The document provides information about PMP certification training offered by Edureka. It discusses that PMP certification is a globally recognized program in project management. It certifies that a professional has experience and education in project management. PMP certified managers typically earn 25% higher salaries. The certification is considered prestigious in the field of project management. The document also includes sample questions that may be asked in the PMP exam and covers topics like project scope, scheduling techniques, risk management, contract types and other project management concepts.
2. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
3. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
Legalizes a professional’s education and
experience in Project Management
4. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
Legalizes a professional’s education and
experience in Project Management
PMP certified project managers
command 25% more salaries than their peers
5. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
Legalizes a professional’s education and
experience in Project Management
PMP certified project managers
command 25% more salaries than their peers
PMP Certificate is very prestigious and is
considered to be the golden standard of Project Management
7. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PM Role wise Salaries
35k 70k 105k 140k0
Director of PM/PMO
Portfolio Manager
Program Manager
Project Management Consultant
Project Manager III
Project Manager II
Project Manager I
Project Management Specialist
9. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Define Project Scope.
It is the design of experiments that is used to complete the project work.
It is the combination of the cost and the schedule which is required to complete the project work.
It is the description of the required work that is necessary to complete the project.
It is the description of the required work and resources that are needed to complete the project.
Q.
10. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Define Project Scope.
It is the design of experiments that is used to complete the project work.
It is the combination of the cost and the schedule which is required to complete the project work.
It is the description of the required work that is necessary to complete the project.
It is the description of the required work and resources that are needed to complete the project.
Q.
11. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
What is a Program?
A very large and complex project
A collection of projects which have common resources
A collection of sub-projects having a common goal
A collection of subprojects having a common customer
Q.
12. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
What is a Program?
A very large and complex project
A collection of projects which have common resources
A collection of sub-projects having a common goal
A collection of subprojects having a common customer
Q.
13. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Which of the following comprises the Project Life Cycle?
Phases
Milestones
Estimates
Activities
Q.
14. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Which of the following comprises the Project Life Cycle?
Phases
Milestones
Estimates
Activities
Q.
15. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Being the project manager of the ABC Project , you have allowed subsequent project phase to
begin even before the predecessor phase completes. Which of the following relates to this
scenario?
Crashing
Fast tracking
Risk management
Tandem scheduling
Q.
16. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Being the project manager of the ABC Project , you have allowed subsequent project phase to
begin even before the predecessor phase completes. Which of the following relates to this
scenario?
Crashing
Fast tracking
Risk management
Tandem scheduling
Q.
17. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Project Manager
Senior Management
Sponsor
Client
The person or group providing the resources and support for the project, program or portfolio
and is also responsible for enabling success is called the:Q.
18. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Project Manager
Senior Management
Sponsor
Client
The person or group providing the resources and support for the project, program or portfolio
and is also responsible for enabling success is called the:Q.
19. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Vendor Bid Analysis
Brainstorming
Affinity Diagram
Nominal Group Technique
Which of the following cannot be the part of Group creativity techniques:
20. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Vendor Bid Analysis
Brainstorming
Affinity Diagram
Nominal Group Technique
Which of the following cannot be the part of Group creativity techniques:
21. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Analogous Estimating
Parametric Estimating
Historical Estimating
Expert Judgement
Being the project manager of a thermal power plant project you need to manage the construction
of an administrative unit building. Which of the following technique will you use to quickly
estimate and decide the use of historic estimate and expert judgement.
22. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Analogous Estimating
Parametric Estimating
Historical Estimating
Expert Judgement
Being the project manager of a thermal power plant project you need to manage the construction
of an administrative unit building. Which of the following technique will you use to quickly
estimate and decide the use of historic estimate and expert judgement.
23. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Level of Accuracy
Units of Measure
Level of Precision
Cost Management Plan
What is the acceptable range used for determining the realistic activity cost estimates?
24. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Level of Accuracy
Units of Measure
Level of Precision
Cost Management Plan
What is the acceptable range used for determining the realistic activity cost estimates?
25. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
0.73
1.2
0.8
1
What is the SPI of a Software development Project where EV = $6,000, PV = $5,000, AC = $4,000?
26. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
0.73
1.2
0.8
1
What is the SPI of a Software development Project where EV = $6,000, PV = $5,000, AC = $4,000?
27. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Plan Cost Management
Estimate Costs
Determine Budget
Control costs
Cost baseline is the output of which of the following?
28. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Plan Cost Management
Estimate Costs
Determine Budget
Control costs
Cost baseline is the output of which of the following?
29. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Organize meetings to resolve misunderstanding and agree on a common solution
Defer the decision to procure turbine components as much as possible
Copy the design of turbine from a similar past project
Procure the turbine parts from the nearest located vendor
Suppose you are the project manager on a thermal power plant project. How will you manage
your team members, if there is a difference in opinion over the design of turbine?
30. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Organize meetings to resolve misunderstanding and agree on a common solution
Defer the decision to procure turbine components as much as possible
Copy the design of turbine from a similar past project
Procure the turbine parts from the nearest located vendor
Suppose you are the project manager on a thermal power plant project. How will you manage
your team members, if there is a difference in opinion over the design of turbine?
31. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Using variance analysis
Using Sensitivity analysis
Using PERT formula
Using Performance Reports
You find that an activity in your project is very risky. How will you estimate the duration for this
activity when your team member has given the optimistic, most likely and pessimistic duration for
the activity?
32. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Using variance analysis
Using Sensitivity analysis
Using PERT formula
Using Performance Reports
You find that an activity in your project is very risky. How will you estimate the duration for this
activity when your team member has given the optimistic, most likely and pessimistic duration for
the activity?
33. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Employees seek to be directed
Employees avoid work
Employees are self-centered
Employees are self-motivated
Which among the following is not valid according to McGreger's Theory X?
34. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Employees seek to be directed
Employees avoid work
Employees are self-centered
Employees are self-motivated
Which among the following is not valid according to McGreger's Theory X?
35. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Retainage
FPEPA
Cost Reimbursable contract
Letter of Intent
You are the project manager on a software development project. Your CPI drops to 0.93 when one
of your key developers suddenly falls ill. To make up for your effected work, you have decided to
outsource it to a vendor. What will be the most appropriate contract type in this case:
36. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Retainage
FPEPA
Cost Reimbursable contract
Letter of Intent
You are the project manager on a software development project. Your CPI drops to 0.93 when one
of your key developers suddenly falls ill. To make up for your effected work, you have decided to
outsource it to a vendor. What will be the most appropriate contract type in this case:
37. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Maslow
Ouchi
McGregor
Herzberg
Who among the following said, “People will be interested in their safety needs only after their
physiological needs have been fulfilled.”:
38. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Maslow
Ouchi
McGregor
Herzberg
Who among the following said, “People will be interested in their safety needs only after their
physiological needs have been fulfilled.”:
39. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Project Resources
Project Schedule
Project Scope
Project Risks
WBS is an excellent and most effective tool that is used for tracking of:
40. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Project Resources
Project Schedule
Project Scope
Project Risks
WBS is an excellent and most effective tool that is used for tracking of:
41. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Matrix Organization
Functional Organization
The best project organization structure for a small but highly technical project will be:
Mixed Organization
Projectized Organization
42. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Matrix Organization
Functional Organization
Mixed Organization
Projectized Organization
The best project organization structure for a small but highly technical project will be:
43. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Work breakdown structure
Staffing Plan
Cohabitation
Colocation
Being a project manager is you need to manage a project where there will be a number of persons
working together. If you want to enhance the ability of the team to work together and perform as
a team which one of the following things you need to do to maximize the ability of the team?
44. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Work breakdown structure
Staffing Plan
Cohabitation
Colocation
Being a project manager is you need to manage a project where there will be a number of persons
working together. If you want to enhance the ability of the team to work together and perform as
a team which one of the following things you need to do to maximize the ability of the team?
45. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Assessing the impact of the change on Project objectives
Defining requirements for the customer
Doing performance appraisal for team members involved in implementing changes
Encouraging team members to raise more change requests
What is the role of the change control board?
46. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Assessing the impact of the change on Project objectives
Defining requirements for the customer
Doing performance appraisal for team members involved in implementing changes
Encouraging team members to raise more change requests
What is the role of the change control board?
47. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
CPFF
FFP
CPPC
T&M
Being the project manager on a STP project, you decide to respond to an identified risk by
contracting out work. Which of the following will lead to the minimum risk of buyer?
48. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
CPFF
FFP
CPPC
T&M
Being the project manager on a STP project, you decide to respond to an identified risk by
contracting out work. Which of the following will lead to the minimum risk of buyer?
49. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Identify Stakeholders
Manage Stakeholder Engagement
Control Stakeholder Engagement
Plan Stakeholder management
For which process the stakeholder’s engagement assessment matrix is prepared as a part?
50. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Identify Stakeholders
Manage Stakeholder Engagement
Control Stakeholder Engagement
Plan Stakeholder management
For which process the stakeholder’s engagement assessment matrix is prepared as a part?
51. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Verbal, Nonverbal and Written
Sender, receiver and message
Text, drawing and picture
Manager, worker and instructions
Being a project manager you need to spend a significant amount of time in communications.
Which of the following option contains the three basic elements of a communications mode?
52. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Verbal, Nonverbal and Written
Sender, receiver and message
Text, drawing and picture
Manager, worker and instructions
Being a project manager you need to spend a significant amount of time in communications.
Which of the following option contains the three basic elements of a communications mode?
53. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Find the root cause of the disagreement
Resolve the conflict in favor of the senior most technical expert
Hire an external consultant to enforce his decision
Remove this technical work from the scope of project work
Suppose you are assigned as the project manager of a 30 months project which is in the executing
phase. What will be the best way to resolve a conflict among the technical experts in your team?
54. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Find the root cause of the disagreement
Resolve the conflict in favor of the senior most technical expert
Hire an external consultant to enforce his decision
Remove this technical work from the scope of project work
Suppose you are assigned as the project manager of a 30 months project which is in the executing
phase. What will be the best way to resolve a conflict among the technical experts in your team?
55. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Effect of adding resources on project end date
Effect of adding resources on S curve
Effect of adding resources on RAM
Effect of adding resources on Cost and Schedule
What should be your primary concern while adding resources to your project?
56. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Effect of adding resources on project end date
Effect of adding resources on S curve
Effect of adding resources on RAM
Effect of adding resources on Cost and Schedule
What should be your primary concern while adding resources to your project?
57. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Units of measure
Level of Precision
Level of accuracy
Control Thresholds
If John is working with his team to decide the degree to which cost estimates should be rounded
up or down, then he is working to establish which of the following:
58. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Units of measure
Level of Precision
Level of accuracy
Control Thresholds
If John is working with his team to decide the degree to which cost estimates should be rounded
up or down, then he is working to establish which of the following:
59. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Keep Satisfied
Keep Informed
Manage Closely
Monitor
Being a Project Manager, how will you deal with a stakeholder who has high power and high
interest?
60. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Keep Satisfied
Keep Informed
Manage Closely
Monitor
Being a Project Manager, how will you deal with a stakeholder who has high power and high
interest?
61. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Lack of Quality Policy
Lack of Communications management plan
Internet connection not reliable
Lack of Historical Information
While estimating the cost of work in a very new technology, being a project manager which of the
following will concern you the most?
62. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Lack of Quality Policy
Lack of Communications management plan
Internet connection not reliable
Lack of Historical Information
While estimating the cost of work in a very new technology, being a project manager which of the
following will concern you the most?
63. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$4,000
$2,000
$8,000
$6,000
A road project was planned to be completed in 8 months. Calculate the SV when the earned value
information at the end of six months is given as: BAC = $8000 , AC = $12000, % complete = 100%.
64. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$4,000
$2,000
$8,000
$6,000
A road project was planned to be completed in 8 months. Calculate the SV when the earned value
information at the end of six months is given as: BAC = $8000 , AC = $12000, % complete = 100%.
65. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
($200)
$200
($600)
$600
What will be incentive amount for a contractor, who is working on a cost plus incentive fee
contract? The project’s target cost is $5,000 with a target fee of $800, minimum fee is $500 & the
maximum fee is $1,000. Also, the buyer seller share ratio is 80:20 with an actual cost of $6000.
66. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
($200)
$200
($600)
$600
What will be incentive amount for a contractor, who is working on a cost plus incentive fee
contract? The project’s target cost is $5,000 with a target fee of $800, minimum fee is $500 & the
maximum fee is $1,000. Also, the buyer seller share ratio is 80:20 with an actual cost of $6000.
67. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Activities
Interrelationship
Time
Activities assigned to
Which of the following a resource histogram shows but a responsibility assignment matrix does
not?
68. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Activities
Interrelationship
Time
Activities assigned to
Which of the following a resource histogram shows but a responsibility assignment matrix does
not?
69. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sensitivity Diagram
Data Flow Diagram
Decision Tree
Tornado Diagram
Which of the following is used to display sensitivity analysis?
70. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sensitivity Diagram
Data Flow Diagram
Decision Tree
Tornado Diagram
Which of the following is used to display sensitivity analysis?
71. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
SV = $3750
CV = $4000
TCPI = 0.8
The project is likely need more money than planned to complete
If SPI = 0.75 and CPI = 0.8, then which of the following reports is correct?
72. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
SV = $3750
CV = $4000
TCPI = 0.8
The project is likely need more money than planned to complete
If SPI = 0.75 and CPI = 0.8, then which of the following reports is correct?
73. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Initiating, designing, planning, executing, controlling, and closing
Designing, developing, testing, and implementing
Initiating, planning, executing, monitoring and controlling, and closing
Initiating, planning, executing, monitoring, and closing
According to PMBOK, project management processes are organized into which of the following
order of process groups?
74. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Initiating, designing, planning, executing, controlling, and closing
Designing, developing, testing, and implementing
Initiating, planning, executing, monitoring and controlling, and closing
Initiating, planning, executing, monitoring, and closing
According to PMBOK, project management processes are organized into which of the following
order of process groups?
75. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
The project manager should try to remove negative float by crashing or fast tracking
There cannot be any negative float in the project
The project manager should try to remove negative float by reducing scope
It is desirable to have negative float in the project
Which of the following statements is true regarding negative float?
76. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
The project manager should try to remove negative float by crashing or fast tracking
There cannot be any negative float in the project
The project manager should try to remove negative float by reducing scope
It is desirable to have negative float in the project
Which of the following statements is true regarding negative float?
77. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Deliverables List
Test Plan
Acceptance Criteria
Punch List
Which of the following represents a set of conditions that should be satisfied before deliverables
are accepted?
78. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Deliverables List
Test Plan
Acceptance Criteria
Punch List
Which of the following represents a set of conditions that should be satisfied before deliverables
are accepted?
79. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Understand the trend of deviations
Prioritization
Complete all activities on time
Identify root causes
How will a Pareto Chart will help in a project with lot of identified action items?
80. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Understand the trend of deviations
Prioritization
Complete all activities on time
Identify root causes
How will a Pareto Chart will help in a project with lot of identified action items?
81. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Start-to-Start
Start-to-Finish
Finish-to-Finish
Finish-to-Start
The activity relationship between the start of cleaning and the start of digging is represented by
which of the following?
82. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Start-to-Start
Start-to-Finish
Finish-to-Finish
Finish-to-Start
The activity relationship between the start of cleaning and the start of digging is represented by
which of the following?
83. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
This always affects the CV
This never affects the CV
A negative value means that the project will likely be delayed
A positive value means that the project will likely be delayed
Schedule Variance is:
84. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
This always affects the CV
This never affects the CV
A negative value means that the project will likely be delayed
A positive value means that the project will likely be delayed
Schedule Variance is:
85. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
High Power - Low Interest
High Power - High Interest
Low Power - Low Interest
Low Power - High Interest
You are currently working as a Project Manager in Realty Logistics. You have been given responsibility for
moving Infrastructure of ABC Software LTD to a new location. For that you need to identify the stakeholders
of your project. Based on the Power/Interest Grid that you have created, which of the following types of
stakeholders' expectation should be managed closely?
86. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
High Power - Low Interest
High Power - High Interest
Low Power - Low Interest
Low Power - High Interest
You are currently working as a Project Manager in Realty Logistics. You have been given responsibility for
moving Infrastructure of ABC Software LTD to a new location. For that you need to identify the stakeholders
of your project. Based on the Power/Interest Grid that you have created, which of the following types of
stakeholders' expectation should be managed closely?
87. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
ISO 9000
Quality planning
Quality control
Quality policy
What is the company-wide policy which mandates all project quality known as?
88. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
ISO 9000
Quality planning
Quality control
Quality policy
What is the company-wide policy which mandates all project quality known as?
89. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Standards are optional but regulations are not
Standards are mandatory but regulations are not
Regulations are mandatory but standards may be seen as guidelines
Regulations and Standards are essentially the same
Which one of the following describes the difference between a Standard and a Deviation
accurately?
90. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Standards are optional but regulations are not
Standards are mandatory but regulations are not
Regulations are mandatory but standards may be seen as guidelines
Regulations and Standards are essentially the same
Which one of the following describes the difference between a Standard and a Deviation
accurately?
91. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$1,000,000.00
$1,012,660.00
$1,582,281.00
None of the above
What will be the BAC of your project, if it has a CPI of 0.80 and an EAC of $ 1265825?
92. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$1,000,000.00
$1,012,660.00
$1,582,281.00
None of the above
What will be the BAC of your project, if it has a CPI of 0.80 and an EAC of $ 1265825?
93. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Manual Forecasting of cost of remaining work
BAC - AC
EAC - AC
(BAC EV) / CPI
The BEST way of making an accurate forecasting of ETC is:
94. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Manual Forecasting of cost of remaining work
BAC - AC
EAC - AC
(BAC EV) / CPI
The BEST way of making an accurate forecasting of ETC is:
95. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
There are no defects
Project Manager should move to the next process as everything is ok
The process is out of control
The process is in control
How will you assess a situation where six observations are within the UPPER CONTROL LIMIT and
control line while the seventh observation is observed within UPPER CONTROL LIMIT and Control
line?
96. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
There are no defects
Project Manager should move to the next process as everything is ok
The process is out of control
The process is in control
How will you assess a situation where six observations are within the UPPER CONTROL LIMIT and
control line while the seventh observation is observed within UPPER CONTROL LIMIT and Control
line?
97. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Control Charts
Cause and Effect Diagram
Run Chart
Pareto Chart
Which of the following can be used for Trend Analysis?
98. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Control Charts
Cause and Effect Diagram
Run Chart
Pareto Chart
Which of the following can be used for Trend Analysis?
99. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Theory X and Theory Y
Theory Z
Contingency Theory
Expectancy Theory
In which of theory, Douglas McGregor has defined two models of worker behaviour?
100. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Theory X and Theory Y
Theory Z
Contingency Theory
Expectancy Theory
In which of theory, Douglas McGregor has defined two models of worker behaviour?
101. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Interest, influence and involvement
Interest, influence and impact
Interest, influence and importance
Importance, inquiry and influence
What are the three 'I's' of stakeholders?
102. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Interest, Influence and Involvement
Interest, Influence and Impact
Interest, Influence and Importance
Importance, Inquiry and Influence
What are the three 'I's' of stakeholders?
103. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
To make sure that all questions from potential sellers are answered privately
To make sure that potential sellers are treated as per the type of questions asked
To make sure that all potential sellers are treated equally and have access to the same information
To ensure that all parties get answers to their questions
Which of the following is the objective of conducting Bidder Conferences?
104. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
To make sure that all questions from potential sellers are answered privately
To make sure that potential sellers are treated as per the type of questions asked
To make sure that all potential sellers are treated equally and have access to the same information
To ensure that all parties get answers to their questions
Which of the following is the objective of conducting Bidder Conferences?
105. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Kanban
Kaizen
Deming Cycle
PDCA
What is the Japanese method of modern quality management called, which relies on continuing
small improvements involving everyone from the top management to the lowest level worker in
the organization?
106. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Kanban
Kaizen
Deming Cycle
PDCA
What is the Japanese method of modern quality management called, which relies on continuing
small improvements involving everyone from the top management to the lowest level worker in
the organization?
107. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sense of personal achievement, work satisfaction
Plush office space, performance-based salary raise
Work satisfaction, fringe benefit
Vacation time, assignment of a personal staff assistant
Herzberg divided motivation factors into two classes: satisfiers and dissatisfies. Which of the
following are the examples of satisfiers then?
108. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sense of personal achievement, work satisfaction
Plush office space, performance-based salary raise
Work satisfaction, fringe benefit
Vacation time, assignment of a personal staff assistant
Herzberg divided motivation factors into two classes: satisfiers and dissatisfies. Which of the
following are the examples of satisfiers then?