1.0 INTRODUCTION
1.1 Introduction to levelling
Image source:sgf.rgo.ac.uk
Levelling is the general term applied to any various process by which elevations of points or
differences in elevation is determined.Levelling is the measurement of geodetic height using
an optical levelling instrument and a level staff or rod having a numbered scale. The
objectives of levelling is to find the elevation of a given point with respect to some assumed
reference line called datum and to establish a point at required elevation to respect datum.
Purpose of levelling:
● Levelling provides data for determining the shape of the ground and drawing
topographic maps.
● The elevations of new facilities such as roads,structural foundations,and pipelines
can then be designed.
● The designed facilities are laid out and marked in the field by the construction
surveyor.
● Determine the proper slope of a road,the first floor elevation of a building,the required
cutoff elevation for foundation piles,the invert elevation for a storm sewer and etc.
3
1.2 Term used in levelling
Elevation: The vertical distance of a point above or below given reference surface is called
the elevation of point.
Level Surface:A level surface is defined as a curved surface which at each point is perpendicular
to the direction of gravity at the point. The surface of a still water is a truly level surface. Any
surface parallel to the mean spheroidal surface of the earth is, therefore, a level surface.
Datum:Datum is any surface to which elevation are referred. The mean sea level affords a
convenient datum world over, and elevations are commonly given as so much above or below
sea level. It is often more convenient, however, to assume some other datum, specially, if only
the relative elevation of points are required.
Bench-mark(B.M.): It is a relatively permanent point of reference whose elevation with respect to
some assumed datum is known. It is used either as a starting point for levelling or as a point
upon which to close as a check.
Temporary bench-mark (T.B.M)is a marking, or location, with a known elevation. These
markings are not usually permanent. They are used by a person doing leveling work as
intermediary points when carrying a known elevation from one point to another
Reduced level(R.L.): A reduced level is the vertical distance between a survey point and the
adopted level datum.
4
Image source:www.fao.org
Back-sight(B.S.): Back-sight is the first sight,or reading,taken after the instrument (the
level)has been set up.
Foresight(F.S.): Foresight is the last staff reading taken before changing the instrument to the
other position.
Intermediate sight( I.S.):An intermediate sight is the reading between Back-sight and Fore-
sight.
Change point(or Turning Point): A change point is an arbitrary point which enables the
levelling to continue from a new instrument position.It is often also termed a turning point.
The line of collimation:It is the elevation of the optical axis of the telescope at the time of the
setup. The line of collimation is the imaginary line at the elevation.
Station:It is the point where the levelling staff is kept.
5
1.3 Vertical Control (Benchmark) Surveys
(i) Height of collimation method
Image source:http://gmba-learning-gateway.co.uk/images/Height_of_Col.jpg?713
(ii) Rise and Fall method
Image source:http://gmba-learning-gateway.co.uk/images/Rise_Fall.jpg?713
6
1.4 OUTLINE OF APPARATUS
Automatic level is the most commonly used in
measuring, surveying, and setting horizontal and
vertical levels. The instrument is normally situated on a
tripod and then calibrated to a leveled position using
leveling screws. The operator of the automatic level
then looks through the telescope attached to the
instrument, while a second person holds a graduated
staff or tape measure at the position under
measurement.
Optical plummet is used in place of a plumb bob to center transits and theodolites over a
given point. The marked point should be located at the center of the point in the bull’s eye.
7
An adjustable tripod is a three-legged stand,
important in providing the foundation for the
