SlideShare a Scribd company logo
1 of 31
Download to read offline
IBM Maximo Asset Management Training 
Work Management 
© 2014 IBM Corporation 
Bruno Portaluri 
Maximo Technical Solution Architect 
Last Update: 2014-11-12
Work Management processes 
Work 
Order 
Job Plans 
Generate WOs 
from PMs 
Generate work 
orders from SRs 
Generate WOs from 
Condition Monitoring 
Cost rollup 
Reserve 
spare parts 
Direct issue of 
purchased parts 
Asset 
Inventory 
Purchasing 
Planning 
Preventive 
Maintenance 
Service 
Requests 
2 © 2014 IBM Corporation
Work Management process 
3 © 2014 IBM Corporation
Work Management modules 
• Work Orders module allows to track the work that has been performed 
in the past, and future work that is being planned. 
• Work Order Tracking 
• Labor Reporting 
• Quick Reporting 
• Activities and Tasks 
• Assignment Manager 
• Service Requests 
• Preventive Maintenance module allows to manage the work performed 
on a regular schedule to keep assets running efficiently 
• Preventive Maintenance 
• Master PM 
4 © 2014 IBM Corporation
Additional application 
• Planning module allows to plan how work should be performed, 
such as creating job plans or safety precautions and procedures 
• Job Plans 
• Routes 
• Safety 
• Resources module (Administration > Resources) allows to create 
records about the people in your workforce 
• Labor 
• Qualifications 
• People 
• Person Groups 
• Crafts 
5 © 2014 IBM Corporation
Work Order Tracking application 
A Work Order (WO) specifies a particular task and the labor, materials, services, and 
tools required to complete the task 
In the Work Order Tracking application, you create and manage work orders for assets and 
locations. 
When you create a work order, you initiate the maintenance management process and create a 
historical record of the work requested and performed. 
6 © 2014 IBM Corporation
Work Order Tracking application – Tabs 
• Work Order (main) - Create, view, or modify work orders, view identifiers for 
an applied job plan and safety plan, view PM and scheduling information. If 
the work order is a follow-up work order, you can view the identifier of its 
originating work order. You also can identify the failure hierarchy for the work 
asset. 
• Plans - Enter, view, or modify information on work orders in a hierarchy, and to 
enter, view, modify, or delete information about planned job tasks, labor, 
materials, services, and tools. 
• Related Records - Add, view, or delete related ticket and work order records. 
• Actuals - Enter, view, or modify actual work order start and finish times, labor 
hours and costs, material quantities, service costs, and tool costs. 
• Safety Plan - Add, view, modify, or delete safety information associated with a 
work order. 
• Log - Create, view, edit, and delete Work Log entries, and view Communication 
Log entries. 
• Failure Reporting - Enter, view, or modify asset and location failure 
information to help identify trends. 
7 © 2014 IBM Corporation
Work Order Status 
Status Description 
Waiting for Approval (WAPPR) The work order needs to be approved by a supervisor or a maintenance leader. 
Waiting for Material (WMATL) Indicates that work cannot be initiated because required material is missing 
Waiting to be Scheduled 
(WSCHED) 
The work order needs to be scheduled. Work orders generated by PM records are 
typically created in WSCHED status. 
Waiting for Plant Condition 
(WPCOND) 
Requires a particular plant condition in order to be worked on. 
Approved (APPR) The work plan has been approved and the work can begin. You can report actuals 
against approved work orders. Maximo reserves items in inventory and records cost 
and rate data. 
In Progress (INPRG) Indicates that work had physically begun. 
Canceled (CAN) Work will not be performed. If the the work order has already initiated or actuals have 
already been reported, you cannot change its status to CAN. Maximo removes item 
reservations from inventory (if any) and makes the work order a historical record. 
Complete (COMP) Physical work is finished. 
Closed (CLOSE) All data has been entered. Maximo removes inventory reservations for items that 
were not used on the work order, and makes the work order a historical record. 
8 © 2014 IBM Corporation
Other applications in Work Orders module 
• Labor Reporting application allows to report the type and 
the total number of hours of work that external contractors 
or internal employees performed. 
• Quick Reporting application allows to plan, to review, and to 
approve work orders for assets and locations. 
• Assignment Manager application allows to dispatch labor 
and schedule work for your organization. 
