COMMUNICATION
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.co.uk
COMMUNICATION
There are different communication instruments, such
as:
 e-mail
 document
 telephone
 meeting
 contracts
 specifications
 reports
 manuals
 schedules
 calculations
COMMUNICATION
 drawings
 computer files
 Disks
 print-outs
 photographs
 agenda’s and minutes of meetings
 The management of documentation and
communication used in a project is used by a
number of subcontractors, the storage and
retrieval thereof for further use.
COMMUNICATION
STANDARDISATION OF COMMUNICATION
 The main purpose of standardisation is to
develop a specific level of conformity.
 This process of standardisation has certain
advantages for the management of a project,
such as:
 Less different documents.
 Revised drawings overtake the other
drawings.
 Records are easy to handle.
COMMUNICATION
 Training is simpler and more uniform.
 Communication planning and especially -
control is simpler.
 Better utilisation of documents and the
compiling thereof.
 Easy to use in one project or another,
although these are totally different
projects.
COMMUNICATION
 Standardisation contributes to
increased productivity.
 The documents and communication
from one project to the next are the
same or similar.
 Therefore less confusion is created.
COMMUNICATION
COMMUNICATION PLAN
 Communication planning brings the
project together.
 The project manager and head office
staff are at the heart of the project’s
information and control system.
 It is the project manager’s responsibility
to develop the project organisation
structure.
 To develop the project’s communication
plan and lines of communication.
COMMUNICATION
The communication plan should outline:
 Who is responsible for lines of communication?
 Who is the sender and who is the receiver?
 What are the scope of communication and the format
adopted?
 How the message, drawings etc are send to all parties
interested.
 What method would be the most appropriate? Is it:
 e-mail
 document
 telephone
 meeting
COMMUNICATION
 presentation
 Feedback (confirm message received
and understood – document control)
Filing system:
 retrieval
 storing
 disaster recovery
COMMUNICATION
COMMUNICATION FLOW AND
INSTUMENTS
Formal communication
Communication flows in four directions:
1. downwards
2. upwards
3. Horizontally
4. laterally
These basic communication flows are:
Communication flows
COMMUNICATION
Informal communication
In the construction industry, the
following are informal communication
methods:
 Regular contact-face to face
 E mailing
 Phone call
 Team Meetings
COMMUNICATION
Project communication instruments
Project communication
 Internal
 External
 Between members of an organisation
at all levels in order to achieve a
mutual goal or goals.
COMMUNICATION
 To achieve goals, it is necessary to
communicate or interact at various levels of
the organisation.
 This is known as internal communication.
 Members also have to communicate with
individuals or groups who are not members
of the project.
 This is referred to as external
communication.
COMMUNICATION
Subcontractor BSubcontractor A
Web Browser
General
Contractor
Web Browser
Web Browser
XML XML
XML
Message
Agent
Message
Agent
Message
Agent
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Platform: IBM PC
OS: Linux
FTP server: WuFTP
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Data
Synchronization
Subcontractor BSubcontractor A
Web Browser
General
Contractor
Web Browser
Web Browser
XML XML
XML
Message
Agent
Message
Agent
Message
Agent
Message
Agent
Message
Agent
Message
Agent