automatic level. The three ‘legs’ can be adjusted
easily to be set up on uneven surface,even on a
very steep slope. It can be easily transport from one
point to another due to its retractable legs.
Horizontal bubble level is used to determine whether
the surface is horizontal. The bubble must be located
inside the circle to ensure that the level rods and
sighting poles are in vertical position.
Levelling staff,also called as levelling rod. It is used to measure
the differences in height between the points or height of the
points above a datum surface.
8
2.0 OBJECTIVES
● To give definitions as a base for the proper understanding of levelling.
● To determine the point at required elevation respect to datum.
● To learn the way to set up and operate the apparatuses for the field work
● To allow the students to apply the theories learnt in the lecture in a hand-on situation
● To have a better understanding the bookings in levelling
● To measure and record down BS (Backsight),IS (Intermediate sight) and FS
(Foresight) reading
● To determine whether the results of the levelling is acceptable by calculating the
error of misclosure with the formulae
● To identify the reduced level of each station
● To analyze the data and adjust the reduced level with the corrections
9
3.0 FIELD WORK MAP
Figure above shows the points of the fieldwork at Taylor’s University Carpark
10
3.1 RISE AND FALL METHOD
BS IS FS RISE FALL R.L. Remarks
1.110 100.000 BM101
1.420 2.560 1.450 98.550 A
1.480 1.460 0.040 98.510 B
1.330 1.180 0.300 98.810 C
1.570 1.430 0.100 98.710 D
1.120 0.450 99.160 E
1.480 1.180 0.060 99.100 F
1.530 1.570 0.090 99.010 G
1.420 0.110 99.120 H
1.690 1.430 0.010 99.110 I
1.570 1.280 0.410 99.520 J
1.110 0.460 99.980 BM101
Σ(BS)=13.180 Σ(FS)=13.200 ΣR=1.730 ΣF=1.750
Arithmetical check:
Σ(BS) - Σ(FS) = ΣR - ΣF = Last Reduced Level Reading - First Reduced Level Reading
Σ(BS) - Σ(FS) = 13.180 - 13.200
= -0.020
ΣR - ΣF = 1.730 - 1.750
= -0.020
Last Reduced Level Reading - First Reduced Level Reading = 99.980 - 100.00
= -0.020
Acceptable Misclosure= ±12√k
K= Number of set-ups
±12√k = ±12√9
= 36.000mm (If the error is more than 36.000mm,then it is not acceptable)
Therefore, this levelling is acceptable.
11
3.2 THE HEIGHT OF COLLIMATION METHOD
BS IS FS H.I R.L. Remarks
1.110 101.110 100.00 BM101
1.420 2.560 99.970 98.550 A
1.480 1.460 99.990 98.510 B
1.330 1.180 100.140 98.810 C
1.570 1.430 100.280 98.710 D
1.120 99.160 E
1.480 1.180 100.580 99.100 F
1.530 1.570 100.540 99.010 G
1.420 99.120 H
1.690 1.430 100.800 99.110 I
1.570 1.280 101.090 99.520 J
1.110 99.980 BM101
Σ(BS)=13.180 Σ(FS)=13.200
Arithmetical check:-
Σ(BS) - Σ(FS) = Last Reduced Level Reading - First Reduced Level Reading
Σ(BS) - Σ(FS) = 13.180 - 13.200
= -0.020
Last Reduced Level Reading - First Reduced Level Reading = 99.980 - 100.00
= -0.020
Acceptable Misclosure= ±12√k
K= Number of set-ups
±12√k = ±12√9
= 36.000mm (If the error is more than 36.000 mm,then it is not acceptable)
Therefore, this levelling is acceptable.
12
3.3 Adjusted Data
RISE AND FALL METHOD
BS IS FS RISE FALL R.L. Adj. Final R.L. Remarks
1.110 100.000 100.000 BM101
1.420 2.560 1.450 98.550 +0.0022 98.552 A
1.480 1.460 0.040 98.510 +0.0044 98.514 B
1.330 1.180 0.300 98.810 +0.0066 98.817 C
1.570 1.430 0.100 98.710 +0.0088 98.719 D
1.120 0.450 99.160 +0.0110 99.171 E
1.480 1.180 0.060 99.100 +0.0132 99.113 F
1.530 1.570 0.090 99.010 +0.0154 99.025 G
1.420 0.110 99.120 +0.0176 99.138 H
1.690 1.430 0.010 99.110 +0.0198 99.130 I
1.570 1.280 0.410 99.520 +0.0220 99.542 J
1.110 0.460 99.980 +0.0242 100.0042
≈100.000
BM101
Σ(BS)=
13.180
Σ(FS)=
13.200
ΣR=
1.730
ΣF=
1.750
Correction per set-up= Error Distribution ÷ Number of set-up
Correction per set-up= (99.980 - 100.000) ÷ 9
= - 0.020 ÷ 9
= 0.0022 m
3.4 ADJUSTED DATA
13
THE HEIGHT OF COLLIMATIONMETHOD
BS IS FS H.I R.L. Adj. Final R.L. Remarks
1.110 101.110 100.00 100.000 BM101
1.420 2.560 99.970 98.550 +0.0022 98.552 A
1.480 1.460 99.990 98.510 +0.0044 98.514 B
1.330 1.180 100.140 98.810 +0.0066 98.817 C
1.570 1.430 100.280 98.710 +0.0088 98.719 D
