BANGALORE DEVELOPMENT AUTHORITY




   PRESENTATION ON LAKE
RESTORATION PROJECTS BEING
     TAKEN UP BY B.D.A.


                                   1
Bangalore Development Authority
Aims & Objectives:
 1.   Regulation and Planning of Bangalore Metropolitan Area.
 2.   BDA has a jurisdictional area of 1046 sq kms.
 3.   Formation of Residential Layouts and Allotment of Sites at
      subsidized rates to the needy people.
 4.   Taking up the required Infrastructure Facilities in Bangalore city
      such as Construction of Flyovers, Road Infrastructure, Construction
      of Complexes etc..
 5.   Construction of Affordable Housing Projects and Allotment of
      Houses to the needy people.
 6.   Environmental Conservation Initiatives Such as Lake Restoration
      projects, Enhancing Green Cover, Development of Parks etc.
Present Scenario of Lakes in Bangalore
• Bangalore City alone has got a total no of around 280
    to 300 lakes.
•   Lakes has lost its identity due to Rapid urbanization.
•   Majority of the lakes are filled with sewage.
•   Majority of the lakes have undergone encroachment of
    the lake areas, cropping up of unauthorized structures
    in the lake areas, dumping of garbage etc.
•   Absence of proper monitoring and maintenance
    system for lakes.
•   Absence of a proper funding mechanism for lakes.
IMPORTANCE OF LAKE RESTORATION PROJECTS
 Based on Government directions, as an environmental
  protection initiative BDA has taken up the conservation and
  preservation of Natural water Bodies to their original glory in
  and around Bangalore .City.
 For Prevention of Pollution
 To prevent encroachment
To develop the lake as a fresh water storage pond
 For Flood Mitigation
 To Preserve the Lake to its original Glory
To develop the lake as a recreational centre.
 To preserve and recharge the depleting underground water
  table.                                                            4
Methodology followed by BDA
 for Project Preparation
 Projects Prepared as Per National Lake Conservation programme
  (NLCP), MoEF, New Delhi Guidelines and with a Master plan
  concept.

 Sewage Diversion & Treatment Proposals prepared as per
  CPHEEO, MoUD, New Delhi Guidelines.

 Remodelling of Inlet/Outlet Channels inline with BBMP SWD
  Master Plan proposals.

 Lake boundary identification and Encroachment removal.

 Works Categorized into Core & Non Core Components.

 Works proposed to be taken up in two stages.


                                                                  5
Methodology followed by BDA for Lake Restoration Projects
   Removal of encroachment. & boundary fixing

   Chain link fencing all along the periphery of the lake to check unauthorized

    encroachment and dumping of debris & construction waste.

   Deweeding.

   Desilting.

   Formation of peripheral Bunds all along the periphery of the lake

   Construction of Wet lands to remove nutrients from non point source.

   Construction of Sewage Water Diversion channel / pipelines.

   Construction of Silt traps to check the entry of silt.

   Construction of Screen barriers to check the entry of floating objects.

                                                                              6
Methodology followed by BDA for Lake Restoration Projects

    Construction of RCC Storm Water inlets

    Improvements to the Waste Weir.

    Creation of islands for the re-habitation of birds.

    Landscaping and development of parks and childrens play area.

    Afforestation.

    Lighting all along the periphery of lakes.

    Construction of localized tertiary sewage treatment plants where ever
     necessary to maintain the water level in the lake for 365 days

    Supply of excess treated water to down stream lake series through
     separate pipeline


                                                                        7
Location of Lakes
                                   • Phase I – 13 Lakes
                                   • Phase II – 32 Lakes
                                   • Phase III – 78 Lakes




Legend
    Primary SWD
    Secondary SWD
    WaterBodies
    BDA Boundary
  Phase I   Phase II   Phase III
STATUS OF LAKE RESTORATION WORKS TAKEN UP BY B.D.A.
Sl No     Phase   Category Total No. Total No. Total No.    Total No   Lake Encroach Encroach
                   of work of Works of Works of works       of works   Area    ment      ment
                                     complete under        for which (A - G) Identified Cleared
                                         d     progress    Revenue            (A - G) (A - G)
                                                           certificati
                                                               on /
                                                            eviction
                                                             orders
                                                            pending