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Platform: IBM PC
OS: Linux
FTP server: WuFTP
Platform: IBM PC
OS: Window 2000 Professional
FTP server: IIS 5.0
Data
Synchronization
COMMUNICATION
Time-Based
Schedule
WWP
Resource
Vendor
Item-Based
Schedule
Task-Based
Schedule
Work package
Breakdown
WWP
Planning
Resource
Limitation
Other External
Information
Other
participants
No
Yes
General
Contractor
Data Collection
Data Conversion
Communication
Time-Based
Schedule
WWP
Resource
Vendor
Item-Based
Schedule
Task-Based
Schedule
Work package
Breakdown
WWP
Planning
Resource
Limitation
Other External
Information
Other
participants
No
Yes
General
Contractor
Data Collection
Data Conversion
Communication
Weekly work plan (WWP)
COMMUNICATION-CITED-SMITH AND CRONJI
(2001)
Project communication instruments
COMMUNICATION AND
PRODUCTIVITY
RESEARCH MODEL
(Process model productivity on site)
 Organisational Factors
 Contract management
 Finance
 Etc
PROJECT WORK ENVIRONMENT
Pre-construction
Activities (1)
D1. Client brief
D2. Project objectives
D3. Specification
D4. Design/build-ability
D5. Contractual
arrangement
D6. Planning
D7. Scheduling
D8. Estimating
Site/Project
Manager (2)
Characteristics
D9. Experience/capability
D10. Leadership style
D11. Authority/influence
D12. Goal commitment
D13. Involvement
Labour (6)
Characteristics
D39. Subcontracting
Labour
D40. Direct labour
Management (3)
Factors
D14. Clarity of tasks
D15. Team work
D16. The style of
management
D17. Safety management
Management (4)
System
D18. Planning
D19. Communication
D20. Controlling
D21. Co-ordinating
Resource (5)
Management
D22. Labour selection
D23. Labour control
D24. Material selection
D25. Material handling
D26. Plant
D27. D31. Waste on site
D32. D38. Delay and
Disruption on site
Motivating
Factors (7)
D41-D46
Hygiene
Factors
D47-D55
P
R
O
D
U
C
T
I
V
I
T
Y
Project
Performance
 Time
 Cost
 Quality
 Safety
Job
SatisfactionEffort Rewards
Ability and Skill of worker
COMMUNICATION RANKING-
RESULT OF A SURVEY
Bivariate/ inferential analysis
 Bivariate/ inferential analysis
 examines the relationship between the research
variables and case studies
 by applying correlation coefficient and chi-
square test
 development of a hypothesis and sub-
hypothesis
COMMUNICATION RANKING-
RESULT OF A SURVEY
 16 case studies with a high level of
productivity.
 16 case studies with a low level of productivity
were investigated in the London area.
 All of the construction firms who participated
in the case studies are involved in providing
homes for Housing Associations.
COMMUNICATION
 In order to test the hypothesis and sub-
hypothesis the following technique was used:
 Data from the 32 case studies is fed onto a
spreadsheet containing all the information
that is related to site productivity.
 Communication was also amongst collected
data.
 The rating for communication was set from 1
to 5.
 Scale 1 is least and scale 5 is rated as best.
COMMUNICATION RANKING-
RESULT OF A SURVEY
 The relationship between influencing
factors and the productivity level is tested.
 The correlation co-efficient and the chi-
square test was used.
 Output from the analysis is tabulated and
highly significant factors affecting
productivity was ranked (see table below).
Determinants
(Variable)
Chi-square test
(x
2
)
Corrltn
Coefficient (r)
Significance
Level of
Association (p)
Ranks
Pre-Construction Activities
D1-Client brief
D2-Project objectives
D3-Specification
D4-Design and build-ability
D5-Contractual arrangement
D6-Planning
D7-Scheduling
D8-Estimating
8.14
6.14
13.32
12.83
12.50
6.15
8.96