1.120 99.160 +0.0110 99.171 E
1.480 1.180 100.580 99.100 +0.0132 99.113 F
1.530 1.570 100.540 99.010 +0.0154 99.025 G
1.420 99.120 +0.0176 99.138 H
1.690 1.430 100.800 99.110 +0.0198 99.130 I
1.570 1.280 101.090 99.520 +0.0220 99.542 J
1.110 99.980 +0.0242 100.0042
≈100.000
BM101
Σ(BS)=1
3.180
Σ(FS)=1
3.200
Correction per set-up= Error Distribution ÷ Number of set-up
Correction per set-up= (99.980 - 100.000) ÷ 9
= - 0.020 ÷ 9
= 0.0022 m
14
4.0 DISCUSSION
For this levelling fieldwork, we have chose the car park area in Taylor’s University
Lakeside Campus as the venue for the survey work. Initially, the reduced level of
Bench Mark 1 (BM 1) is given to be 100.00 m.
To start up the leveling process, the apparatus is set up over turning point 1 and the
reading is made by obtaining the reading of the staff held vertically over the
backsight (BS) of BM1 and the foresight (FS). Then we shifted the auto level to
obtain the backsight (BS) of turning point (TP 1) and the foresight (FS) of turning
point 2 (TP 2). This process is repeated by shifting the auto level to obtain the
backsight (BS) and foresight (FS) of the following staff stations. After that we went
back to Bench Mark 1 (BM 1) in order to obtain its FS and after that we calculated
the error of misclosure.
After completed the leveling, we decided to use two different methods which are the
height of collimation and rise and fall method to calculate the reduced level of each
staff station. The error of collected data misclosure is 0.018 mm. According to the
third order of accuracy, the maximum allowable error of closure is calculated by
using the formulae of ± 𝟏𝟐√ 𝒌, where 𝒌 represents the number of set-ups, which then
gives the value of ±39.80mm. Hence, our data obtained is acceptable.
Therefore, each set-up is adjusted by adding equivalent value which is calculated by
distributing the error obtained to each set-up and so, the reduced level is able to be
identical to the benchmark 100.00 m.
There are few natural factors which causes occurrence of errors:
1. The curvature of the earth may affect the staff reading when the distance of
sight is long.
2. The effect of refraction may cause a wrong staff reading.
3. High velocity wind may cause a wrong staff reading as well.
Other possible errors includes the following:
15
1. Foresight and backsight reading not being taken on exactly the same point.
2. Reading the staff upward instead of downward.
3. Reading of stadia hair.
4. Reading of wrong metre and decimetre.
5. Entering backsight in F.S. or vice versa.
6. Transposing the figures.
7. Omitting an entry.
8. The levelling staff is not fully extended.
It is compulsory for us as a future quantity surveyor to have some hands-on skill on a
levelling is done. Additional knowledge of site surveying which is inter-related to the
construction process may be useful in future times. Surveying is the technique,
profession, and science of determining the dimensions and contour of the Earth's
surface.
Using specialized surveying equipment such as automatic level, leveling rod, tripod
and so on, we are then armored with supplementary skills which can be said as an
advantage to us when competing with other surveyors out there. It seems to be
important as a consumer is to acquire the assistance of a surveyor is the acquisition
of a new piece of land, as it has to be legally determined where one person's
property ends and another begins for government issued deeds. Additionally,
surveyors work with cartographers to create accurate maps.
Each member contributes in this survey work and to propose this report. Discussion
is made to further our thinking incorporate with explanations our lecturer to gain
deeper understanding. It is a great experience to conduct such survey work as this is
the first time we are exposed to the method and instrument. We have done all work
on time as we follow the procedures and precautions to obtain data that its error has
been minimized to an accepted level. Hence, we can see that teamwork plays a vital
position in completing a task given and shorten the time needed to complete the
task.