        1PHASE-1 Compreh      13        12         1          --    766 - 33   31 - 16    14 - 27
                 ensive
                 developm
                 ent of
                 Lakes
        2PHASE-2 Fencing      32        15        17          16    2373-37    57 - 36    04 - 24
                 works
                 Compreh       -         -         -          -         -         -          -
                 ensive
                 developm
                 ent of
                 Lakes
        3PHASE-3 Fencing      78        25         6          48    1917-17    187 - 00   44 - 00
                 works
           Total              123       52        24          64    5057 - 37 276 - 12    63 - 11
Total
                                                                          No. of   Tenders     Revenue
                       Total    Estimated                 Total No. of
                                            Expenditure                   works     under    certification
Sl.No       Phase      No. of     Cost                       Works
                                              In Crs                      under    process     pending
                       Works     In Crs                    completed
                                                                         progres                 Nos
                                                                            s
         Phase-1
         Comprehe
 1       nsive
         developme
         nt of Lakes    13       90.21        87.51           12           1          -            -

         Phase-2
         Fencing
         works          32       19.50         3.70           15           17         -           16

 2       Comprehe
         nsive
         developme
         nt of Lakes
                         -       541.50          -             -            -         -            -
         Phase-3
 3       Fencing
         works          78                       -            25           06        47           48

        Total           123      876.21       91.21           52           24        47           64
                                                                                                   10
Details of Revenue Certification, Rehabilitation, Sewage and Lake Feeding
                                     ABSTRACT
Sl No    Phase   Category Total No. Total No. Total No. Total No Total No       Total No Total No. of
                 of work of Works of Works of works of lakes of Lakes           of Lakes Lakes which
                                    completed under      for which for which   which are   require
                                              progress Revenue rehabilitat      polluted feeding of
                                                        certificatio ion is    by sewage   treated
                                                             n/     required                water
                                                          eviction
                                                           orders
                                                          pending

        PHASE-1 Comprehe     13        12         1        03         05           -         03
                nsive                                               (211)
 1              developme
                nt of
                Lakes
        PHASE-2 Fencing      32        15        17        16         17          26         22
                works                                               (1031)

                Comprehe      -         -                   -         -            -          -
 2              nsive
                developme
                nt of
                Lakes
        PHASE-3 Fencing      78        25         6        48         35          55         37
 3              works                                               (1069)

         Total              123        52        24        68       57            81         62
                                                                  (2311)
B. NARAYANAPURA LAKE:-   SEWAGE ENTRY




B. NARAYANAPURA LAKE: ENCROACHMENT IN TANK AREA
KALKERE- RAMPURA LAKE:- GARBAGE DUMPING SEWAGE ENTRY




                  VIBUTHIPURA LAKE:-
             ENCROACHMENT & SEWAGE ENTRY
Chain link fencing to               Chain link fencing to
Lingadeeranahalli Lake (32 Lakes)   Chikkabettahalli Lake
                                    (32 Lakes)
Chain link fencing of Gandhinagara Hosakere
Barbed wire Fencing to Sooli Kere




                                    Chain link fencing of Gandhinagara Hosakere
Completed Projects – Mallathahalli LAKE (13 Lakes)




Newly Commissioned 5.0 MLD STP near Malathahalli Lake   16
Completed Projects – Mallathahalli LAKE




  Sewage entry through SWD                            Sewage diverted to STP.
  before commissioning of STP                         No sewage entry into lake




                                          Lake filled with tertiary treated water
     Lake view after restoration          after restoration                         17
Mallathahalli LAKE




                     18
Before
          Ullala Lake




During




                 After




                    19
Kommaghatta Lake
                             After


Before



During




         After Restoration




                                     20
Before
                  Sompura Lake
                       After




         During




                               21
The following are the issues which had slowed down the progress
of lake restoration works.

• All the lakes are transferred from BBMP / Forest Department to BDA
 for further development / maintenance, wherein the majority of the
 lakes are encroached, polluted with sewage and garbage dumping.

