What is Small Bore System ?
• Small bore sewer system is designed to collect and transport
only the liquid portion of the domestic sewage for off-site
treatment and disposal.
• The solids are separated from the sewage in septic tanks or
aqua privies installed upstream of every connection to the
small bore sewers.
• This system provides an alternative where conventional
sewerage systems doesn't fit well.
• Provides an economical way to upgrade the existing on-site
sanitation facilities to a level of service comparable to
conventional sewers.
• Since the small bore sewer collects only settled sewage, it
needs reduced water requirements and reduced velocities of
flow. This in turn reduces the cost of excavation, material
and treatment. This is also called as settled sewerage.
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Components of the System
• house connections
• interceptor tanks
• Sewers
• Cleanouts
• manholes
• vents and
• in some cases lift stations
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Suitability of the System
• This system is suitable under the following conditions,
where
• Effluent from pour-flush toilets and household sullage
cannot be disposed off on-site
• Installation of new schemes is taken up, especially for
fringe areas.
• A planned sequence of incremental sanitation
improvements with small bore sewers as a first stage is
contemplated.
• Existing septic tank systems have failed or where there
are a number of septic tanks requiring the effluent to be
discharged, but soil and ground water conditions do not
permit such a discharge.
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Design Criteria
• Each house sewer is usually connected to an interceptor tank,
which is designed as a septic tank.
• The optimum number of house sewers to be connected to an
interceptor tank can be worked out.
• The effluent from the tank is discharged into the small bore
sewer system, where flow occurs by gravity utilizing the head
resulting from the difference in elevation of its upstream and
downstream ends.
• The sewer should be set deep enough to carry these flows.
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Design Criteria
• First consider the available ground slope and choose a
minimum of 100 mm sewer pipe and use Manning’s formula
for pipes flowing full and find out the flow carrying capacity.
If this is lesser than the actual flow in that section, increase
the pipe diameter in that section as needed. Velocity is not a
criterion.
• Design decisions regarding the location, depth, size and
gradient of the sewer must be carefully made to hold
hydraulic losses within the limits of available head.
• Minimum pipe diameter of 100 mm is recommended.
• Maintenance of strict sewer gradients to ensure minimum
self-cleansing velocities is not necessary.
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Design Criteria
• The sewer may be constructed with any profile as long as the
hydraulic gradient remains below all interceptor tank outlet
inverts.
• Ventilation is not necessary for small bore sewers, if they are laid
on a falling gradient.
• A vent cleanout to release air may be provided at every hump.
• Profiles are shown in Figures in next slide.
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Schematic Diagram of Small Bore System.
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Schematic Diagram of Small Bore System.
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
Thank You
• Contact:
Email Address: dhruv.saxena@ecajmer.ac.in
Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
References: CPHEEO Manual, Government of India.

More Related Content

What's hot

What's hot (20)

Duty, Delta and Base Period and their relationship
Duty, Delta and Base Period and their relationshipDuty, Delta and Base Period and their relationship
Duty, Delta and Base Period and their relationship
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
Laying and Testing of sewer
Laying and Testing of sewerLaying and Testing of sewer
Laying and Testing of sewer
 
Pumping Stations
Pumping StationsPumping Stations
Pumping Stations
 
Design of sewerage system
Design of sewerage systemDesign of sewerage system
Design of sewerage system
 
Spillways
SpillwaysSpillways
Spillways
 
Plain sedimentation
Plain sedimentationPlain sedimentation
Plain sedimentation
 
Intake structures in wwwe
Intake structures in wwweIntake structures in wwwe
Intake structures in wwwe
 
Energy dissipators
Energy dissipatorsEnergy dissipators
Energy dissipators
 
Canal lining
Canal liningCanal lining
Canal lining
 
Intake structures
Intake structures Intake structures
Intake structures
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
 
WATER SUPPLY SYSTEM
WATER SUPPLY SYSTEM WATER SUPPLY SYSTEM
WATER SUPPLY SYSTEM
 
Canal Fall
Canal FallCanal Fall
Canal Fall
 
Low Cost Sanitation Systems
Low Cost Sanitation SystemsLow Cost Sanitation Systems
Low Cost Sanitation Systems
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Design and construction of sewer
Design and construction of sewer Design and construction of sewer
Design and construction of sewer
 
L 13 grit chamber
L 13 grit chamberL 13 grit chamber
L 13 grit chamber
 

Similar to Small bore system: Wastewater Engineering

Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvac
Yashna Garg
 
sewageconveyanceandpumping-150329090857-conversion-gate01.pdf
sewageconveyanceandpumping-150329090857-conversion-gate01.pdfsewageconveyanceandpumping-150329090857-conversion-gate01.pdf
sewageconveyanceandpumping-150329090857-conversion-gate01.pdf
AutoCad27
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
kalyanmaji
 

Similar to Small bore system: Wastewater Engineering (20)

4495118.ppt
4495118.ppt4495118.ppt
4495118.ppt
 
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignVacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
 
sewage and sewer.pptx
sewage and sewer.pptxsewage and sewer.pptx
sewage and sewer.pptx
 
Services report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvacServices report - plumbing, electrical and hvac
Services report - plumbing, electrical and hvac
 
Sewer appurtenances
Sewer appurtenancesSewer appurtenances
Sewer appurtenances
 
Lecture 0 design of spilways an overview
Lecture 0 design of spilways an overviewLecture 0 design of spilways an overview
Lecture 0 design of spilways an overview
 
