SlideShare a Scribd company logo
1 of 16
1
BACHELOR OF QUANTITY SURVEYING (HONOURS)
QSB60103103946-M - SITE SURVEYING
Fieldwork Report 1
TITLE: LEVELING
Name Student ID
Yeo Dor Een 0316224
Welson Lum Wei Jiunn 0319514
Yap Jia En 0319550
Yong Sing Yew 0318766
2
Table of Content
Content Pages
Cover Page 1
Table of Content 2
Introduction to Leveling 3-5
Introduction of Apparatus 6-11
Data and Results 12-14
Discussion 16
3
INTRODUCTION TO LEVELING
Leveling may be part of determine the relative heights or elevation of points are object on the
earth’s surface. It deal with measurements in a vertical plane. It is also a level surface that
everywhere at right angles to the direction of gravity of the earth.
OBJECTIVES
The objectives of this field work 1 (Leveling) is to:
a) To give definitions as a basic for the proper understanding of leveling
b) To understand the methods used in leveling
c) To understand the collimation method and rise and fall method
There are few definitions of terms used in leveling which are:
DATUM
A datum may be a surface or a line to which observed heights are related. It is any arbitrarily
assumed level surface or line from which vertical distances are measured in India the datum
adopted for G.T.S. bench marks is the mean sea level at Karachi now in Pakistan. There are two
types of datum which are:
a) The ordnance datum (O.D) is the datum to which all heights shown on Ordnance Sydney
(O.S) maps are referred. The datum line is the mean sea level at Liverpool datum
b) Assumed datum is used where it is inconvenient or impossible to relate the work in hand
to the ordnance datum.
BENCH-MARK (B.M)
Bench-mark is a fixed point of know height above O.D from which the height above O.D of any
other point may be pointed. Bench-mark also used as our starting point and ending point during
our field work.
4
REDUCED LEVEL
A reduced level is the height of a point or object stated with reference to the selected datum for
the work in hand. The reduced level can be increase or decrease at every points depends on the
datum. There are some formula to get the amount of reduce level which are:
a) The height of instrument - Back sight= Reduced level (Collimation method)
b) The previous height of instrument – (I.S) or (B.s)= Reduced level(Collimation Method)
For the rise and fall method is use the previous B.S to minus the I.S or F.S to get the amount
which will be negative or positive amount and add them with the reduced level of the previous
B.S.
LINE OF COLLIMATION
It is the line joining the intersection of cross hairs of the optical center of the object glass. The
line extending from an instrument along which distance objects are seen, when viewed with the
telescope. It also called the line of sight.
5
BACKSIGHT
Back-sight is the first sight reading taken after the instrument has been set up. The sight taken to
a point whose height is known, has been assumed, or can be calculated. Its abbreviated is called
B.S and is taken at the start of the work at and a change point.
FORESGHT
Foresight also called the last staff reading denoting the shifting of the instrument. It is a termed
as minus sight. It is abbreviated to F.S and is taken a change point and at the end of operations.
INTERMEDIATE SIGHT
Intermediate sight is the sight or reading that take between the F.S and B.S. It is abbreviated to
I.S.
CHANGE POINT
It is appoint denoting the shifting of the level. It is after the reading of B.S and F.S where the
instrument is ready to move to a new position. It is abbreviated to C.P. A bench-mark may also
be taken as a changer point and it also called a turning point (T.P).
6
APPARATUS USED
Telescope/Digital Level
1. Object Lens
2. Focusing Screw
3. Focusing Lens
4. Diaphragm
5. Eyepiece
7
Tripod Stand
It have 3 legs which can be extend to the height required. It function is to carry the Digital Level
and it has a special screw is done purposely to lock the Optical Plummet which attached to the
Digital Level.
Optical Plummet
A device which use to make sure the Digital Level is on the center position over a point.
8
Way to set-up the Optical Plummet so that the Digital Level are at the center position
Rotate A and B at the same time and C at the different time to adjust the bubble move into the
center which mean the Digital Level is already in the center position. Do not rotate the three
rotate buttons at the same time.
9
Pond Bubble
-When pond bubble is centered this mean the instrument’s standing axis is approximately
vertical.