• Service Requests application allows to manage requests for 
services that involve an asset or location in your enterprise. 
For example, you might receive a request to upgrade the 
computer software on the notebook for a user, or for all 
users at certain locations. 
9 © 2014 IBM Corporation
Preventive Maintenance application 
Preventive maintenance (PM) records are templates for scheduled preventive 
maintenance work. They are used to generate work orders. 
The schedule determines how often work orders are generated from PMs. The schedule can 
generate work orders based on elapsed time between work orders, on meter units used, or both. 
Create a PM hierarchy to schedule a group of work orders for an asset or location hierarchy. 
Work orders can be created manually or automatically. 
10 © 2014 IBM Corporation
Preventive Maintenance application 
Use the target start date of the last PM 
work order to calculate the due date of 
the next PM work order. 
If cleared, use the completion date of the 
last PM work order to calculate the next 
due date. 
Insert frequency of the work 
orders to be generated 
11 © 2014 IBM Corporation
Master PM application 
Master preventive maintenance records (master PMs) are templates that you use for 
other PMs, called associated PMs. 
Master PMs are linked to an Item 
PMs can be generated for all the item’s assets or locations 
12 © 2014 IBM Corporation
Job Plans application 
A job plan is a detailed description of work that is performed for a work order. 
Job plans contain tasks and information about the estimated labor, materials, services, and tools 
that are required for the work. 
To ensure that work on an asset is performed safely, you can associate safety plans. 
Job plans can be also applied to preventive maintenance records. 
Job plans can be created from an existing work order or created manually. 
After a job plan becomes a work plan on a work order, you can change the work plan without 
affecting the job plan. 
13 © 2014 IBM Corporation
Routes application 
A route is a list of related assets, locations, or both 
Routes can be used to: 
• generate child work orders for each route stop 
• generate a single work order that contains a list of assets and locations for all the route stops 
• generate work orders tasks for each route stop 
Job plans can be also applied to preventive maintenance records. 
14 © 2014 IBM Corporation
People application 
The People application stores information about individuals, such as users, laborers, 
asset owners, and supervisors 
A Person can be set as an owner or supervisor of a work order. 
Person records are typically created by the Maximo administrator. 
A person can receive a record routed by a workflow process. 
15 © 2014 IBM Corporation
Person Group application 
A person group is a list of individuals who may have similar job responsibilities, levels of 
authority, and security clearances. 
After you define person groups, responsibility for records such as work orders, tickets, and 
purchasing records can be assigned to a group rather than an individual. 
A person group can receive a record routed by a workflow process. 
16 © 2014 IBM Corporation
Labor application 
Labor records are needed for tracking and analyzing labor performed against work 
orders 
Labor records can contain personal and work-related information as well as crafts, skill levels, 
qualifications, and certifications that are associated with workers. 
Before you create a labor record, you must create a corresponding person record. You create 
person records in the People application. 
17 © 2014 IBM Corporation
Craft application 
A craft represents an occupation or trade, and typically the craft name reflects the type 
of work done by members of the trade. 
If pay rates differ based on expertise you can create multiple skill levels and assign different pay 
rates to each skill level. 
For each craft you can specify standard rates, and add premium pay codes for premium pay rates. 
18 © 2014 IBM Corporation
Qualifications application 
A qualification is an indication of a particular job skill or specialized training. A 
qualification is often indicated by a license or certificate that signifies proficiency in a 
particular skill. 
Qualification records can be associated with labor records in the Qualifications or Labor 
applications. 
19 © 2014 IBM Corporation
Exercises – Person and Labor 
• View Person Details 
• Open People application (Administration > Resources > People) 
• Open person ‘DUDLEY’ and view its details 
• View Labor Details 
• Open Labor application 
• Open labor ‘DUDLEY’ and view its details 
• Switch to crafts and qualification tabs 
20 © 2014 IBM Corporation
Exercises – Work Order 