More Related Content

What's hot

Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Haziq1511
 
Tranverse report
Tranverse report Tranverse report
Tranverse report Wen Crystal
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-reportFelix Vong
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i마 이환
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Sheng Zhe
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsBahzad5
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELINGFarah Sham
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfMuhammadMuazzam16
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESBahzad5
 
Levelling final
Levelling finalLevelling final
Levelling finalseenyee
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - ReportSarchia Khursheed
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - LevellingKai Yun Pang
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: TransversingFarah Sham
 

What's hot (20)

Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
Levelling
LevellingLevelling
Levelling
 
Tranverse report
Tranverse report Tranverse report
Tranverse report
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
 
Theodolite report
Theodolite reportTheodolite report
Theodolite report
 
Site surveying report i
Site surveying   report iSite surveying   report i
Site surveying report i
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
SITE SURVEYING LEVELING
SITE SURVEYING LEVELINGSITE SURVEYING LEVELING
SITE SURVEYING LEVELING
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
 
Introduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURESIntroduction to Surveying LEVELLING PROCEDURES
Introduction to Surveying LEVELLING PROCEDURES
 
Two pegtest
Two pegtestTwo pegtest
Two pegtest
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Levelling final
Levelling finalLevelling final
Levelling final
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: Transversing
 

Viewers also liked

Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)Chee Lee
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1Yap Xin
 
Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversingKhangWei Chin
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSheng Zhe
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Levelingashleyyeap
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling seenyee
 
Cálculo de muestra cuando la población es conocida.
Cálculo de muestra cuando la población es  conocida.Cálculo de muestra cuando la población es  conocida.
Cálculo de muestra cuando la población es conocida.JuanCamy2013
 
Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1jbusse
 
Practicas ug ene jun 2014-no 5_nivelacion de un terreno
Practicas ug ene jun 2014-no 5_nivelacion de un terrenoPracticas ug ene jun 2014-no 5_nivelacion de un terreno
Practicas ug ene jun 2014-no 5_nivelacion de un terrenochatito95
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Yap Xin
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2Self-employed
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Pramesh Hada
 
Basic Civil Engineering MCQ
Basic Civil Engineering MCQBasic Civil Engineering MCQ
Basic Civil Engineering MCQPralhad Kore
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouringANAND JIBHKATE
 

Viewers also liked (20)

Field work 1 (1)
Field work 1 (1)Field work 1 (1)
Field work 1 (1)
 
Levelling
LevellingLevelling
Levelling
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversing
 
Site survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversingSite survey Fieldwork 2 traversing
Site survey Fieldwork 2 traversing
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Cálculo de muestra cuando la población es conocida.
Cálculo de muestra cuando la población es  conocida.Cálculo de muestra cuando la población es  conocida.
Cálculo de muestra cuando la población es conocida.
 
Booking sheets, 2011 v1
Booking sheets, 2011 v1Booking sheets, 2011 v1
Booking sheets, 2011 v1
 
Practicas ug ene jun 2014-no 5_nivelacion de un terreno
Practicas ug ene jun 2014-no 5_nivelacion de un terrenoPracticas ug ene jun 2014-no 5_nivelacion de un terreno
Practicas ug ene jun 2014-no 5_nivelacion de un terreno
 
Site Surveying Fieldwork 2
Site Surveying Fieldwork 2Site Surveying Fieldwork 2
Site Surveying Fieldwork 2
 
levelling survey
levelling surveylevelling survey
levelling survey
 
Las excepciones en materia civil
Las excepciones en materia civilLas excepciones en materia civil
Las excepciones en materia civil
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..Contouring - Surveying...for civil Engineering and Architecture..
Contouring - Surveying...for civil Engineering and Architecture..
 