• Any lake restoration project has to be started with revenue survey of
 the lake area, identification of encroachment, demarcation of
 encroachment and finally eviction of encroachment which has to be
 done by the revenue department, since the proprietary of all the lakes
 vests with the revenue department.

•The clearance of encroachment on the lake areas is one of the serious
 issues which has slowed down the progress of lake works. In 64 cases the
 certification of encroachment, issue of eviction orders are pending which
 has to be taken up on priority.
• 81 Lakes under BDA control are affected by huge sewage flows, which has to be
  connected from the source to the main trunk sewer lines through a conduit which
  has to be taken up by BWSSB on priority.

• Since the majority of the lakes in the core areas of the city are encroached, which has
 huge no of habitants, wherein rehabilitation of such encroachers has to be taken up on
 priority. As a rough estimate 57 lakes contains 2311 No’s of un-authorized habitants
 which needs to be rehabilitated. This issue is to be taken up on top priority by the
 Urban Deputy Commissioner and The Commissioner Slum Board.

• In majority of the lakes, the Rajakaluves connecting lake to lake to transport the
 surplus water are non existant which has led to flooding, loss of property etc. So these
 Rajakaluves has to be demarcated on ground, encroachments to be removed and an
 earthen section of the Rajakaluve has to be provided for a free flow .

• Lack of adequate financial resources .

• Lack of proper maintenance mechanism.

• Lack of adequate man power .
                                                                                      23
 There should be a more rigorous approach from the revenue
  authorities in tackling encroachments and related issues.
 Strict penal actions from the enforcing authorities in tackling
  encroachments, dumping of garbage, Entry of sewage into the lakes.
 There should be an integrated sewage network system for the entire
  Bangalore Metropolitan area, to be addressed by BWSSB on top
  priority.
 The Rehabilitation of the un-authorized habitants on the lake areas
  has to be taken up on priority by the Slum Development Board and
  the Revenue Authorities.
 The existing lake development authority should be made as a single
  nodal agency who can execute, enforce, monitor, maintain all urban
  lakes.
 The existing Lake Development Authority should be strengthened
  with adequate man power.
 A proper funding mechanism should be developed to provide
 adequate funds for execution and maintenance of lake systems.
25

More Related Content

What's hot

River front development
River front developmentRiver front development
River front developmentBismi S
 
Bangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBhargavi Rao
 
Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes RestorationPigtail Pundits
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 ExamplesRohit Kumar Singh
 
District and City Plan of Varanasi UP
District and City Plan of Varanasi UPDistrict and City Plan of Varanasi UP
District and City Plan of Varanasi UPAdithyaA16
 
India's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIndia's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIWRS Society
 
Yamuna action plan
Yamuna action plan Yamuna action plan
Yamuna action plan Shailja km
 
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATIONA STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATIONAmartya Jha
 
Overview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionOverview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionAman Kudesia
 
Fieldy study report: Buddhanagar neighbourhood structure
Fieldy study report: Buddhanagar neighbourhood structureFieldy study report: Buddhanagar neighbourhood structure
Fieldy study report: Buddhanagar neighbourhood structureAmit Pokharel
 
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1Riddhi Vakharia
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONYash Shah
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresPrasad Thanthratey
 
A presentation on Ganga pollution Varanasi
A presentation on Ganga pollution VaranasiA presentation on Ganga pollution Varanasi
A presentation on Ganga pollution VaranasiShubham Chaturvedi
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront developmentmisschand
 

What's hot (20)

River front development
River front developmentRiver front development
River front development
 
Bangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground water
 
Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes Restoration
 
Mithi river action plan presentation
Mithi river action plan presentationMithi river action plan presentation
Mithi river action plan presentation
 
River - Front Development with 2 Examples
River - Front Development with 2 ExamplesRiver - Front Development with 2 Examples
River - Front Development with 2 Examples
 
District and City Plan of Varanasi UP
District and City Plan of Varanasi UPDistrict and City Plan of Varanasi UP
District and City Plan of Varanasi UP
 
India's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for ImplementationIndia's Water Policy and Strategy for Implementation
India's Water Policy and Strategy for Implementation
 
