The Wet Valley 
Crisis 
Case study 
Prepared for: 
 Dr. Jeff. 
Prepared by: 
 Haliza. “Overview” 
 Hissein. “The best managerial technique and suggestions” 
 Dikko. “The main problem” 
 Ben Lahcene. “Addressing the main problem”
Outlines 
1. Overview. 
2. The main problem. 
3. Addressing the main problem. 
4. The best managerial technique and suggestions.
1. overview 
 Globally, water is under threat from depletion, pollution, 
mismanagement and even from being hijacked by multi-nationals. 
 Hence, if a country has bad water governance, its water resources 
would not be managed sustainably. 
 Klang Valley is a part of Selangor and Kuala Lumpur territory. 
 Since 1998, Klang Valley experienced a serious water shortage and 
affected many residential in term of water supply. 
 The situation of water declining in Klang Valley since 1995, when the 
director of Selangor Waterworks Department (SWD) presented the 
impending water situation to the state government.
 Generally, the causes contributed to the shortage of water in the 
Klang Valley: 
• Demand for water has been growing at 
7.6% annually. 
• Pipe leakages and faulty meter recordings. 
River pollution. 
• Shortage of manpower and financial 
resources in the SWD (privatization). 
 However, there are internal and external 
problems that caused the crisis occurred.
2. The main problem 
• The main problem in this case is Poor Planning. 
• Poor planning: The problem could have been avoided if people 
are more proactive and do some long term planning instead of 
looking for short term solution to some complex problems. Mr. 
Junid 
• The poor planning of the water crisis in the Klang Valley leads 
to other problems discussed below: 
• Inter governmental relationship problem. The inter relationship 
between the SWD and the Selangor State Government. For 
example the early signal regarding water crisis in high 
possibility to occur by the SWD to the Selangor State 
Government in 1995. 
• Shortage of staffs: Mr Junid had already explained many times 
that his department was facing a shortage of staff.
• Communication restriction due to insufficient communication 
equipment required by staffs, no monitoring of lorry movement 
resulting in water distribution process not effective and broken pipe 
because of pipe ageing factor (installed since Malaysian independence 
time). For example time factor since it take 30 minutes to 1 hour to fill 
up one tanker. 
• Ethics: The problems that cause a temper flared up in the residents 
because they didn’t receive water supply as promised by the SWD. 
For example, the chairman said that the Selangor SWD had 
implemented water rationing for 207 areas as a short term measure to 
overcome the water shortage problem. The distribution of water was 
divided into 2 areas zone A and zone B, each would receive water 
supply for 12 hour on alternate days.
• High demand of water consumption due to industrial 
development and rapid population growth in the city of Kuala 
Lumpur and Selangor. 
• El-Nino and river pollution as factors paralyzing amount of 
water supply during the crisis. Factories located along side the 
rivers has been discharging great amount of chemicals 
effluence which affect the water treatment plants.
3. Addressing the main problem 
Which managerial approach to apply? 
Traditional 
management 
New public 
management
1) Intergovernmental relationship: Selangor 
waterworks Department (SWD) need to coordinate and cooperate 
together and harmonize the activities of the government during 
this water crisis because the overlaps that occur in the 
implementation process of the public sector activities are 
inevitable, resulting from different forces (departments, agencies, 
parties, politicians) that are involved in this sector.
• The best approach to address this problem here is the 
traditional management approach because this approach takes 
the view that managers have a more policy making focus and 
as we have seen that there is an absence of policy making and 
poor planning. This management style is as much, if not more 
concerned, with how goals are accomplished. Also concerned 
with making sure that policies are in place to ensure that 
processes are in compliance with government regulations.
2) El-Nino, river pollution, high population 
growth, rapid development growth: 
all of those are external problems that contributed significantly in 
this crisis and make it more difficult due to insufficiency in 
decision making process as well as poor strategic planning.
3) Ethical problem: 
ethical problem which is lying on the residents that everything is 
okay and the situation in the hand “..The Chairman saying that 
everything was under control...” page 126.
• Here we believe that the new public management approach can 
be very helpful to eliminate those problems but with some 
implication of the traditional approach like control from the 
headquarters and control on inputs and procedures.
4) The shortage of staffs and communication 
equipment: 
The problems here caused by lack of prioritizing and 
misallocation of resources by the state water supply authority.
• New public management insure that the resources demand are 
under check also make sure that we are doing more with less 
means that public servants shall endeavor to ensure the proper, 
effective and efficient use of public money and it focus is to 
ensure client satisfaction and thus gives managers the flexibility 
and tools to make decisions “hire new employees and purchase 
new equipment” that will allow more efficient and effective ways 
to solve and end this crisis.
4. The managerial technique 
planning methods needs to be improved to address the main 
problem because it : 
1. guide and define the organization’s goal . 
2. Identify the problem and opportunity to capitalize on. 
3. Designing alternative course of action and forecast the 
consequences of each alternative. 
4. compare and evaluate the alternatives with each other and choose 
the alternative that offers the most preferred outcome. 
5. Implementing the plan through developing a budget, project 
schedules regulatory measures and Gather feedback and review 
progress.
Suggestions 
1. SWD &SSG should make strategic planning by using the rational 
planning technique which identifies the problem to be solved and 
highlight alternatives course of action. 
2. Designing a technology in management of water distribution 
including 24 hour complaint hotline, computerizing water 
distribution system and broken pipe detectors. Hence promoting 
and improving distribution, creating control in water distribution to 
each area and monitoring the schedule of lorry tankers operation. 
3. Holding workshops and discussions with the technical about how 
to handling the water crisis and enlighten them the importance of 
making the right decision when a problem sets in.
4. They should Make Cooperation with the meteorology, 
climatology, geophysics institutions to get more advice related to 
water crisis and also recruiting more employ’s to solve shortage 
of staffs in SWD will enhance water distribution in the Klang 
valley. 
5. They should relocate those factories located close to the river to 
new area or build industrial zone because there part of problem by 
making pollution . 
6. Issues of ethnic each of them should take his responsibility to 
serving public first and also decision making should build Based 
on the best interests of the collective, overarching community or 
national good, not narrow interests of small or self-serving groups.
The wet valley crisis in Koula lampur Malaysia

