1. New Construction Concrete Systems Pvt. Ltd.
NCCS
Specialist in:
• Repairs
• Restoration
• Permanent Waterproofing
• Civil Construction
2. BHATI MOHIUDDIN
THE FOUNDER OF NCWC
Bhati Mohiuddin, the founder of the New Construction
Waterproofing Company was so proficient in his work that he
was simply known as “The Mistry”. Born in 1919 in Sikar,
Rajasthan, the Mistry started his career with the India
Waterproofing Company, the pioneers of the cement based
structural waterproofing in then united India. His progress there
was phenomenal, and he became the head of his division in no
time.
The Mistry had an inquisitive mind since his childhood and he felt
a sense of wonder in everything. This sensitivity increased and
got enhanced with the years and pervaded in his sphere of
vocation, that is waterproofing. He was always introspecting in
methods, means and techniques to better and develop further the structural waterproofing
which resulted in the invention of Box Type waterproofing with Shahbad tiles which was tried
in the Churchgate Subway for the first time. It was so successful that it became one of the
classical treatments of waterproofing.
His experimentation in his field of endeavor led him to adopt various techniques which
resulted in greater durability, lesser time consumption and saving of costs in waterproofing
treatments.
He breathed his last in 1985, and is survived by three sons: Iqbal Bhati, Amin Bhati &
Nazar Ali Bhati. They have always been working with him and helping him in carrying out his
projects. With their vast experience at hand, they successfully expanded the activities of the
New Construction Waterproofing Co., converting it into one of the finest waterproofing
concerns in India.
New Construction Waterproofing Company
Iqbal Bhati Amin Bhati Nazar Ali Bhati
3. New Construction Concrete Systems Pvt. Ltd.
was formerly known as
New Construction Waterproofing Company
New Construction Concrete Systems Pvt. Ltd. was formerly known as New
Construction Waterproofing Company is aptly committed to a tradition for fast
quality works since three generation.
Our strength lies in our reputation for perfection which is backed by a proven track
record, proven quality, expertise, workmanship, service, competence, reliability and
most importantly a commitment to excellence and customer satisfaction which is
substantiated by our impressive repeated clients and projects.
New Construction Concrete Systems Pvt. Ltd. is involved in Civil Repairs &
Restoration, and Permanent Waterproofing. Company delivers world-class
Engineering & Construction services.
It is well ingrained in the team of our staff personal, engineers, supervisors, Masons
and Male Coolies, that no compromise with quality is tolerable at any cost or risk.
Constant vigil and supervision are enforced at every stage of work to make sure that
perfection and quality are gained in all the work.
Hashim Bhati
M.D.
Kasim Bhati
Director
Yusuf Bhati
Director
Yunus Bhati
Director
4. Project: World Trade Centre - 1, Cuffe Parade, Mumbai
Project Involved Restoration Works, Featuring : Complete External Plaster, Waterproofing,
P/F New Windows And Texture Paint To The Building.
Height - 150 Mtrs. (500ft.), Work Carried Out By Mast Moving Platform
5. Project: The Arcade, Cuffe Parade, Mumbai
Project Involved Restoration Works, Featuring : Complete External Plaster, Waterproofing,
P/F New Elliptical Windows And Painting
6. Project: Reserve Bank of India Building - Head Office, Fort, Mumbai
Civil Repairs, Restoration, Waterproofing Works Of Full Building, Window Frames
Building Height - 120 Mtrs. (395ft.)
Work Done With H Frame Steel Scaffolding And Mast Moving Platforms
7. Project Mahalaxmi Chambers Income Tax Building
Opp. Race Course, Mahalaxmi, Mumbai
Civil Repairs And Restoration, Guniting, Waterproofing, Plumbing,
P/F New Windows & Painting
Project: Shalina Laboratory Pvt. Ltd., Turbe, Navi Mumbai
Civil Repairs And Restoration, Strengthening Of Columns & Beams By Jacketing & Fibre Wrapping Treatment,
Guniting, Waterproofing, Plumbing Painting & External Facade Glazing.
