitor the building’s mechanical, electrical & other utility equipment
  • 35. Building Services Services Equipments Mechanical system HVAC , Plumbing , Fire Fighting, STP Electrical System Electrical DB’s/Lighting control & monitoring, Generator set, UPS Utility Lifts, Fire Alarm System, Security System, Public address system
  • 36. What is a Building Automation System? A BMS system collects the operating information required for intelligent building management. It analyses the operation of the building systems by viewing all important temperatures, humidities and equipment status. Further to collection of these data, the BMS presents these data on the screen with full color • Automates some control strategies such as turning equipment On/Off according to a time schedule – ensures energy savings • Allows an operator sitting at the BMS work station to view key information about the building – improves building operationsthe building – improves building operations • Allows an operator sitting at the BMS work station to control some of the equipment in the building – improves building operations allowing remote control / over-ride where necessary • Maintains an audit trail of what happened and when it happened – improves building management by means reporting and traceability • Maintains historical data for selected information (like temperature, humidity ..etc) – improves building management by means reporting and traceability • Alerts the operator at the BMS work station when readings fall outside of normal range (i.e. breaker trips, temperature too warm, etc.) – improves building management by having a faster reaction time to problems • By doing the above and more a BMS system saves manpower, ensures productive occupants (especially in an office environment), prolongs equipment life, and the most important of all saves energy. diagrams (graphics) for the ease of understanding.
  • 37. BMS Protocols BMS system manufacturer divided predominantly into two different protocols, mentioned below- • BACnet - A Data Communication Protocol for Building Automation and Control Networks developed by ASHRAE. It gives freedom to client to connect all BACnet compliant devices and ease in commissioning & configuring.configuring. • Lonworks -Lon Works is actually a family of products originally developed by the Echelon Corporation. At the core of this technology is a proprietary communications protocol called Lon Talk. Here one needs to buy license for each individual controllers & devices. Commissioning requires software key (dongle) all the time for commissioning & configuration. • Modbus is developed by Modicon in 1979. It is used to establish master- slave/client-server communication between intelligent devices. It is a de facto standard, truly open and the most widely used network protocol in the industrial environment and devices.
  • 38. BMS System Architecture – • IP- 1 Tier Where all controllers are connected to HMI on LAN.
  • 39. RS 485 – 2Tier Level1-: where all controllers are connected to each other in daisy chain fashion & then after they connect to router or gateway. Level2-: When router or gateway is connected to any HMI for monitoring & controlling.to any HMI for monitoring & controlling.
  • 40. Building Automation System Software Alarms User Interface and Password Energy Operations Maintenance Supervisory Controller (processing) Operator Workstation (long term storage) Operator Workstation Where this feature resides Control Logic Demand Limiting and Duty Cycling Historical Data Graphics Scheduling Supervisory Controller DDC Controller Supervisory Controller Operator Workstation Supervisory Controller Supervisory Controller (processing) Operator Workstation (long term storage)
  • 41. BMS Typical BOQ- It can be categorized in 3 broad categories- 1. BMS controllers, Softwares, POT(Portable Operator Terminal),integration & PC. 2. Field Devices- It comprises different kind of sensors, switches, actuators, Transmitters etcswitches, actuators, Transmitters etc 3. Cables & conduits
  • 42. 1. BMS controllers, Software's, POT (Portable Operator Terminal), for integration & PC. • Controllers selection can be done based on the IO (Input Output) requirements directly just to match AI(Analog Input), AO(Analog Output), DI(Digital Input), DO(Digital Output) in the layman’s language. • Integration to collect the data from different devices.
  • 43. 2. Field Devices- Comprises different kind of sensors, switches, actuators, Transmitters BMS Areas Category Type Sub- Category Application AHU(Airside) Temperature(cum Humidity/RH) Sensor Room To know the actual Temp inside without cooling Duct To know flowing air Temp(& RH) inside duct for supply & Return Air Differential Pressure Across AHU Fan to check it is on or off physically,Differential Pressure Switch Air Across AHU Fan to check it is on or off physically, across filter to check the status Valve & Actuators Across cooling coil Chillers, cooling towers(Waterside) Temperature(cum Humidity/RH) Sensor Immersion To Know water temperature from the chillers & to the chillers Outside To Know outside temp & RH Differential Pressure Switch Water Across Pumps to check it is on or off physically, across filter to check the status Others Level Transmitters Water To know the water level Oil To know the oil level CO2, CO sensor Room To know the air quality as in parking lot
  • 44. 3. Cable It generally can be categorized in two different applications-: • Signal/Control Cable: From different field devices to controllers & from Controllers to field devices to control the equipments • Communication Cable: cable between different controllers, routers & gateways for the purpose of intercommunication between& gateways for the purpose of intercommunication between controllers. • Integration cable: cable required for monitoring of third party devices.
