LEED Gold Headquarters Building
Houston, Texas
1,000 Ton Cooling Tower
Key Success Factors
 Prevent scale and biofoul
accumulation in tower and chiller
 Reduce water consumption
 Optimize chemical program
effectiveness
 Extend service life of
infrastructure, fill and piping
 Reduce energy costs
 Reduce maintenance expenses
Electronic Water Conditioning
Allows for Substantial Savings
in Commercial Building
Results
 All key success factors were
met during the 90-day
demonstration
 Cycles of Concentration
doubled without scale
accumulation while chemical
use was reduced by 75%,
resulting in over 50% water
savings
 Projected payback period aligns
with the customer’s
expectations
Cooling Tower
Case Study
August 18, 2016
Texas and Oklahoma
About the Cooling Tower
The headquarters campus features two buildings, each with a 1,000 ton cooling
tower situated on the rooftop. The cooling towers exhibited scale buildup on
infrastructure, fill, and piping. The chiller units are opened for cleaning and
inspection annually, with scale accumulation at entry sections and rifling that
required cleaning. Three cycles of concentration were allowed with conductivity
set-point of 1,500 µS for blowdown. Despite a diligent chemicals management
program for the control of scale, bacteria and corrosion; the cooling towers
continued to exhibit accumulated scale and biofoul.
A Fortune 100 headquarters, located in Houston, TX was certified LEED Gold in
2008. While continued efforts have been made each year to improve energy and
water efficiencies, the company still identified the need for its cooling system to
improve water conservation, as well as energy savings and chemicals reduction.
HydroFLOW electronic water conditioning was the recommended solution for
achieving these additional savings. HydroTech Solutions, the HydroFLOW
distributor in Texas and Oklahoma, provided a 90-day demonstration, beginning
April 26, 2016.
The HydroFLOW Demonstration
HydroTech Solutions provided the 90-day demonstration of HydroFLOW
electronic water conditioning as a means of reducing scale and biofoul
accumulation, optimizing the chemical program, decreasing the cost of makeup
water and lessening the expense of blowdown disposal. An additional added
value was to extend the service life of the cooling tower and chiller.
A 12” Custom HydroFLOW unit was installed inside the building, on the return
line from the chiller. No pipes were drilled or cut, and the circulation of the
cooling tower water was not interrupted during the installation. As a part of the
baseline data gathering process, HydroTech personnel cleaned scale, to bare
metal, on several surface areas. The purpose was to prove HydroFLOW prevents
new scale from forming. Additional baseline data which was collected included
make-up water volume, sanitary sewer disposal volume, total bacteria in the
water, chemical costs and maintenance related expenses.
The purpose of collecting the baseline data came to demonstrate the cost
savings associated with HydroFLOW electronic water conditioning.
Testing Procedure
Chemicals were gradually reduced over a span on 4 weeks. Once it was
confirmed scale and biofoul control can be achieved with a combination of
HydroFLOW and minimal chemical usage, cycles of concentration were
increased.
HydroFLOW Benefits Included:
 Makeup water savings of approximately 250,000 gallons per month
 Blowdown reduced by approximately 50%, saving significant water
disposal
 Reduction of chemical use by 80%
 Prevention of scale formation throughout the cooling system
 Improved filtration capabilities of existing side stream filter
 Chiller tubes were free of scale deposits
 Cycles of concentration were doubled
 Water cost savings of $2,500 per month
HydroTech Solutions, Inc.
1019 North Henderson Blvd. #109
Fort Worth, Texas 76107
(817) 894-5280 www.hydrotech.solutions
Before After
Pictures of Chiller Tubes
“HydroFLOW significantly improved the
operation of our cooling system, in
terms of cost and maintenance. This
technology pays for itself with the
monthly savings it attains.”
Headquarters Facilities Manager
Results
HydroFLOW successfully met the key success factor and also restored equipment
condition by removing existing deposits. This allowed efficient operation for
extended periods with less maintenance.
Sustained Cost Savings
The company’s goal of maintaining the cooling system within industry standards
while reducing chemical and blowdown water usage was achieved. The monthly
fee of leasing the electronic water conditioning equipment is covered by the cost
savings.
Pictures of Fill Media
90 days into the demonstration, deposits
inside the tubes and on the fill media did
not increase after chemicals were reduced
and the water concentration cycles were
increased. Hard scale deposits began to
soften and could be removed easily.
About HydroFLOW
HydroFLOW devices, which are powered by Hydropath technology, apply a
frequency that travels throughout the water system and causes dissolved
minerals to cluster in the water thus preventing hard scale from forming on
pipes and equipment. The ±150 kHz frequency also disrupts biofilm and
bacteria, which minimizes biological loading in a recirculating water system,
such as a cooling tower.
HydroFLOW is installed on the outside of a pipe of any material (plastic, metal,
etc.) without cutting or modifications.