Vembanad kol wetland system
Vembanad kol wetland systemVembanad kol wetland system
Vembanad kol wetland system
 
Vembanad kol
Vembanad kolVembanad kol
Vembanad kol
 
Yamuna action plan
Yamuna action plan Yamuna action plan
Yamuna action plan
 
Canal revitalization
Canal revitalizationCanal revitalization
Canal revitalization
 
can the Cooum river be cleaned
can the Cooum river be cleanedcan the Cooum river be cleaned
can the Cooum river be cleaned
 
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATIONA STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
 
Overview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan RegionOverview - Bangalore Metropolitan Region
Overview - Bangalore Metropolitan Region
 
Fieldy study report: Buddhanagar neighbourhood structure
Fieldy study report: Buddhanagar neighbourhood structureFieldy study report: Buddhanagar neighbourhood structure
Fieldy study report: Buddhanagar neighbourhood structure
 
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1Institutional changes in peri urban areas  a ase of bopal ghuma nagarplaika 1
Institutional changes in peri urban areas a ase of bopal ghuma nagarplaika 1
 
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGIONREGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
REGIONAL PLAN: A CASE OF MUMBAI METROPOLITAN REGION
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
A presentation on Ganga pollution Varanasi
A presentation on Ganga pollution VaranasiA presentation on Ganga pollution Varanasi
A presentation on Ganga pollution Varanasi
 
Riverfront development
Riverfront developmentRiverfront development
Riverfront development
 

Viewers also liked

Lake Privatisation
Lake PrivatisationLake Privatisation
Lake PrivatisationBhargavi Rao
 
Lake Development Authority_CEO
Lake Development Authority_CEOLake Development Authority_CEO
Lake Development Authority_CEOEkonnect
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGEkonnect Knowledge Foundation
 
RECONSTRUCTION OF LAKES IN BANGALORE
RECONSTRUCTION OF LAKES IN BANGALORERECONSTRUCTION OF LAKES IN BANGALORE
RECONSTRUCTION OF LAKES IN BANGALOREBangalore Property
 
Water conservation
Water conservationWater conservation
Water conservationHans kaushik
 
Development and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMPDevelopment and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMPEkonnect
 
Technical Paper Water Demand Management For Bangalore City
Technical Paper Water Demand Management For Bangalore CityTechnical Paper Water Demand Management For Bangalore City
Technical Paper Water Demand Management For Bangalore CityDEEPAK MALLICK
 
Study on open wells in yamalur watershed, bengaluru a historical perspective
Study on open wells in yamalur watershed, bengaluru  a historical perspectiveStudy on open wells in yamalur watershed, bengaluru  a historical perspective
Study on open wells in yamalur watershed, bengaluru a historical perspectivebiomeshubha
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Ekonnect Knowledge Foundation
 
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Sweet Water
 
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert MonnatSweet Water
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesEkonnect
 

Viewers also liked (20)

Lake Privatisation
Lake PrivatisationLake Privatisation
Lake Privatisation
 
Cleaning lakes
Cleaning lakesCleaning lakes
Cleaning lakes
 
Lake & Pond Cleaning
Lake & Pond CleaningLake & Pond Cleaning
Lake & Pond Cleaning
 
Lake restoration
Lake restorationLake restoration
Lake restoration
 
Lake Development Authority_CEO
Lake Development Authority_CEOLake Development Authority_CEO
Lake Development Authority_CEO
 
Muskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success StoryMuskegon Lake Restoration: A Success Story
Muskegon Lake Restoration: A Success Story
 
Strategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESGStrategic Action Planning for Revival of Bangalore Lakes _ESG
Strategic Action Planning for Revival of Bangalore Lakes _ESG
 
RECONSTRUCTION OF LAKES IN BANGALORE
RECONSTRUCTION OF LAKES IN BANGALORERECONSTRUCTION OF LAKES IN BANGALORE
RECONSTRUCTION OF LAKES IN BANGALORE
 
Water conservation
Water conservationWater conservation
Water conservation
 
Vadgaon lake
Vadgaon lakeVadgaon lake
Vadgaon lake
 
The Restoration of A Lake - Kundawada Kere
The Restoration of A Lake - Kundawada KereThe Restoration of A Lake - Kundawada Kere
The Restoration of A Lake - Kundawada Kere
 