• Open Work Order Tracking application 
• Create a new Work Order 
Scenario 
Create a new Work Order to 
replace a broken fan 
• Work Order: [generated value] 
• Description: Circulation Fan broken 
• Asset: 11250 (location and failure class are automatically filled) 
• Work Type: CM – Corrective Maintenance 
• Change the status to ‘APPR’ 
21 © 2014 IBM Corporation
Exercises – Work Order 
• Open Work Order Tracking application 
• Search for the opened Work Order 
• Description: Fan 
• Status: =APPR 
Scenario 
Execute task, report labor and 
close the work order 
• Change status to ‘INPRG’ (Actual Start is automatically updated) 
• Switch to ‘Actuals’ tab 
• Create a new row in the ‘Labor’ table 
• Open the lookup dialog for ‘Labor’ field and select 
• Labor: BARRY 
• Craft: MECH 
• Enter a value in ‘Regular Hours’ field an press TAB key (the ‘Line Cost’ 
is automatically calculated) 
• Change status to ‘COMP’ (Actual Finish is automatically updated) 
• Change status to ‘CLOSE’ (record becomes read-only) 
22 © 2014 IBM Corporation
Exercises – Complex Work Order 
• Open Work Order Tracking application 
• Create a new Work Order 
• Work Order: [generated value] 
• Description: Centrifugal pump not working 
• Asset: 11430 
• Work Type: CM – Corrective Maintenance 
Scenario 
Create a new Work Order to 
perform preventive maintenance 
activities on a pump planning 
tasks and labor 
23 © 2014 IBM Corporation
Exercises – Complex Work Order 
• Switch to ‘Plans’ tab 
• Enter the following planned tasks 
• 10 – Check and lubricate bearings (duration 0:30) 
• 20 – Check alignment (duration 0:10) 
• 30 – Replace coupling rubbers (duration 0:30) 
• 40 – Test pump pressure (duration 0:10) 
• Enter the following planned labor 
• Task 10 – Craft LUB – Skill FIRSTCLASS 
• Task 20 – MECH 
• Task 30 – MECH 
• Task 40 – MECH 
• View costs Select Action > View > Costs 
• Change the status to ‘APPR’ 
• Note that planned tasks are now also in ‘WAPPR’ status 
24 © 2014 IBM Corporation
Exercises – Complex Work Order 
• Change status to ‘INPRG’ 
• Switch to ‘Actuals’ tab 
• Set task 10 in ‘COMP’ status (completed) 
• Report labor for task 10 
• In the Labor section click on ‘Select Planned Labor’ 
• Select task 10 
• Select ‘SCHAFER’ person 
• Change status to ‘COMP’ (all actual labor is in ‘COMP’ status) 
• Complete actual labor reporting 
• In the Labor section click on ‘Select Planned Labor’ 
• Select task 20, 30, 40 
• Select ‘LEWIS’ person 
25 © 2014 IBM Corporation
Exercises – Complex Work Order 
• Switch to Failure Reporting tab 
• Click on ‘Select Failure Codes’ button 
• PROBLEM: Leaking 
• CAUSE: Seal Leaking 
• REMEDY: Replace Seal 
• Change status to ‘CLOSE’ 
26 © 2014 IBM Corporation
Exercises – Job Plan 
• Open Work Order Tracking application 
• Search previous Work Order 
Scenario 
Create a new Job Plan from 
a completed work order 
• Asset: 11430 
• You may need to clear ‘History’ flag in the advanced search 
• Open the WO 
• Select Action > Create Job Plan from Work Plan 
• Click on ‘Autonumber’ button to automatically generate a Job 
Plan ID 
• Open Job Plan application 
• View details of the newly created Job Plan 
27 © 2014 IBM Corporation
Exercises – Preventive Maintenance 
• Open Preventive Maintenance application 
• Create a new PM 
• PM: [generated value] 
• Description: Pump maintenance 
• Asset: 11430 
• Work Type: PM 
• Verify Work Order Status (default to WSCH) 
• Switch to Frequency - Time Based Frequency tab 
• Set the Estimated Next Due Date as the first day of your PM schedule 
• Set the Frequency and Frequency Units 
• Change status to ‘ACTIVE’ 
• Generate work orders (Select Action > Generate Work Orders 
• Set a number of days in the future in order to generate a WO 
28 © 2014 IBM Corporation
Exercises – Report Asset downtime 
• Open ‘Work Order Tracking’ application 
• Create a new Work Order 
• Description: Pump broken 
• Asset: 11430 
• Work Type: EM (Emergency Maintenance) 
• Select Action > Report Downtime 
• Verify the current status of the Asset in the ‘Asset Up’ field 
• Check the Status Date (default value is current time) 
• Downtime Code: BRKDWN 
• Asset > Go To Assets 
• Verify the status of the asset 
in the ‘Downtime’ section 
• Select Action > Manage Downtime History 
• Try to close the work order and look at the warning messages 
29 © 2014 IBM Corporation
Exercises – Additional excercises 
• Use a Job Plan in a PM and generate work order 
• Plan labor, material, services and tools in a job plan or 
work order 
• Report labor, material, services and tools in a work 
order 
• Use other Work Order applications such as Quick 
Reporting, Labor Reporting, Activities and Tasks 
30 © 2014 IBM Corporation
31 © 2014 IBM Corporation