-The compensators in the instrument take over and adjust the optical of Line of Collimation so
that it is horizontal.
-When the instrument is rotated the compensator ensure that a horizontal plane of collimation is
swept out.
10
E-type leveling ruler
This type of ruler can allow us have a better vision on the reading compare to normal type ruler.
11
COMMON ERROR SOURCES
There are always some common error sources due to the failure of the measurement. The
common error sources are:
a) Level rod not vertical
b) Levelling rod not fully extended or incorrect length
c) Level instrument not level
d) Instrument out of adjustment
e) Environment – wind and heat.
12
Data/ Result of Leveling
Height of Collimation Method
Backsight Intersight Foresight Height of
Collimation
Reduced Level
1.519 101.519 100.000
1.429 3.785 99.163 97.734
1.369 1.330 99.202 97.833
1.439 1.555 99.086 97.647
1.631 1.495 99.222 97.591
1.378 1.345 99.255 97.877
1.303 1.384 99.174 97.871
1.423 1.553 99.044 97.621
1.490 1.391 99.143 97.653
3.675 1.480 101.338 97.663
1.479 1.317 101.500 100.021
1.468 100.032
18.135 18.103 100.032
18.103 100.000
0.032 0.032
Rise and Fall Method
Backsight Intersight Foresight Rise Fall Reduced
Level
1.519 100.000
1.429 3.785 2.266 97.734
1.369 1.330 0.099 97.833
1.439 1.555 0.186 97.647
1.631 1.495 0.056 97.591
1.378 1.345 0.286 97.877
1.303 1.384 0.006 97.871
1.423 1.553 0.250 97.621
1.490 1.391 0.032 97.653
3.675 1.480 0.010 97.663
1.479 1.317 2.358 100.021
1.468 0.011 100.032
18.135 18.103 2.796 2.764 100.032
18.103 2.764 100.000
0.032 0.032 0.032
13
Adjusted Field Data
Height of Collimation Method
Backsight Intersight Foresight Height of
Collimation
Reduced
Level
Adjustment Final Reduce
Level
1.519 101.519 100.000 100.000
1.429 3.785 99.163 97.734 -0.003 97.731
1.369 1.330 99.202 97.833 -0.006 97.827
1.439 1.555 99.086 97.647 -0.009 97.638
1.631 1.495 99.222 97.591 -0.012 97.579
1.378 1.345 99.255 97.877 -0.015 97.862
1.303 1.384 99.174 97.871 -0.018 97.853
1.423 1.553 99.044 97.621 -0.021 97.600
1.490 1.391 99.143 97.653 -0.024 97.629
3.675 1.480 101.338 97.663 -0.027 97.636
1.479 1.317 101.500 100.021 -0.030 99.991
1.468 100.032 -0.032 100.000
18.135 18.103 100.032
18.103 100.000
0.032 0.032 Arith.
Checked
Rise and Fall Method
Backsight Intersight Foresight Rise Fall Reduced
Level
Adjustment Final
Reduce
Level
1.519 100.000 100.000
1.429 3.785 2.266 97.734 -0.003 97.731
1.369 1.330 0.099 97.833 -0.006 97.827
1.439 1.555 0.186 97.647 -0.009 97.638
1.631 1.495 0.056 97.591 -0.012 97.579
1.378 1.345 0.286 97.877 -0.015 97.862
1.303 1.384 0.006 97.871 -0.018 97.853
1.423 1.553 0.250 97.621 -0.021 97.600
1.490 1.391 0.032 97.653 -0.024 97.629
3.675 1.480 0.010 97.663 -0.027 97.636
1.479 1.317 2.358 100.021 -0.030 99.991
1.468 0.011 100.032 -0.032 100.000
18.135 18.103 2.796 2.764 100.032
18.103 2.764 100.000
0.032 0.032 0.032 Arith.
Checked
14
Acceptable Error of closure = ±12 √k
K = the number of set-ups
±12 √11 = ±39.799mm
Hence, the leveling is acceptable.
Correctionper set-up
Error of misclosure ÷ Number of set up
= (100.0000-100.032) ÷ 11
= -0.003 m
15
Discussion
For the first fieldwork, we were required to set up the leveling instrument on a
suitable spot. After finished set up, the height of instrument will remain the same
for each observation made until the instrument is moved to a new position. Two
persons carried their own level rods (vertical rods)stood at two different points and
mark the places with correction fluid. Then, the level rods’ readings were
measured and recorded. We were asked to measure 11 points (included bench-
mark) with 10 set ups in this fieldwork. After that, calculate the readings we
recorded in two methods which are height of collimation method and rise and fall
method and calculate the reduced level of each station. To ensure the total readings
are same or within the allowable error of closure, we use the formula of constant ×
√(distance).
constant× √(distance)
= ± 12 √k
= ± 12 √11
= ± 39.799mm
Therefore, the acceptable range for error of closure is ± 39.799mm. If the answer
is over ± 39.799mm, we have to do the fieldwork again until we get it. For our
group, we get the answer for the allowable error of closure, -0.032mm, thus it is
acceptable. After that, we need to do adjustment table for height of collimation
method and rise and fall method with this formula:
16
Correctionper set-up
Error of misclosure ÷ Number of set up
= (100.0000-100.032) ÷ 11
= -0.003 m
Lastly, calculate the final reduced level with the addition of reduced level and
adjustment.