More Related Content

What's hot

Produced Water | Session X - Steve Jester
Produced Water | Session X - Steve JesterProduced Water | Session X - Steve Jester
Produced Water | Session X - Steve Jesteratlanticcouncil
 
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...San Diego County Water Authority
 
Produced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil RecoveryProduced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil Recoverygusgon
 
CONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECTCONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECTMudassar Raut
 
05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and EnergyJill Watkins
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsDustin Powell, MBA
 
Produced Water | Session XI - Alleman
Produced Water | Session XI - AllemanProduced Water | Session XI - Alleman
Produced Water | Session XI - Allemanatlanticcouncil
 
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)Stephen Flood
 
Produced Water | Session II - John Veil
Produced Water | Session II - John VeilProduced Water | Session II - John Veil
Produced Water | Session II - John Veilatlanticcouncil
 
Hydraulic peroformnace of faucet aerator as water
Hydraulic peroformnace of faucet aerator as waterHydraulic peroformnace of faucet aerator as water
Hydraulic peroformnace of faucet aerator as watereSAT Publishing House
 
AMWAY GRAND Hotel Case Study SSF
AMWAY GRAND Hotel Case Study SSFAMWAY GRAND Hotel Case Study SSF
AMWAY GRAND Hotel Case Study SSFSteve Fournier
 
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...Stephen Flood
 

What's hot (20)

Csu venture pitch_tong
Csu venture pitch_tongCsu venture pitch_tong
Csu venture pitch_tong
 
Produced Water | Session X - Steve Jester
Produced Water | Session X - Steve JesterProduced Water | Session X - Steve Jester
Produced Water | Session X - Steve Jester
 
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
Commercial, Industrial, and Institutional Water Use Efficiency - East Bay Mun...
 
NextGen Athens, Greece
NextGen Athens, GreeceNextGen Athens, Greece
NextGen Athens, Greece
 
Produced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil RecoveryProduced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil Recovery
 
CONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECTCONDENSATE RECOVERY IN MUTRAFIAH PROJECT
CONDENSATE RECOVERY IN MUTRAFIAH PROJECT
 
Next Gen Filton Airfield, UK
Next Gen Filton Airfield, UKNext Gen Filton Airfield, UK
Next Gen Filton Airfield, UK
 
Grey water treatment & reuse
Grey water treatment & reuseGrey water treatment & reuse
Grey water treatment & reuse
 
05 Water and Energy
05 Water and Energy05 Water and Energy
05 Water and Energy
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment Needs
 
Produced Water | Session XI - Alleman
Produced Water | Session XI - AllemanProduced Water | Session XI - Alleman
Produced Water | Session XI - Alleman
 
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
River water quality modelling using MIKE 11 ECO Lab - Vera Jones (Atkins)
 
NextGen Gotland Sweden
NextGen Gotland SwedenNextGen Gotland Sweden
NextGen Gotland Sweden
 
NextGen Spernal United Kingdom
NextGen Spernal United KingdomNextGen Spernal United Kingdom
NextGen Spernal United Kingdom
 
Produced Water | Session II - John Veil
Produced Water | Session II - John VeilProduced Water | Session II - John Veil
Produced Water | Session II - John Veil
 