Communication ( Basic Process and Ways to Improve)
Communication ( Basic Process and Ways to Improve)Communication ( Basic Process and Ways to Improve)
Communication ( Basic Process and Ways to Improve)
 
Development and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMPDevelopment and Maintenance of Lakes_BBMP
Development and Maintenance of Lakes_BBMP
 
Technical Paper Water Demand Management For Bangalore City
Technical Paper Water Demand Management For Bangalore CityTechnical Paper Water Demand Management For Bangalore City
Technical Paper Water Demand Management For Bangalore City
 
Vegetable & fruit entreprenuer
Vegetable & fruit entreprenuerVegetable & fruit entreprenuer
Vegetable & fruit entreprenuer
 
Study on open wells in yamalur watershed, bengaluru a historical perspective
Study on open wells in yamalur watershed, bengaluru  a historical perspectiveStudy on open wells in yamalur watershed, bengaluru  a historical perspective
Study on open wells in yamalur watershed, bengaluru a historical perspective
 
Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore Assessment Derived Conservation Strategies for Lakes in Bangalore
Assessment Derived Conservation Strategies for Lakes in Bangalore
 
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
Clean Rivers, Clean Lake 8 -- Restoration Issues/Root River Restoration Plan ...
 
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert MonnatClean Rivers, Clean Lake 8 -- Leveraging Resources --  Robert Monnat
Clean Rivers, Clean Lake 8 -- Leveraging Resources -- Robert Monnat
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 

Similar to Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Authority

Towards A Sustainable Drainage Solution
Towards A Sustainable Drainage SolutionTowards A Sustainable Drainage Solution
Towards A Sustainable Drainage Solutionceal2005
 
WEF Stormwater Trends Webinar
WEF Stormwater Trends WebinarWEF Stormwater Trends Webinar
WEF Stormwater Trends Webinarcrockettc
 
Cawasa newsletter 2nd quarter 2012
Cawasa newsletter   2nd quarter 2012Cawasa newsletter   2nd quarter 2012
Cawasa newsletter 2nd quarter 2012CAWASA
 
Reducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer ExtensionsReducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer ExtensionsChesapeake Bay Foundation
 
Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008GreenHomeNYC
 
Groundwater Update and Remedial Optimization Process Overview
Groundwater Update and Remedial Optimization Process OverviewGroundwater Update and Remedial Optimization Process Overview
Groundwater Update and Remedial Optimization Process OverviewSteve Williams
 
Cape Cod Regional Wastewater Management Plan Overview
Cape Cod Regional Wastewater Management Plan OverviewCape Cod Regional Wastewater Management Plan Overview
Cape Cod Regional Wastewater Management Plan OverviewBuzzards Bay Coalition
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGDEEPAK MALLICK
 
2-2_2. master plans bulgaria 2012
2-2_2. master plans bulgaria   20122-2_2. master plans bulgaria   2012
2-2_2. master plans bulgaria 2012YWPBulgaria
 
Enduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc LimitedEnduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc LimitedIndia Water Portal
 
Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...
Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...
Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...Healthy Lakes, Healthy Lives
 
When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?sneapa
 

Similar to Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Authority (20)

Integrated modeling of RMS impacts: Hydrological processes, and water resourc...
Integrated modeling of RMS impacts: Hydrological processes, and water resourc...Integrated modeling of RMS impacts: Hydrological processes, and water resourc...
Integrated modeling of RMS impacts: Hydrological processes, and water resourc...
 