More Related Content

What's hot

Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
Bahzad5
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
seenyee
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
tfkc1212
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
Bahzad5
 
Levelling final
Levelling finalLevelling final
Levelling final
seenyee
 
S2 2 leveling
S2 2 levelingS2 2 leveling
S2 2 leveling
Est
 

What's hot (20)

Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Levelling report
Levelling reportLevelling report
Levelling report
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINEROAD  PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Tacheometry @surveyingreport
Tacheometry @surveyingreportTacheometry @surveyingreport
Tacheometry @surveyingreport
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Leveling final-report
Leveling final-reportLeveling final-report
Leveling final-report
 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
 
Levelling final
Levelling finalLevelling final
Levelling final
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 
S2 2 leveling
S2 2 levelingS2 2 leveling
S2 2 leveling
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Tranverse report
Tranverse report Tranverse report
Tranverse report
 

Similar to Site surveying report 1

Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
Sheng Zhe
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
LeulDamtew
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only note
SHAMJITH KM
 
Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1
Yap Xin
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
XinYee Khoo
 
Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)
Chee Lee
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
Jing Chuang
 

Similar to Site surveying report 1 (20)

Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 
Site survey report 1
Site survey report 1Site survey report 1
Site survey report 1
 
1 st report
1 st report1 st report
1 st report
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Levelling
LevellingLevelling
Levelling
 
Levelling
LevellingLevelling
Levelling
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Advanced surveying equipment ppt
Advanced surveying equipment pptAdvanced surveying equipment ppt
Advanced surveying equipment ppt
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only note
 
Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
LEVELING.pdf
LEVELING.pdfLEVELING.pdf
LEVELING.pdf
 
Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)
 
Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)Indirect contouring 31 35 (IIUI)
Indirect contouring 31 35 (IIUI)
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 

More from Doreen Yeo

More from Doreen Yeo (20)

Value management presentation slides
Value management presentation slidesValue management presentation slides
Value management presentation slides
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
CIPAA presentation
CIPAA presentationCIPAA presentation
CIPAA presentation
 
Financial Management Report
Financial Management ReportFinancial Management Report
Financial Management Report
 
CSI Report
CSI ReportCSI Report
CSI Report
 
Pp2 coursework 2 brief
Pp2 coursework 2  briefPp2 coursework 2  brief
Pp2 coursework 2 brief
 
BE Cost Plan
BE Cost Plan BE Cost Plan
BE Cost Plan
 
BE presentation slides
BE presentation slidesBE presentation slides
BE presentation slides
 
BE cost appraisal
BE cost appraisalBE cost appraisal
BE cost appraisal
 
Estimating seminar 2 glazing answer
Estimating seminar 2 glazing answerEstimating seminar 2 glazing answer
Estimating seminar 2 glazing answer
 
Estimating seminar 1 slides
Estimating seminar 1 slidesEstimating seminar 1 slides
Estimating seminar 1 slides
 
Assignment ceiling finishes
Assignment ceiling finishesAssignment ceiling finishes
Assignment ceiling finishes
 
PP1 report
PP1 reportPP1 report
PP1 report
 
PP1 assignment presentation slides
PP1 assignment presentation slidesPP1 assignment presentation slides
PP1 assignment presentation slides
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slides
 
