Colin ANDREWS
PROFESSION : Mechanical Engineer
QUALIFICATIONS : Bachelor of Engineering, Mechanical, University of Wollongong,
CONTACTS : Mob. 042 335 4449
Hm. (07) 5524 7950
Email a2cjand@yahoo.com.au
Linkedin Col Andrews - LinkedIn
RECENT WORK
MINERAL TECHNOLOGIES (DOWNER EDI) November 2011 – August 2013
Senior Mechanical Engineer
 Southern Ionics Inc., Georgia, USA - Detail design engineering of wet
concentrating plant.
 Tioline, Kazakhstan - Feasibility study for combined wet concentrating plant and
mineral separation plant in insulated building.
 Grande Cote, Senegal, West Africa - Detail design engineering of 8,000 t/h wet
concentrating plant (gross floating mass 12,000 t) and 50 t/h land based mineral
separation plant.
Specification and selection of equipment and design integration into plant for bucket
elevators, re-heaters, conveyors, dryers, cyclones, dedusting systems, bag houses,
sumps, screens, baggers and specialist equipment.
Referees: Greg Hill, Engineering Manager, 07 5569 1395
Mick Hagarty, Lead Mechanical Engineer, 07 5644 2927
AUSENCO & AUSENCO-TAGART February 2008 – November 2011
Senior Mechanical Engineer
 Rio Tinto, Kestrel Coal Mine - Upgrade and expand capacity of existing coal
handling and preparation plant.
 Newcrest, Cadia East Project, Stage 2 - detailed design of 4,200 t/h screenhouse
with conveying and dedusting systems,
 Bemax, Snapper HMC Project - detailed design of wet concentrating plant (WCP),
 Newcrest, Cadia East Feasibility Study - arranging, scoping and pricing options
for new screening, processing and materials handling systems,
 Oxiana, Sepon Laos – detailed design for copper concentrator expansion including
oxygen plant and acid fume collection system,
Referee: Peter Litzow, Engineering Manager, 07 3169 7000
February 2014 Resume of Colin Andrews page 1 of 4
WORK HISTORY
MINERAL TECHNOLOGIES (DOWNER EDI) June 2004 – February 2008
Project Mechanical Engineer
 Iluka, Murray Basin Project - Detail engineering design of Hamilton 50 t/h
mineral separation plant (MSP) with wet and dry circuits with truck load in and
load out.
 Corridor Sands, Mozambique - Feasibility options study of MSP.
 Tiomin, Kwale Kenya - Bankable feasibility study.
 El Buruluus, Iron Sands Project Egypt - Bankable feasibility study.
 Trimex, India - Design engineering for MSP.
 Centennial Coal, Hunter Valley - Detailed design engineering for Anvil Hill Coal
Mine coal preparation plant with raw coal and product coal handling yards and
train load out.
SPECIALISED LABOUR AND ENGINEERING July 2000 – February 2001
Site Mechanical Engineer
 Anglogold, Pine Creek, NT - Project management and site supervision of capital
and repair and maintenance work for Union Reefs gold mine including autoclave
change out, storage bin repair and acid storage system upgrade.
January 2014 Resume of Colin Andrews page 2 of 4
Typical tasks Skills and attributes
 Write and review technical documents;
Technical Specifications, Scopes of Work,
Scopes of Supply
 Diligent following procedures and work
instructions
 Technical analysis, review and
recommend selection of equipment
 Advanced skills with Microsoft Office,
Word, Excel, Outlook, Project, Access
 OH&S application and review to process
and equipment
 Highly competent interpretation and
review of 2D and 3D drawings
 Interpretation of Process Flow Diagrams  Empathy with junior staff
 Transfer of technical information for
electrical structural and civil works
 Competent engineering analysis and
calculations
 Control of technical aspects of equipment
design and supply.
 Excellent rapport with designers &
drafters
 Design of specialized equipment  Detailed equipment knowledge
 Integration of equipment into process  Proud history of high safety awareness
 Process layout & arrangement  Efficient time management
 Client and management communications  Pleasant and happy persona
 Supervision of designers & drafters  Great phone rapport ‘hear my smile’
 Supervision and training of Graduates  Honest and diligent work ethic
 Search and selection of equipment  Effective attention to detail
ENERGY RESOURCES OF AUSTRALIA October 1997 – February 2000
Senior Mechanical Engineer
 ERA, Jabiru NT, - Project management and site supervision of capital and repair
and maintenance projects for Ranger Uranium Mine. Projects included a site
upgrade of the diesel distribution system, new drum packing and handling facilities
and safe access provisions to the concentrator settling tanks.
BHP ENGINEERING March 1995 – October 1997
Senior Site Supervisor and Project Engineer
 FPD Projects Group, Port Kembla - Project planning and implementation of
significant site upgrades and new works for BHP Port Kembla Steel Works. Works
in #5 Blast furnace, # 4 Blast furnace, Raw Materials and Basic Oxygen Steel
plant.
EPT PTY LTD November 1990 – March 1995
Project Mechanical Engineer November 1990 – August 1991
 EPT Sydney - Mechanical input for the tender and procurement of Australian
fabricated and proprietary components for a Germany designed coal charging car.
Site Engineer September 1991 – August 1992
 EPT Site, BHP Pt Kembla - Supervise site personnel and sub-contractors for the
installation of the coal charging car. Site client liaison, site meetings and training
of production personnel.
Project Mechanical Engineer September 1992 – November 1993
 EPT Sydney - Update drawings and procurement for supply of additional four
coal cars. Preparation of installation inspection and test plans. Write and present
350 page Operation and Maintenance Manual. Design improvements for hydraulic
systems, pneumatic systems and vacuum systems.
Site Engineer November 1993 – March 1995
 EPT Site, BHP Pt Kembla, Supervise site personnel and sub-contractors. Client
liaison and site meetings. Training of production personnel. Investigation of
hydraulic operating problems. Install and commission improvements to hydraulic,
pneumatic and vacuum systems.
SEDGMAN AND ASSOCIATES May 1990 – October 1990
Project Engineer, North Sydney - Detailed design engineering for supply of coal handling and
coal preparation equipment.
BHP – SPPD DESIGN DEPARTMENT May 1989 – April 1990
Design Engineer, Port Kembla - Conceptual design of a semi-automatic coil sampling and export
strapping line.
January 2014 Resume of Colin Andrews page 3 of 4
KELLOGG AUSTRALIA PTY LTD , January 1988 – Mar 1989
Project Engineer, Botany NSW
 Demolish existing product line. Install hygienic wet basin. Procure, install and
commission new ‘Mini Wheat’ processing line.
 Refurbish a 10m x 40m basement into a drive through cool room to store dried
fruit ingredients in a hygienic low temperature environment.
MALCO INDUSTRIES PTY LTD November 1987 – January 1988
Design Draftsman, Sydney - Layout and detail drafting of vibratory screens and associated
equipment for mining industry.
SIMSMETAL PTY LTD October 1987 – November 1987
Design Engineer and Draftsman, South Sydney - Engineering design, layout and drafting of
aluminum re-melt reverberation furnace.
GFA – ANALGENBAU GMBH November 1985 – September 1987
Mechanical Engineer, BHP SPPD Pt Kembla
 Assist with many aspects of the drafting and documentation of a German designed
Twin Strand Continuous Slab Caster.
 Assist with the installation and commissioning of the Twin Strand Continuous Slab
Caster.
January 2014 Resume of Colin Andrews page 4 of 4

