2. Bangalore Development Authority
Aims & Objectives:
1. Regulation and Planning of Bangalore Metropolitan Area.
2. BDA has a jurisdictional area of 1046 sq kms.
3. Formation of Residential Layouts and Allotment of Sites at
subsidized rates to the needy people.
4. Taking up the required Infrastructure Facilities in Bangalore city
such as Construction of Flyovers, Road Infrastructure, Construction
of Complexes etc..
5. Construction of Affordable Housing Projects and Allotment of
Houses to the needy people.
6. Environmental Conservation Initiatives Such as Lake Restoration
projects, Enhancing Green Cover, Development of Parks etc.
3. Present Scenario of Lakes in Bangalore
• Bangalore City alone has got a total no of around 280
to 300 lakes.
• Lakes has lost its identity due to Rapid urbanization.
• Majority of the lakes are filled with sewage.
• Majority of the lakes have undergone encroachment of
the lake areas, cropping up of unauthorized structures
in the lake areas, dumping of garbage etc.
• Absence of proper monitoring and maintenance
system for lakes.
• Absence of a proper funding mechanism for lakes.
4. IMPORTANCE OF LAKE RESTORATION PROJECTS
Based on Government directions, as an environmental
protection initiative BDA has taken up the conservation and
preservation of Natural water Bodies to their original glory in
and around Bangalore .City.
For Prevention of Pollution
To prevent encroachment
To develop the lake as a fresh water storage pond
For Flood Mitigation
To Preserve the Lake to its original Glory
To develop the lake as a recreational centre.
To preserve and recharge the depleting underground water
table. 4
5. Methodology followed by BDA
for Project Preparation
Projects Prepared as Per National Lake Conservation programme
(NLCP), MoEF, New Delhi Guidelines and with a Master plan
concept.
Sewage Diversion & Treatment Proposals prepared as per
CPHEEO, MoUD, New Delhi Guidelines.
Remodelling of Inlet/Outlet Channels inline with BBMP SWD
Master Plan proposals.
Lake boundary identification and Encroachment removal.
Works Categorized into Core & Non Core Components.
Works proposed to be taken up in two stages.
5
6. Methodology followed by BDA for Lake Restoration Projects
Removal of encroachment. & boundary fixing
Chain link fencing all along the periphery of the lake to check unauthorized
encroachment and dumping of debris & construction waste.
Deweeding.
Desilting.
Formation of peripheral Bunds all along the periphery of the lake
Construction of Wet lands to remove nutrients from non point source.
Construction of Sewage Water Diversion channel / pipelines.
Construction of Silt traps to check the entry of silt.
Construction of Screen barriers to check the entry of floating objects.
6
7. Methodology followed by BDA for Lake Restoration Projects
Construction of RCC Storm Water inlets
Improvements to the Waste Weir.
Creation of islands for the re-habitation of birds.
Landscaping and development of parks and childrens play area.
Afforestation.
Lighting all along the periphery of lakes.