More Related Content

What's hot

Classifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementClassifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementRobert Zientara
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementRobert Zientara
 
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming EnhancementsPlanning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming EnhancementsIBM Danmark
 
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...Duane Aritonang
 
Administering maximo asset management
Administering maximo asset managementAdministering maximo asset management
Administering maximo asset managementKhaled Saleh
 
Maximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith PresentationMaximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith PresentationHelen Fisher
 
Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Bruno Portaluri
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for UtilitiesVincent Kwon
 
IBM Maximo Tips & Tricks
IBM Maximo Tips & TricksIBM Maximo Tips & Tricks
IBM Maximo Tips & Tricksjohnnyg14
 
Generic Maximo Business Processes
Generic Maximo Business ProcessesGeneric Maximo Business Processes
Generic Maximo Business ProcessesMisha Jain
 
Using IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansUsing IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansDuane Aritonang
 
Bulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementBulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementRobert Zientara
 
Maximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journeyMaximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journeyHelen Fisher
 
Maximo integration to other systems by Bashar Mahasen
 Maximo integration to other systems by Bashar Mahasen Maximo integration to other systems by Bashar Mahasen
Maximo integration to other systems by Bashar MahasenBashar Mahasen
 

What's hot (20)

Classifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementClassifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset Management
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset Management
 
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming EnhancementsPlanning and Scheduling in Maximo: Best Practices and Coming Enhancements
Planning and Scheduling in Maximo: Best Practices and Coming Enhancements
 
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
IBM Maximo Asset Management Training - Asset and Work Management for Chang Sh...
 
Maximo 7.5 New Features
Maximo 7.5 New FeaturesMaximo 7.5 New Features
Maximo 7.5 New Features
 
Administering maximo asset management
Administering maximo asset managementAdministering maximo asset management
Administering maximo asset management
 
Maximo Scheduler 7.5.1
Maximo Scheduler 7.5.1Maximo Scheduler 7.5.1
Maximo Scheduler 7.5.1
 
Maximo overview
Maximo overviewMaximo overview
Maximo overview
 
Why upgrade to maximo v7.6
Why upgrade to maximo v7.6Why upgrade to maximo v7.6
Why upgrade to maximo v7.6
 
Maximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith PresentationMaximo Planning & Scheduling - BPD Zenith Presentation
Maximo Planning & Scheduling - BPD Zenith Presentation
 
Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Maximo Roadmap - September 2019
Maximo Roadmap - September 2019
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for Utilities
 
IBM Maximo Tips & Tricks
IBM Maximo Tips & TricksIBM Maximo Tips & Tricks
IBM Maximo Tips & Tricks
 
Scheduling Priority in Maximo
Scheduling Priority in Maximo Scheduling Priority in Maximo
Scheduling Priority in Maximo
 
IBM Maximo Asset Management
IBM Maximo Asset ManagementIBM Maximo Asset Management
IBM Maximo Asset Management
 
Generic Maximo Business Processes
Generic Maximo Business ProcessesGeneric Maximo Business Processes
Generic Maximo Business Processes
 
Using IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansUsing IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety Plans
 
Bulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementBulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset Management
 
Maximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journeyMaximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journey
 
Maximo integration to other systems by Bashar Mahasen
 Maximo integration to other systems by Bashar Mahasen Maximo integration to other systems by Bashar Mahasen
Maximo integration to other systems by Bashar Mahasen
 

Similar to Maximo Training - Work Management

206480 facility and real estate management unifier
206480 facility and real estate management unifier206480 facility and real estate management unifier
206480 facility and real estate management unifierp6academy
 
6. Paul Smit - Global Payroll Update & Roadmap June 2017
6. Paul Smit - Global Payroll Update & Roadmap June 20176. Paul Smit - Global Payroll Update & Roadmap June 2017
6. Paul Smit - Global Payroll Update & Roadmap June 2017Cedar Consulting
 