Measurement IV assignment presentation slides
Measurement IV assignment presentation slides Measurement IV assignment presentation slides
Measurement IV assignment presentation slides
 
Building Services ll Assignment
Building Services ll AssignmentBuilding Services ll Assignment
Building Services ll Assignment
 
Management Science Report
Management Science ReportManagement Science Report
Management Science Report
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
Sustainable stormwater management(building services1)
Sustainable stormwater management(building services1)Sustainable stormwater management(building services1)
Sustainable stormwater management(building services1)
 

Recently uploaded

一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
q6pzkpark
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Bertram Ludäscher
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
vexqp
 
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
nirzagarg
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
ranjankumarbehera14
 
Cytotec in Jeddah+966572737505) get unwanted pregnancy kit Riyadh
Cytotec in Jeddah+966572737505) get unwanted pregnancy kit RiyadhCytotec in Jeddah+966572737505) get unwanted pregnancy kit Riyadh
Cytotec in Jeddah+966572737505) get unwanted pregnancy kit Riyadh
Abortion pills in Riyadh +966572737505 get cytotec
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
nirzagarg
 
怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制
怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制
怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制
vexqp
 

Recently uploaded (20)

一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
一比一原版(曼大毕业证书)曼尼托巴大学毕业证成绩单留信学历认证一手价格
 
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book nowVadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
 
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...Reconciling Conflicting Data Curation Actions:  Transparency Through Argument...
Reconciling Conflicting Data Curation Actions: Transparency Through Argument...
 
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
怎样办理圣地亚哥州立大学毕业证(SDSU毕业证书)成绩单学校原版复制
 
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
 
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hapur [ 7014168258 ] Call Me For Genuine Models We ...
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
Aspirational Block Program Block Syaldey District - Almora
Aspirational Block Program Block Syaldey District - AlmoraAspirational Block Program Block Syaldey District - Almora
Aspirational Block Program Block Syaldey District - Almora
 
Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1Lecture_2_Deep_Learning_Overview-newone1
Lecture_2_Deep_Learning_Overview-newone1
 
Harnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptxHarnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptx
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 
Discover Why Less is More in B2B Research
Discover Why Less is More in B2B ResearchDiscover Why Less is More in B2B Research
Discover Why Less is More in B2B Research
 
SR-101-01012024-EN.docx Federal Constitution of the Swiss Confederation
SR-101-01012024-EN.docx  Federal Constitution  of the Swiss ConfederationSR-101-01012024-EN.docx  Federal Constitution  of the Swiss Confederation
SR-101-01012024-EN.docx Federal Constitution of the Swiss Confederation
 
Cytotec in Jeddah+966572737505) get unwanted pregnancy kit Riyadh
Cytotec in Jeddah+966572737505) get unwanted pregnancy kit RiyadhCytotec in Jeddah+966572737505) get unwanted pregnancy kit Riyadh
Cytotec in Jeddah+966572737505) get unwanted pregnancy kit Riyadh
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 
7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.ppt7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.ppt
 
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
SAC 25 Final National, Regional & Local Angel Group Investing Insights 2024 0...
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
 
Digital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham WareDigital Transformation Playbook by Graham Ware
Digital Transformation Playbook by Graham Ware
 
怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制
怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制
怎样办理纽约州立大学宾汉姆顿分校毕业证(SUNY-Bin毕业证书)成绩单学校原版复制
 

