Network Construction Dr. Mahmoud Abbas Mahmoud
0
Network Construction
Dr. Mahmoud Abbas Mahmoud
Assistant Professor
2016
Network Construction Dr. Mahmoud Abbas Mahmoud
1
Network Construction
1- Introduction
Network scheduling is a technique used for planning, and scheduling large
projects in the field of construction, maintenance, fabrication, purchasing
computer system etc. The technique is a method of minimizing the trouble spots
such as production, delays and interruptions, by determining critical factors and
coordinating various parts of the overall job. There are two basic planning and
control technique that utilize a network to complete a predetermined project or
schedule. These are Programme Evaluation and Review Technique (PERT) and
Critical Path Method (CPM). A project is defined as a combination of interrelated
activities all of which must be executed in a certain order for its completion
2- Basic Terms
To understand the network techniques one should be familiar with a few basic
terms of which both CPM and PERT are special applications.
Network It is the graphic representation of logically and sequentially connected
activities. Note: There are two types of network diagrams.
(i) Activity on Arrow (AOA) diagram or Arrow Diagram
(ii) Activity on Node (AON) diagram or Precedence Diagram Method (PDM)
In the following sections we will explain how to construct (AOA) diagram which
also called arrow diagram, while (AON) diagram will be explained later on.
Activity An activity represents some action and is a time consuming effort
necessary to complete a particular part of the overall project. Thus, each and every
activity has a point of time where it begins and a point where it ends. It is
represented in the network by an arrow as follows.
Here A is called the activity and i and j are start and end nodes.
Event The beginning and end points of an activity are called events or nodes.
Event is a point in the time and does not consume any resources. It is represented
Network Construction Dr. Mahmoud Abbas Mahmoud
2
by a numbered circle. The head event called the jth event has always a number
higher than the tail event called the ith event.
Merge and burst events it is not necessary for an event to be the ending event of
only one activity but can be the ending event of two or more activities. Such event
is defined as a Merge event.
If the event happens to be the beginning event of two or more activities it is
defined as a Burst event
Preceding, succeeding and concurrent activities
Activities which must be accomplished before a given event can occur are termed
as preceding activities.
Activities which cannot be accomplished until an event has occurred are termed
as succeeding activities.
Activities which can be accomplished concurrently are known as concurrent
activities.
This classification is relative, which means that one activity can be preceding to
a certain event, and the same activity can be succeeding to some other event or it
may be a concurrent activity with one or more activities.
Network Construction Dr. Mahmoud Abbas Mahmoud
3
Dummy activity certain activities which neither consumes time nor resources but
are used simply to represent a connection or a link between the events are known
as dummies. It is shown in the network by a dotted line. The purpose of
introducing dummy activity is -
(i) To maintain uniqueness in the numbering system as every activity may have
distinct set of events by which the activity can be identified.
(ii) To maintain a proper logic in the network.
Note: No two activities can be identified by the same beginning and end event. In
such cases, a dummy activity is introduced to resolve the problem.
3- Common Errors
Following are the three common errors in a network construction:
Looping (cycling): In a network diagram looping error is also known as cycling
error. Drawing an endless loop in a network is known as error of looping. A loop
can be formed if an activity were represented as going back in line.
Dangling To disconnect an activity before the completion of all the activities in
a network diagram is known as Dangling.
Network Construction Dr. Mahmoud Abbas Mahmoud
4
Redundancy If a dummy activity is the only activity emanating from an event
and which can be eliminated is known as redundancy.
4- Rules of Network Construction
There are number of rules in connection with the handling of events and activities
of a project network that should be followed.
(i) Try to avoid arrows which cross each other.
(ii) Use straight arrows.
(iii) No event can occur until every activity preceding, it has been completed.
(iv) An event cannot occur twice i.e. there must be no loops.
(v) An activity succeeding an event cannot be started until that event has occurred.
(vi) Use arrows from left to right. Avoid mixing two directions, vertical and
standing arrows may be used if necessary.
(vii) Dummies should be introduced if it is extremely necessary.
(viii) The network has only one entry point called the start event and one point of
emergence called the end or terminal event.
Numbering the Events
After the network is drawn in a logical sequence every event is assigned a number.
The number sequence must be such so as to reflect the flow of the network. In
numbering the events the following rules should be observed.
(i) Event numbers should be unique.
(ii) Event numbering should be carried out on a sequential basis from left to right.
(iii) The initial event which has all outgoing arrows with no incoming arrow is
numbered as 1.
(iv) Delete all arrows emerging from all the numbered events. This will
create at least one new start event out of the preceding events.
Network Construction Dr. Mahmoud Abbas Mahmoud
5
(v) Number all new start events 2,3 and so on. Repeat this process until all the
terminal event without any successor activity is reached, number the terminal
node suitably.
Note: The head of an arrow should always bear a number higher than the one
assigned to the tail of the arrow.
EXAMPLE- 1
Construct the arrow diagram comprising activities A, B, C, ……….., and L, such
that the following relationships are satisfied.
1. A, B, and C, the first activities of the project, can start simultaneously.
2. A and B precede D.
3. B precedes E, F, and H.
4. F and C precede G.
5. E and H precede I and J.
6. C, D, F, and J precede K.
7. K precedes L.
8. I, G, and L are the terminal activities of the project.
SOLUTION
The resulting arrow diagram is shown below. The diagram shows that the dummy
activities D1 and D2 are used to establish correct precedence relationships. D3 is
used to identify activities E and H with unique end events. The event of the project
are numbered such that their ascending order indicates the direction of progress
in the project.
Network Construction Dr. Mahmoud Abbas Mahmoud
6
EXAMPLE- 2
Construct a network for the project whose activities and their precedence
relationships are as given in Table 1:
TABLE 1
Activity A B C D E F G H I
Predecessor
Activity
- A A - D B, C, E F D G, H
SOLUTION From the given constraints, it is clear that A, D are the starting
activity and I the terminal activity. B, C are starting with the same event and are
both the predecessors of the activity F. Also E has to be the predecessor of F.
Hence, we have to introduce a dummy activity.
Network Construction Dr. Mahmoud Abbas Mahmoud
7
D1 is the dummy activity.
Finally we have the following network.
EXAMPLE- 3
Construct a network for the project whose activities and their precedence
relationships are as given in Table 2.
TABLE 2
Activity A B C D E F G H I J K
Predecessor
Activity
- - - A C B, D B, D E, F A G, H E, F
SOLUTION
Network Construction Dr. Mahmoud Abbas Mahmoud
8
Network Construction Dr. Mahmoud Abbas Mahmoud
9
Network Construction Dr. Mahmoud Abbas Mahmoud
10
EXAMPLE- 4
Construct the network for the project whose activities, their durations and their
precedence relationships are as given in Table 3:
(Note: In this Example durations are given therefore durations should be
mentioned on the network)
TABLE 3
Activity
Predecessor
Activity
Duration
A - 2
B A 6
C B 6
D B 1
E A 3
F E, D 3
G C, F 2
SOLUTION