Hydraulic peroformnace of faucet aerator as water
Hydraulic peroformnace of faucet aerator as waterHydraulic peroformnace of faucet aerator as water
Hydraulic peroformnace of faucet aerator as water
 
WWT Poster
WWT PosterWWT Poster
WWT Poster
 
NextGen Westland, Netherlands
NextGen Westland, NetherlandsNextGen Westland, Netherlands
NextGen Westland, Netherlands
 
AMWAY GRAND Hotel Case Study SSF
AMWAY GRAND Hotel Case Study SSFAMWAY GRAND Hotel Case Study SSF
AMWAY GRAND Hotel Case Study SSF
 
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
 

Viewers also liked

livepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-studylivepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-studyCourtney Jowsey
 
Stansted Airport Case Study
Stansted Airport Case StudyStansted Airport Case Study
Stansted Airport Case StudySteve Carter
 
Birmingham Airport Case Study
Birmingham Airport Case StudyBirmingham Airport Case Study
Birmingham Airport Case StudyCristina Calleja
 
Gander Airport Case Study
Gander Airport Case StudyGander Airport Case Study
Gander Airport Case Studyjtaylorireland
 
Case study brookfield airport
Case study brookfield airportCase study brookfield airport
Case study brookfield airportColo_cr
 
Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09mario kallab
 
USACE Construction Quality Management manual
USACE Construction Quality Management manualUSACE Construction Quality Management manual
USACE Construction Quality Management manualJerico Awat
 
Cqm student study guide
Cqm student study guideCqm student study guide
Cqm student study guideRobert Rodgers
 
Gatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudyGatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudySteelhenge
 
Quality control in construction site
Quality control in construction siteQuality control in construction site
Quality control in construction siteMohamed Saber
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In ConstructionIsidro Sid Calayag
 

Viewers also liked (14)

livepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-studylivepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-study
 
Birmingham Airport Case study
Birmingham Airport Case studyBirmingham Airport Case study
Birmingham Airport Case study
 
Stansted Airport Case Study
Stansted Airport Case StudyStansted Airport Case Study
Stansted Airport Case Study
 
Birmingham Airport Case Study
Birmingham Airport Case StudyBirmingham Airport Case Study
Birmingham Airport Case Study
 
Gander Airport Case Study
Gander Airport Case StudyGander Airport Case Study
Gander Airport Case Study
 
Case study brookfield airport
Case study brookfield airportCase study brookfield airport
Case study brookfield airport
 
Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09
 
Hitachi case study
Hitachi case studyHitachi case study
Hitachi case study
 
USACE Construction Quality Management manual
USACE Construction Quality Management manualUSACE Construction Quality Management manual
USACE Construction Quality Management manual
 
Cqm student study guide
Cqm student study guideCqm student study guide
Cqm student study guide
 
Challenges airport planning
Challenges airport planningChallenges airport planning
Challenges airport planning
 
Gatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudyGatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case Study
 
Quality control in construction site
Quality control in construction siteQuality control in construction site
Quality control in construction site
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 

Similar to Houston Commercial Cooling Tower Case Study - Aug. 22 2016

dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014GWT
 
PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)Rick Nabett
 
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxBULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxPushpaHarshitha05
 
Analytika - Research University case study
Analytika - Research University case studyAnalytika - Research University case study
Analytika - Research University case studyCimetrics Inc
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetDeanDallwitz
 
Factory Infrastructure for PV Manufacturing
Factory Infrastructure for PV ManufacturingFactory Infrastructure for PV Manufacturing
Factory Infrastructure for PV ManufacturingM+W Group
 
Environmental Stewardship & Regulatory Compliance
Environmental Stewardship & Regulatory ComplianceEnvironmental Stewardship & Regulatory Compliance
Environmental Stewardship & Regulatory Compliancealbertaoiltool
 
Vacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacVacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacMorris Group International
 
Harnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgradeHarnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgradeLinde Gas Benelux
 
Process optimization potential china chemicals
Process optimization potential china chemicalsProcess optimization potential china chemicals
Process optimization potential china chemicalsKai Pflug
 