CA Cloud Service Management: Using Task Flows
CA Cloud Service Management: Using Task FlowsCA Cloud Service Management: Using Task Flows
CA Cloud Service Management: Using Task FlowsCA Technologies
 
Oracle_SCM_Maintenance_TipsNTricks.pdf
Oracle_SCM_Maintenance_TipsNTricks.pdfOracle_SCM_Maintenance_TipsNTricks.pdf
Oracle_SCM_Maintenance_TipsNTricks.pdfWalidShoman3
 
SAP SF - EC Demo.pptx
SAP SF - EC Demo.pptxSAP SF - EC Demo.pptx
SAP SF - EC Demo.pptxudayasree76
 
EAM COURSE CONTENT
EAM COURSE CONTENT EAM COURSE CONTENT
EAM COURSE CONTENT Vikram Reddy
 
payroll management -1.
payroll management -1.payroll management -1.
payroll management -1.DJananiJanani
 
Intro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdf
Intro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdfIntro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdf
Intro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdfSrinivasan N
 
Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...
Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...
Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...Perficient, Inc.
 
Resume
ResumeResume
Resumebzidan
 
PS-1 Final PRESENTATION
PS-1 Final PRESENTATIONPS-1 Final PRESENTATION
PS-1 Final PRESENTATIONAditya Agarwal
 
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...IBM Rational
 
Pcty 2013 service catalog overview
Pcty 2013 service catalog   overviewPcty 2013 service catalog   overview
Pcty 2013 service catalog overviewIBM Danmark
 
MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence
 

Similar to Maximo Training - Work Management (20)

206480 facility and real estate management unifier
206480 facility and real estate management unifier206480 facility and real estate management unifier
206480 facility and real estate management unifier
 
6. Paul Smit - Global Payroll Update & Roadmap June 2017
6. Paul Smit - Global Payroll Update & Roadmap June 20176. Paul Smit - Global Payroll Update & Roadmap June 2017
6. Paul Smit - Global Payroll Update & Roadmap June 2017
 
Sky erp datasheet
Sky erp datasheetSky erp datasheet
Sky erp datasheet
 
CA Cloud Service Management: Using Task Flows
CA Cloud Service Management: Using Task FlowsCA Cloud Service Management: Using Task Flows
CA Cloud Service Management: Using Task Flows
 
Oracle_SCM_Maintenance_TipsNTricks.pdf
Oracle_SCM_Maintenance_TipsNTricks.pdfOracle_SCM_Maintenance_TipsNTricks.pdf
Oracle_SCM_Maintenance_TipsNTricks.pdf
 
HRM.pptx
HRM.pptxHRM.pptx
HRM.pptx
 
SAP SF - EC Demo.pptx
SAP SF - EC Demo.pptxSAP SF - EC Demo.pptx
SAP SF - EC Demo.pptx
 
EAM COURSE CONTENT
EAM COURSE CONTENT EAM COURSE CONTENT
EAM COURSE CONTENT
 
payroll management -1.
payroll management -1.payroll management -1.
payroll management -1.
 
Microsoft Dynamics GP 2015 features
Microsoft Dynamics GP 2015 featuresMicrosoft Dynamics GP 2015 features
Microsoft Dynamics GP 2015 features
 
EAM workshop-version .pptx
EAM workshop-version .pptxEAM workshop-version .pptx
EAM workshop-version .pptx
 
Intro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdf
Intro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdfIntro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdf
Intro_S4HANA_Using_Global_Bike_Slides_EAM_en_v3.3.pdf
 
Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...
Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...
Blue Shield of CA Revolutionizes its Portal Environment on IBM PureApplicatio...
 
Resume
ResumeResume
Resume
 
PS-1 Final PRESENTATION
PS-1 Final PRESENTATIONPS-1 Final PRESENTATION
PS-1 Final PRESENTATION
 
Basics of ERP
Basics of ERPBasics of ERP
Basics of ERP
 
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
 
Pcty 2013 service catalog overview
Pcty 2013 service catalog   overviewPcty 2013 service catalog   overview
Pcty 2013 service catalog overview
 
EAM
EAMEAM
EAM
 
MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence Drilling Platform
MineExcellence Drilling Platform
 

Recently uploaded

How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?IES VE
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
UiPath Studio Web workshop series - Day 5
UiPath Studio Web workshop series - Day 5UiPath Studio Web workshop series - Day 5
UiPath Studio Web workshop series - Day 5DianaGray10
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAshyamraj55
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024D Cloud Solutions
 
IEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK GuideIEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK GuideHironori Washizaki
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfJamie (Taka) Wang
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 

Recently uploaded (20)

How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?How Accurate are Carbon Emissions Projections?
How Accurate are Carbon Emissions Projections?
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
UiPath Studio Web workshop series - Day 5
UiPath Studio Web workshop series - Day 5UiPath Studio Web workshop series - Day 5
UiPath Studio Web workshop series - Day 5
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024
 
IEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK GuideIEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
IEEE Computer Society’s Strategic Activities and Products including SWEBOK Guide
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
activity_diagram_combine_v4_20190827.pdfactivity_diagram_combine_v4_20190827.pdf
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 

Maximo Training - Work Management

  • 1. IBM Maximo Asset Management Training Work Management © 2014 IBM Corporation Bruno Portaluri Maximo Technical Solution Architect Last Update: 2014-11-12
  • 2. Work Management processes Work Order Job Plans Generate WOs from PMs Generate work orders from SRs Generate WOs from Condition Monitoring Cost rollup Reserve spare parts Direct issue of purchased parts Asset Inventory Purchasing Planning Preventive Maintenance Service Requests 2 © 2014 IBM Corporation
  • 3. Work Management process 3 © 2014 IBM Corporation
  • 4. Work Management modules • Work Orders module allows to track the work that has been performed in the past, and future work that is being planned. • Work Order Tracking • Labor Reporting • Quick Reporting • Activities and Tasks • Assignment Manager • Service Requests • Preventive Maintenance module allows to manage the work performed on a regular schedule to keep assets running efficiently • Preventive Maintenance • Master PM 4 © 2014 IBM Corporation
  • 5. Additional application • Planning module allows to plan how work should be performed, such as creating job plans or safety precautions and procedures • Job Plans • Routes • Safety • Resources module (Administration > Resources) allows to create records about the people in your workforce • Labor • Qualifications • People • Person Groups • Crafts 5 © 2014 IBM Corporation
  • 6. Work Order Tracking application A Work Order (WO) specifies a particular task and the labor, materials, services, and tools required to complete the task In the Work Order Tracking application, you create and manage work orders for assets and locations. When you create a work order, you initiate the maintenance management process and create a historical record of the work requested and performed. 6 © 2014 IBM Corporation
  • 7. Work Order Tracking application – Tabs • Work Order (main) - Create, view, or modify work orders, view identifiers for an applied job plan and safety plan, view PM and scheduling information. If the work order is a follow-up work order, you can view the identifier of its originating work order. You also can identify the failure hierarchy for the work asset. • Plans - Enter, view, or modify information on work orders in a hierarchy, and to enter, view, modify, or delete information about planned job tasks, labor, materials, services, and tools. • Related Records - Add, view, or delete related ticket and work order records. • Actuals - Enter, view, or modify actual work order start and finish times, labor hours and costs, material quantities, service costs, and tool costs. • Safety Plan - Add, view, modify, or delete safety information associated with a work order. • Log - Create, view, edit, and delete Work Log entries, and view Communication Log entries. • Failure Reporting - Enter, view, or modify asset and location failure information to help identify trends. 7 © 2014 IBM Corporation
  • 8. Work Order Status Status Description Waiting for Approval (WAPPR) The work order needs to be approved by a supervisor or a maintenance leader. Waiting for Material (WMATL) Indicates that work cannot be initiated because required material is missing Waiting to be Scheduled (WSCHED) The work order needs to be scheduled. Work orders generated by PM records are typically created in WSCHED status. Waiting for Plant Condition (WPCOND) Requires a particular plant condition in order to be worked on. Approved (APPR) The work plan has been approved and the work can begin. You can report actuals against approved work orders. Maximo reserves items in inventory and records cost and rate data. In Progress (INPRG) Indicates that work had physically begun. Canceled (CAN) Work will not be performed. If the the work order has already initiated or actuals have already been reported, you cannot change its status to CAN. Maximo removes item reservations from inventory (if any) and makes the work order a historical record. Complete (COMP) Physical work is finished. Closed (CLOSE) All data has been entered. Maximo removes inventory reservations for items that were not used on the work order, and makes the work order a historical record. 8 © 2014 IBM Corporation