6.14
0.67
0.41
0.67
0.74
0.55
0.48
0.61
0.36
P<0.01
P<0.01
P<0.001
P<0.001
P<0.001
P<0.01
P<0.001
P<0.01
5th
7
th
1
st
2
nd
3
rd
6th
4
th
8
th
Resultsrelatingtoproject/sitemanagercharacteristic
Determinant
(Variable)
Chi-squaretest
(x
2
)
Corrltn
Coefficient(r)
Significance
Levelof
Association(p)
Rank
s
Site/Projectmanagercharacteristic
D9-Experience/capability
D10-Managerleadershipstyle
D11-Authority/influence
D12-Goalcommitment
D13-Project/sitemanager
involvement
21.20
10.16
21.89
12.48
8.54
0.87
0.48
0.69
0.62
0.61
P<0.001
P<0.001
P<0.001
P<0.001
P<0.001
2
nd
4
th
1
st
3
rd
5
th
Determinant
(Variable)
Chi-squaretest
(x2
)
Corrltn
Coefficient(r)
Significance
Levelof
Association(p)
Rank
s
ManagementFactor
D14-Clarityoftasks
D15-Teamwork
D16-Thestyleofmanagement
D17-Safetymanagement
12.52
12.52
10.16
6.14
0.75
0.62
0.64
0.36
P<0.001
P<0.001
P<0.001
P<0.001
1
st
2
nd
3rd
4
th
Determinant
(Variable)
Chi-square test
(x
2
)
Corrltn
Coefficient (r)
Significance
Level of
Association (p)
Resource Management-Box 4
D18-Labour Selection 1.24 -0.09 P<0.1(No
significance)
D19-Labour Control 21.20 0.75 P<0.001
D20-Material Selection 21.20 0.67 P<0.001
D21-Material Handling 10.78 0.74 P<0.001
D22-Plant 10.90 0.56 P<0.001
Waste on site following
D29-Design change 1.12 0.42 P<0.1(No
significance)
D30- Design error 8.0 0.55 P<0.001
D31-Bad workmanship 9.14 0.56 P<0.001
D32-Bad handling of material 0.5 0.09 P<0.5(No
significance)
Delays and Disruption on site
Caused by
D34-Contractors action 9.62 0.72 P<0.001
D35-Late arrival of materials
Determinant (variable)
5.58 0.34 P<0.01
D36-Late arrival of machinery 2.1 0.28 P<0.1(No
significance)
D37-Client’s action 1.65 0.34 P<0.1(No
significance)
D38-Design team mistakes 1.13 0.17 P<0.1(No
significance)
D39-Sub-contractors action 1.14 0.39 P<0.1(No
significance)
D40-Bad weather 0.28 0.18 P<0.5(No
significance)
Determinant
(Variable)
Chi-square test
(x
2
)
Corrltn
Coefficient (r)
Significance
Level of
Association (p)
Rank
s
Management System
D23-Site planning
D24-Communication
D25-Controlling
D26-Coordinating
8.53
12.50
4.50
15.40
0.34
0.68
0.42
0.74
P<0.001
P<0.001
P<0.02
P<0.001
3rd
2
nd
4th
1
st
Results related to labour characteristics
Determinant
(Variable)
Chi-square test
(x
2
)
Carlton
Coefficient (r)
Significance
Level of
Association (p)
Rank
s
Labour Characteristics
D27-Subcontracting Labour
D28-Direct Labour
28.24
17.88
0.87
0.72
P<0.001
P<0.001
1
st
2
nd
Results related motivating factors and hygiene factors
Determinants
(Variable)
Chi-square test
(x
2
)
Corrltn
Coefficient (r)
Significance
Level of
Association (p)
Rank
s
Motivating Factors
D41-Achievement
D42-Recognition
D43-Work itself
D44-Responsibility
D45-Advancement
D46-Growth
Hygiene Factors
D47-Company policy
D48-Supervision
D49-Relationship with above
D50- Relationship with equal
D51- Relationship with below
D52-Status
D53-Job security
D54-Salary
D55-Personal Factors
15.39
8.13
0.82
16.00
15.18
4.38
0.18
20.74
6.16
6.14
6.35
0.53
8.53
17.89
0
0.77
0.48
0.13
0.94
0.56
0.44
0.21
0.94
0.30
0.43
0.38
-0.17
0.55
0.82
-0.19
P<0.001
P<0.001
P<0.1 (no
significance)
P<0.001
P<0.001
P<0.02 (no
significance)
P<0.5 (no
significance)
P<0.001
P<0.01
P<0.01
P<0.01
P<0.5 (no
significance)
P<0.001
P<0.001
4
th
8
th
12th
3
rd
5
th
11
th
14
th
1
st
9
th
10
th
7
th
13
th
6
th
2nd
15
1h
DEVELOPMENT OF A MODEL
 CONSIDER VARIABLES WITHIN THE
PROCESS MODEL
 CONSIDER ALL SFACTORS-
INETERNAL AND EXTERNAL
 DEVELOP A RELATIONSHIP BETWEEN
PRODUCTIVITY AND EFFECTIVE
COMMUNICATION
 DEVELOP A PROCESS MODEL
 READ ABOUT PRINCE 2-NOT
RECOMMENDED.