Towards A Sustainable Drainage Solution
Towards A Sustainable Drainage SolutionTowards A Sustainable Drainage Solution
Towards A Sustainable Drainage Solution
 
Wb final presentation
Wb final presentationWb final presentation
Wb final presentation
 
WEF Stormwater Trends Webinar
WEF Stormwater Trends WebinarWEF Stormwater Trends Webinar
WEF Stormwater Trends Webinar
 
23.02.11
23.02.1123.02.11
23.02.11
 
Nisqually Thin Project
Nisqually Thin ProjectNisqually Thin Project
Nisqually Thin Project
 
ORP FY13 Budget Workshop
ORP FY13 Budget WorkshopORP FY13 Budget Workshop
ORP FY13 Budget Workshop
 
Cawasa newsletter 2nd quarter 2012
Cawasa newsletter   2nd quarter 2012Cawasa newsletter   2nd quarter 2012
Cawasa newsletter 2nd quarter 2012
 
Reducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer ExtensionsReducing Wastewater Pollution: Upgrades and Sewer Extensions
Reducing Wastewater Pollution: Upgrades and Sewer Extensions
 
Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008Stormwater GreenHomeNYC August 2008
Stormwater GreenHomeNYC August 2008
 
Groundwater Update and Remedial Optimization Process Overview
Groundwater Update and Remedial Optimization Process OverviewGroundwater Update and Remedial Optimization Process Overview
Groundwater Update and Remedial Optimization Process Overview
 
Water Talks : Regional Seawater Desalination
Water Talks : Regional Seawater DesalinationWater Talks : Regional Seawater Desalination
Water Talks : Regional Seawater Desalination
 
Cape Cod Regional Wastewater Management Plan Overview
Cape Cod Regional Wastewater Management Plan OverviewCape Cod Regional Wastewater Management Plan Overview
Cape Cod Regional Wastewater Management Plan Overview
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
 
Resource Recovery Panel
Resource Recovery PanelResource Recovery Panel
Resource Recovery Panel
 
2-2_2. master plans bulgaria 2012
2-2_2. master plans bulgaria   20122-2_2. master plans bulgaria   2012
2-2_2. master plans bulgaria 2012
 
Enduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc LimitedEnduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc Limited
 
Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...
Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...
Cleveland Harbor Sustainable Sediment Management Strategies-White, Carter-Cor...
 
Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3Dwirs community impact pres 4 4-13-v3
Dwirs community impact pres 4 4-13-v3
 
When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?When Do Stormwater Ulitilities Make Sense?
When Do Stormwater Ulitilities Make Sense?
 

Recently uploaded

IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsSafe Software
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024D Cloud Solutions
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXTarek Kalaji
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...DianaGray10
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Adtran
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Commit University
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarPrecisely
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 

Recently uploaded (20)

IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration WorkflowsIgniting Next Level Productivity with AI-Infused Data Integration Workflows
Igniting Next Level Productivity with AI-Infused Data Integration Workflows
 
Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024Artificial Intelligence & SEO Trends for 2024
Artificial Intelligence & SEO Trends for 2024
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
VoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBXVoIP Service and Marketing using Odoo and Asterisk PBX
VoIP Service and Marketing using Odoo and Asterisk PBX
 
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
Connector Corner: Extending LLM automation use cases with UiPath GenAI connec...
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™Meet the new FSP 3000 M-Flex800™
Meet the new FSP 3000 M-Flex800™
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)
 
AI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity WebinarAI You Can Trust - Ensuring Success with Data Integrity Webinar
AI You Can Trust - Ensuring Success with Data Integrity Webinar
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 

Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Authority

  • 1. BANGALORE DEVELOPMENT AUTHORITY PRESENTATION ON LAKE RESTORATION PROJECTS BEING TAKEN UP BY B.D.A. 1
  • 2. Bangalore Development Authority Aims & Objectives: 1. Regulation and Planning of Bangalore Metropolitan Area. 2. BDA has a jurisdictional area of 1046 sq kms. 3. Formation of Residential Layouts and Allotment of Sites at subsidized rates to the needy people. 4. Taking up the required Infrastructure Facilities in Bangalore city such as Construction of Flyovers, Road Infrastructure, Construction of Complexes etc.. 5. Construction of Affordable Housing Projects and Allotment of Houses to the needy people. 6. Environmental Conservation Initiatives Such as Lake Restoration projects, Enhancing Green Cover, Development of Parks etc.
  • 3. Present Scenario of Lakes in Bangalore • Bangalore City alone has got a total no of around 280 to 300 lakes. • Lakes has lost its identity due to Rapid urbanization. • Majority of the lakes are filled with sewage. • Majority of the lakes have undergone encroachment of the lake areas, cropping up of unauthorized structures in the lake areas, dumping of garbage etc. • Absence of proper monitoring and maintenance system for lakes. • Absence of a proper funding mechanism for lakes.
  • 4. IMPORTANCE OF LAKE RESTORATION PROJECTS  Based on Government directions, as an environmental protection initiative BDA has taken up the conservation and preservation of Natural water Bodies to their original glory in and around Bangalore .City.  For Prevention of Pollution  To prevent encroachment To develop the lake as a fresh water storage pond  For Flood Mitigation  To Preserve the Lake to its original Glory To develop the lake as a recreational centre.  To preserve and recharge the depleting underground water table. 4
  • 5. Methodology followed by BDA for Project Preparation  Projects Prepared as Per National Lake Conservation programme (NLCP), MoEF, New Delhi Guidelines and with a Master plan concept.  Sewage Diversion & Treatment Proposals prepared as per CPHEEO, MoUD, New Delhi Guidelines.  Remodelling of Inlet/Outlet Channels inline with BBMP SWD Master Plan proposals.  Lake boundary identification and Encroachment removal.  Works Categorized into Core & Non Core Components.  Works proposed to be taken up in two stages. 5
  • 6. Methodology followed by BDA for Lake Restoration Projects  Removal of encroachment. & boundary fixing  Chain link fencing all along the periphery of the lake to check unauthorized encroachment and dumping of debris & construction waste.  Deweeding.  Desilting.  Formation of peripheral Bunds all along the periphery of the lake  Construction of Wet lands to remove nutrients from non point source.  Construction of Sewage Water Diversion channel / pipelines.  Construction of Silt traps to check the entry of silt.  Construction of Screen barriers to check the entry of floating objects. 6
  • 7. Methodology followed by BDA for Lake Restoration Projects  Construction of RCC Storm Water inlets  Improvements to the Waste Weir.  Creation of islands for the re-habitation of birds.  Landscaping and development of parks and childrens play area.  Afforestation.  Lighting all along the periphery of lakes.  Construction of localized tertiary sewage treatment plants where ever necessary to maintain the water level in the lake for 365 days  Supply of excess treated water to down stream lake series through separate pipeline 7
  • 8. Location of Lakes • Phase I – 13 Lakes • Phase II – 32 Lakes • Phase III – 78 Lakes Legend Primary SWD Secondary SWD WaterBodies BDA Boundary Phase I Phase II Phase III
  • 9. STATUS OF LAKE RESTORATION WORKS TAKEN UP BY B.D.A. Sl No Phase Category Total No. Total No. Total No. Total No Lake Encroach Encroach of work of Works of Works of works of works Area ment ment complete under for which (A - G) Identified Cleared d progress Revenue (A - G) (A - G) certificati on / eviction orders pending 1PHASE-1 Compreh 13 12 1 -- 766 - 33 31 - 16 14 - 27 ensive developm ent of Lakes 2PHASE-2 Fencing 32 15 17 16 2373-37 57 - 36 04 - 24 works Compreh - - - - - - - ensive developm ent of Lakes 3PHASE-3 Fencing 78 25 6 48 1917-17 187 - 00 44 - 00 works Total 123 52 24 64 5057 - 37 276 - 12 63 - 11
  • 10. Total No. of Tenders Revenue Total Estimated Total No. of Expenditure works under certification Sl.No Phase No. of Cost Works In Crs under process pending Works In Crs completed progres Nos s Phase-1 Comprehe 1 nsive developme nt of Lakes 13 90.21 87.51 12 1 - - Phase-2 Fencing works 32 19.50 3.70 15 17 - 16 2 Comprehe nsive developme nt of Lakes - 541.50 - - - - - Phase-3 3 Fencing works 78 - 25 06 47 48 Total 123 876.21 91.21 52 24 47 64 10