  • 9. Other applications in Work Orders module • Labor Reporting application allows to report the type and the total number of hours of work that external contractors or internal employees performed. • Quick Reporting application allows to plan, to review, and to approve work orders for assets and locations. • Assignment Manager application allows to dispatch labor and schedule work for your organization. • Service Requests application allows to manage requests for services that involve an asset or location in your enterprise. For example, you might receive a request to upgrade the computer software on the notebook for a user, or for all users at certain locations. 9 © 2014 IBM Corporation
  • 10. Preventive Maintenance application Preventive maintenance (PM) records are templates for scheduled preventive maintenance work. They are used to generate work orders. The schedule determines how often work orders are generated from PMs. The schedule can generate work orders based on elapsed time between work orders, on meter units used, or both. Create a PM hierarchy to schedule a group of work orders for an asset or location hierarchy. Work orders can be created manually or automatically. 10 © 2014 IBM Corporation
  • 11. Preventive Maintenance application Use the target start date of the last PM work order to calculate the due date of the next PM work order. If cleared, use the completion date of the last PM work order to calculate the next due date. Insert frequency of the work orders to be generated 11 © 2014 IBM Corporation
  • 12. Master PM application Master preventive maintenance records (master PMs) are templates that you use for other PMs, called associated PMs. Master PMs are linked to an Item PMs can be generated for all the item’s assets or locations 12 © 2014 IBM Corporation
  • 13. Job Plans application A job plan is a detailed description of work that is performed for a work order. Job plans contain tasks and information about the estimated labor, materials, services, and tools that are required for the work. To ensure that work on an asset is performed safely, you can associate safety plans. Job plans can be also applied to preventive maintenance records. Job plans can be created from an existing work order or created manually. After a job plan becomes a work plan on a work order, you can change the work plan without affecting the job plan. 13 © 2014 IBM Corporation
  • 14. Routes application A route is a list of related assets, locations, or both Routes can be used to: • generate child work orders for each route stop • generate a single work order that contains a list of assets and locations for all the route stops • generate work orders tasks for each route stop Job plans can be also applied to preventive maintenance records. 14 © 2014 IBM Corporation
  • 15. People application The People application stores information about individuals, such as users, laborers, asset owners, and supervisors A Person can be set as an owner or supervisor of a work order. Person records are typically created by the Maximo administrator. A person can receive a record routed by a workflow process. 15 © 2014 IBM Corporation
  • 16. Person Group application A person group is a list of individuals who may have similar job responsibilities, levels of authority, and security clearances. After you define person groups, responsibility for records such as work orders, tickets, and purchasing records can be assigned to a group rather than an individual. A person group can receive a record routed by a workflow process. 16 © 2014 IBM Corporation
  • 17. Labor application Labor records are needed for tracking and analyzing labor performed against work orders Labor records can contain personal and work-related information as well as crafts, skill levels, qualifications, and certifications that are associated with workers. Before you create a labor record, you must create a corresponding person record. You create person records in the People application. 17 © 2014 IBM Corporation
  • 18. Craft application A craft represents an occupation or trade, and typically the craft name reflects the type of work done by members of the trade. If pay rates differ based on expertise you can create multiple skill levels and assign different pay rates to each skill level. For each craft you can specify standard rates, and add premium pay codes for premium pay rates. 18 © 2014 IBM Corporation
  • 19. Qualifications application A qualification is an indication of a particular job skill or specialized training. A qualification is often indicated by a license or certificate that signifies proficiency in a particular skill. Qualification records can be associated with labor records in the Qualifications or Labor applications. 19 © 2014 IBM Corporation
