SlideShare a Scribd company logo
1 of 34
Download to read offline
Can a Subcontractor Have a Critical Path Delay
          When the GC Does Not?



Christopher Carson, PSP
Shannon Campbell, PSP
Shannon Campbell, PSP

• Degree:
   – B.S. Civil Engineering
   – M.S. Engineering Management
• University:
   – B.S – United States Military Academy
   – M.S. – University of Missouri-Rolla
• Years of Experience:
   – 10 years
• Professional Field:
   – Engineering Claims Consultant
• Something you do not know about me:
   – Served 6.5 years in the military as an army engineer travelling to 14 different countries across 5
     continents – many of these visits were to view construction projects throughout the world.




                                                                                                      2
Chris Carson, PSP, CCM, PMP

 •   Corporate Director of Project Controls, Alpha Corporation
      –   Responsible for standards, processes, and procedures for a team of schedulers, analysts, and project
          managers in multiple office locations, as well as analysis, work product, and testimony
      –   Developed and manages the in-house project controls training program at Alpha
 •   Certifications:
      –   PSP (Planning & Scheduling Professional – AACEi)
      –   CCM (Certified Construction Manager - CMAA)
      –   PMP (Project Management Professional – PMI)
 •   University: University of Virginia, Mechanical Engineering, 1972
 •   Professional Field: 38 years of experience in Construction Management Services specializing in
     Scheduling, Schedule Analysis, Estimating, Claims
 •   Active in AACEi (Association for the Advancement of Cost Estimating International)
      –   Author of Recommended Practices in Scheduling & Forensic Schedule Analysis RP
 •   Active in PMI (Project Management Institute) College of Scheduling
      –   Vice President of Scheduling Excellence
      –   Managing Director for SEI (Scheduling Excellence Initiative) writing Best Practices and Guidelines for
          Scheduling and Schedule Impact Analysis
      –   Serving on team writing Best Practices for Scheduling for GAO
 •   Active in CMAA (Construction Management Association of America)
      –   Served on committee revising Time Management Chapter of CMAA’s CM Standards of Practice
 •   Active in Planning Planet (global planning association)
      –   Chief Editor for US, writing Planner Users’ Guide, developing accreditation Guild for planners
 •   Something you don’t know about me: I’m a glider co-pilot, see picture
                                                                                                                   3
                                                                                                                   3
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                               Introduction
• Entitlement to Delay Damages only when there is Critical Path
  Delay to Project Completion
• What happens when an owner impact extends the time a
  subcontractor is on the job but the impact does NOT extend the
  Project Completion?
• What, if any, entitlement does the Subcontractor have to recover
  delay-related costs?




                                                                       4
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Topics to be Covered
•   Example
•   Pass-Through Claims
•   The Miller Act
•   Combating the No Damage For Delay Clause
•   Strategies for Proving a Subcontractor’s Delay Claim
•   From the Owner’s Standpoint




                                                                       5
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Topics to be Covered
•   Example
•   Pass-Through Claims
•   The Miller Act
•   Combating the No Damage For Delay Clause
•   Strategies for Proving a Subcontractor’s Delay Claim
•   From the Owner’s Standpoint




                                                                       6
As–Planned Schedule - Office Building
 Months
 1    2   3     4    5    6    7    8       9      10 11 12 13 14 15 16 17 18



 Foundations
                4    Structural Steel
                                            Roof
                                        4
                                             1
NTP                           Curtainwall
                                                   4   Interior Finishes     Punch
 Coord. Dwgs.                                                              4
                                                                              List

           3    Fab/Deliver   MEP Rough In                 MEP Finishes         1
                         3                         4                3




                                                                                     7
As–Planned v. As–Built Schedule
 Months
 1    2   3     4    5    6    7       8     9     10 11 12 13 14 15 16 17 18
  Foundations
                4    Structural Steel
                                            Roof
                                        4
                                             1
NTP                           Curtainwall
                                                   4   Interior Finishes     Punch
 Coord. Dwgs.                                                              4
                                                                              List

           3    Fab/Deliver   MEP Rough In                 MEP Finishes         1
                         3                         4                3
 Foundations
                4   Structural Steel
                                            Roof
                                        4
                                             1
NTP                           Curtainwall
                                                   4 Interior Finishes       Punch
 Coord. Dwgs.                                                              4
                                                                              List

           3    Fab/Deliver   MEP Rough In                 MEP Finishes         1
                         3                   4     3 Wks           3
                                                                                     8
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Topics to be Covered
•   Example
•   Pass-Through Claims
•   The Miller Act
•   Combating the No Damage For Delay Clause
•   Strategies for Proving a Subcontractor’s Delay Claim
•   From the Owner’s Standpoint




                                                                       9
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Pass-Through Claims
• Privity of Contract
• Recovery of Damages through a Pass Through Claim
• Definition:

      A pass-through claim is a claim:
    1) by a Subcontractor who has incurred damages due to the
       actions of the Owner/Government with whom it has no
       contract; and
    2) submitted by the GC who has a contractual relationship with
       both the Subcontractor and the Owner/Government.



