Eu strategy for ertms deployment j. schlichting and p. buhrsch
1. DB Netz AG
ETCS Programme Management (I.NXC, I.NXS)
GSI 2, NVE 2
Riga, 22 June 2015
ETCS Programme Management
TEN-T Days on 22 June 2015
2. The current projects of DB Netz AG cover approx.
2,500 km of double tracks
In the coming years approx. 2,500 km of
tracks will be equipped with ETCS
through current and planned projects;
approx. 1,450 km thereof along ERTMS
Corridor A until 2022.
According to the current plans the Class B
Train Control System LZB will be
replaced with ETCS Level 2 by 2030 –
in total around 2.500 km.
Furthermore obligation to equip the
TEN-network in Germany with ETCS until
2050 (16,000 km)
One overall approach and strategy required
TEN-T Days on 22 June 2015 2
Current situation
3. In October 2015 the ETCS Programme took over the leading
role of coordinating the several ETCS related activities inside DB Netz
Overview ETCS programme management
Development of a medium- and long-term deployment strategy for ETCS in the network of DB Netz AG
Coordination of all strategic and technological activities related to the ETCS implementation –
one central ETCS programme management with the responsibility for
– planning and delivery
– strategy and technology
The ETCS programme management tgeam acts as the central contact point of DB Netz AG concerning
all ETCS-related topics internally and externally
Tasks
3TEN-T Days on 22 June 2015
Organisational Structure
ETCS Programme Management
Planning and
Delivery (I.NXC)
Strategy and
Technology (I.NXS)
Planning&Delivery
large-scale projects
Risk & Chance
Management
Planning/Delivery
Project Corridor A
ETCS Strategy ETCS Technology
4. DB Netz AG appreciates the EU-Initiative to agree on a new
European Deployment Plan
4
The goal of writing a realistic deployment
plan is appreciated and fully supported
The TOCs’ concerns are focused on and are
decisive for a new EDP
The protection of investments requires
stability in baseline 3
Approx. 2.500 km of ETCS equipment in
current projects (incl. Corridor A); two-step
approach is appreciated and prioritized
according to a set of criteria
With an increasing number of tracks to be
equipped economies of scale shall be
generated
Proposal ERTMS Work Plan Position DB Netz AG
Goal: Realistic & committed deployment plan
Principle: “Users first”
Specification: focus on stability
Equipment in Germany:
1. Corridor A and cross-border sections
2. TEN-Corridors
Cost reduction through ERTMS
TEN-T Days on 22 June 2015
5. Focus on cross-border sections – to ensure cooperation
of the involved states and therefore interoperability
Equipment of the TEN Corridors in 2 steps:
1st Step:
Commissioning 12 cross-border sections until 2020
Commissioning Corridor A in 2022
2nd Step:
Completion of remaining TEN-corridor sections by 2030
EU proposal: equip cross-border sections until 2020,
Corridor A until 2022 and the complete TEN-corridors until 2030
EU prioritization
Nürnberg
Stuttgart Passau
Karlsruhe
Mannheim
Bad Bentheim
Frankfurt
(Oder)
Puttgarden
Leipzig
Regensburg
München
Kufstein
Dresden
Berlin
Rostock
Flensburg
Bremen
Aachen
Köln
Düsseldorf
Mainz
Frankfurt / Main
Würzburg
Kehl
Basel
Hannover
Hamburg
Emmerich
Bis 2020 Bis 2022 Bis 2030
5TEN-T Days on 22 June 2015
Conclusions drawn early 2015:
Equipping of all 12 cross-border sections until 2020 not feasible
For the identification of cross-border sections that could be
equipped with ETCS up to 2020 a mutual approach by the EU
Com, BMVI and DB Netz AG should be taken
The priorization-criteria for the necessary analysis should jointly
be agreed on
Agreement: Analysis to be finalized by end of April 2015
6. The feasibility study was conducted around five dimensions
Analyzed dimensions
1) German Federal Ministry of Transport
2) German Federal Ministry of Finance
Substantiated
feasibility
analysis incl.
