SlideShare a Scribd company logo
1 of 14
Muhammad Faisal Wattoo
CURRICULUM VITAE
Designation: Principal Engineer Costing,
Planning / Scheduling and
Contracts
Profession: Civil Engineer
Professional Experience: 14 Years
Present Employer SMEC-EGC Pvt. Ltd
Date of Birth: August 16, 1976
Contact Details: +923004577588,
faisal_wattoo843@hotmail.com
faisal_wattoo843 (Skype ID)
426-E1, WAPDA Town, Lahore
Nationality: Pakistani
Membership in Professional Societies:
• Pakistan Engineering Council CIVIL/22990.
• Pakistan Engineering Congress: 4835
• The Institute of Engineers, Pakistan: M-18363 / LHR-4778
Other Training:
• Continuing Professional Development Programme “Process Safety Management
course (0.5 CPD Point)” on March 26, 2012 in Lahore, Pakistan.
• 2-Days training Work Shop on PEC Contract Documents and PICC Cost Data
held in Pearl Continental Lahore on July 19-20, 2011, Pakistan.
• Training Course of Project Planning and Scheduling (Primavera P6) from
Pakistan Engineering Congress (Nov-2010).
• MS Project
• AutoCAD
Countries of Work Experience: Pakistan, Mozambique, Kenya
Detailed Tasks Assigned:
• Quantity/Cost Estimation, Planning/Scheduling, Documentation and Contracts
Key Qualifications:
14 years experience in Dams and Hydropower projects (funded/financed by World
Bank, Asian Development Bank and other funding agencies), infrastructure
projects including buildings and residential colonies. Activities include:
• Quantities and Cost Estimation (Dams, Spillways, Powerhouse buildings, Stilling
basins, Tunnels, Hydropower Stations, Multistorey Buildings etc).
• Preparation of Construction Schedules and Construction Planning Report.
Page 1 of 14
Muhammad Faisal Wattoo
• Preparation of Feasibility Reports, Technical Specifications (Civil Works),
Detailed Engineering Drawings, Tender Documents, Tender Drawings.
• Preparation of Bill of Quantities.
• Preparation of Detailed Structure Drawings (Dams and affiliated structures,
Hydropower Stations on AutoCad).
• Digitization & Preparation of Drawings, Profiles, Cross sections of Dam on
AutoCAD.
• Progress Reports Management.
• Preparation and Compilation of Technical Proposals.
• Site Inspection and Execution.
• Monitoring and Evaluation of Hydropower Projects.
• Concreting Supervision
Education:
• B.Sc. Civil Engineering, University of Engineering &
Technology, Lahore, 2002
Employment Record:
Name of Assignment or Project: Consultancy Services for Monitoring and
Evaluation (M&E) of Tarbela 4th
Extension
Hydropower Project in Pakistan
From: January 2015 to date
Employer: Engineering General Consultants (Pvt.) Ltd
Location: KPK, Pakistan
Main project Features:
The overall Project development objective is enhancement of electricity generation
capacity to help reduce power shortages in the country. The Tarbela 4th Extension
Project proposes to add additional generation to the existing 3,478 MW hydropower
installed at Tarbela. The proposed project would have an installed capacity of 1,410
MW. This would be achieved by installing three (3) new turbines and generators
onto the existing irrigation Tunnel 4 which will be converted into power without
affecting the existing irrigation release capabilities from Tarbela.
Position Held: Planning and Documentation Engineer
Description of Duties:
Working as Planning and Documentation Engineer under the guidance of the Team
Leader and contributing where relevant to the tasks assigned by the TL / DTL related
to specifically:
• Assisting in preparation of weekly, monthly and quarterly progress reports.
• Assisting in the preparation of Performance Monitoring Information System
(PMIS) for the Monitoring and Evaluation of the Progress and Key Performance
Indicators.
• Assisting the Team Leader in resolving the Management and Administration
issues arising at site.
• Monitoring the Contractor’s Progress, Evaluation of delays and
Recommendations.
• Liaison with Technical Team and Stakeholders for progress updates and
ultimately preparation of reports for the information of the PMU.
Page 2 of 14
Muhammad Faisal Wattoo
• Documentation Control
Name of Assignment or Project: Review, Preparation, Evaluation of EPC
Tender Documents for 720MW Karot HPP in
Pakistan
From: July 2014 to January 2015
Employer: Engineering General Consultants (Pvt.) Ltd
Location: KPK, Pakistan
Main project Features:
Karot Hydropower Station is the 4th station in five cascade hydropower stations
planed around Jhelum River within Pakistan. The 3rd station is Azad Pattan. The 5th
station is Mangla. Controlled drainage area of dam site is 26,700 km2. Long term
average runoff is 819m3/s. Long term average annual runoff is 25,830 million m3.
The project is the hydropower complex with generating electricity. Full Supply Level
of the reservoir is 461m. Installed capacity of the power station is 720 MW
(4×180MW)
Position Held: Contracts and Costing Engineer
Description of Duties:
Worked as Contracts Engineer under the guidance of the Team Leader and
contributing where relevant to the tasks assigned by the TL / DTL related to
specifically:
• Assist in review and finalization of EPC Contract bidding criteria and Documents.