                                                                       10
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                            Severin Doctrine

       “a prime contractor may sue the Government on behalf of its
       Subcontractor, in the nature of a pass-through suit, for costs
       incurred by the Subcontractor [due to the Government’s
       conduct] . . . [i]f the prime contractor proves its liability to the
       Subcontractor for the damages sustained by the latter . . . a
       showing [which] overcomes the objection to the lack of privity
       between the Government and the Subcontractor.”




                                                                              11
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                           Liquidating Agreements
• Acknowledgement of liability to the Subcontractor
    – Satisfies the Severin doctrine requirement that the GC is technically and legally liable to the
      subcontractor for the claim before submitting to Government
• Limits liability to the amount that a prime is able to recover from the
  owner
    – Protects the prime




                                                                                                        12
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


               E.R. Mitchell Constr. Co. v. Danzig
   • Basics of the case
   • Players
   • Facts
      • No dispute of Federal Government liability
      • Government approved schedule
      • Government put on notice of damages to both GC and
         subcontractor
      • Owner responsible delays not of project schedule critical path
   • Results
      • Subcontractor satisfied all requirements for entitlement to
         Eichleay damages

                                                                         13
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Pass Through Claims -
                         General Information
  • J.L. Simmons v. United States – provides the definition of the
  requirements of a liquidating agreement
  • Case law varies among State courts
  • Benefits of the Pass Through Claim




                                                                       14
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Topics to be Covered
•   Example
•   Pass-Through Claims
•   The Miller Act
•   Combating the No Damage For Delay Clause
•   Strategies for Proving a Subcontractor’s Delay Claim
•   From the Owner’s Standpoint




                                                                       15
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                              The Miller Act
• Basic Purpose – means for a subcontractor to receive payment for labor
  and materials furnished Players
• Successful recovery of delay damages through the Miller Act




                                                                           16
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                             The Miller Act -
                      Recovering Delay Damages
• Generally recoverable if characterized as increased cost of labor and
  materials – other costs have been successfully recovered
• Not relevant whether fault lies with the Owner of the Prime
• Seen as the only alternative in many cases for a subcontractor to recover
  increased costs




                                                                              17
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                             The Miller Act -
                 Considerations & Recommendations
•   Is a payment bond required?
•   Was the payment bond actually attained?
•   Timely initiation of a payment bond
•   Limited liability by surety – multiple claimants may require each to take a
    pro rata share of the penal sum




                                                                              18
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Topics to be Covered
•   Example
•   Pass-Through Claims
•   The Miller Act
•   Combating the No Damage For Delay Clause
•   Strategies for Proving a Subcontractor’s Delay Claim
•   From the Owner’s Standpoint




                                                                       19
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                  No Damage for Delay (NDFD)
• Basic Purpose – protects an owner or GC from paying monetary damages
  when a project is delayed
• Sample Clause

 “No payment or compensation of any kind shall be made to the contractor
      for damages because of hindrance or delay from any cause in the
   progress of the work, whether such hindrances or delays be avoidable or
                               unavoidable.”




                                                                             20
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


            No Damage for Delay - Enforceability
• Unenforceable in many states
• Established exceptions otherwise –
   • (1) not contemplated by the parties;
   • (2) so unreasonable in length as to amount to an abandonment of
      the project by the Owner;
   • (3) caused by acts of bad faith or fraud by the Owner; or
   • (4) caused by active interference by the Owner.
   • A fifth exception is also sometimes cited - delays caused by gross
      negligence.




                                                                          21
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


           No Damage for Delay – Considerations
• Sometimes incorporated by reference or in a “Flow-Down” Provision
• May be defense for an owner when presented with a pass through claim
   • Has been circumvented by use of a liquidating agreement as already
     discussed




                                                                          22
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Topics to be Covered
•   Example
•   Pass-Through Claims
•   The Miller Act
•   Combating the No Damage For Delay Clause
•   Strategies for Proving a Subcontractor’s Delay Claim
•   From the Owner’s Standpoint




                                                                       23
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


    Strategies for Proving a Subcontractor’s Delay Claim
•   Review and Negotiation of the Contract
•   Timely Notice
•   Waiver of Rights
•   Good Documentation
•   Involvement in the Baseline Schedule and Subsequent Updates