11. Project: Windemere Building, Band Stand, Bandra (W), Mumbai
Civil Repairs, Restoration, Waterproofing
& Plumbing work done in 2007
Project: Windemere Building, Band Stand, Bandra(W), Mumbai
Repainted in 2015
Project: Sea Breeze CHS., Band Stand, Bandra (W), Mumbai
Civil Repairs, Restoration,
Waterproofing, Plumbing & Painting work, Featuring work:
Recasting of all balconies, Jacketing, Window renovation,
Chajjah recasting, External Plaster
Project: Noor Mahal Building, Turner Road, Bandra(W), Mumbai
Civil Repairs, Restoration,
Waterproofing, Plumbing & Painting work, Featuring work:
Recasting of all balconies, Jacketing, Window renovation,
Chajjah recasting, External Plaster
12. Project: Merwanjee Cama Park CHS Ltd., Andheri, Mumbai
11 Building – Civil Repairs in Patchwork,
Waterproofing work, All 44nos. of Plumbing Shaft,
Dry balcony waterproofing, Tiling, Fixing heavy duty RCC grills,
Painting of all Building
Project: Sea Breeze CHS., Santacruz (W), Mumbai
Civil Repairs, Waterproofing, Painting work,
Featuring: Structural Strengthening
Project: Sea Breeze CHS., Santacruz (W), Mumbai
Civil Repairs, Waterproofing, Painting work,
Featuring: Structural Strengthening
Project: Merwanjee Cama Park CHS Ltd., Andheri, Mumbai
11 Building – Civil Repairs in Patchwork,
Waterproofing work, All 44nos. of Plumbing Shaft,
Dry balcony waterproofing, Tiling, Fixing heavy duty RCC grills,
Painting of all Building
13. Project: Anand Chaya, Tata Press Lane, Prabhadevi, Mumbai
Civil repairs, Restoration, Waterproofing,
Plumbing & Painting work, Featuring: Recasting of all balconies,
Jacketing, window renovation, Chajjah recasting,
Recasting of internal Slabs, Guniting, External Plaster
Project: Anand Chaya, Tata Press Lane, Prabhadevi, Mumbai
Civil repairs, Restoration, Waterproofing,
Plumbing & Painting work, Featuring: Recasting of all balconies,
Jacketing, window renovation, Chajjah recasting,
Recasting of internal Slabs, Guniting, External Plaster
Project: Madhukunj Apartments Condominium,
Prabhadevi, Mumbai
Civil repairs, Restoration, Waterproofing, Plumbing &
Featuring: Recasting of all balconies, window renovation,
Chajjah recasting, Guniting, External Plaster, Heavy Duty MS Grill
Project: Madhukunj Apartments Condominium,
Prabhadevi, Mumbai
Civil repairs, Restoration, Waterproofing, Plumbing &
Featuring: Recasting of all balconies, window renovation,
Chajjah recasting, Guniting, External Plaster, Heavy Duty MS Grill
14. Sagar Lahiri Bungalow, Century,
Worli, Mumbai
Civil Repairs, Waterproofing and Painting works.
Century Park, Worli, Mumbai
Civil Repairs, Waterproofing and Painting works.
Project: Century Bhavan Worli, Mumbai
Civil Repairs, Waterproofing works, Featuring: Guniting, Chajjah recasting,
Terrace Slab Strengthening
Repaired in 1996 - 97 & Re-Repaired & Renovated in 2012
15. Project: Kalumal Chs Ltd., Kalumal Estate Juhu, Mumbai
2 Buildings, 6 Storeyed Each
External Plastering, Waterproofing & Painting Work
Work Done In 2000 - 2001 & Repainted In 2013
Project: Juhu Beach Heaven II, Mumbai
Civil Repairs, Restoration, Waterproofing, Plumbing & Painting Work,
Featuring: Guniting, Recasting of all balconies, Jacketing,
Window renovation, Chajjah recasting, External Plaster
Project: Vaishali Shopping Center, Juhu, Mumbai
Civil Repairs & Restoration, Waterproofing
Project: Vaishali Shopping Center, Juhu, Mumbai
Civil Repairs & Restoration, Waterproofing
Project: High Tide Building, Juhu, Mumbai
Waterproofing Of Sub Structure & Super Structure
16. Project: Times of India, (Kandivali) - Mumbai, Delhi, Kolkata, Pune
(New & Old Building) Terrace Waterproofing work more than five Lac sq.ft.