More Related Content

What's hot

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULEAjeesh Mk
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Akaresh Jose Kaviyil JY
 
time cost trade off
 time cost trade off time cost trade off
time cost trade offbriankirui9
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisAsif Sultan Razu
 
Critical path method (cpm)
Critical path method (cpm)Critical path method (cpm)
Critical path method (cpm)hoang tung
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management A Makwana
 
4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculations4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculationsVishal Tidake
 
Unit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertUnit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertDagnaygebawGoshme
 
PERT and CPM
PERT and CPMPERT and CPM
PERT and CPMstudent
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineeringrathodjaydeep2
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource SmoothingDavidMcLachlan1
 

What's hot (20)

PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Network analysis
Network analysisNetwork analysis
Network analysis
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
time cost trade off
 time cost trade off time cost trade off
time cost trade off
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Critical path method (cpm)
Critical path method (cpm)Critical path method (cpm)
Critical path method (cpm)
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
 
4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculations4.10 determination of float & slack in cpm network calculations
4.10 determination of float & slack in cpm network calculations
 
Unit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pertUnit.6. network analysis with cpm and pert
Unit.6. network analysis with cpm and pert
 
PERT and CPM
PERT and CPMPERT and CPM
PERT and CPM
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
Network Techniques
Network TechniquesNetwork Techniques
Network Techniques
 
Bar chart
Bar chartBar chart
Bar chart
 
Cpm pert
Cpm pertCpm pert
Cpm pert
 
Per tand project crashing
Per tand project crashingPer tand project crashing
Per tand project crashing
 
Pert & Cpm
Pert & CpmPert & Cpm
Pert & Cpm
 
Project Management - Critical path method
Project Management - Critical path methodProject Management - Critical path method
Project Management - Critical path method
 
6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing6.5 Resource Leveling and Resource Smoothing
6.5 Resource Leveling and Resource Smoothing
 