                                                                       24
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


 Strategies for Proving a Subcontractor’s Delay Claim
• Review and Negotiation of the Contract
   • Subcontractor should
       • Carefully review contract, especially from a legal perspective
       • Assume any NDFD will be enforced
       • Attempt to remove or reduce general assumption of delay risk
          • Reduce to specific risks that are under sub’s control
       • Watch for verbiage that limits recovery to “active interference”
         only by Owner
       • Attempt to include language that provides a “Grace Period” that
         delays must exceed to allow an adjustment for delays
          • Allows a contingency for that period to be carried
       • Seek language related to specific events, proof required or price

                                                                             25
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


 Strategies for Proving a Subcontractor’s Delay Claim
• Timely Notice
   • Assume that notice requirements will be enforced and meet them
   • Keep the GC informed so he can inform the Owner
      • Owner then has opportunity to participate in mitigation
      • Owner must be made aware of delays contemporaneously




                                                                       26
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


 Strategies for Proving a Subcontractor’s Delay Claim
• Waiver of Rights
  • Watch for waiver language
      • Could be part of a payment application or certification
      • Could be part of a change order indicating all past claims are
         waived as of change order date
  • Provide reservation of rights language to any document if
     contemplating submitting a delay claim




                                                                         27
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


 Strategies for Proving a Subcontractor’s Delay Claim
• Good Documentation
   • Key to proving damages
   • Accurate and contemporaneous
   • All documents including bid documentation, daily reports, pay
     requisitions, invoices, correspondence, all input into baseline and
     update scheduling process, minutes, resources both planned and
     actual




                                                                           28
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


 Strategies for Proving a Subcontractor’s Delay Claim
• Involvement in the Baseline Schedule and Subsequent Updates
   • Ensure input into all schedules
   • Review any updates provided by GC to ensure no acceleration or
      stacking of crews are planned
       • Ensure adequate time and sequencing
       • Note subcontractor’s expectations for period of performance
           • Includes planned resources in crews and composition
           • Stockpiling and materials distribution needs
       • Watch for reduction in durations or overlapping of work
       • Watch for shifts in start dates, access dates, or completion dates
       • Document any problems with schedules

                                                                              29
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


 Strategies for Proving a Subcontractor’s Delay Claim
• Involvement in the Baseline Schedule and Subsequent Updates
   • Review total float for subcontractors’ work to identify criticality at
      project schedule
   • Attempt to have the impacts to the subcontractor shown on the
      schedule
       • If failed, document the delay or disruption
   • Recognize that the Measured Mile is the most effective analysis for
      loss of efficiency
       • Requires good resource information
       • Related to the schedule to prove impacted & unimpacted times
   • Includes participation in any REAs submitted by GC – subcontractors
      can lose their rights against the Owner if not involved with REAs
                                                                              30
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                        Topics to be Covered
•   Example
•   Pass-Through Claims
•   The Miller Act
•   Combating the No Damage For Delay Clause
•   Strategies for Proving a Subcontractor’s Delay Claim
•   From the Owner’s Standpoint




                                                                       31
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                  From the Owner’s Standpoint
• Provide fair allocation of risk
   • Assign risk to the party most able to control it
   • This will reduce claims efforts
• Provide timely and fair review and approval of legitimate time extension
  requests
• Follow the same general rules as outlined in the strategies for the
  Subcontractor
• Should an Owner be able recover equivalent damages from a
  Subcontractor due to Subcontractor impacts?




                                                                             32
Can a Subcontractor Have a Critical Path Delay When the GC Does Not?


                                Conclusion
•   Negotiate the Contract
•   Know the Contract
•   Be involved in the schedule from start to finish
•   Maintain accurate documentation
•   Seek legal advice




                                                                       33
Can a Subcontractor Have a Critical Path Delay
          When the GC Does Not?

Questions?
Shannon Campbell, PSP
   Chris Carson, PSP

More Related Content

What's hot

Use Of Schedule Logs 2012 Pmi Scop Conference
Use Of Schedule Logs   2012 Pmi Scop ConferenceUse Of Schedule Logs   2012 Pmi Scop Conference
Use Of Schedule Logs 2012 Pmi Scop ConferenceChris Carson
 
Innovative Program Delivery - Airport
Innovative Program Delivery - AirportInnovative Program Delivery - Airport
Innovative Program Delivery - AirportChris Carson
 
Recovery Scheduling
Recovery SchedulingRecovery Scheduling
Recovery SchedulingChris Carson
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueChris Carson
 
Use Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodUse Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodChris Carson
 
Roadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls PpRoadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls PpChris Carson
 
