Birmingham International Airport Case Study
Reducing Energy
Birmingham International
Airport (BHX) lies to the
southeast of Birmingham city
centre. The airport sees over
9 million passengers a year
and has plans to double
capacity by 2020.
The airport is a base for Flybe,
Monarch, Ryanair, Thomas Cook
Airlines and Thomson Airways and
offers both domestic flights within
the UK, and international flights to
destinations in Europe, the Middle
East, Pakistan, India, North America
and the Caribbean.
The airport handles scheduled and
charter short and long-haul flights.
Birmingham is the first UK airport
outside of London to offer direct
charter flights to China, made possible
by an extension of the runway.
Key Objectives for Birmingham
International Airport
LCMB were instructed by Birmingham Airport,
in May 2013, to deliver energy management services
in partnership with the internal engineering and
operations team. This service was designed to bring
about a step change in the way that energy and the
associated cost and emissions were managed. Energy
is particularly important at Birmingham Airport as it is
their largest controllable cost.
LCMB were asked to focus on meeting the following key
client objectives:
• Improving the level of sub-metering and data visibility.
• Develop a wider accountability for energy by business
unit level reporting and assigning energy budgets to
manage and reduce.
• Engage staff in taking an active role to save and
promote energy saving.
• Identifying and costing projects to yield energy savings.
LCMB are working
with our teams at
all levels to deliver
a transformation in
energy management
which will secure
lasting cost and
carbon reductions
for the airport.
As an airport with
ambitious growth
plans it is vital that
we both understand
and continually find
ways to reduce what
is one of our largest
controllable costs.”
Simon Richards
Chief Financial Officer,
Birmingham
International Airport
CaseStudy
LCMB Building Performance Ltd
Bloxham Mill, Barford Road, Bloxham, Banbury, Oxfordshire OX15 4FF
t. 01295 722 823 | e. enquiries@lcmb.co.uk | www.lcmb.co.uk Printed on 100% recycled paper
Our approach
LCMB set about developing a greater understanding
of where energy was used within Birmingham Airport.
Once understood this led to us being able to establish
targets for each business unit.
Our initial work involved the
development of a metering strategy
and specification from which LCMB led
a planned approach to identify and
tender 150 electricity sub-meters.
To put energy on the agenda of
management staff, LCMB set up a
monthly energy group. Along with
regular monthly energy reports provided
to business unit leaders this has had the
effect of improving awareness as well
as accountability.
Joint actions across the airport were
successful in leading to an energy saving
in the first year of our involvement of
£85,000.
We have now put in place the reporting
structures enabling the establishment
of a 5% energy saving target to be
achieved over the course of the
coming year.
Key Outcomes delivered for BHX
•	 A metering strategy and programme of electrical
sub-metering to expand the Birmingham Airports
understanding of significant energy consumers.
• 	 Increased accountability for energy within each
business unit and in excess of £85k of energy cost
being saved within the financial year.
•	 Staff engagement in suggesting and
implementing energy saving ideas.
•	 A number of energy saving projects
implemented, under trial or identified.
•	 A regular energy cost saving reporting process
for each business unit.
•	 The basis for devolved energy saving targets
for 2014/15.
Following a successful year of delivering these
benefits, LCMB have been commissioned to extend
our service for Birmingham Airport in order to
secure long term savings.
Contact Us
If you want to discover how you can save energy,
carbon and cost, please visit our website
www.lcmb.co.uk or call 01295 722823
Matt and the team at
LCMB continue to drive
year on year energy
savings and to date the
airport has benefited
from lower costs and
improved accountability.
LCMB deliver a service
that embraces our core
values of intelligence,
support and delivery and
understand the need to
deliver a service that is
aligned to the needs of the
customer.”
Simon Richards
Chief Financial Officer,
Birmingham International Airport
LCMB Building Performance Ltd
Bloxham Mill, Barford Road, Bloxham, Banbury, Oxfordshire OX15 4FF
t. 01295 722 823 | e. enquiries@lcmb.co.uk | www.lcmb.co.uk Printed on 100% recycled paper