Basic Civil Engineering MCQ
Basic Civil Engineering MCQBasic Civil Engineering MCQ
Basic Civil Engineering MCQ
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 

Similar to Site surveying report1

Ss report 1
Ss report 1Ss report 1
Ss report 1Shen Sin
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eportMELVIN tan
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Ss report 2
Ss report 2Ss report 2
Ss report 2Shen Sin
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Enoch Wong
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying TraversingDarren Lee
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)Jing Chuang
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only noteSHAMJITH KM
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfLeulDamtew
 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2 JamesMoy7
 
Fly Levelling
Fly LevellingFly Levelling
Fly LevellingBahzad5
 

Similar to Site surveying report1 (20)

Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Site survey report 1
Site survey report 1Site survey report 1
Site survey report 1
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
1 st report
1 st report1 st report
1 st report
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
Leveling report
Leveling reportLeveling report
Leveling report
 
Fieldwork 1 (leveling)
Fieldwork 1 (leveling)Fieldwork 1 (leveling)
Fieldwork 1 (leveling)
 
Site Surveying Traversing
Site Surveying TraversingSite Surveying Traversing
Site Surveying Traversing
 
Traversing
TraversingTraversing
Traversing
 
Site surveying
Site surveying Site surveying
Site surveying
 
Ss report 2
Ss report 2Ss report 2
Ss report 2
 
ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)ABC Report - 123 (gathered with reference)
ABC Report - 123 (gathered with reference)
 
Surveying - Module iii-levelling only note
Surveying - Module  iii-levelling only noteSurveying - Module  iii-levelling only note
Surveying - Module iii-levelling only note
 
Levelling
LevellingLevelling
Levelling
 
chapter 3 up to booking method.pdf
chapter 3 up to booking method.pdfchapter 3 up to booking method.pdf
chapter 3 up to booking method.pdf
 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
 
Fieldwork 2
Fieldwork 2 Fieldwork 2
Fieldwork 2
 
Fly Levelling
Fly LevellingFly Levelling
Fly Levelling
 
Site survey report 2
Site survey report 2Site survey report 2
Site survey report 2
 

More from Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmEst
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM PartneringEst
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in constructionEst
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscmEst
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangementEst
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systemsEst
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignmentEst
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MSEst
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrmEst
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergEst
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationEst
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communicationEst
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016Est
 

More from Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Recently uploaded

Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书Fir La
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...Kumaran637735
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 

Recently uploaded (20)

Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
如何办理密苏里大学堪萨斯分校毕业证(文凭)UMKC学位证书
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, April 23, 2024
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
The resilient U.S. late-cycle expansion contributed to a stalling pattern in ...
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Uttam Nagar Delhi reach out to us at 🔝9953056974🔝
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 