Expansion joints treatment, External Plastering
Geoman
Printing Press
Multifacility
Press Building
Times of India
Goss Machine
Press Building &
Administration Block
19. Project: Eaze Zone Mall, Goregaon (W), Mumbai
External Waterproof Plaster
Project: UB Steel, Nasik
Civil Repairs & Restoration, Waterproofing & Painting
Project: Citi Bank, BKC, Mumbai
Civil Repairs & Restoration, Strengthening
Of Columns & Beams by Fibre Wrapping Treatment,
Podium Slab Waterproofing
20. Project: Nuclear Power Corporation of India Ltd.
Nabhikiya Urja Bhavan (NUB Bhavan), Anushakti Nagar
Light Weight Structure - B & C Block
Complete Civil work, Structure Glazing, ACP Cladding, Thermal Insulation
B & C Block Work Done in 2007, D, E & F Block Work Done in 2013
21. Project: Nuclear Power Corporation of India Ltd. Phase - I & II
Nabhikiya Urja Bhavan (NUB Bhavan), Anushakti Nagar (5 Blocks)
One lac sq. ft. of Terrace waterproofing, External Plastering, Expansion Joints treatment,
External Painting, Internal Painting, Complete Internal Electrical & Interior Furniture work including Heating,
Ventilation and Air Conditioning (HVAC) Work Done in 2013
22. Project: Zenith House, Opp. Race Course, Mahalaxmi, Mumbai
Civil Repairs, Terrace Waterproofing, Structural Strengthening to the Terrace slab,
Painting & Plumbing Work
Project: Barodawala Bunglow, Lonavala
Waterproofing, Painting
23. Project: Zenith Tins (Extension of Factory)
Extension of one floor 16000 sq.ft. with construction of New Staircases, Lift shaft of the factory building.
Jacketting of Ground Floor columns.
24. Project: Horizon Hotel, Juhu, Mumbai
200 Column Strengthening Ten Storeyed Building
Project: Factory Building at Palghar
Construction of Factory Building and Development of the area including Landscaping.
Construction of 15000 sq/ft shed including Heating, Ventilation and Air Conditioning (HVAC) & External Glazing
26. Project: TSCPL - Kalpataru Crest, Bhandup, Mumbai
Waterproofing
Project: TSCPL - Ashford Royale, Nahur, Mumbai
waterproofing
We have been working with
Talib & Shamsi Construction Pvt. Ltd.
(TSCPL) since last 40 years.
In this 4 Decades our 3 Generation
have work with
Talib & Shamsi Construction Pvt. Ltd.
this long period have
created a very strong bond of
trust Relationship
Between both companies.
27. Project: TSCPL - Aspire Tower 1-10 - Amanora Park -Pune
Waterproofing
Project: TSCPL - DSK Drem City, Pune
Waterproofing
28. Project: TSCPL - Abil House, Pune
Waterproofing
Project: TSCPL - Nirlon Knowledge Park,
Phase - IV, Goregaon (E), Mumbai
Waterproofing
Project: TSCPL - Nirlon Knowledge Park,
Phase - III, Goregaon (E), Mumbai
Waterproofing
Project: TSCPL -
DSK Durgamata , Colaba, Mumbai
Waterproofing
Project: TSCPL - Sapphire Lokhandwala Complex,
Kandivali (E)
Waterproofing
32. Client: Rustomjee, Contractor: TSCPL - Project: Global City, Virar
Waterproofing of more than 80 Building
Client: Rustomjee, Contractor: TSCPL - Project: Global City, Virar
Waterproofing of more than 80 Building