Fleming.jon
Fleming.jonFleming.jon
Fleming.jonNASAPMC
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay AnalysisChris Carson
 
Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...
Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...
Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...Project Controls Expo
 
Baseline Schedules 1
Baseline Schedules 1Baseline Schedules 1
Baseline Schedules 1Chris Carson
 
Business of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basicsBusiness of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basicseisenmannusa
 
Schedule Design AACE
Schedule Design AACESchedule Design AACE
Schedule Design AACEChris Carson
 
The Commissioning Process
The Commissioning ProcessThe Commissioning Process
The Commissioning Processd_mackay
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBrown Smith Wallace
 
Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02guest2aa104
 
Airport Quaraterly update feb.14 2012
Airport Quaraterly update feb.14 2012Airport Quaraterly update feb.14 2012
Airport Quaraterly update feb.14 2012city of dania beach
 

What's hot (20)

Use Of Schedule Logs 2012 Pmi Scop Conference
Use Of Schedule Logs   2012 Pmi Scop ConferenceUse Of Schedule Logs   2012 Pmi Scop Conference
Use Of Schedule Logs 2012 Pmi Scop Conference
 
Innovative Program Delivery - Airport
Innovative Program Delivery - AirportInnovative Program Delivery - Airport
Innovative Program Delivery - Airport
 
Claims
ClaimsClaims
Claims
 
Recovery Scheduling
Recovery SchedulingRecovery Scheduling
Recovery Scheduling
 
Schedule Recovery Using Earned Value
Schedule Recovery Using Earned ValueSchedule Recovery Using Earned Value
Schedule Recovery Using Earned Value
 
Use Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis MethodUse Of A Claims Triage Workshop To Choose An Analysis Method
Use Of A Claims Triage Workshop To Choose An Analysis Method
 
Roadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls PpRoadmap To World Class Project Controls Pp
Roadmap To World Class Project Controls Pp
 
Schedule Updates
Schedule UpdatesSchedule Updates
Schedule Updates
 
Claim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINALClaim Presentation Rev 03 FINAL
Claim Presentation Rev 03 FINAL
 
Fleming.jon
Fleming.jonFleming.jon
Fleming.jon
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
 
Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...
Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...
Project Controls Expo - 31st Oct 2012 - Forensic Delay Analysis The Ultimate ...
 
Baseline Schedules 1
Baseline Schedules 1Baseline Schedules 1
Baseline Schedules 1
 
Business of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basicsBusiness of anaerobic digestion project delivery basics
Business of anaerobic digestion project delivery basics
 
Schedule Design AACE
Schedule Design AACESchedule Design AACE
Schedule Design AACE
 
The Commissioning Process
The Commissioning ProcessThe Commissioning Process
The Commissioning Process
 
Balancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction ProjectsBalancing Flexibility and Cost Control in Construction Projects
Balancing Flexibility and Cost Control in Construction Projects
 
Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02Miros Design Build Approach 3.20.02
Miros Design Build Approach 3.20.02
 
Airport Quaraterly update feb.14 2012
Airport Quaraterly update feb.14 2012Airport Quaraterly update feb.14 2012
Airport Quaraterly update feb.14 2012
 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
 

Viewers also liked

Aba february 2013_presentation
Aba february 2013_presentationAba february 2013_presentation
Aba february 2013_presentationRoland_Nikles
 
Overhead analysis cost final ppt (1)
Overhead analysis cost final ppt (1)Overhead analysis cost final ppt (1)
Overhead analysis cost final ppt (1)Rocquie
 
Create a Profit Plan for a Successful 2011
Create a Profit Plan for a Successful 2011 Create a Profit Plan for a Successful 2011
Create a Profit Plan for a Successful 2011 Linnea Blair
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction CostingManish Kandpal
 
Pricing by Philiph Kotler
Pricing by Philiph KotlerPricing by Philiph Kotler
Pricing by Philiph KotlerFahad Aziz
 
Pricing strategies(philip kotler)
Pricing strategies(philip kotler)Pricing strategies(philip kotler)
Pricing strategies(philip kotler)Shailja Pathak
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Pricing Ppt
Pricing PptPricing Ppt
Pricing Pptsid30
 
Pricing Strategies
Pricing StrategiesPricing Strategies
Pricing Strategiesramyasn16
 

Viewers also liked (14)

Break Even
Break EvenBreak Even
Break Even
 
Estimate Summary Example
Estimate Summary ExampleEstimate Summary Example
Estimate Summary Example
 
Aba february 2013_presentation
Aba february 2013_presentationAba february 2013_presentation
Aba february 2013_presentation
 