Site surveying report1

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB60103103946-M Site Surveying Fieldwork Report 1 LEVELLING GROUP MEMBERS STUDENT ID Liew Li Wen 0324297 Lim Kar Yan 0325602 Tan Hwee Min 0326057 Esther Chuah Ning Sie 0321422
  • 2. 1 TABLE OF CONTENT Content Pages Cover Page 1 Table of Content 2 Introduction 3 - 7 Objectives 8 Data and Results 9 - 13 Discussion 14 - 15
  • 3. 2 1.0 INTRODUCTION 1.1 Introduction to levelling Image source:sgf.rgo.ac.uk Levelling is the general term applied to any various process by which elevations of points or differences in elevation is determined.Levelling is the measurement of geodetic height using an optical levelling instrument and a level staff or rod having a numbered scale. The objectives of levelling is to find the elevation of a given point with respect to some assumed reference line called datum and to establish a point at required elevation to respect datum. Purpose of levelling: ● Levelling provides data for determining the shape of the ground and drawing topographic maps. ● The elevations of new facilities such as roads,structural foundations,and pipelines can then be designed. ● The designed facilities are laid out and marked in the field by the construction surveyor. ● Determine the proper slope of a road,the first floor elevation of a building,the required cutoff elevation for foundation piles,the invert elevation for a storm sewer and etc.
  • 4. 3 1.2 Term used in levelling Elevation: The vertical distance of a point above or below given reference surface is called the elevation of point. Level Surface:A level surface is defined as a curved surface which at each point is perpendicular to the direction of gravity at the point. The surface of a still water is a truly level surface. Any surface parallel to the mean spheroidal surface of the earth is, therefore, a level surface. Datum:Datum is any surface to which elevation are referred. The mean sea level affords a convenient datum world over, and elevations are commonly given as so much above or below sea level. It is often more convenient, however, to assume some other datum, specially, if only the relative elevation of points are required. Bench-mark(B.M.): It is a relatively permanent point of reference whose elevation with respect to some assumed datum is known. It is used either as a starting point for levelling or as a point upon which to close as a check. Temporary bench-mark (T.B.M)is a marking, or location, with a known elevation. These markings are not usually permanent. They are used by a person doing leveling work as intermediary points when carrying a known elevation from one point to another Reduced level(R.L.): A reduced level is the vertical distance between a survey point and the adopted level datum.
  • 5. 4 Image source:www.fao.org Back-sight(B.S.): Back-sight is the first sight,or reading,taken after the instrument (the level)has been set up. Foresight(F.S.): Foresight is the last staff reading taken before changing the instrument to the other position. Intermediate sight( I.S.):An intermediate sight is the reading between Back-sight and Fore- sight. Change point(or Turning Point): A change point is an arbitrary point which enables the levelling to continue from a new instrument position.It is often also termed a turning point. The line of collimation:It is the elevation of the optical axis of the telescope at the time of the setup. The line of collimation is the imaginary line at the elevation. Station:It is the point where the levelling staff is kept.
  • 6. 5 1.3 Vertical Control (Benchmark) Surveys (i) Height of collimation method Image source:http://gmba-learning-gateway.co.uk/images/Height_of_Col.jpg?713 (ii) Rise and Fall method Image source:http://gmba-learning-gateway.co.uk/images/Rise_Fall.jpg?713
  • 7. 6 1.4 OUTLINE OF APPARATUS Automatic level is the most commonly used in measuring, surveying, and setting horizontal and vertical levels. The instrument is normally situated on a tripod and then calibrated to a leveled position using leveling screws. The operator of the automatic level then looks through the telescope attached to the instrument, while a second person holds a graduated staff or tape measure at the position under measurement. Optical plummet is used in place of a plumb bob to center transits and theodolites over a given point. The marked point should be located at the center of the point in the bull’s eye.