H2O biotech presentation - cooling tower - eng - 131118
H2O biotech   presentation - cooling tower - eng - 131118H2O biotech   presentation - cooling tower - eng - 131118
H2O biotech presentation - cooling tower - eng - 131118Phil Boileau
 
Sloan - High Performing & Sustainable Restroom Solutions
Sloan - High Performing & Sustainable Restroom SolutionsSloan - High Performing & Sustainable Restroom Solutions
Sloan - High Performing & Sustainable Restroom SolutionsFMA Summits
 
Essential Expertise for Water, Energy and Air
Essential Expertise for Water, Energy and AirEssential Expertise for Water, Energy and Air
Essential Expertise for Water, Energy and AirAlliance To Save Energy
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talkPhucPhamThanh
 
Pool Dehumidification Systems Overview
Pool Dehumidification Systems OverviewPool Dehumidification Systems Overview
Pool Dehumidification Systems OverviewScott Harwood
 
New Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementNew Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementPeter Armstrong
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant OptimizationJoePessa
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 

Similar to Houston Commercial Cooling Tower Case Study - Aug. 22 2016 (20)

dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)
 
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptxBULLITT CENTER, SEATTLE, WASHINGTON.pptx
BULLITT CENTER, SEATTLE, WASHINGTON.pptx
 
Analytika - Research University case study
Analytika - Research University case studyAnalytika - Research University case study
Analytika - Research University case study
 
ECS - State Of Ohio
ECS - State Of OhioECS - State Of Ohio
ECS - State Of Ohio
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact Sheet
 
Factory Infrastructure for PV Manufacturing
Factory Infrastructure for PV ManufacturingFactory Infrastructure for PV Manufacturing
Factory Infrastructure for PV Manufacturing
 
Environmental Stewardship & Regulatory Compliance
Environmental Stewardship & Regulatory ComplianceEnvironmental Stewardship & Regulatory Compliance
Environmental Stewardship & Regulatory Compliance
 
Vacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacVacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVac
 
Harnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgradeHarnessing oxygen to boost performance in wastewater treatment plant upgrade
Harnessing oxygen to boost performance in wastewater treatment plant upgrade
 
Process optimization potential china chemicals
Process optimization potential china chemicalsProcess optimization potential china chemicals
Process optimization potential china chemicals
 
H2O biotech presentation - cooling tower - eng - 131118
H2O biotech   presentation - cooling tower - eng - 131118H2O biotech   presentation - cooling tower - eng - 131118
H2O biotech presentation - cooling tower - eng - 131118
 
Sloan - High Performing & Sustainable Restroom Solutions
Sloan - High Performing & Sustainable Restroom SolutionsSloan - High Performing & Sustainable Restroom Solutions
Sloan - High Performing & Sustainable Restroom Solutions
 
Essential Expertise for Water, Energy and Air
Essential Expertise for Water, Energy and AirEssential Expertise for Water, Energy and Air
Essential Expertise for Water, Energy and Air
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talk
 
Pool Dehumidification Systems Overview
Pool Dehumidification Systems OverviewPool Dehumidification Systems Overview
Pool Dehumidification Systems Overview
 
New Era of Energy-Efficiency Management
New Era of Energy-Efficiency ManagementNew Era of Energy-Efficiency Management
New Era of Energy-Efficiency Management
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
 
Water Treatment Plant 4 Administration Building - LEED Profile
Water Treatment Plant 4 Administration Building - LEED ProfileWater Treatment Plant 4 Administration Building - LEED Profile
Water Treatment Plant 4 Administration Building - LEED Profile
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 