Water distribution
Water distributionWater distribution
Water distribution
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
1. Onsite sanitation system and disposal of sludge slide series (1) septic tank
 
Pumping test
Pumping testPumping test
Pumping test
 
L 37
L 37L 37
L 37
 
Sewer Appurtanances
Sewer AppurtanancesSewer Appurtanances
Sewer Appurtanances
 
water supply engineering Module 5 PPT docs
water supply engineering Module 5 PPT docswater supply engineering Module 5 PPT docs
water supply engineering Module 5 PPT docs
 
Plumbing and drainage services
Plumbing and drainage servicesPlumbing and drainage services
Plumbing and drainage services
 
L 5and l-6 sewer design
L 5and l-6 sewer designL 5and l-6 sewer design
L 5and l-6 sewer design
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
unit ii.pptx
unit  ii.pptxunit  ii.pptx
unit ii.pptx
 
sewageconveyanceandpumping-150329090857-conversion-gate01.pdf
sewageconveyanceandpumping-150329090857-conversion-gate01.pdfsewageconveyanceandpumping-150329090857-conversion-gate01.pdf
sewageconveyanceandpumping-150329090857-conversion-gate01.pdf
 
Unit 4
Unit 4Unit 4
Unit 4
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
 

More from Dhruv Saxena

More from Dhruv Saxena (8)

Disaster Management Course Objectives
Disaster Management Course ObjectivesDisaster Management Course Objectives
Disaster Management Course Objectives
 
Disaster Management - Medical and Institutional arrangement
Disaster Management - Medical and Institutional arrangementDisaster Management - Medical and Institutional arrangement
Disaster Management - Medical and Institutional arrangement
 
Disaster Preparedness
Disaster PreparednessDisaster Preparedness
Disaster Preparedness
 
Disaster Management Introduction & Classification
Disaster Management Introduction & ClassificationDisaster Management Introduction & Classification
Disaster Management Introduction & Classification
 
Hazards in Textile processing Industries
Hazards in Textile processing IndustriesHazards in Textile processing Industries
Hazards in Textile processing Industries
 
Drought - Disaster management
Drought - Disaster managementDrought - Disaster management
Drought - Disaster management
 
Cloudburst | Disaster Management
Cloudburst | Disaster ManagementCloudburst | Disaster Management
Cloudburst | Disaster Management
 
Introduction to Data Science and Analytics
Introduction to Data Science and AnalyticsIntroduction to Data Science and Analytics
Introduction to Data Science and Analytics
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 

Small bore system: Wastewater Engineering

  • 1. Small Bore System Wastewater Engineering Prof. Dhruv Saxena Deptt. of Civil Engineering, Engineering College Ajmer.
  • 2. What is Small Bore System ? • Small bore sewer system is designed to collect and transport only the liquid portion of the domestic sewage for off-site treatment and disposal. • The solids are separated from the sewage in septic tanks or aqua privies installed upstream of every connection to the small bore sewers. • This system provides an alternative where conventional sewerage systems doesn't fit well. • Provides an economical way to upgrade the existing on-site sanitation facilities to a level of service comparable to conventional sewers. • Since the small bore sewer collects only settled sewage, it needs reduced water requirements and reduced velocities of flow. This in turn reduces the cost of excavation, material and treatment. This is also called as settled sewerage. Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 3. Components of the System • house connections • interceptor tanks • Sewers • Cleanouts • manholes • vents and • in some cases lift stations Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 4. Suitability of the System • This system is suitable under the following conditions, where • Effluent from pour-flush toilets and household sullage cannot be disposed off on-site • Installation of new schemes is taken up, especially for fringe areas. • A planned sequence of incremental sanitation improvements with small bore sewers as a first stage is contemplated. • Existing septic tank systems have failed or where there are a number of septic tanks requiring the effluent to be discharged, but soil and ground water conditions do not permit such a discharge. Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 5. Design Criteria • Each house sewer is usually connected to an interceptor tank, which is designed as a septic tank. • The optimum number of house sewers to be connected to an interceptor tank can be worked out. • The effluent from the tank is discharged into the small bore sewer system, where flow occurs by gravity utilizing the head resulting from the difference in elevation of its upstream and downstream ends. • The sewer should be set deep enough to carry these flows. Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 6. Design Criteria • First consider the available ground slope and choose a minimum of 100 mm sewer pipe and use Manning’s formula for pipes flowing full and find out the flow carrying capacity. If this is lesser than the actual flow in that section, increase the pipe diameter in that section as needed. Velocity is not a criterion. • Design decisions regarding the location, depth, size and gradient of the sewer must be carefully made to hold hydraulic losses within the limits of available head. • Minimum pipe diameter of 100 mm is recommended. • Maintenance of strict sewer gradients to ensure minimum self-cleansing velocities is not necessary. Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 7. Design Criteria • The sewer may be constructed with any profile as long as the hydraulic gradient remains below all interceptor tank outlet inverts. • Ventilation is not necessary for small bore sewers, if they are laid on a falling gradient. • A vent cleanout to release air may be provided at every hump. • Profiles are shown in Figures in next slide. Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 8. Schematic Diagram of Small Bore System. Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 9. Schematic Diagram of Small Bore System. Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA
  • 10. Thank You • Contact: Email Address: dhruv.saxena@ecajmer.ac.in Dhruv Saxena, Asst. Professor (NPIU-TEQIP-III), ECA References: CPHEEO Manual, Government of India.