Site surveying report 1

  • 1. 1 BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB60103103946-M - SITE SURVEYING Fieldwork Report 1 TITLE: LEVELING Name Student ID Yeo Dor Een 0316224 Welson Lum Wei Jiunn 0319514 Yap Jia En 0319550 Yong Sing Yew 0318766
  • 2. 2 Table of Content Content Pages Cover Page 1 Table of Content 2 Introduction to Leveling 3-5 Introduction of Apparatus 6-11 Data and Results 12-14 Discussion 16
  • 3. 3 INTRODUCTION TO LEVELING Leveling may be part of determine the relative heights or elevation of points are object on the earth’s surface. It deal with measurements in a vertical plane. It is also a level surface that everywhere at right angles to the direction of gravity of the earth. OBJECTIVES The objectives of this field work 1 (Leveling) is to: a) To give definitions as a basic for the proper understanding of leveling b) To understand the methods used in leveling c) To understand the collimation method and rise and fall method There are few definitions of terms used in leveling which are: DATUM A datum may be a surface or a line to which observed heights are related. It is any arbitrarily assumed level surface or line from which vertical distances are measured in India the datum adopted for G.T.S. bench marks is the mean sea level at Karachi now in Pakistan. There are two types of datum which are: a) The ordnance datum (O.D) is the datum to which all heights shown on Ordnance Sydney (O.S) maps are referred. The datum line is the mean sea level at Liverpool datum b) Assumed datum is used where it is inconvenient or impossible to relate the work in hand to the ordnance datum. BENCH-MARK (B.M) Bench-mark is a fixed point of know height above O.D from which the height above O.D of any other point may be pointed. Bench-mark also used as our starting point and ending point during our field work.
  • 4. 4 REDUCED LEVEL A reduced level is the height of a point or object stated with reference to the selected datum for the work in hand. The reduced level can be increase or decrease at every points depends on the datum. There are some formula to get the amount of reduce level which are: a) The height of instrument - Back sight= Reduced level (Collimation method) b) The previous height of instrument – (I.S) or (B.s)= Reduced level(Collimation Method) For the rise and fall method is use the previous B.S to minus the I.S or F.S to get the amount which will be negative or positive amount and add them with the reduced level of the previous B.S. LINE OF COLLIMATION It is the line joining the intersection of cross hairs of the optical center of the object glass. The line extending from an instrument along which distance objects are seen, when viewed with the telescope. It also called the line of sight.
  • 5. 5 BACKSIGHT Back-sight is the first sight reading taken after the instrument has been set up. The sight taken to a point whose height is known, has been assumed, or can be calculated. Its abbreviated is called B.S and is taken at the start of the work at and a change point. FORESGHT Foresight also called the last staff reading denoting the shifting of the instrument. It is a termed as minus sight. It is abbreviated to F.S and is taken a change point and at the end of operations. INTERMEDIATE SIGHT Intermediate sight is the sight or reading that take between the F.S and B.S. It is abbreviated to I.S. CHANGE POINT It is appoint denoting the shifting of the level. It is after the reading of B.S and F.S where the instrument is ready to move to a new position. It is abbreviated to C.P. A bench-mark may also be taken as a changer point and it also called a turning point (T.P).
  • 6. 6 APPARATUS USED Telescope/Digital Level 1. Object Lens 2. Focusing Screw 3. Focusing Lens 4. Diaphragm 5. Eyepiece
  • 7. 7 Tripod Stand It have 3 legs which can be extend to the height required. It function is to carry the Digital Level and it has a special screw is done purposely to lock the Optical Plummet which attached to the Digital Level. Optical Plummet A device which use to make sure the Digital Level is on the center position over a point.
  • 8. 8 Way to set-up the Optical Plummet so that the Digital Level are at the center position Rotate A and B at the same time and C at the different time to adjust the bubble move into the center which mean the Digital Level is already in the center position. Do not rotate the three rotate buttons at the same time.