prioritization
Interlockings (changeover and new constructions)
Decision L1LS/L2 (e.g. speed profiles)
Involvement of all regional business units
Traffic-related importance of cross-border sections
Future traffic development (Railway Undertakings and
Infrastructure Managers)
Redirected traffic due to other projects
Alternate routes for analysed cross-border section
Other projects at analysed cross-border section
Availability of stable and compatible SRS
Delivery capabilities of the signalling industry
Duration of plan approval procedures (NSA)
Cost estimates
Coordination with BMVI1 and BMF2
Time
Technology
Financing
Traffic
Operation
TEN-T Days on 22 June 2015 6
=
Ranking of cross-border sections according to points
calculated and achieved by each cross-border-section
Result:
+
+
+
+
7. EU-Com, BMVI1 and DB Netz AG agreed on installation and
commissioning of 6 cross-border sections with ETCS until 2020
7
Schematic overview of cross border sections
Stuttgart
Karlsruhe
Mannheim
Passau
Frankfurt
(Oder)
Puttgarden
Leipzig
Dresden
Rostock
Flensburg
Bremen
Aachen
Köln
Düsseldorf
Mainz
Frankfurt / Main
Würzburg
Kehl
Basel
Hannover
Emmerich
München
Kufstein
TEN Korridor
2016/17
2023?
9 km
2020
21km
2018/2025
6 km/73
km
2022
2025/2030
80km/120km
2020/2030
7km/210k
m
2020/2025
63km/124k
m
2023/2028
11km/55k
m
2020/offen
3km/150km
2020/2025
3km/229k
m
2025/offen
2km/offen
offen
107km
5 (2nd stage)
6 complete
ca. 1,000
5 (1st stage)
1 complete
ca. 105
To be
equipped
by 2020
To be
equipped
by 2030
Cross-border
sections/
constr. stages
Length [km]
Total
5
7
12
1,105
Status
05/05/2015
Commiss. date 1. stage / complete
Track lengtth 1. stage / complete
2022/2025
7 km/(73
km)
TEN-T Days on 22 June 2015
Assumptions:
ETCS-equipment in addition to existing PZB
Equipment dates and the planning of
transitions have to be harmonized with the
neighboring countries
Planning dates preliminary and depending on availability of
signed financing agreements
BerlinBad Bentheim
Hamburg
Regensburg
Nürnberg
1) German Federal Ministry of Transport
8. For the feasibility study concerning the entire TEN-corridors
the same method will be applied – target date April 2016
8
Analysed track lengths
TEN-T Days on 22 June 2015
12 cross-
border
sections
Approx.
1.350 km
Criteria-based
Analysis Result
1. step
until 2020
2. step
2020 - 2030
6 TEN-
Corridors
Approx.
7.200 km
Close, regular and mutual consultations of the European Commission,
German Federal Ministry of Transport and DB Netz AG
Procedure for the analysis of the equipment dates concerning the entire TEN-Corridors until 2030
6 cross-
border
sections
Approx.
105 km
6 cross-border sections
(approx. 1,000 km)
6 corridors
(XX,000 km)
April
2016
9. DB Netz AG is working on an ETCS rollout strategy
for the entire network of DB Netz AG beyond the TEN-corridors
Strategie ETCS Rollout
Schematic representation
ETCS-equipment outstanding
9.000
17.000
Length in km
1
2
3
What?
Scope & technology
When?
Schedule
How?
Implementation
tbd
In addition to existing projects, the TEN-
corridors and the TEN network, a consistent
ETCS strategy for the whole network will be
developed (33,000 km)
tdb
tbd
TEN-T Days on 22 June 2015 9
ETCS-equipment known/in discussion
tbd
tbd
7.000
16.000(TEN-network)
+