Overhead analysis cost final ppt (1)
Overhead analysis cost final ppt (1)Overhead analysis cost final ppt (1)
Overhead analysis cost final ppt (1)
 
Create a Profit Plan for a Successful 2011
Create a Profit Plan for a Successful 2011 Create a Profit Plan for a Successful 2011
Create a Profit Plan for a Successful 2011
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Overhead
OverheadOverhead
Overhead
 
ACH 216 Lecture 04a (Estimating)
ACH 216 Lecture 04a (Estimating)ACH 216 Lecture 04a (Estimating)
ACH 216 Lecture 04a (Estimating)
 
Pricing by Philiph Kotler
Pricing by Philiph KotlerPricing by Philiph Kotler
Pricing by Philiph Kotler
 
Pricing strategies(philip kotler)
Pricing strategies(philip kotler)Pricing strategies(philip kotler)
Pricing strategies(philip kotler)
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Pricing strategies
Pricing strategiesPricing strategies
Pricing strategies
 
Pricing Ppt
Pricing PptPricing Ppt
Pricing Ppt
 
Pricing Strategies
Pricing StrategiesPricing Strategies
Pricing Strategies
 

Similar to Can A Subcontractor Have CP Delay When The Gc Does Not

Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Paul Allen
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Paul Allen
 
Energy Star In Modular Resnet 2009 Revised
Energy Star In Modular   Resnet 2009 RevisedEnergy Star In Modular   Resnet 2009 Revised
Energy Star In Modular Resnet 2009 Revisedfterry3
 
FPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - FinalFPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - FinalGurin Hanspal
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 
GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11cmcgoverntobin
 
Infrastructure project and responsibility break down
Infrastructure project and responsibility break downInfrastructure project and responsibility break down
Infrastructure project and responsibility break downBhim Upadhyaya
 
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...Surya Bhai
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebarsParam Saxena
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectAllen Green
 
Project Management Report for Tank Farm
Project Management Report for Tank FarmProject Management Report for Tank Farm
Project Management Report for Tank FarmAbhik Tushar Das
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxIrfanAwan25
 
Using Point Clouds for a Boundary Survey and Volumetric Analysis
Using Point Clouds for a Boundary Survey and Volumetric AnalysisUsing Point Clouds for a Boundary Survey and Volumetric Analysis
Using Point Clouds for a Boundary Survey and Volumetric Analysismercatorlem
 

Similar to Can A Subcontractor Have CP Delay When The Gc Does Not (20)

Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011Pmi Pifg Presentation Nov2011
Pmi Pifg Presentation Nov2011
 
A8 construction management bill downs - usda
A8 construction management   bill downs - usdaA8 construction management   bill downs - usda
A8 construction management bill downs - usda
 
claims management framework
 claims management framework claims management framework
claims management framework
 
Energy Star In Modular Resnet 2009 Revised
Energy Star In Modular   Resnet 2009 RevisedEnergy Star In Modular   Resnet 2009 Revised
Energy Star In Modular Resnet 2009 Revised
 
FPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - FinalFPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - Final
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Coordinated project information (cpi)
Coordinated project information (cpi)Coordinated project information (cpi)
Coordinated project information (cpi)
 
GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11GCCC contracts experience to date 08'03'11
GCCC contracts experience to date 08'03'11
 
Infrastructure project and responsibility break down
Infrastructure project and responsibility break downInfrastructure project and responsibility break down
Infrastructure project and responsibility break down
 
Contracting strategies for_terminal_construction
Contracting strategies for_terminal_constructionContracting strategies for_terminal_construction
Contracting strategies for_terminal_construction
 
Contracting strategies for_terminal_construction
Contracting strategies for_terminal_constructionContracting strategies for_terminal_construction
Contracting strategies for_terminal_construction
 
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebars
 
CV
CVCV
CV
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 
Project Management Report for Tank Farm
Project Management Report for Tank FarmProject Management Report for Tank Farm
Project Management Report for Tank Farm
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptx
 
IRENEC-PPT
IRENEC-PPTIRENEC-PPT
IRENEC-PPT
 
Using Point Clouds for a Boundary Survey and Volumetric Analysis
Using Point Clouds for a Boundary Survey and Volumetric AnalysisUsing Point Clouds for a Boundary Survey and Volumetric Analysis
Using Point Clouds for a Boundary Survey and Volumetric Analysis
 

More from Chris Carson

Favorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIFavorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIChris Carson
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingChris Carson
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueChris Carson
 
Types Of Industry Scheduling
Types Of Industry SchedulingTypes Of Industry Scheduling
Types Of Industry SchedulingChris Carson
 