  • 9. 9 Pond Bubble -When pond bubble is centered this mean the instrument’s standing axis is approximately vertical. -The compensators in the instrument take over and adjust the optical of Line of Collimation so that it is horizontal. -When the instrument is rotated the compensator ensure that a horizontal plane of collimation is swept out.
  • 10. 10 E-type leveling ruler This type of ruler can allow us have a better vision on the reading compare to normal type ruler.
  • 11. 11 COMMON ERROR SOURCES There are always some common error sources due to the failure of the measurement. The common error sources are: a) Level rod not vertical b) Levelling rod not fully extended or incorrect length c) Level instrument not level d) Instrument out of adjustment e) Environment – wind and heat.
  • 12. 12 Data/ Result of Leveling Height of Collimation Method Backsight Intersight Foresight Height of Collimation Reduced Level 1.519 101.519 100.000 1.429 3.785 99.163 97.734 1.369 1.330 99.202 97.833 1.439 1.555 99.086 97.647 1.631 1.495 99.222 97.591 1.378 1.345 99.255 97.877 1.303 1.384 99.174 97.871 1.423 1.553 99.044 97.621 1.490 1.391 99.143 97.653 3.675 1.480 101.338 97.663 1.479 1.317 101.500 100.021 1.468 100.032 18.135 18.103 100.032 18.103 100.000 0.032 0.032 Rise and Fall Method Backsight Intersight Foresight Rise Fall Reduced Level 1.519 100.000 1.429 3.785 2.266 97.734 1.369 1.330 0.099 97.833 1.439 1.555 0.186 97.647 1.631 1.495 0.056 97.591 1.378 1.345 0.286 97.877 1.303 1.384 0.006 97.871 1.423 1.553 0.250 97.621 1.490 1.391 0.032 97.653 3.675 1.480 0.010 97.663 1.479 1.317 2.358 100.021 1.468 0.011 100.032 18.135 18.103 2.796 2.764 100.032 18.103 2.764 100.000 0.032 0.032 0.032
  • 13. 13 Adjusted Field Data Height of Collimation Method Backsight Intersight Foresight Height of Collimation Reduced Level Adjustment Final Reduce Level 1.519 101.519 100.000 100.000 1.429 3.785 99.163 97.734 -0.003 97.731 1.369 1.330 99.202 97.833 -0.006 97.827 1.439 1.555 99.086 97.647 -0.009 97.638 1.631 1.495 99.222 97.591 -0.012 97.579 1.378 1.345 99.255 97.877 -0.015 97.862 1.303 1.384 99.174 97.871 -0.018 97.853 1.423 1.553 99.044 97.621 -0.021 97.600 1.490 1.391 99.143 97.653 -0.024 97.629 3.675 1.480 101.338 97.663 -0.027 97.636 1.479 1.317 101.500 100.021 -0.030 99.991 1.468 100.032 -0.032 100.000 18.135 18.103 100.032 18.103 100.000 0.032 0.032 Arith. Checked Rise and Fall Method Backsight Intersight Foresight Rise Fall Reduced Level Adjustment Final Reduce Level 1.519 100.000 100.000 1.429 3.785 2.266 97.734 -0.003 97.731 1.369 1.330 0.099 97.833 -0.006 97.827 1.439 1.555 0.186 97.647 -0.009 97.638 1.631 1.495 0.056 97.591 -0.012 97.579 1.378 1.345 0.286 97.877 -0.015 97.862 1.303 1.384 0.006 97.871 -0.018 97.853 1.423 1.553 0.250 97.621 -0.021 97.600 1.490 1.391 0.032 97.653 -0.024 97.629 3.675 1.480 0.010 97.663 -0.027 97.636 1.479 1.317 2.358 100.021 -0.030 99.991 1.468 0.011 100.032 -0.032 100.000 18.135 18.103 2.796 2.764 100.032 18.103 2.764 100.000 0.032 0.032 0.032 Arith. Checked
  • 14. 14 Acceptable Error of closure = ±12 √k K = the number of set-ups ±12 √11 = ±39.799mm Hence, the leveling is acceptable. Correctionper set-up Error of misclosure ÷ Number of set up = (100.0000-100.032) ÷ 11 = -0.003 m
  • 15. 15 Discussion For the first fieldwork, we were required to set up the leveling instrument on a suitable spot. After finished set up, the height of instrument will remain the same for each observation made until the instrument is moved to a new position. Two persons carried their own level rods (vertical rods)stood at two different points and mark the places with correction fluid. Then, the level rods’ readings were measured and recorded. We were asked to measure 11 points (included bench- mark) with 10 set ups in this fieldwork. After that, calculate the readings we recorded in two methods which are height of collimation method and rise and fall method and calculate the reduced level of each station. To ensure the total readings are same or within the allowable error of closure, we use the formula of constant × √(distance). constant× √(distance) = ± 12 √k = ± 12 √11 = ± 39.799mm Therefore, the acceptable range for error of closure is ± 39.799mm. If the answer is over ± 39.799mm, we have to do the fieldwork again until we get it. For our group, we get the answer for the allowable error of closure, -0.032mm, thus it is acceptable. After that, we need to do adjustment table for height of collimation method and rise and fall method with this formula:
  • 16. 16 Correctionper set-up Error of misclosure ÷ Number of set up = (100.0000-100.032) ÷ 11 = -0.003 m Lastly, calculate the final reduced level with the addition of reduced level and adjustment.