More Related Content

Viewers also liked

Lecc 2 Un Sistema Moral
Lecc 2 Un Sistema MoralLecc 2 Un Sistema Moral
Lecc 2 Un Sistema Moraljesustimoteo
 
Bioseñales y sistemas de información
Bioseñales y sistemas de informaciónBioseñales y sistemas de información
Bioseñales y sistemas de informaciónBrain Dynamics
 
Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...
Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...
Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...ProjecteRiuPolopAlcoi
 
Insight Magazine
Insight MagazineInsight Magazine
Insight MagazineMicrohire
 
TMX Equicom Corporate Presentation
TMX Equicom Corporate PresentationTMX Equicom Corporate Presentation
TMX Equicom Corporate PresentationTMX Equicom
 
History Of Vincennes, Indiana
History Of Vincennes, IndianaHistory Of Vincennes, Indiana
History Of Vincennes, Indianaguest37e850
 
Evolucion De Redes De Computadoras
Evolucion De Redes De ComputadorasEvolucion De Redes De Computadoras
Evolucion De Redes De Computadorasefrain jaime
 
Webquest carol
Webquest carolWebquest carol
Webquest carolCalonso011
 
Idol Server 7.3 Admin Rev7
Idol Server 7.3 Admin Rev7Idol Server 7.3 Admin Rev7
Idol Server 7.3 Admin Rev7guest0a2cbfba
 
Chapter 1 overview
Chapter 1 overviewChapter 1 overview
Chapter 1 overviewdr_edw777
 

Viewers also liked (18)

Lecc 2 Un Sistema Moral
Lecc 2 Un Sistema MoralLecc 2 Un Sistema Moral
Lecc 2 Un Sistema Moral
 
Anthromes v1
Anthromes v1Anthromes v1
Anthromes v1
 
Team Building
Team BuildingTeam Building
Team Building
 
MECANET
MECANETMECANET
MECANET
 
Bioseñales y sistemas de información
Bioseñales y sistemas de informaciónBioseñales y sistemas de información
Bioseñales y sistemas de información
 
Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...
Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...
Manual Técnico para el control de la especie invasora Ailanthus altissima (Mi...
 