More Related Content

What's hot

INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...
INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...
INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...cscpconf
 
Project communication management
Project communication managementProject communication management
Project communication managementdyaksa hanindito
 
Robert brownresume nov1
Robert brownresume nov1Robert brownresume nov1
Robert brownresume nov1Bob Brown
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
Software design (SWEBOK3 Knowledge area)
Software design (SWEBOK3 Knowledge area)Software design (SWEBOK3 Knowledge area)
Software design (SWEBOK3 Knowledge area)Ashikur Rahman
 
MODELS OF IT-PROJECT MANAGEMENT
MODELS OF IT-PROJECT MANAGEMENTMODELS OF IT-PROJECT MANAGEMENT
MODELS OF IT-PROJECT MANAGEMENTijcsit
 

What's hot (6)

INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...
INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...
INCREASING THE ARCHITECTURES DESIGN QUALITY FOR MAS: AN APPROACH TO MINIMIZE ...
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Robert brownresume nov1
Robert brownresume nov1Robert brownresume nov1
Robert brownresume nov1
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Software design (SWEBOK3 Knowledge area)
Software design (SWEBOK3 Knowledge area)Software design (SWEBOK3 Knowledge area)
Software design (SWEBOK3 Knowledge area)
 
MODELS OF IT-PROJECT MANAGEMENT
MODELS OF IT-PROJECT MANAGEMENTMODELS OF IT-PROJECT MANAGEMENT
MODELS OF IT-PROJECT MANAGEMENT
 

Similar to 017 communication

049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity 049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity Dr Fereidoun Dejahang
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructabilitydrdej19
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxclarebernice
 
10. Project Communications Management.pptx
10. Project Communications Management.pptx10. Project Communications Management.pptx
10. Project Communications Management.pptxKamranKhan353531
 
Communication Management
Communication ManagementCommunication Management
Communication ManagementSanjay Rajpoot
 
Communication a success to project management
Communication a success to project managementCommunication a success to project management
Communication a success to project managementShankar Mandapaka
 
Improving IT Project Communication
Improving IT Project CommunicationImproving IT Project Communication
Improving IT Project Communicationarshriz
 
Chapter15 -- implementing and managing networks
Chapter15  -- implementing and managing networksChapter15  -- implementing and managing networks
Chapter15 -- implementing and managing networksRaja Waseem Akhtar
 
Communication management
Communication management Communication management
Communication management ammara2010
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course reviewAsa Chan
 
TaskNetworking Systems Administration StudentsTaskBased on y.docx
TaskNetworking  Systems Administration StudentsTaskBased on y.docxTaskNetworking  Systems Administration StudentsTaskBased on y.docx
TaskNetworking Systems Administration StudentsTaskBased on y.docxjohniemcm5zt
 
Project communication management
Project communication  managementProject communication  management
Project communication managementyouness jabbar
 
Technology supported requirement handling an estimation
Technology supported requirement handling an estimationTechnology supported requirement handling an estimation
Technology supported requirement handling an estimationKjetil Moløkken-Østvold
 
10 me667 chap5 coordination and control
10 me667 chap5 coordination and control10 me667 chap5 coordination and control
10 me667 chap5 coordination and controlPavan Kumar
 
Project communication management
Project communication managementProject communication management
Project communication managementSaad Al Jabri
 

Similar to 017 communication (20)

017 communication
017 communication017 communication
017 communication
 
017 communication
017 communication017 communication
017 communication
 
049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity 049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity
 
049 integration of constructability
049 integration of constructability049 integration of constructability
049 integration of constructability
 
Communications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docxCommunications Management PlanProject NameTable of Contents.docx
Communications Management PlanProject NameTable of Contents.docx
 
10. Project Communications Management.pptx
10. Project Communications Management.pptx10. Project Communications Management.pptx
10. Project Communications Management.pptx
 
Communication Management
Communication ManagementCommunication Management
Communication Management
 
Communication a success to project management
Communication a success to project managementCommunication a success to project management
Communication a success to project management
 
Pmp communication chapter 10
Pmp communication chapter 10Pmp communication chapter 10
Pmp communication chapter 10
 
Improving IT Project Communication
Improving IT Project CommunicationImproving IT Project Communication
Improving IT Project Communication
 
Chapter15 -- implementing and managing networks
Chapter15  -- implementing and managing networksChapter15  -- implementing and managing networks
Chapter15 -- implementing and managing networks
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Communication management
Communication management Communication management
Communication management
 
Is5540 course review
Is5540 course reviewIs5540 course review
Is5540 course review
 
TaskNetworking Systems Administration StudentsTaskBased on y.docx
TaskNetworking  Systems Administration StudentsTaskBased on y.docxTaskNetworking  Systems Administration StudentsTaskBased on y.docx
TaskNetworking Systems Administration StudentsTaskBased on y.docx
 
10 communication
10 communication10 communication
10 communication
 
Project communication management
Project communication  managementProject communication  management
Project communication management
 
Technology supported requirement handling an estimation
Technology supported requirement handling an estimationTechnology supported requirement handling an estimation
Technology supported requirement handling an estimation
 
10 me667 chap5 coordination and control
10 me667 chap5 coordination and control10 me667 chap5 coordination and control
10 me667 chap5 coordination and control
 
Project communication management
Project communication managementProject communication management
Project communication management
 

More from Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrun028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrun028 fast-tracking projects &amp; cost overrun
028 fast-tracking projects &amp; cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 

Recently uploaded

Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 

Recently uploaded (20)

Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 

017 communication