  • 8. 7 An adjustable tripod is a three-legged stand, important in providing the foundation for the automatic level. The three ‘legs’ can be adjusted easily to be set up on uneven surface,even on a very steep slope. It can be easily transport from one point to another due to its retractable legs. Horizontal bubble level is used to determine whether the surface is horizontal. The bubble must be located inside the circle to ensure that the level rods and sighting poles are in vertical position. Levelling staff,also called as levelling rod. It is used to measure the differences in height between the points or height of the points above a datum surface.
  • 9. 8 2.0 OBJECTIVES ● To give definitions as a base for the proper understanding of levelling. ● To determine the point at required elevation respect to datum. ● To learn the way to set up and operate the apparatuses for the field work ● To allow the students to apply the theories learnt in the lecture in a hand-on situation ● To have a better understanding the bookings in levelling ● To measure and record down BS (Backsight),IS (Intermediate sight) and FS (Foresight) reading ● To determine whether the results of the levelling is acceptable by calculating the error of misclosure with the formulae ● To identify the reduced level of each station ● To analyze the data and adjust the reduced level with the corrections
  • 10. 9 3.0 FIELD WORK MAP Figure above shows the points of the fieldwork at Taylor’s University Carpark
  • 11. 10 3.1 RISE AND FALL METHOD BS IS FS RISE FALL R.L. Remarks 1.110 100.000 BM101 1.420 2.560 1.450 98.550 A 1.480 1.460 0.040 98.510 B 1.330 1.180 0.300 98.810 C 1.570 1.430 0.100 98.710 D 1.120 0.450 99.160 E 1.480 1.180 0.060 99.100 F 1.530 1.570 0.090 99.010 G 1.420 0.110 99.120 H 1.690 1.430 0.010 99.110 I 1.570 1.280 0.410 99.520 J 1.110 0.460 99.980 BM101 Σ(BS)=13.180 Σ(FS)=13.200 ΣR=1.730 ΣF=1.750 Arithmetical check: Σ(BS) - Σ(FS) = ΣR - ΣF = Last Reduced Level Reading - First Reduced Level Reading Σ(BS) - Σ(FS) = 13.180 - 13.200 = -0.020 ΣR - ΣF = 1.730 - 1.750 = -0.020 Last Reduced Level Reading - First Reduced Level Reading = 99.980 - 100.00 = -0.020 Acceptable Misclosure= ±12√k K= Number of set-ups ±12√k = ±12√9 = 36.000mm (If the error is more than 36.000mm,then it is not acceptable) Therefore, this levelling is acceptable.
  • 12. 11 3.2 THE HEIGHT OF COLLIMATION METHOD BS IS FS H.I R.L. Remarks 1.110 101.110 100.00 BM101 1.420 2.560 99.970 98.550 A 1.480 1.460 99.990 98.510 B 1.330 1.180 100.140 98.810 C 1.570 1.430 100.280 98.710 D 1.120 99.160 E 1.480 1.180 100.580 99.100 F 1.530 1.570 100.540 99.010 G 1.420 99.120 H 1.690 1.430 100.800 99.110 I 1.570 1.280 101.090 99.520 J 1.110 99.980 BM101 Σ(BS)=13.180 Σ(FS)=13.200 Arithmetical check:- Σ(BS) - Σ(FS) = Last Reduced Level Reading - First Reduced Level Reading Σ(BS) - Σ(FS) = 13.180 - 13.200 = -0.020 Last Reduced Level Reading - First Reduced Level Reading = 99.980 - 100.00 = -0.020 Acceptable Misclosure= ±12√k K= Number of set-ups ±12√k = ±12√9 = 36.000mm (If the error is more than 36.000 mm,then it is not acceptable) Therefore, this levelling is acceptable.
  • 13. 12 3.3 Adjusted Data RISE AND FALL METHOD BS IS FS RISE FALL R.L. Adj. Final R.L. Remarks 1.110 100.000 100.000 BM101 1.420 2.560 1.450 98.550 +0.0022 98.552 A 1.480 1.460 0.040 98.510 +0.0044 98.514 B 1.330 1.180 0.300 98.810 +0.0066 98.817 C 1.570 1.430 0.100 98.710 +0.0088 98.719 D 1.120 0.450 99.160 +0.0110 99.171 E 1.480 1.180 0.060 99.100 +0.0132 99.113 F 1.530 1.570 0.090 99.010 +0.0154 99.025 G 1.420 0.110 99.120 +0.0176 99.138 H 1.690 1.430 0.010 99.110 +0.0198 99.130 I 1.570 1.280 0.410 99.520 +0.0220 99.542 J 1.110 0.460 99.980 +0.0242 100.0042 ≈100.000 BM101 Σ(BS)= 13.180 Σ(FS)= 13.200 ΣR= 1.730 ΣF= 1.750 Correction per set-up= Error Distribution ÷ Number of set-up Correction per set-up= (99.980 - 100.000) ÷ 9 = - 0.020 ÷ 9 = 0.0022 m 3.4 ADJUSTED DATA