Insight Magazine
Insight MagazineInsight Magazine
Insight Magazine
 
Tema 1
Tema 1Tema 1
Tema 1
 
TMX Equicom Corporate Presentation
TMX Equicom Corporate PresentationTMX Equicom Corporate Presentation
TMX Equicom Corporate Presentation
 
Trabajo aplicativo 2
Trabajo aplicativo 2Trabajo aplicativo 2
Trabajo aplicativo 2
 
Virtualizacion 2010 10
Virtualizacion 2010 10Virtualizacion 2010 10
Virtualizacion 2010 10
 
Forward to 100 Report
Forward to 100 ReportForward to 100 Report
Forward to 100 Report
 
History Of Vincennes, Indiana
History Of Vincennes, IndianaHistory Of Vincennes, Indiana
History Of Vincennes, Indiana
 
Evolucion De Redes De Computadoras
Evolucion De Redes De ComputadorasEvolucion De Redes De Computadoras
Evolucion De Redes De Computadoras
 
Webquest carol
Webquest carolWebquest carol
Webquest carol
 
Idol Server 7.3 Admin Rev7
Idol Server 7.3 Admin Rev7Idol Server 7.3 Admin Rev7
Idol Server 7.3 Admin Rev7
 
Chapter 1 overview
Chapter 1 overviewChapter 1 overview
Chapter 1 overview
 
Codigo De Etica Cna
Codigo De Etica CnaCodigo De Etica Cna
Codigo De Etica Cna
 

Colin Andrews Eng CV FEB2015

  • 1. Colin ANDREWS PROFESSION : Mechanical Engineer QUALIFICATIONS : Bachelor of Engineering, Mechanical, University of Wollongong, CONTACTS : Mob. 042 335 4449 Hm. (07) 5524 7950 Email a2cjand@yahoo.com.au Linkedin Col Andrews - LinkedIn RECENT WORK MINERAL TECHNOLOGIES (DOWNER EDI) November 2011 – August 2013 Senior Mechanical Engineer  Southern Ionics Inc., Georgia, USA - Detail design engineering of wet concentrating plant.  Tioline, Kazakhstan - Feasibility study for combined wet concentrating plant and mineral separation plant in insulated building.  Grande Cote, Senegal, West Africa - Detail design engineering of 8,000 t/h wet concentrating plant (gross floating mass 12,000 t) and 50 t/h land based mineral separation plant. Specification and selection of equipment and design integration into plant for bucket elevators, re-heaters, conveyors, dryers, cyclones, dedusting systems, bag houses, sumps, screens, baggers and specialist equipment. Referees: Greg Hill, Engineering Manager, 07 5569 1395 Mick Hagarty, Lead Mechanical Engineer, 07 5644 2927 AUSENCO & AUSENCO-TAGART February 2008 – November 2011 Senior Mechanical Engineer  Rio Tinto, Kestrel Coal Mine - Upgrade and expand capacity of existing coal handling and preparation plant.  Newcrest, Cadia East Project, Stage 2 - detailed design of 4,200 t/h screenhouse with conveying and dedusting systems,  Bemax, Snapper HMC Project - detailed design of wet concentrating plant (WCP),  Newcrest, Cadia East Feasibility Study - arranging, scoping and pricing options for new screening, processing and materials handling systems,  Oxiana, Sepon Laos – detailed design for copper concentrator expansion including oxygen plant and acid fume collection system, Referee: Peter Litzow, Engineering Manager, 07 3169 7000 February 2014 Resume of Colin Andrews page 1 of 4
  • 2. WORK HISTORY MINERAL TECHNOLOGIES (DOWNER EDI) June 2004 – February 2008 Project Mechanical Engineer  Iluka, Murray Basin Project - Detail engineering design of Hamilton 50 t/h mineral separation plant (MSP) with wet and dry circuits with truck load in and load out.  Corridor Sands, Mozambique - Feasibility options study of MSP.  Tiomin, Kwale Kenya - Bankable feasibility study.  El Buruluus, Iron Sands Project Egypt - Bankable feasibility study.  Trimex, India - Design engineering for MSP.  Centennial Coal, Hunter Valley - Detailed design engineering for Anvil Hill Coal Mine coal preparation plant with raw coal and product coal handling yards and train load out. SPECIALISED LABOUR AND ENGINEERING July 2000 – February 2001 Site Mechanical Engineer  Anglogold, Pine Creek, NT - Project management and site supervision of capital and repair and maintenance work for Union Reefs gold mine including autoclave change out, storage bin repair and acid storage system upgrade. January 2014 Resume of Colin Andrews page 2 of 4 Typical tasks Skills and attributes  Write and review technical documents; Technical Specifications, Scopes of Work, Scopes of Supply  Diligent following procedures and work instructions  Technical analysis, review and recommend selection of equipment  Advanced skills with Microsoft Office, Word, Excel, Outlook, Project, Access  OH&S application and review to process and equipment  Highly competent interpretation and review of 2D and 3D drawings  Interpretation of Process Flow Diagrams  Empathy with junior staff  Transfer of technical information for electrical structural and civil works  Competent engineering analysis and calculations  Control of technical aspects of equipment design and supply.  