  • 11. Details of Revenue Certification, Rehabilitation, Sewage and Lake Feeding ABSTRACT Sl No Phase Category Total No. Total No. Total No. Total No Total No Total No Total No. of of work of Works of Works of works of lakes of Lakes of Lakes Lakes which completed under for which for which which are require progress Revenue rehabilitat polluted feeding of certificatio ion is by sewage treated n/ required water eviction orders pending PHASE-1 Comprehe 13 12 1 03 05 - 03 nsive (211) 1 developme nt of Lakes PHASE-2 Fencing 32 15 17 16 17 26 22 works (1031) Comprehe - - - - - - 2 nsive developme nt of Lakes PHASE-3 Fencing 78 25 6 48 35 55 37 3 works (1069) Total 123 52 24 68 57 81 62 (2311)
  • 12. B. NARAYANAPURA LAKE:- SEWAGE ENTRY B. NARAYANAPURA LAKE: ENCROACHMENT IN TANK AREA
  • 13. KALKERE- RAMPURA LAKE:- GARBAGE DUMPING SEWAGE ENTRY VIBUTHIPURA LAKE:- ENCROACHMENT & SEWAGE ENTRY
  • 14. Chain link fencing to Chain link fencing to Lingadeeranahalli Lake (32 Lakes) Chikkabettahalli Lake (32 Lakes)
  • 15. Chain link fencing of Gandhinagara Hosakere Barbed wire Fencing to Sooli Kere Chain link fencing of Gandhinagara Hosakere
  • 16. Completed Projects – Mallathahalli LAKE (13 Lakes) Newly Commissioned 5.0 MLD STP near Malathahalli Lake 16
  • 17. Completed Projects – Mallathahalli LAKE Sewage entry through SWD Sewage diverted to STP. before commissioning of STP No sewage entry into lake Lake filled with tertiary treated water Lake view after restoration after restoration 17
  • 19. Before Ullala Lake During After 19
  • 20. Kommaghatta Lake After Before During After Restoration 20
  • 21. Before Sompura Lake After During 21
  • 22. The following are the issues which had slowed down the progress of lake restoration works. • All the lakes are transferred from BBMP / Forest Department to BDA for further development / maintenance, wherein the majority of the lakes are encroached, polluted with sewage and garbage dumping. • Any lake restoration project has to be started with revenue survey of the lake area, identification of encroachment, demarcation of encroachment and finally eviction of encroachment which has to be done by the revenue department, since the proprietary of all the lakes vests with the revenue department. •The clearance of encroachment on the lake areas is one of the serious issues which has slowed down the progress of lake works. In 64 cases the certification of encroachment, issue of eviction orders are pending which has to be taken up on priority.
  • 23. • 81 Lakes under BDA control are affected by huge sewage flows, which has to be connected from the source to the main trunk sewer lines through a conduit which has to be taken up by BWSSB on priority. • Since the majority of the lakes in the core areas of the city are encroached, which has huge no of habitants, wherein rehabilitation of such encroachers has to be taken up on priority. As a rough estimate 57 lakes contains 2311 No’s of un-authorized habitants which needs to be rehabilitated. This issue is to be taken up on top priority by the Urban Deputy Commissioner and The Commissioner Slum Board. • In majority of the lakes, the Rajakaluves connecting lake to lake to transport the surplus water are non existant which has led to flooding, loss of property etc. So these Rajakaluves has to be demarcated on ground, encroachments to be removed and an earthen section of the Rajakaluve has to be provided for a free flow . • Lack of adequate financial resources . • Lack of proper maintenance mechanism. • Lack of adequate man power . 23
  • 24.  There should be a more rigorous approach from the revenue authorities in tackling encroachments and related issues.  Strict penal actions from the enforcing authorities in tackling encroachments, dumping of garbage, Entry of sewage into the lakes.  There should be an integrated sewage network system for the entire Bangalore Metropolitan area, to be addressed by BWSSB on top priority.  The Rehabilitation of the un-authorized habitants on the lake areas has to be taken up on priority by the Slum Development Board and the Revenue Authorities.  The existing lake development authority should be made as a single nodal agency who can execute, enforce, monitor, maintain all urban lakes.  The existing Lake Development Authority should be strengthened with adequate man power.  A proper funding mechanism should be developed to provide adequate funds for execution and maintenance of lake systems.
  • 25. 25

Editor's Notes

  1. Phase I – 13 Lakes Phase II – 32 Lakes Phase III – 78 Lakes