Early Completion Schedules
Early Completion SchedulesEarly Completion Schedules
Early Completion SchedulesChris Carson
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationChris Carson
 
Presentation Classification Of Schedule Types
Presentation Classification Of Schedule TypesPresentation Classification Of Schedule Types
Presentation Classification Of Schedule TypesChris Carson
 
Mitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel SchedulesMitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel SchedulesChris Carson
 
Planning A Complex Project
Planning A Complex ProjectPlanning A Complex Project
Planning A Complex ProjectChris Carson
 
Schedule Review PMI
Schedule Review PMISchedule Review PMI
Schedule Review PMIChris Carson
 
Testimony Mistakes
Testimony MistakesTestimony Mistakes
Testimony MistakesChris Carson
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule DevelopmentChris Carson
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMIChris Carson
 
DB Medical Pgm Mgmnt.
DB Medical Pgm Mgmnt.DB Medical Pgm Mgmnt.
DB Medical Pgm Mgmnt.Chris Carson
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2Chris Carson
 

More from Chris Carson (16)

Favorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEIFavorite Delay Analysis Methodologies Town Hall SEI
Favorite Delay Analysis Methodologies Town Hall SEI
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
 
Mitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned ValueMitigation And Performance Recovery Using Earned Value
Mitigation And Performance Recovery Using Earned Value
 
Types Of Industry Scheduling
Types Of Industry SchedulingTypes Of Industry Scheduling
Types Of Industry Scheduling
 
Early Completion Schedules
Early Completion SchedulesEarly Completion Schedules
Early Completion Schedules
 
Design & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan PresentationDesign & Development Of A Schedule Management Plan Presentation
Design & Development Of A Schedule Management Plan Presentation
 
Presentation Classification Of Schedule Types
Presentation Classification Of Schedule TypesPresentation Classification Of Schedule Types
Presentation Classification Of Schedule Types
 
Claims Triage
Claims TriageClaims Triage
Claims Triage
 
Mitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel SchedulesMitigation Of Risks In Using Parallel Schedules
Mitigation Of Risks In Using Parallel Schedules
 
Planning A Complex Project
Planning A Complex ProjectPlanning A Complex Project
Planning A Complex Project
 
Schedule Review PMI
Schedule Review PMISchedule Review PMI
Schedule Review PMI
 
Testimony Mistakes
Testimony MistakesTestimony Mistakes
Testimony Mistakes
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
 
DB Medical Pgm Mgmnt.
DB Medical Pgm Mgmnt.DB Medical Pgm Mgmnt.
DB Medical Pgm Mgmnt.
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
 

Recently uploaded

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Recently uploaded (20)

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Can A Subcontractor Have CP Delay When The Gc Does Not