Excellent rapport with designers & drafters  Design of specialized equipment  Detailed equipment knowledge  Integration of equipment into process  Proud history of high safety awareness  Process layout & arrangement  Efficient time management  Client and management communications  Pleasant and happy persona  Supervision of designers & drafters  Great phone rapport ‘hear my smile’  Supervision and training of Graduates  Honest and diligent work ethic  Search and selection of equipment  Effective attention to detail
  • 3. ENERGY RESOURCES OF AUSTRALIA October 1997 – February 2000 Senior Mechanical Engineer  ERA, Jabiru NT, - Project management and site supervision of capital and repair and maintenance projects for Ranger Uranium Mine. Projects included a site upgrade of the diesel distribution system, new drum packing and handling facilities and safe access provisions to the concentrator settling tanks. BHP ENGINEERING March 1995 – October 1997 Senior Site Supervisor and Project Engineer  FPD Projects Group, Port Kembla - Project planning and implementation of significant site upgrades and new works for BHP Port Kembla Steel Works. Works in #5 Blast furnace, # 4 Blast furnace, Raw Materials and Basic Oxygen Steel plant. EPT PTY LTD November 1990 – March 1995 Project Mechanical Engineer November 1990 – August 1991  EPT Sydney - Mechanical input for the tender and procurement of Australian fabricated and proprietary components for a Germany designed coal charging car. Site Engineer September 1991 – August 1992  EPT Site, BHP Pt Kembla - Supervise site personnel and sub-contractors for the installation of the coal charging car. Site client liaison, site meetings and training of production personnel. Project Mechanical Engineer September 1992 – November 1993  EPT Sydney - Update drawings and procurement for supply of additional four coal cars. Preparation of installation inspection and test plans. Write and present 350 page Operation and Maintenance Manual. Design improvements for hydraulic systems, pneumatic systems and vacuum systems. Site Engineer November 1993 – March 1995  EPT Site, BHP Pt Kembla, Supervise site personnel and sub-contractors. Client liaison and site meetings. Training of production personnel. Investigation of hydraulic operating problems. Install and commission improvements to hydraulic, pneumatic and vacuum systems. SEDGMAN AND ASSOCIATES May 1990 – October 1990 Project Engineer, North Sydney - Detailed design engineering for supply of coal handling and coal preparation equipment. BHP – SPPD DESIGN DEPARTMENT May 1989 – April 1990 Design Engineer, Port Kembla - Conceptual design of a semi-automatic coil sampling and export strapping line. January 2014 Resume of Colin Andrews page 3 of 4
  • 4. KELLOGG AUSTRALIA PTY LTD , January 1988 – Mar 1989 Project Engineer, Botany NSW  Demolish existing product line. Install hygienic wet basin. Procure, install and commission new ‘Mini Wheat’ processing line.  Refurbish a 10m x 40m basement into a drive through cool room to store dried fruit ingredients in a hygienic low temperature environment. MALCO INDUSTRIES PTY LTD November 1987 – January 1988 Design Draftsman, Sydney - Layout and detail drafting of vibratory screens and associated equipment for mining industry. SIMSMETAL PTY LTD October 1987 – November 1987 Design Engineer and Draftsman, South Sydney - Engineering design, layout and drafting of aluminum re-melt reverberation furnace. GFA – ANALGENBAU GMBH November 1985 – September 1987 Mechanical Engineer, BHP SPPD Pt Kembla  Assist with many aspects of the drafting and documentation of a German designed Twin Strand Continuous Slab Caster.  Assist with the installation and commissioning of the Twin Strand Continuous Slab Caster. January 2014 Resume of Colin Andrews page 4 of 4