  • 20. Exercises – Person and Labor • View Person Details • Open People application (Administration > Resources > People) • Open person ‘DUDLEY’ and view its details • View Labor Details • Open Labor application • Open labor ‘DUDLEY’ and view its details • Switch to crafts and qualification tabs 20 © 2014 IBM Corporation
  • 21. Exercises – Work Order • Open Work Order Tracking application • Create a new Work Order Scenario Create a new Work Order to replace a broken fan • Work Order: [generated value] • Description: Circulation Fan broken • Asset: 11250 (location and failure class are automatically filled) • Work Type: CM – Corrective Maintenance • Change the status to ‘APPR’ 21 © 2014 IBM Corporation
  • 22. Exercises – Work Order • Open Work Order Tracking application • Search for the opened Work Order • Description: Fan • Status: =APPR Scenario Execute task, report labor and close the work order • Change status to ‘INPRG’ (Actual Start is automatically updated) • Switch to ‘Actuals’ tab • Create a new row in the ‘Labor’ table • Open the lookup dialog for ‘Labor’ field and select • Labor: BARRY • Craft: MECH • Enter a value in ‘Regular Hours’ field an press TAB key (the ‘Line Cost’ is automatically calculated) • Change status to ‘COMP’ (Actual Finish is automatically updated) • Change status to ‘CLOSE’ (record becomes read-only) 22 © 2014 IBM Corporation
  • 23. Exercises – Complex Work Order • Open Work Order Tracking application • Create a new Work Order • Work Order: [generated value] • Description: Centrifugal pump not working • Asset: 11430 • Work Type: CM – Corrective Maintenance Scenario Create a new Work Order to perform preventive maintenance activities on a pump planning tasks and labor 23 © 2014 IBM Corporation
  • 24. Exercises – Complex Work Order • Switch to ‘Plans’ tab • Enter the following planned tasks • 10 – Check and lubricate bearings (duration 0:30) • 20 – Check alignment (duration 0:10) • 30 – Replace coupling rubbers (duration 0:30) • 40 – Test pump pressure (duration 0:10) • Enter the following planned labor • Task 10 – Craft LUB – Skill FIRSTCLASS • Task 20 – MECH • Task 30 – MECH • Task 40 – MECH • View costs Select Action > View > Costs • Change the status to ‘APPR’ • Note that planned tasks are now also in ‘WAPPR’ status 24 © 2014 IBM Corporation
  • 25. Exercises – Complex Work Order • Change status to ‘INPRG’ • Switch to ‘Actuals’ tab • Set task 10 in ‘COMP’ status (completed) • Report labor for task 10 • In the Labor section click on ‘Select Planned Labor’ • Select task 10 • Select ‘SCHAFER’ person • Change status to ‘COMP’ (all actual labor is in ‘COMP’ status) • Complete actual labor reporting • In the Labor section click on ‘Select Planned Labor’ • Select task 20, 30, 40 • Select ‘LEWIS’ person 25 © 2014 IBM Corporation
  • 26. Exercises – Complex Work Order • Switch to Failure Reporting tab • Click on ‘Select Failure Codes’ button • PROBLEM: Leaking • CAUSE: Seal Leaking • REMEDY: Replace Seal • Change status to ‘CLOSE’ 26 © 2014 IBM Corporation
  • 27. Exercises – Job Plan • Open Work Order Tracking application • Search previous Work Order Scenario Create a new Job Plan from a completed work order • Asset: 11430 • You may need to clear ‘History’ flag in the advanced search • Open the WO • Select Action > Create Job Plan from Work Plan • Click on ‘Autonumber’ button to automatically generate a Job Plan ID • Open Job Plan application • View details of the newly created Job Plan 27 © 2014 IBM Corporation
  • 28. Exercises – Preventive Maintenance • Open Preventive Maintenance application • Create a new PM • PM: [generated value] • Description: Pump maintenance • Asset: 11430 • Work Type: PM • Verify Work Order Status (default to WSCH) • Switch to Frequency - Time Based Frequency tab • Set the Estimated Next Due Date as the first day of your PM schedule • Set the Frequency and Frequency Units • Change status to ‘ACTIVE’ • Generate work orders (Select Action > Generate Work Orders • Set a number of days in the future in order to generate a WO 28 © 2014 IBM Corporation
  • 29. Exercises – Report Asset downtime • Open ‘Work Order Tracking’ application • Create a new Work Order • Description: Pump broken • Asset: 11430 • Work Type: EM (Emergency Maintenance) • Select Action > Report Downtime • Verify the current status of the Asset in the ‘Asset Up’ field • Check the Status Date (default value is current time) • Downtime Code: BRKDWN • Asset > Go To Assets • Verify the status of the asset in the ‘Downtime’ section • Select Action > Manage Downtime History • Try to close the work order and look at the warning messages 29 © 2014 IBM Corporation
  • 30. Exercises – Additional excercises • Use a Job Plan in a PM and generate work order • Plan labor, material, services and tools in a job plan or work order • Report labor, material, services and tools in a work order • Use other Work Order applications such as Quick Reporting, Labor Reporting, Activities and Tasks 30 © 2014 IBM Corporation
  • 31. 31 © 2014 IBM Corporation