Construction of localized tertiary sewage treatment plants where ever
necessary to maintain the water level in the lake for 365 days
Supply of excess treated water to down stream lake series through
separate pipeline
7
8. Location of Lakes
• Phase I – 13 Lakes
• Phase II – 32 Lakes
• Phase III – 78 Lakes
Legend
Primary SWD
Secondary SWD
WaterBodies
BDA Boundary
Phase I Phase II Phase III
9. STATUS OF LAKE RESTORATION WORKS TAKEN UP BY B.D.A.
Sl No Phase Category Total No. Total No. Total No. Total No Lake Encroach Encroach
of work of Works of Works of works of works Area ment ment
complete under for which (A - G) Identified Cleared
d progress Revenue (A - G) (A - G)
certificati
on /
eviction
orders
pending
1PHASE-1 Compreh 13 12 1 -- 766 - 33 31 - 16 14 - 27
ensive
developm
ent of
Lakes
2PHASE-2 Fencing 32 15 17 16 2373-37 57 - 36 04 - 24
works
Compreh - - - - - - -
ensive
developm
ent of
Lakes
3PHASE-3 Fencing 78 25 6 48 1917-17 187 - 00 44 - 00
works
Total 123 52 24 64 5057 - 37 276 - 12 63 - 11
10. Total
No. of Tenders Revenue
Total Estimated Total No. of
Expenditure works under certification
Sl.No Phase No. of Cost Works
In Crs under process pending
Works In Crs completed
progres Nos
s
Phase-1
Comprehe
1 nsive
developme
nt of Lakes 13 90.21 87.51 12 1 - -
Phase-2
Fencing
works 32 19.50 3.70 15 17 - 16
2 Comprehe
nsive
developme
nt of Lakes
- 541.50 - - - - -
Phase-3
3 Fencing
works 78 - 25 06 47 48
Total 123 876.21 91.21 52 24 47 64
10
11. Details of Revenue Certification, Rehabilitation, Sewage and Lake Feeding
ABSTRACT
Sl No Phase Category Total No. Total No. Total No. Total No Total No Total No Total No. of
of work of Works of Works of works of lakes of Lakes of Lakes Lakes which
completed under for which for which which are require
progress Revenue rehabilitat polluted feeding of
certificatio ion is by sewage treated
n/ required water
eviction
orders
pending
PHASE-1 Comprehe 13 12 1 03 05 - 03
nsive (211)
1 developme
nt of
Lakes
PHASE-2 Fencing 32 15 17 16 17 26 22
works (1031)
Comprehe - - - - - -
2 nsive
developme
nt of
Lakes
PHASE-3 Fencing 78 25 6 48 35 55 37
3 works (1069)
Total 123 52 24 68 57 81 62
(2311)
14. Chain link fencing to Chain link fencing to
Lingadeeranahalli Lake (32 Lakes) Chikkabettahalli Lake
(32 Lakes)
15. Chain link fencing of Gandhinagara Hosakere
Barbed wire Fencing to Sooli Kere
Chain link fencing of Gandhinagara Hosakere
16. Completed Projects – Mallathahalli LAKE (13 Lakes)
Newly Commissioned 5.0 MLD STP near Malathahalli Lake 16
17. Completed Projects – Mallathahalli LAKE
Sewage entry through SWD Sewage diverted to STP.
before commissioning of STP No sewage entry into lake
Lake filled with tertiary treated water
Lake view after restoration after restoration 17
22. The following are the issues which had slowed down the progress
of lake restoration works.
• All the lakes are transferred from BBMP / Forest Department to BDA
for further development / maintenance, wherein the majority of the
lakes are encroached, polluted with sewage and garbage dumping.
• Any lake restoration project has to be started with revenue survey of
the lake area, identification of encroachment, demarcation of
encroachment and finally eviction of encroachment which has to be
done by the revenue department, since the proprietary of all the lakes
vests with the revenue department.
•The clearance of encroachment on the lake areas is one of the serious
issues which has slowed down the progress of lake works. In 64 cases the
certification of encroachment, issue of eviction orders are pending which
has to be taken up on priority.
23. • 81 Lakes under BDA control are affected by huge sewage flows, which has to be
connected from the source to the main trunk sewer lines through a conduit which
has to be taken up by BWSSB on priority.
• Since the majority of the lakes in the core areas of the city are encroached, which has
huge no of habitants, wherein rehabilitation of such encroachers has to be taken up on
priority. As a rough estimate 57 lakes contains 2311 No’s of un-authorized habitants
which needs to be rehabilitated. This issue is to be taken up on top priority by the
Urban Deputy Commissioner and The Commissioner Slum Board.
• In majority of the lakes, the Rajakaluves connecting lake to lake to transport the
surplus water are non existant which has led to flooding, loss of property etc. So these
Rajakaluves has to be demarcated on ground, encroachments to be removed and an
earthen section of the Rajakaluve has to be provided for a free flow .
• Lack of adequate financial resources .
• Lack of proper maintenance mechanism.
• Lack of adequate man power .
23
24. There should be a more rigorous approach from the revenue
authorities in tackling encroachments and related issues.
Strict penal actions from the enforcing authorities in tackling
encroachments, dumping of garbage, Entry of sewage into the lakes.
There should be an integrated sewage network system for the entire
Bangalore Metropolitan area, to be addressed by BWSSB on top
priority.
The Rehabilitation of the un-authorized habitants on the lake areas
has to be taken up on priority by the Slum Development Board and
the Revenue Authorities.
The existing lake development authority should be made as a single
nodal agency who can execute, enforce, monitor, maintain all urban
lakes.
The existing Lake Development Authority should be strengthened
with adequate man power.
A proper funding mechanism should be developed to provide
adequate funds for execution and maintenance of lake systems.