  • 1. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Christopher Carson, PSP Shannon Campbell, PSP
  • 2. Shannon Campbell, PSP • Degree: – B.S. Civil Engineering – M.S. Engineering Management • University: – B.S – United States Military Academy – M.S. – University of Missouri-Rolla • Years of Experience: – 10 years • Professional Field: – Engineering Claims Consultant • Something you do not know about me: – Served 6.5 years in the military as an army engineer travelling to 14 different countries across 5 continents – many of these visits were to view construction projects throughout the world. 2
  • 3. Chris Carson, PSP, CCM, PMP • Corporate Director of Project Controls, Alpha Corporation – Responsible for standards, processes, and procedures for a team of schedulers, analysts, and project managers in multiple office locations, as well as analysis, work product, and testimony – Developed and manages the in-house project controls training program at Alpha • Certifications: – PSP (Planning & Scheduling Professional – AACEi) – CCM (Certified Construction Manager - CMAA) – PMP (Project Management Professional – PMI) • University: University of Virginia, Mechanical Engineering, 1972 • Professional Field: 38 years of experience in Construction Management Services specializing in Scheduling, Schedule Analysis, Estimating, Claims • Active in AACEi (Association for the Advancement of Cost Estimating International) – Author of Recommended Practices in Scheduling & Forensic Schedule Analysis RP • Active in PMI (Project Management Institute) College of Scheduling – Vice President of Scheduling Excellence – Managing Director for SEI (Scheduling Excellence Initiative) writing Best Practices and Guidelines for Scheduling and Schedule Impact Analysis – Serving on team writing Best Practices for Scheduling for GAO • Active in CMAA (Construction Management Association of America) – Served on committee revising Time Management Chapter of CMAA’s CM Standards of Practice • Active in Planning Planet (global planning association) – Chief Editor for US, writing Planner Users’ Guide, developing accreditation Guild for planners • Something you don’t know about me: I’m a glider co-pilot, see picture 3 3
  • 4. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Introduction • Entitlement to Delay Damages only when there is Critical Path Delay to Project Completion • What happens when an owner impact extends the time a subcontractor is on the job but the impact does NOT extend the Project Completion? • What, if any, entitlement does the Subcontractor have to recover delay-related costs? 4
  • 5. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Topics to be Covered • Example • Pass-Through Claims • The Miller Act • Combating the No Damage For Delay Clause • Strategies for Proving a Subcontractor’s Delay Claim • From the Owner’s Standpoint 5
  • 6. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Topics to be Covered • Example • Pass-Through Claims • The Miller Act • Combating the No Damage For Delay Clause • Strategies for Proving a Subcontractor’s Delay Claim • From the Owner’s Standpoint 6
  • 7. As–Planned Schedule - Office Building Months 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Foundations 4 Structural Steel Roof 4 1 NTP Curtainwall 4 Interior Finishes Punch Coord. Dwgs. 4 List 3 Fab/Deliver MEP Rough In MEP Finishes 1 3 4 3 7
  • 8. As–Planned v. As–Built Schedule Months 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Foundations 4 Structural Steel Roof 4 1 NTP Curtainwall 4 Interior Finishes Punch Coord. Dwgs. 4 List 3 Fab/Deliver MEP Rough In MEP Finishes 1 3 4 3 Foundations 4 Structural Steel Roof 4 1 NTP Curtainwall 4 Interior Finishes Punch Coord. Dwgs. 4 List 3 Fab/Deliver MEP Rough In MEP Finishes 1 3 4 3 Wks 3 8
  • 9. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Topics to be Covered • Example • Pass-Through Claims • The Miller Act • Combating the No Damage For Delay Clause • Strategies for Proving a Subcontractor’s Delay Claim • From the Owner’s Standpoint 9
  • 10. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Pass-Through Claims • Privity of Contract • Recovery of Damages through a Pass Through Claim • Definition: A pass-through claim is a claim: 1) by a Subcontractor who has incurred damages due to the actions of the Owner/Government with whom it has no contract; and 2) submitted by the GC who has a contractual relationship with both the Subcontractor and the Owner/Government. 10
  • 11. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Severin Doctrine “a prime contractor may sue the Government on behalf of its Subcontractor, in the nature of a pass-through suit, for costs incurred by the Subcontractor [due to the Government’s conduct] . . . [i]f the prime contractor proves its liability to the Subcontractor for the damages sustained by the latter . . . a showing [which] overcomes the objection to the lack of privity between the Government and the Subcontractor.” 11
  • 12. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Liquidating Agreements • Acknowledgement of liability to the Subcontractor – Satisfies the Severin doctrine requirement that the GC is technically and legally liable to the subcontractor for the claim before submitting to Government • Limits liability to the amount that a prime is able to recover from the owner – Protects the prime 12
  • 13. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? E.R. Mitchell Constr. Co. v. Danzig • Basics of the case • Players • Facts • No dispute of Federal Government liability • Government approved schedule • Government put on notice of damages to both GC and subcontractor • Owner responsible delays not of project schedule critical path • Results • Subcontractor satisfied all requirements for entitlement to Eichleay damages 13
  • 14. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Pass Through Claims - General Information • J.L. Simmons v. United States – provides the definition of the requirements of a liquidating agreement • Case law varies among State courts • Benefits of the Pass Through Claim 14
  • 15. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Topics to be Covered • Example • Pass-Through Claims • The Miller Act • Combating the No Damage For Delay Clause • Strategies for Proving a Subcontractor’s Delay Claim • From the Owner’s Standpoint 15
  • 16. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? The Miller Act • Basic Purpose – means for a subcontractor to receive payment for labor and materials furnished Players • Successful recovery of delay damages through the Miller Act 16
  • 17. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? The Miller Act - Recovering Delay Damages • Generally recoverable if characterized as increased cost of labor and materials – other costs have been successfully recovered • Not relevant whether fault lies with the Owner of the Prime • Seen as the only alternative in many cases for a subcontractor to recover increased costs 17