More Related Content

What's hot

Southwest airlines ppt
Southwest airlines pptSouthwest airlines ppt
Southwest airlines pptspreet1304
 
Southwest Airlines
Southwest AirlinesSouthwest Airlines
Southwest AirlinesAnkit Uttam
 
EPRG Characteristics -international-business
EPRG Characteristics -international-businessEPRG Characteristics -international-business
EPRG Characteristics -international-businessDinker Vaid
 
Southwest Airlines
Southwest AirlinesSouthwest Airlines
Southwest AirlinesMing Wei Lu
 
Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis Sanjay Sharma
 
Silvio Napoli at Schindler India
Silvio Napoli at Schindler IndiaSilvio Napoli at Schindler India
Silvio Napoli at Schindler IndiaShubham Rishav
 
Internationalization
InternationalizationInternationalization
InternationalizationManoj Kumar
 
International strategy
International strategyInternational strategy
International strategydaryl10
 
COMPETITIVE POSITION : INDIGO AIRLINES
 COMPETITIVE POSITION : INDIGO AIRLINES COMPETITIVE POSITION : INDIGO AIRLINES
COMPETITIVE POSITION : INDIGO AIRLINESJatinder Singh
 
Regiocentric Orientation
Regiocentric OrientationRegiocentric Orientation
Regiocentric OrientationBhawna Gupta
 
Southwest Airlines : Case Study
Southwest Airlines : Case StudySouthwest Airlines : Case Study
Southwest Airlines : Case StudySarang Bhutada
 
wholly owned manufacturing facility - entry strategies - corporate managemen...
wholly owned manufacturing facility -  entry strategies - corporate managemen...wholly owned manufacturing facility -  entry strategies - corporate managemen...
wholly owned manufacturing facility - entry strategies - corporate managemen...manumelwin
 
Case Study Analysis on General Electric
Case Study Analysis on General ElectricCase Study Analysis on General Electric
Case Study Analysis on General ElectricSubhi Pradhan
 

What's hot (20)

challenges faced by international business
challenges faced by international businesschallenges faced by international business
challenges faced by international business
 
Southwest airlines ppt
Southwest airlines pptSouthwest airlines ppt
Southwest airlines ppt
 
Southwest Airlines
Southwest AirlinesSouthwest Airlines
Southwest Airlines
 
EPRG Characteristics -international-business
EPRG Characteristics -international-businessEPRG Characteristics -international-business
EPRG Characteristics -international-business
 
Southwest Airlines
Southwest AirlinesSouthwest Airlines
Southwest Airlines
 
Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis Karnataka Engineering Case Analysis
Karnataka Engineering Case Analysis
 
Silvio Napoli at Schindler India
Silvio Napoli at Schindler IndiaSilvio Napoli at Schindler India
Silvio Napoli at Schindler India
 
Internationalization
InternationalizationInternationalization
Internationalization
 
Zip car presentation
Zip car presentationZip car presentation
Zip car presentation
 
international strategy IBM
international strategy IBMinternational strategy IBM
international strategy IBM
 
International strategy
International strategyInternational strategy
International strategy
 
COMPETITIVE POSITION : INDIGO AIRLINES
 COMPETITIVE POSITION : INDIGO AIRLINES COMPETITIVE POSITION : INDIGO AIRLINES
COMPETITIVE POSITION : INDIGO AIRLINES
 
International Strategic Alliance
International Strategic AllianceInternational Strategic Alliance
International Strategic Alliance
 
Regiocentric Orientation
Regiocentric OrientationRegiocentric Orientation
Regiocentric Orientation
 
Ryanair: the profit function
Ryanair: the profit functionRyanair: the profit function
Ryanair: the profit function
 
Southwest Airlines : Case Study
Southwest Airlines : Case StudySouthwest Airlines : Case Study
Southwest Airlines : Case Study
 
Global Manufacturing and Material Management
Global Manufacturing and Material ManagementGlobal Manufacturing and Material Management
Global Manufacturing and Material Management
 
wholly owned manufacturing facility - entry strategies - corporate managemen...
wholly owned manufacturing facility -  entry strategies - corporate managemen...wholly owned manufacturing facility -  entry strategies - corporate managemen...
wholly owned manufacturing facility - entry strategies - corporate managemen...
 