  • 14. 13 THE HEIGHT OF COLLIMATIONMETHOD BS IS FS H.I R.L. Adj. Final R.L. Remarks 1.110 101.110 100.00 100.000 BM101 1.420 2.560 99.970 98.550 +0.0022 98.552 A 1.480 1.460 99.990 98.510 +0.0044 98.514 B 1.330 1.180 100.140 98.810 +0.0066 98.817 C 1.570 1.430 100.280 98.710 +0.0088 98.719 D 1.120 99.160 +0.0110 99.171 E 1.480 1.180 100.580 99.100 +0.0132 99.113 F 1.530 1.570 100.540 99.010 +0.0154 99.025 G 1.420 99.120 +0.0176 99.138 H 1.690 1.430 100.800 99.110 +0.0198 99.130 I 1.570 1.280 101.090 99.520 +0.0220 99.542 J 1.110 99.980 +0.0242 100.0042 ≈100.000 BM101 Σ(BS)=1 3.180 Σ(FS)=1 3.200 Correction per set-up= Error Distribution ÷ Number of set-up Correction per set-up= (99.980 - 100.000) ÷ 9 = - 0.020 ÷ 9 = 0.0022 m
  • 15. 14 4.0 DISCUSSION For this levelling fieldwork, we have chose the car park area in Taylor’s University Lakeside Campus as the venue for the survey work. Initially, the reduced level of Bench Mark 1 (BM 1) is given to be 100.00 m. To start up the leveling process, the apparatus is set up over turning point 1 and the reading is made by obtaining the reading of the staff held vertically over the backsight (BS) of BM1 and the foresight (FS). Then we shifted the auto level to obtain the backsight (BS) of turning point (TP 1) and the foresight (FS) of turning point 2 (TP 2). This process is repeated by shifting the auto level to obtain the backsight (BS) and foresight (FS) of the following staff stations. After that we went back to Bench Mark 1 (BM 1) in order to obtain its FS and after that we calculated the error of misclosure. After completed the leveling, we decided to use two different methods which are the height of collimation and rise and fall method to calculate the reduced level of each staff station. The error of collected data misclosure is 0.018 mm. According to the third order of accuracy, the maximum allowable error of closure is calculated by using the formulae of ± 𝟏𝟐√ 𝒌, where 𝒌 represents the number of set-ups, which then gives the value of ±39.80mm. Hence, our data obtained is acceptable. Therefore, each set-up is adjusted by adding equivalent value which is calculated by distributing the error obtained to each set-up and so, the reduced level is able to be identical to the benchmark 100.00 m. There are few natural factors which causes occurrence of errors: 1. The curvature of the earth may affect the staff reading when the distance of sight is long. 2. The effect of refraction may cause a wrong staff reading. 3. High velocity wind may cause a wrong staff reading as well. Other possible errors includes the following:
  • 16. 15 1. Foresight and backsight reading not being taken on exactly the same point. 2. Reading the staff upward instead of downward. 3. Reading of stadia hair. 4. Reading of wrong metre and decimetre. 5. Entering backsight in F.S. or vice versa. 6. Transposing the figures. 7. Omitting an entry. 8. The levelling staff is not fully extended. It is compulsory for us as a future quantity surveyor to have some hands-on skill on a levelling is done. Additional knowledge of site surveying which is inter-related to the construction process may be useful in future times. Surveying is the technique, profession, and science of determining the dimensions and contour of the Earth's surface. Using specialized surveying equipment such as automatic level, leveling rod, tripod and so on, we are then armored with supplementary skills which can be said as an advantage to us when competing with other surveyors out there. It seems to be important as a consumer is to acquire the assistance of a surveyor is the acquisition of a new piece of land, as it has to be legally determined where one person's property ends and another begins for government issued deeds. Additionally, surveyors work with cartographers to create accurate maps. Each member contributes in this survey work and to propose this report. Discussion is made to further our thinking incorporate with explanations our lecturer to gain deeper understanding. It is a great experience to conduct such survey work as this is the first time we are exposed to the method and instrument. We have done all work on time as we follow the procedures and precautions to obtain data that its error has been minimized to an accepted level. Hence, we can see that teamwork plays a vital position in completing a task given and shorten the time needed to complete the task.