  • 45. Cable Selection BMS Areas Category Cable Type Application AHU Duct, Room Temp sensor 2c x 1 sqmm shielded Passive Temp(2c) signals from sensor to controllers Temp cum humidity sensor 4c x 1sqmm shielded Passive Temperature(2c) & Active(2c-power) RH measurement from sensor to controllers DP Switch for Air 2c x 1 sqmm shielded Passive Temp(2c) signals from switch to controllers AHU FAN VFD 2c x 1 sqmm shielded Run status 2c x 1 sqmm shielded On/off status 2c x 1 sqmm shielded Relay output for VFD On/OFF Operation Valve & Actuator 5c x 1sqmm shielded Control & Power (3c power and command) & Monitor (2c)
  • 46. Integration BMS Areas Category Cable Type Application Integartion DG 2c x 1.5 sqmm twisted pair shielded Integration is only to collect data from different devices to monitor & generate reports UPS 2c x 1.5 sqmm twisted pair shielded Integration is only to collect data from different devices to monitor & generate reports VAV's 2c x 1.5 sqmm twisted pair shielded Integration is only to collect data from different devices to monitor & generate reports 2c x 1.5 sqmm twisted pairIntegration is only to collect data from different devices to monitor Electrical Panels 2c x 1.5 sqmm twisted pair shielded Integration is only to collect data from different devices to monitor & generate reports Chillers 2c x 1.5 sqmm twisted pair shielded Integration is only to collect data from different devices to monitor & generate reports Security & Fire Alarm system 2c x 1.5 sqmm twisted pair shielded Integration is only to collect data from different devices to monitor & generate reports Elevator 2c x 1.5 sqmm twisted pair shielded Integration is only to collect data from different devices to monitor & generate reports
  • 47. BMS Design Aspects Basic data required before you start system design: 1. Input / Output summary for all subsystems, which need to either monitor or control. 2. Selection of appropriate field devices. 3. All integration devices & respective point details which has to be monitored. 4. Signal & Communication cable route layout (at least tentative). 5. Panel (Enclosure for controllers) location, BMS PC location. Steps to follow for designing-: 1. Select the suitable controllers required for the requirement. 2. Select the enclosure to mount those controllers, which includes power supply for controllers & other wirings for field device connection. 3. Now start with the AHU designing which includes signal & control cabling requirement for different field device selection as per the requirement. 4. A typical AHU generally requires following field devices-Temperature cum Humidity sensor (or only Temp) in return & supply duct. Differential Pressure Switch (For Air) across the AHU Fan, Filter, Actuators for AHU Line. 5. A typical AHU will have following wiring connection- Connection to all Field devices, Connection to electrical panels as per I/O, connection to VFD’s. 6. A typical Chiller side will have following field devices-Immersion type temperature sensor (for supply & return pipes), Butterfly Valve & Actuator in each chiller supply, differential Pressure sensor across main supply & return . 7. A typical chiller will have connection to all field devices, chiller panels, Pump VFD’s.
  • 48. BMS Commissioning Aspects – Air Side Commissioning- It comprises individual commissioning of AHU (Air handling Unit), CSU (Ceiling Suspended Unit), Fans & associated field devices. • We need to measure each field devices value during AHU commissioning as first task to make sure all field devices are working & then all points can be put in a logic. Water side commissioning – It comprises individual commissioning of Water cooled chillers, Air cooled chillers, Cooling towers, Primary pumps, Secondary pumps, VFD’s & associated field devicesdevices • We need to measure each field device value & other connected points value individually before putting them into logic. Integration of Air side & water side in a logic-This is to integrate all independent system in logic. Which can work automatically based on the user defined parameters without any conflict of individual system functionality.
  • 49. BMS Commissioning Aspects Integration of monitoring points- • This is to collect all data in BMS system for the purpose of monitoring only. • PICS details i.e mapping details to be taken from respective equipment supplier. • Protocol significance for integration purpose-whenever we say one device supports Modbus over RS485, here RS 485 signifies physical channel (cable type) & communication port while Modbus signifies data pattern. Therefore all devices in a loop must support same protocol & configure to the same. • Cable used for integration is 2 core x 1.5 sqmm shielded• Cable used for integration is 2 core x 1.5 sqmm shielded • All monitored devices have to be looped in daisy chain connection to RS-485 port. Devices can support different communication over different protocols. We need to make sure whenever making a loop all devices should support same communication & protocol type. for instance Modbus over RS485. Client User interface (UI) • Client can change parameters as temperature & humidity from UI as per the comfort level & all basic information can be viewed on the UI.
  • 51. PANEL
  • 58. CHW & CDW PUMPS