Case Study Analysis on General Electric
Case Study Analysis on General ElectricCase Study Analysis on General Electric
Case Study Analysis on General Electric
 
Reinventing your business model
Reinventing your business modelReinventing your business model
Reinventing your business model
 

Viewers also liked

livepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-studylivepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-studyCourtney Jowsey
 
Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016Bevan Brinkley
 
Stansted Airport Case Study
Stansted Airport Case StudyStansted Airport Case Study
Stansted Airport Case StudySteve Carter
 
Gander Airport Case Study
Gander Airport Case StudyGander Airport Case Study
Gander Airport Case Studyjtaylorireland
 
Case study brookfield airport
Case study brookfield airportCase study brookfield airport
Case study brookfield airportColo_cr
 
Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09mario kallab
 
USACE Construction Quality Management manual
USACE Construction Quality Management manualUSACE Construction Quality Management manual
USACE Construction Quality Management manualJerico Awat
 
Cqm student study guide
Cqm student study guideCqm student study guide
Cqm student study guideRobert Rodgers
 
Gatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudyGatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudySteelhenge
 
Quality control in construction site
Quality control in construction siteQuality control in construction site
Quality control in construction siteMohamed Saber
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristicssrinivas2036
 
Case studies ppp
Case studies pppCase studies ppp
Case studies pppamityasum23
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In ConstructionIsidro Sid Calayag
 

Viewers also liked (18)

Birmingham Airport Case study
Birmingham Airport Case studyBirmingham Airport Case study
Birmingham Airport Case study
 
livepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-studylivepool-john-lennon-airport-case-study
livepool-john-lennon-airport-case-study
 
Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016Houston Commercial Cooling Tower Case Study - Aug. 22 2016
Houston Commercial Cooling Tower Case Study - Aug. 22 2016
 
Stansted Airport Case Study
Stansted Airport Case StudyStansted Airport Case Study
Stansted Airport Case Study
 
Gander Airport Case Study
Gander Airport Case StudyGander Airport Case Study
Gander Airport Case Study
 
Case study brookfield airport
Case study brookfield airportCase study brookfield airport
Case study brookfield airport
 
Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09Construction quality control plan draft rev0 27_feb09
Construction quality control plan draft rev0 27_feb09
 
Hitachi case study
Hitachi case studyHitachi case study
Hitachi case study
 
USACE Construction Quality Management manual
USACE Construction Quality Management manualUSACE Construction Quality Management manual
USACE Construction Quality Management manual
 
Cqm student study guide
Cqm student study guideCqm student study guide
Cqm student study guide
 
Challenges airport planning
Challenges airport planningChallenges airport planning
Challenges airport planning
 
Gatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case StudyGatwick Airport Disruption 2013 - A Case Study
Gatwick Airport Disruption 2013 - A Case Study
 
Quality control in construction site
Quality control in construction siteQuality control in construction site
Quality control in construction site
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristics
 
Case studies ppp
Case studies pppCase studies ppp
Case studies ppp
 
Airport engineering
Airport engineering Airport engineering
Airport engineering
 
Site Selection Criteria
Site Selection CriteriaSite Selection Criteria
Site Selection Criteria
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 

Similar to Birmingham Airport Case Study

Vinni nadageri British Airways ppt
Vinni nadageri British Airways ppt Vinni nadageri British Airways ppt
Vinni nadageri British Airways ppt Vinni Nadageri
 
British Airways
British AirwaysBritish Airways
British AirwaysSM3027
 
GTD Summit 2016 - Anne Shaw, Birmingham City Council
GTD Summit 2016 - Anne Shaw, Birmingham City CouncilGTD Summit 2016 - Anne Shaw, Birmingham City Council
GTD Summit 2016 - Anne Shaw, Birmingham City CouncilJoe Green
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Steelhenge
 
FBE Birmingham Airport Plans & Opportunities
FBE Birmingham Airport Plans & OpportunitiesFBE Birmingham Airport Plans & Opportunities
FBE Birmingham Airport Plans & OpportunitiesFbeWhale
 
Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020danlovrekovic
 
Rail 2009
Rail 2009Rail 2009
Rail 2009Jimon
 
Supply chain europe
Supply chain europeSupply chain europe
Supply chain europe3t-Europe
 
Large hotel case study
Large hotel case studyLarge hotel case study
Large hotel case studySarah Revell
 
Energy - research that matters
Energy -  research that mattersEnergy -  research that matters
Energy - research that mattersGavin Harper
 
Engage with...Centre for Future Clean Mobility
Engage with...Centre for Future Clean MobilityEngage with...Centre for Future Clean Mobility
Engage with...Centre for Future Clean MobilityKTN
 
Port of SD Fact Sheets
Port of SD Fact SheetsPort of SD Fact Sheets
Port of SD Fact SheetsCrowdbrite
 
Fleet Management Consultancy Services | EVP Solutions
Fleet Management Consultancy Services | EVP SolutionsFleet Management Consultancy Services | EVP Solutions
Fleet Management Consultancy Services | EVP SolutionsNick Jones
 
Mirvac Facility Management
Mirvac Facility ManagementMirvac Facility Management
Mirvac Facility ManagementStephen Butler
 
ESOS Transportation energy consumption-eco3 partnership brochure
ESOS  Transportation energy consumption-eco3 partnership brochureESOS  Transportation energy consumption-eco3 partnership brochure
ESOS Transportation energy consumption-eco3 partnership brochureEco3 Partnership
 

Similar to Birmingham Airport Case Study (20)

Vinni nadageri British Airways ppt
Vinni nadageri British Airways ppt Vinni nadageri British Airways ppt
Vinni nadageri British Airways ppt
 
British Airways
British AirwaysBritish Airways
British Airways
 
GTD Summit 2016 - Anne Shaw, Birmingham City Council
GTD Summit 2016 - Anne Shaw, Birmingham City CouncilGTD Summit 2016 - Anne Shaw, Birmingham City Council
GTD Summit 2016 - Anne Shaw, Birmingham City Council
 
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
Implementing Business Continuity in Crossrail: Europe's Largest Construction ...
 
FBE Birmingham Airport Plans & Opportunities
FBE Birmingham Airport Plans & OpportunitiesFBE Birmingham Airport Plans & Opportunities
FBE Birmingham Airport Plans & Opportunities
 
Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020Fuel matrix introductory presentation for lond capital october 2020
Fuel matrix introductory presentation for lond capital october 2020
 
Rail 2009
Rail 2009Rail 2009
Rail 2009
 
Supply chain europe
Supply chain europeSupply chain europe
Supply chain europe
 
Copenhagen's Big Incentive
Copenhagen's Big IncentiveCopenhagen's Big Incentive
Copenhagen's Big Incentive
 
CYPT. Copenhagen Report
CYPT. Copenhagen ReportCYPT. Copenhagen Report
CYPT. Copenhagen Report
 
Large hotel case study
Large hotel case studyLarge hotel case study
Large hotel case study
 
14. The cost and value of Water - Caroline Johnston - Water Event 2019
14. The cost and value of Water - Caroline Johnston - Water Event 201914. The cost and value of Water - Caroline Johnston - Water Event 2019
14. The cost and value of Water - Caroline Johnston - Water Event 2019
 
MM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLDMM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLD
 
Energy - research that matters
Energy -  research that mattersEnergy -  research that matters
Energy - research that matters
 
Engage with...Centre for Future Clean Mobility
Engage with...Centre for Future Clean MobilityEngage with...Centre for Future Clean Mobility
Engage with...Centre for Future Clean Mobility
 
Port of SD Fact Sheets
Port of SD Fact SheetsPort of SD Fact Sheets
Port of SD Fact Sheets
 
VIEW Points-December2015
VIEW Points-December2015VIEW Points-December2015
VIEW Points-December2015
 
Fleet Management Consultancy Services | EVP Solutions
Fleet Management Consultancy Services | EVP SolutionsFleet Management Consultancy Services | EVP Solutions
Fleet Management Consultancy Services | EVP Solutions
 