Houston Commercial Cooling Tower Case Study - Aug. 22 2016

  • 1. LEED Gold Headquarters Building Houston, Texas 1,000 Ton Cooling Tower Key Success Factors  Prevent scale and biofoul accumulation in tower and chiller  Reduce water consumption  Optimize chemical program effectiveness  Extend service life of infrastructure, fill and piping  Reduce energy costs  Reduce maintenance expenses Electronic Water Conditioning Allows for Substantial Savings in Commercial Building Results  All key success factors were met during the 90-day demonstration  Cycles of Concentration doubled without scale accumulation while chemical use was reduced by 75%, resulting in over 50% water savings  Projected payback period aligns with the customer’s expectations Cooling Tower Case Study August 18, 2016 Texas and Oklahoma About the Cooling Tower The headquarters campus features two buildings, each with a 1,000 ton cooling tower situated on the rooftop. The cooling towers exhibited scale buildup on infrastructure, fill, and piping. The chiller units are opened for cleaning and inspection annually, with scale accumulation at entry sections and rifling that required cleaning. Three cycles of concentration were allowed with conductivity set-point of 1,500 µS for blowdown. Despite a diligent chemicals management program for the control of scale, bacteria and corrosion; the cooling towers continued to exhibit accumulated scale and biofoul. A Fortune 100 headquarters, located in Houston, TX was certified LEED Gold in 2008. While continued efforts have been made each year to improve energy and water efficiencies, the company still identified the need for its cooling system to improve water conservation, as well as energy savings and chemicals reduction. HydroFLOW electronic water conditioning was the recommended solution for achieving these additional savings. HydroTech Solutions, the HydroFLOW distributor in Texas and Oklahoma, provided a 90-day demonstration, beginning April 26, 2016. The HydroFLOW Demonstration HydroTech Solutions provided the 90-day demonstration of HydroFLOW electronic water conditioning as a means of reducing scale and biofoul accumulation, optimizing the chemical program, decreasing the cost of makeup water and lessening the expense of blowdown disposal. An additional added value was to extend the service life of the cooling tower and chiller. A 12” Custom HydroFLOW unit was installed inside the building, on the return line from the chiller. No pipes were drilled or cut, and the circulation of the cooling tower water was not interrupted during the installation. As a part of the baseline data gathering process, HydroTech personnel cleaned scale, to bare metal, on several surface areas. The purpose was to prove HydroFLOW prevents new scale from forming. Additional baseline data which was collected included make-up water volume, sanitary sewer disposal volume, total bacteria in the water, chemical costs and maintenance related expenses. The purpose of collecting the baseline data came to demonstrate the cost savings associated with HydroFLOW electronic water conditioning. Testing Procedure Chemicals were gradually reduced over a span on 4 weeks. Once it was confirmed scale and biofoul control can be achieved with a combination of HydroFLOW and minimal chemical usage, cycles of concentration were increased.
  • 2. HydroFLOW Benefits Included:  Makeup water savings of approximately 250,000 gallons per month  Blowdown reduced by approximately 50%, saving significant water disposal  Reduction of chemical use by 80%  Prevention of scale formation throughout the cooling system  Improved filtration capabilities of existing side stream filter  Chiller tubes were free of scale deposits  Cycles of concentration were doubled  Water cost savings of $2,500 per month HydroTech Solutions, Inc. 1019 North Henderson Blvd. #109 Fort Worth, Texas 76107 (817) 894-5280 www.hydrotech.solutions Before After Pictures of Chiller Tubes “HydroFLOW significantly improved the operation of our cooling system, in terms of cost and maintenance. This technology pays for itself with the monthly savings it attains.” Headquarters Facilities Manager Results HydroFLOW successfully met the key success factor and also restored equipment condition by removing existing deposits. This allowed efficient operation for extended periods with less maintenance. Sustained Cost Savings The company’s goal of maintaining the cooling system within industry standards while reducing chemical and blowdown water usage was achieved. The monthly fee of leasing the electronic water conditioning equipment is covered by the cost savings. Pictures of Fill Media 90 days into the demonstration, deposits inside the tubes and on the fill media did not increase after chemicals were reduced and the water concentration cycles were increased. Hard scale deposits began to soften and could be removed easily. About HydroFLOW HydroFLOW devices, which are powered by Hydropath technology, apply a frequency that travels throughout the water system and causes dissolved minerals to cluster in the water thus preventing hard scale from forming on pipes and equipment. The ±150 kHz frequency also disrupts biofilm and bacteria, which minimizes biological loading in a recirculating water system, such as a cooling tower. HydroFLOW is installed on the outside of a pipe of any material (plastic, metal, etc.) without cutting or modifications.