Similar to Network construction

Similar to Network construction (20)

CPM and PERT
CPM and  PERTCPM and  PERT
CPM and PERT
 
PERT-CPM PPT.pptx
PERT-CPM PPT.pptxPERT-CPM PPT.pptx
PERT-CPM PPT.pptx
 
Ovi project
Ovi  projectOvi  project
Ovi project
 
CPM PERT.pptx
CPM PERT.pptxCPM PERT.pptx
CPM PERT.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and scheduling
 
Ii. pert cpm
Ii. pert cpmIi. pert cpm
Ii. pert cpm
 
Pert cpm-22-3-21
Pert cpm-22-3-21Pert cpm-22-3-21
Pert cpm-22-3-21
 
Appliedresearchmethodologylecture1 111207045430-phpapp01
Appliedresearchmethodologylecture1 111207045430-phpapp01Appliedresearchmethodologylecture1 111207045430-phpapp01
Appliedresearchmethodologylecture1 111207045430-phpapp01
 
Network problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMARNetwork problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMAR
 
EEM MID2.PPT.pptx
EEM MID2.PPT.pptxEEM MID2.PPT.pptx
EEM MID2.PPT.pptx
 
Operation research's CPM techniques
Operation research's CPM techniques Operation research's CPM techniques
Operation research's CPM techniques
 
Cpm network analysis and problems
Cpm network analysis and problemsCpm network analysis and problems
Cpm network analysis and problems
 
PERT AND CPM 2.pdf
PERT AND CPM  2.pdfPERT AND CPM  2.pdf
PERT AND CPM 2.pdf
 
Spm
SpmSpm
Spm
 
Network analysis
Network analysisNetwork analysis
Network analysis
 
Pert & cpm
Pert & cpmPert & cpm
Pert & cpm
 
Lecture 2 PERT-CPM.pdf
Lecture 2 PERT-CPM.pdfLecture 2 PERT-CPM.pdf
Lecture 2 PERT-CPM.pdf
 
IGNOU PERT CPM
IGNOU PERT CPMIGNOU PERT CPM
IGNOU PERT CPM
 
Pert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOLPert cpm SIDDANNA M BALAPGOL
Pert cpm SIDDANNA M BALAPGOL
 

More from Dr. Mahmoud Al-Naimi

أسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfأسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfDr. Mahmoud Al-Naimi
 
Certificate - Dr. Mahmoud AL-Naimi
Certificate  - Dr. Mahmoud AL-NaimiCertificate  - Dr. Mahmoud AL-Naimi
Certificate - Dr. Mahmoud AL-NaimiDr. Mahmoud Al-Naimi
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعDr. Mahmoud Al-Naimi
 
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةكيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةDr. Mahmoud Al-Naimi
 
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...Dr. Mahmoud Al-Naimi
 
أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)Dr. Mahmoud Al-Naimi
 
Product design and manufacture lecture 1
Product design and manufacture lecture  1Product design and manufacture lecture  1
Product design and manufacture lecture 1Dr. Mahmoud Al-Naimi
 
Easy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsEasy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsDr. Mahmoud Al-Naimi
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Dr. Mahmoud Al-Naimi
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationDr. Mahmoud Al-Naimi
 
ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق Dr. Mahmoud Al-Naimi
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Dr. Mahmoud Al-Naimi
 
Computer in Design and Manufacturing
Computer in Design and Manufacturing Computer in Design and Manufacturing
Computer in Design and Manufacturing Dr. Mahmoud Al-Naimi
 
إنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةإنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةDr. Mahmoud Al-Naimi
 

More from Dr. Mahmoud Al-Naimi (20)

أسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdfأسلوب تقييم ومراجعة المشروع (بيرت).pdf
أسلوب تقييم ومراجعة المشروع (بيرت).pdf
 
Certificate - Dr. Mahmoud AL-Naimi
Certificate  - Dr. Mahmoud AL-NaimiCertificate  - Dr. Mahmoud AL-Naimi
Certificate - Dr. Mahmoud AL-Naimi
 
ملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريعملاحظات مهمة عن تعجيل المشاريع
ملاحظات مهمة عن تعجيل المشاريع
 
Resource allocation and smoothing
Resource allocation and smoothingResource allocation and smoothing
Resource allocation and smoothing
 
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفةكيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
كيفية حساب إحتمالية إنجاز المشروع باستخدام طرق وجدوال مختلفة
 
(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...(AOA) and (AON) Network construction and critical path calculations (using fo...
(AOA) and (AON) Network construction and critical path calculations (using fo...
 
أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)أسلوب تقييم ومراجعة المشروع (PERT)
أسلوب تقييم ومراجعة المشروع (PERT)
 
(Aoa) and (aon) networks
(Aoa) and (aon) networks(Aoa) and (aon) networks
(Aoa) and (aon) networks
 
Applications dr. mahmoud al-naimi
Applications   dr. mahmoud al-naimiApplications   dr. mahmoud al-naimi
Applications dr. mahmoud al-naimi
 
Product design and manufacture lecture 1
Product design and manufacture lecture  1Product design and manufacture lecture  1
Product design and manufacture lecture 1
 
Easy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projectsEasy steps to critical path determination and floats calculations for projects
Easy steps to critical path determination and floats calculations for projects
 
Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations Step by step network construction and (cpm) calculations
Step by step network construction and (cpm) calculations
 
Easy steps to network construction and critical path determination
Easy steps to network construction and critical path determinationEasy steps to network construction and critical path determination
Easy steps to network construction and critical path determination
 
ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق ألأستدامة والتصنيع الرشيق
ألأستدامة والتصنيع الرشيق
 
Control charts for variables
Control charts for variables Control charts for variables
Control charts for variables
 
Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)Just in time (jit), lean, and toyota production system (tps)
Just in time (jit), lean, and toyota production system (tps)
 
Evolution of mrp type systems
Evolution of mrp type systemsEvolution of mrp type systems
Evolution of mrp type systems
 
Computer in Design and Manufacturing
Computer in Design and Manufacturing Computer in Design and Manufacturing
Computer in Design and Manufacturing
 
إنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكيةإنشاء ورسم المخططات الشبكية
إنشاء ورسم المخططات الشبكية
 
Production planning hierarchy
Production planning hierarchyProduction planning hierarchy
Production planning hierarchy
 

Recently uploaded

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxPurva Nikam
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
An introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptxAn introduction to Semiconductor and its types.pptx
An introduction to Semiconductor and its types.pptx
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Network construction