More Related Content

Similar to The wet valley crisis in Koula lampur Malaysia

Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationIwl Pcu
 
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...ICIMOD
 
Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia
Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia
Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia Soksophors yim
 
Iwrm in myanmar by prof ni 20aug2015
Iwrm in myanmar by prof ni 20aug2015Iwrm in myanmar by prof ni 20aug2015
Iwrm in myanmar by prof ni 20aug2015Knnt Thein
 
Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015
Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015
Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015water-decade
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportFesto Wasukira
 
Assignment On: Government of the People’s Republic of Bangladesh National Po...
Assignment On:  Government of the People’s Republic of Bangladesh National Po...Assignment On:  Government of the People’s Republic of Bangladesh National Po...
Assignment On: Government of the People’s Republic of Bangladesh National Po...Asian Paint Bangladesh Ltd
 
CCAA IRIS - Water and-sanitation-project
CCAA IRIS - Water and-sanitation-projectCCAA IRIS - Water and-sanitation-project
CCAA IRIS - Water and-sanitation-projectShawn Lennie
 
Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]Shraddha Kulkarni
 
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...Iwl Pcu
 
National policy for safe water supply & sanitation 1998
National policy for safe water supply & sanitation 1998National policy for safe water supply & sanitation 1998
National policy for safe water supply & sanitation 1998Asian Paint Bangladesh Ltd
 
2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-webJennifer Dingman, PhD
 
4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)
4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)
4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)Ephraim Mwendamseke
 
Project title Project Management
Project title Project Management Project title Project Management
Project title Project Management Tofik Yusuf
 
Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015
Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015
Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015water-decade
 
Session SDM - Juntopas.Thailand rural water supply 21
Session SDM - Juntopas.Thailand rural water supply 21Session SDM - Juntopas.Thailand rural water supply 21
Session SDM - Juntopas.Thailand rural water supply 21IRC
 
Deanna’s Input for Question 1As Chief Executive Officer of Ri.docx
Deanna’s Input for Question 1As Chief Executive Officer of Ri.docxDeanna’s Input for Question 1As Chief Executive Officer of Ri.docx
Deanna’s Input for Question 1As Chief Executive Officer of Ri.docxedwardmarivel
 

Similar to The wet valley crisis in Koula lampur Malaysia (20)

Ramon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project PresentationRamon Aguilar - Manila Third Sewerage Project Presentation
Ramon Aguilar - Manila Third Sewerage Project Presentation
 
National water law policy
National water law policy  National water law policy
National water law policy
 
Kenya Impact Assessment Apr12
Kenya Impact Assessment Apr12Kenya Impact Assessment Apr12
Kenya Impact Assessment Apr12
 
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...
SWaRMA_IRBM_Module4_#1, Governance, Policy and institutional framework, Arabi...
 
Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia
Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia
Climate Vulnerability Assessment Report in Kampong Chhnang, Cambodia
 
Iwrm in myanmar by prof ni 20aug2015
Iwrm in myanmar by prof ni 20aug2015Iwrm in myanmar by prof ni 20aug2015
Iwrm in myanmar by prof ni 20aug2015
 
Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015
Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015
Governments: Tomas Sancho, WCCE, 16th January UN Water Zaragoza Conference 2015
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement Report
 
Assignment On: Government of the People’s Republic of Bangladesh National Po...
Assignment On:  Government of the People’s Republic of Bangladesh National Po...Assignment On:  Government of the People’s Republic of Bangladesh National Po...
Assignment On: Government of the People’s Republic of Bangladesh National Po...
 
CCAA IRIS - Water and-sanitation-project
CCAA IRIS - Water and-sanitation-projectCCAA IRIS - Water and-sanitation-project
CCAA IRIS - Water and-sanitation-project
 
Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]Public private partnership_(sanitation)[1]
Public private partnership_(sanitation)[1]
 
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
 
National policy for safe water supply & sanitation 1998
National policy for safe water supply & sanitation 1998National policy for safe water supply & sanitation 1998
National policy for safe water supply & sanitation 1998
 
2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web2015-Canadian-Municipal-Water-Consortium-Report-web
2015-Canadian-Municipal-Water-Consortium-Report-web
 
4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)
4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)
4effdefa-1f24-417b-b1d8-b1e7986ab574-160812013320 (1)
 
Project title Project Management
Project title Project Management Project title Project Management
Project title Project Management
 
Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015
Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015
Civil Society: Shauna Curry, 16th January UN Water Zaragoza Conference 2015
 
Session SDM - Juntopas.Thailand rural water supply 21
Session SDM - Juntopas.Thailand rural water supply 21Session SDM - Juntopas.Thailand rural water supply 21
Session SDM - Juntopas.Thailand rural water supply 21
 
2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision2. Integrated Catchment Management - Vision
2. Integrated Catchment Management - Vision
 
Deanna’s Input for Question 1As Chief Executive Officer of Ri.docx
Deanna’s Input for Question 1As Chief Executive Officer of Ri.docxDeanna’s Input for Question 1As Chief Executive Officer of Ri.docx
Deanna’s Input for Question 1As Chief Executive Officer of Ri.docx
 

Recently uploaded

Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Managementshakkardaddy
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...dsnow9802
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Conny Dethloff
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBusiness of Software Conference
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Nagarjuna Reddy Aturi
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfcoolsnoopy1
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Designshakkardaddy
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 

Recently uploaded (20)

Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Management
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdf
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 