Mirvac Facility Management
Mirvac Facility ManagementMirvac Facility Management
Mirvac Facility Management
 
ESOS Transportation energy consumption-eco3 partnership brochure
ESOS  Transportation energy consumption-eco3 partnership brochureESOS  Transportation energy consumption-eco3 partnership brochure
ESOS Transportation energy consumption-eco3 partnership brochure
 

Birmingham Airport Case Study

  • 1. Birmingham International Airport Case Study Reducing Energy Birmingham International Airport (BHX) lies to the southeast of Birmingham city centre. The airport sees over 9 million passengers a year and has plans to double capacity by 2020. The airport is a base for Flybe, Monarch, Ryanair, Thomas Cook Airlines and Thomson Airways and offers both domestic flights within the UK, and international flights to destinations in Europe, the Middle East, Pakistan, India, North America and the Caribbean. The airport handles scheduled and charter short and long-haul flights. Birmingham is the first UK airport outside of London to offer direct charter flights to China, made possible by an extension of the runway. Key Objectives for Birmingham International Airport LCMB were instructed by Birmingham Airport, in May 2013, to deliver energy management services in partnership with the internal engineering and operations team. This service was designed to bring about a step change in the way that energy and the associated cost and emissions were managed. Energy is particularly important at Birmingham Airport as it is their largest controllable cost. LCMB were asked to focus on meeting the following key client objectives: • Improving the level of sub-metering and data visibility. • Develop a wider accountability for energy by business unit level reporting and assigning energy budgets to manage and reduce. • Engage staff in taking an active role to save and promote energy saving. • Identifying and costing projects to yield energy savings. LCMB are working with our teams at all levels to deliver a transformation in energy management which will secure lasting cost and carbon reductions for the airport. As an airport with ambitious growth plans it is vital that we both understand and continually find ways to reduce what is one of our largest controllable costs.” Simon Richards Chief Financial Officer, Birmingham International Airport CaseStudy LCMB Building Performance Ltd Bloxham Mill, Barford Road, Bloxham, Banbury, Oxfordshire OX15 4FF t. 01295 722 823 | e. enquiries@lcmb.co.uk | www.lcmb.co.uk Printed on 100% recycled paper
  • 2. Our approach LCMB set about developing a greater understanding of where energy was used within Birmingham Airport. Once understood this led to us being able to establish targets for each business unit. Our initial work involved the development of a metering strategy and specification from which LCMB led a planned approach to identify and tender 150 electricity sub-meters. To put energy on the agenda of management staff, LCMB set up a monthly energy group. Along with regular monthly energy reports provided to business unit leaders this has had the effect of improving awareness as well as accountability. Joint actions across the airport were successful in leading to an energy saving in the first year of our involvement of £85,000. We have now put in place the reporting structures enabling the establishment of a 5% energy saving target to be achieved over the course of the coming year. Key Outcomes delivered for BHX • A metering strategy and programme of electrical sub-metering to expand the Birmingham Airports understanding of significant energy consumers. • Increased accountability for energy within each business unit and in excess of £85k of energy cost being saved within the financial year. • Staff engagement in suggesting and implementing energy saving ideas. • A number of energy saving projects implemented, under trial or identified. • A regular energy cost saving reporting process for each business unit. • The basis for devolved energy saving targets for 2014/15. Following a successful year of delivering these benefits, LCMB have been commissioned to extend our service for Birmingham Airport in order to secure long term savings. Contact Us If you want to discover how you can save energy, carbon and cost, please visit our website www.lcmb.co.uk or call 01295 722823 Matt and the team at LCMB continue to drive year on year energy savings and to date the airport has benefited from lower costs and improved accountability. LCMB deliver a service that embraces our core values of intelligence, support and delivery and understand the need to deliver a service that is aligned to the needs of the customer.” Simon Richards Chief Financial Officer, Birmingham International Airport LCMB Building Performance Ltd Bloxham Mill, Barford Road, Bloxham, Banbury, Oxfordshire OX15 4FF t. 01295 722 823 | e. enquiries@lcmb.co.uk | www.lcmb.co.uk Printed on 100% recycled paper