  • 1. Network Construction Dr. Mahmoud Abbas Mahmoud 0 Network Construction Dr. Mahmoud Abbas Mahmoud Assistant Professor 2016
  • 2. Network Construction Dr. Mahmoud Abbas Mahmoud 1 Network Construction 1- Introduction Network scheduling is a technique used for planning, and scheduling large projects in the field of construction, maintenance, fabrication, purchasing computer system etc. The technique is a method of minimizing the trouble spots such as production, delays and interruptions, by determining critical factors and coordinating various parts of the overall job. There are two basic planning and control technique that utilize a network to complete a predetermined project or schedule. These are Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM). A project is defined as a combination of interrelated activities all of which must be executed in a certain order for its completion 2- Basic Terms To understand the network techniques one should be familiar with a few basic terms of which both CPM and PERT are special applications. Network It is the graphic representation of logically and sequentially connected activities. Note: There are two types of network diagrams. (i) Activity on Arrow (AOA) diagram or Arrow Diagram (ii) Activity on Node (AON) diagram or Precedence Diagram Method (PDM) In the following sections we will explain how to construct (AOA) diagram which also called arrow diagram, while (AON) diagram will be explained later on. Activity An activity represents some action and is a time consuming effort necessary to complete a particular part of the overall project. Thus, each and every activity has a point of time where it begins and a point where it ends. It is represented in the network by an arrow as follows. Here A is called the activity and i and j are start and end nodes. Event The beginning and end points of an activity are called events or nodes. Event is a point in the time and does not consume any resources. It is represented
  • 3. Network Construction Dr. Mahmoud Abbas Mahmoud 2 by a numbered circle. The head event called the jth event has always a number higher than the tail event called the ith event. Merge and burst events it is not necessary for an event to be the ending event of only one activity but can be the ending event of two or more activities. Such event is defined as a Merge event. If the event happens to be the beginning event of two or more activities it is defined as a Burst event Preceding, succeeding and concurrent activities Activities which must be accomplished before a given event can occur are termed as preceding activities. Activities which cannot be accomplished until an event has occurred are termed as succeeding activities. Activities which can be accomplished concurrently are known as concurrent activities. This classification is relative, which means that one activity can be preceding to a certain event, and the same activity can be succeeding to some other event or it may be a concurrent activity with one or more activities.
  • 4. Network Construction Dr. Mahmoud Abbas Mahmoud 3 Dummy activity certain activities which neither consumes time nor resources but are used simply to represent a connection or a link between the events are known as dummies. It is shown in the network by a dotted line. The purpose of introducing dummy activity is - (i) To maintain uniqueness in the numbering system as every activity may have distinct set of events by which the activity can be identified. (ii) To maintain a proper logic in the network. Note: No two activities can be identified by the same beginning and end event. In such cases, a dummy activity is introduced to resolve the problem. 3- Common Errors Following are the three common errors in a network construction: Looping (cycling): In a network diagram looping error is also known as cycling error. Drawing an endless loop in a network is known as error of looping. A loop can be formed if an activity were represented as going back in line. Dangling To disconnect an activity before the completion of all the activities in a network diagram is known as Dangling.
  • 5. Network Construction Dr. Mahmoud Abbas Mahmoud 4 Redundancy If a dummy activity is the only activity emanating from an event and which can be eliminated is known as redundancy. 4- Rules of Network Construction There are number of rules in connection with the handling of events and activities of a project network that should be followed. (i) Try to avoid arrows which cross each other. (ii) Use straight arrows. (iii) No event can occur until every activity preceding, it has been completed. (iv) An event cannot occur twice i.e. there must be no loops. (v) An activity succeeding an event cannot be started until that event has occurred. (vi) Use arrows from left to right. Avoid mixing two directions, vertical and standing arrows may be used if necessary. (vii) Dummies should be introduced if it is extremely necessary. (viii) The network has only one entry point called the start event and one point of emergence called the end or terminal event. Numbering the Events After the network is drawn in a logical sequence every event is assigned a number. The number sequence must be such so as to reflect the flow of the network. In numbering the events the following rules should be observed. (i) Event numbers should be unique. (ii) Event numbering should be carried out on a sequential basis from left to right. (iii) The initial event which has all outgoing arrows with no incoming arrow is numbered as 1. (iv) Delete all arrows emerging from all the numbered events. This will create at least one new start event out of the preceding events.
  • 6. Network Construction Dr. Mahmoud Abbas Mahmoud 5 (v) Number all new start events 2,3 and so on. Repeat this process until all the terminal event without any successor activity is reached, number the terminal node suitably. Note: The head of an arrow should always bear a number higher than the one assigned to the tail of the arrow. EXAMPLE- 1 Construct the arrow diagram comprising activities A, B, C, ……….., and L, such that the following relationships are satisfied. 1. A, B, and C, the first activities of the project, can start simultaneously. 2. A and B precede D. 3. B precedes E, F, and H. 4. F and C precede G. 5. E and H precede I and J. 6. C, D, F, and J precede K. 7. K precedes L. 8. I, G, and L are the terminal activities of the project. SOLUTION The resulting arrow diagram is shown below. The diagram shows that the dummy activities D1 and D2 are used to establish correct precedence relationships. D3 is used to identify activities E and H with unique end events. The event of the project are numbered such that their ascending order indicates the direction of progress in the project.
  • 7. Network Construction Dr. Mahmoud Abbas Mahmoud 6 EXAMPLE- 2 Construct a network for the project whose activities and their precedence relationships are as given in Table 1: TABLE 1 Activity A B C D E F G H I Predecessor Activity - A A - D B, C, E F D G, H SOLUTION From the given constraints, it is clear that A, D are the starting activity and I the terminal activity. B, C are starting with the same event and are both the predecessors of the activity F. Also E has to be the predecessor of F. Hence, we have to introduce a dummy activity.
  • 8. Network Construction Dr. Mahmoud Abbas Mahmoud 7 D1 is the dummy activity. Finally we have the following network. EXAMPLE- 3 Construct a network for the project whose activities and their precedence relationships are as given in Table 2. TABLE 2 Activity A B C D E F G H I J K Predecessor Activity - - - A C B, D B, D E, F A G, H E, F SOLUTION
  • 9. Network Construction Dr. Mahmoud Abbas Mahmoud 8
  • 10. Network Construction Dr. Mahmoud Abbas Mahmoud 9
  • 11. Network Construction Dr. Mahmoud Abbas Mahmoud 10 EXAMPLE- 4 Construct the network for the project whose activities, their durations and their precedence relationships are as given in Table 3: (Note: In this Example durations are given therefore durations should be mentioned on the network) TABLE 3 Activity Predecessor Activity Duration A - 2 B A 6 C B 6 D B 1 E A 3 F E, D 3 G C, F 2 SOLUTION