The wet valley crisis in Koula lampur Malaysia

  • 1. The Wet Valley Crisis Case study Prepared for:  Dr. Jeff. Prepared by:  Haliza. “Overview”  Hissein. “The best managerial technique and suggestions”  Dikko. “The main problem”  Ben Lahcene. “Addressing the main problem”
  • 2. Outlines 1. Overview. 2. The main problem. 3. Addressing the main problem. 4. The best managerial technique and suggestions.
  • 3. 1. overview  Globally, water is under threat from depletion, pollution, mismanagement and even from being hijacked by multi-nationals.  Hence, if a country has bad water governance, its water resources would not be managed sustainably.  Klang Valley is a part of Selangor and Kuala Lumpur territory.  Since 1998, Klang Valley experienced a serious water shortage and affected many residential in term of water supply.  The situation of water declining in Klang Valley since 1995, when the director of Selangor Waterworks Department (SWD) presented the impending water situation to the state government.
  • 4.  Generally, the causes contributed to the shortage of water in the Klang Valley: • Demand for water has been growing at 7.6% annually. • Pipe leakages and faulty meter recordings. River pollution. • Shortage of manpower and financial resources in the SWD (privatization).  However, there are internal and external problems that caused the crisis occurred.
  • 5. 2. The main problem • The main problem in this case is Poor Planning. • Poor planning: The problem could have been avoided if people are more proactive and do some long term planning instead of looking for short term solution to some complex problems. Mr. Junid • The poor planning of the water crisis in the Klang Valley leads to other problems discussed below: • Inter governmental relationship problem. The inter relationship between the SWD and the Selangor State Government. For example the early signal regarding water crisis in high possibility to occur by the SWD to the Selangor State Government in 1995. • Shortage of staffs: Mr Junid had already explained many times that his department was facing a shortage of staff.
  • 6. • Communication restriction due to insufficient communication equipment required by staffs, no monitoring of lorry movement resulting in water distribution process not effective and broken pipe because of pipe ageing factor (installed since Malaysian independence time). For example time factor since it take 30 minutes to 1 hour to fill up one tanker. • Ethics: The problems that cause a temper flared up in the residents because they didn’t receive water supply as promised by the SWD. For example, the chairman said that the Selangor SWD had implemented water rationing for 207 areas as a short term measure to overcome the water shortage problem. The distribution of water was divided into 2 areas zone A and zone B, each would receive water supply for 12 hour on alternate days.
  • 7. • High demand of water consumption due to industrial development and rapid population growth in the city of Kuala Lumpur and Selangor. • El-Nino and river pollution as factors paralyzing amount of water supply during the crisis. Factories located along side the rivers has been discharging great amount of chemicals effluence which affect the water treatment plants.
  • 8. 3. Addressing the main problem Which managerial approach to apply? Traditional management New public management
  • 9.
  • 10.
  • 11. 1) Intergovernmental relationship: Selangor waterworks Department (SWD) need to coordinate and cooperate together and harmonize the activities of the government during this water crisis because the overlaps that occur in the implementation process of the public sector activities are inevitable, resulting from different forces (departments, agencies, parties, politicians) that are involved in this sector.
  • 12. • The best approach to address this problem here is the traditional management approach because this approach takes the view that managers have a more policy making focus and as we have seen that there is an absence of policy making and poor planning. This management style is as much, if not more concerned, with how goals are accomplished. Also concerned with making sure that policies are in place to ensure that processes are in compliance with government regulations.
  • 13. 2) El-Nino, river pollution, high population growth, rapid development growth: all of those are external problems that contributed significantly in this crisis and make it more difficult due to insufficiency in decision making process as well as poor strategic planning.
  • 14. 3) Ethical problem: ethical problem which is lying on the residents that everything is okay and the situation in the hand “..The Chairman saying that everything was under control...” page 126.
  • 15. • Here we believe that the new public management approach can be very helpful to eliminate those problems but with some implication of the traditional approach like control from the headquarters and control on inputs and procedures.
  • 16. 4) The shortage of staffs and communication equipment: The problems here caused by lack of prioritizing and misallocation of resources by the state water supply authority.
  • 17. • New public management insure that the resources demand are under check also make sure that we are doing more with less means that public servants shall endeavor to ensure the proper, effective and efficient use of public money and it focus is to ensure client satisfaction and thus gives managers the flexibility and tools to make decisions “hire new employees and purchase new equipment” that will allow more efficient and effective ways to solve and end this crisis.
  • 18. 4. The managerial technique planning methods needs to be improved to address the main problem because it : 1. guide and define the organization’s goal . 2. Identify the problem and opportunity to capitalize on. 3. Designing alternative course of action and forecast the consequences of each alternative. 4. compare and evaluate the alternatives with each other and choose the alternative that offers the most preferred outcome. 5. Implementing the plan through developing a budget, project schedules regulatory measures and Gather feedback and review progress.
  • 19. Suggestions 1. SWD &SSG should make strategic planning by using the rational planning technique which identifies the problem to be solved and highlight alternatives course of action. 2. Designing a technology in management of water distribution including 24 hour complaint hotline, computerizing water distribution system and broken pipe detectors. Hence promoting and improving distribution, creating control in water distribution to each area and monitoring the schedule of lorry tankers operation. 3. Holding workshops and discussions with the technical about how to handling the water crisis and enlighten them the importance of making the right decision when a problem sets in.
  • 20. 4. They should Make Cooperation with the meteorology, climatology, geophysics institutions to get more advice related to water crisis and also recruiting more employ’s to solve shortage of staffs in SWD will enhance water distribution in the Klang valley. 5. They should relocate those factories located close to the river to new area or build industrial zone because there part of problem by making pollution . 6. Issues of ethnic each of them should take his responsibility to serving public first and also decision making should build Based on the best interests of the collective, overarching community or national good, not narrow interests of small or self-serving groups.