  • 18. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? The Miller Act - Considerations & Recommendations • Is a payment bond required? • Was the payment bond actually attained? • Timely initiation of a payment bond • Limited liability by surety – multiple claimants may require each to take a pro rata share of the penal sum 18
  • 19. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Topics to be Covered • Example • Pass-Through Claims • The Miller Act • Combating the No Damage For Delay Clause • Strategies for Proving a Subcontractor’s Delay Claim • From the Owner’s Standpoint 19
  • 20. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? No Damage for Delay (NDFD) • Basic Purpose – protects an owner or GC from paying monetary damages when a project is delayed • Sample Clause “No payment or compensation of any kind shall be made to the contractor for damages because of hindrance or delay from any cause in the progress of the work, whether such hindrances or delays be avoidable or unavoidable.” 20
  • 21. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? No Damage for Delay - Enforceability • Unenforceable in many states • Established exceptions otherwise – • (1) not contemplated by the parties; • (2) so unreasonable in length as to amount to an abandonment of the project by the Owner; • (3) caused by acts of bad faith or fraud by the Owner; or • (4) caused by active interference by the Owner. • A fifth exception is also sometimes cited - delays caused by gross negligence. 21
  • 22. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? No Damage for Delay – Considerations • Sometimes incorporated by reference or in a “Flow-Down” Provision • May be defense for an owner when presented with a pass through claim • Has been circumvented by use of a liquidating agreement as already discussed 22
  • 23. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Topics to be Covered • Example • Pass-Through Claims • The Miller Act • Combating the No Damage For Delay Clause • Strategies for Proving a Subcontractor’s Delay Claim • From the Owner’s Standpoint 23
  • 24. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Strategies for Proving a Subcontractor’s Delay Claim • Review and Negotiation of the Contract • Timely Notice • Waiver of Rights • Good Documentation • Involvement in the Baseline Schedule and Subsequent Updates 24
  • 25. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Strategies for Proving a Subcontractor’s Delay Claim • Review and Negotiation of the Contract • Subcontractor should • Carefully review contract, especially from a legal perspective • Assume any NDFD will be enforced • Attempt to remove or reduce general assumption of delay risk • Reduce to specific risks that are under sub’s control • Watch for verbiage that limits recovery to “active interference” only by Owner • Attempt to include language that provides a “Grace Period” that delays must exceed to allow an adjustment for delays • Allows a contingency for that period to be carried • Seek language related to specific events, proof required or price 25
  • 26. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Strategies for Proving a Subcontractor’s Delay Claim • Timely Notice • Assume that notice requirements will be enforced and meet them • Keep the GC informed so he can inform the Owner • Owner then has opportunity to participate in mitigation • Owner must be made aware of delays contemporaneously 26
  • 27. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Strategies for Proving a Subcontractor’s Delay Claim • Waiver of Rights • Watch for waiver language • Could be part of a payment application or certification • Could be part of a change order indicating all past claims are waived as of change order date • Provide reservation of rights language to any document if contemplating submitting a delay claim 27
  • 28. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Strategies for Proving a Subcontractor’s Delay Claim • Good Documentation • Key to proving damages • Accurate and contemporaneous • All documents including bid documentation, daily reports, pay requisitions, invoices, correspondence, all input into baseline and update scheduling process, minutes, resources both planned and actual 28
  • 29. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Strategies for Proving a Subcontractor’s Delay Claim • Involvement in the Baseline Schedule and Subsequent Updates • Ensure input into all schedules • Review any updates provided by GC to ensure no acceleration or stacking of crews are planned • Ensure adequate time and sequencing • Note subcontractor’s expectations for period of performance • Includes planned resources in crews and composition • Stockpiling and materials distribution needs • Watch for reduction in durations or overlapping of work • Watch for shifts in start dates, access dates, or completion dates • Document any problems with schedules 29
  • 30. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Strategies for Proving a Subcontractor’s Delay Claim • Involvement in the Baseline Schedule and Subsequent Updates • Review total float for subcontractors’ work to identify criticality at project schedule • Attempt to have the impacts to the subcontractor shown on the schedule • If failed, document the delay or disruption • Recognize that the Measured Mile is the most effective analysis for loss of efficiency • Requires good resource information • Related to the schedule to prove impacted & unimpacted times • Includes participation in any REAs submitted by GC – subcontractors can lose their rights against the Owner if not involved with REAs 30
  • 31. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Topics to be Covered • Example • Pass-Through Claims • The Miller Act • Combating the No Damage For Delay Clause • Strategies for Proving a Subcontractor’s Delay Claim • From the Owner’s Standpoint 31
  • 32. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? From the Owner’s Standpoint • Provide fair allocation of risk • Assign risk to the party most able to control it • This will reduce claims efforts • Provide timely and fair review and approval of legitimate time extension requests • Follow the same general rules as outlined in the strategies for the Subcontractor • Should an Owner be able recover equivalent damages from a Subcontractor due to Subcontractor impacts? 32
  • 33. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Conclusion • Negotiate the Contract • Know the Contract • Be involved in the schedule from start to finish • Maintain accurate documentation • Seek legal advice 33
  • 34. Can a Subcontractor Have a Critical Path Delay When the GC Does Not? Questions? Shannon Campbell, PSP Chris Carson, PSP