• Assist in preparation of proposal to carryout EPC Tendering Process
• Liaison with Technical Team for preparation of specifications for tender
documents on EPC basis
• Assist Technical Team in post qualification bid evaluations
• Assist the Technical Team in preparation of bid evaluation report
Name of Assignment or Project: Feasibility Study of 340MW Gahrait-Swir Lasht
HPP, 52MW Isatru Booni HHP and
Construction Supervision of 69MW Lawi HPP
in Pakistan
From: October 2012 to June 2014
Employer: Engineering General Consultants (Pvt.) Ltd
Location: KPK, Pakistan
Main project Features:
For 340MW Gahrait Swir Lasht HPP, the weir site is proposed about 35 km
downstream of Chitral Town. The project layout is proposed on the right bank of
Chitral Valley with weir site about 35 km downstream of Chitral and powerhouse site
about 8 km downstream of Drosh Town near Swir Lasht Village. The national grid at
Chakdara is in a distance of about 170 km from the powerhouse site.
The proposed 52MW Istaru-Booni Hydropower Project (IB HPP) has its weir site
located on Turkho River about 2 km downstream of Istaru Village. The powerhouse
site is proposed on the right bank of Mastuj River near Booni Town. Both weir and
powerhouse sites are accessible from Booni Town by a jeepable road.
Page 3 of 14
Muhammad Faisal Wattoo
Management Consultancy Services for Construction of Lawi Hydropower Project
(69mw) District Chitral (Lower).”
Lawi Hydropower Project is located about 40 km short of Chitral city in the northern
most district of Khyber Pakhtunkhwa Province of Pakistan. Chitral lies from 35°-15' to
36°- 55' North and 71°-12' to 73°-55' East. Lawi Hydropower Project (69MW) is
aimed to develop indigenous, non-polluting and renewable source of energy to help
meet KP’s power shortage and improve the quality and reliability of the power
system, especially in surrounding areas of Chitral.
Position Held: Principal Engineer Quantity/Cost Estimation,
Planning, Contracts and Head Documentation
Description of Duties:
Worked as Principal Engineer Quantity and Cost Estimation, Planning, Contracts and
Head Documentation under the guidance of the Team Leader and Deputy Team
Leader and contributing where relevant to the tasks assigned by the TL / DTL related
to specifically:
• Bi-Monthly, Quarterly Progress Reports Management
• Compilation and Management of Technical Memorandums, Field Investigations
Reports, Feasibility Study Reports etc
• Manning Schedules and Work Plans Updations
• Preparation of Construction Schedule
• Rate analysis
• Quantities and cost estimation
• Preparation of Bill of Quantities
• Assistance in preparation of Contact documents for Geotechnical Investigations
and evaluation of Contractors
Name of Assignment or Project: Review of Feasibility Study, Detailed
Engineering Design, Tender Documents and
PC-1 for 740MW Munda Dam Project in
Pakistan
From: June 2012 to date
Employer: Engineering General Consultants (Pvt) Ltd
Location: KPK, Pakistan
Main project Features:
Munda Dam site and its reservoir area is located in Swat River basin, about 5 km
upstream of existing Munda Headworks at Abazai near Shabqadar Deri, in NWFP,
37 km north of Peshawar.
A concrete face rock-fill dam containing 16.5 million cubic metres of rock-fill with
maximum height of 213 m above the lowest point of foundation, River diversion
intake structure on left bank of Swat River, concrete spillway structure on left side of
the dam with a discharge capacity of 19,390 m3/s, power intake structure on right
bank of Swat River, normal surface powerhouse containing four 185 MW turbine
generators on right bank of river and downstream of dam, re-regulation weir to store
water released from the power station during the peak generation for 4 hours a day,
and to regulate the river flow releasing the stored water constantly downstream the
weir, Transmission System, Irrigation Facilities for Right and Left Irrigation System.
Position Held: Senior Engineer Quantity and Cost Estimation,
Construction Planning, Contract Documents
and Documentation
Page 4 of 14
Muhammad Faisal Wattoo
Description of Duties:
Working as Senior Engineer on Quantity and Cost Estimation, Contracts Engineer
and Construction Planning under the guidance of the Project Manager and
contributing where relevant to the tasks assigned by the Project Manager related to
specifically:
• Progress Reports Management
• Quantities calculation and Cost estimation.
• Rate analysis.
• Preparation of Bill of quantities.
• Preparation of cost estimation report.
• Preparation of Construction Planning Report.
• Preparation of a Construction / implementation Schedules.
• Assistance in preparation of technical specifications for Civil works, Tender
documents for contractors
Name of Assignment or Project: Feasibility Study to increase the capacity of
Sans Souci Dam in Mauritius
From: February 2012 to June 2012
Employer: Engineering General Consultants (Pvt) Ltd
Location: Mauritius
Main project Features:
The Feasibility Study to increase the capacity of Sans Souci Dam in Mauritius under
the Central Electricity Board, Republic of Mauritius.
It consists of a 35.5m high Rockfill Dam with Central Clay Core having crest Length
of 350m, Power Tunnel 3000 m long, fully lined with inner diameter of 2,5 m, Surface
powerhouse with 2 x 15 MW Francis turbines with horizontal axis with 66 kV
Transmission Line.
Position Held: Senior Engineer Quantity and Cost Estimation,
Construction Planning and Contracts
Description of Duties:
Worked as Senior Engineer on Quantity and Cost Estimation, Contracts and
Construction Planning under the guidance of the Project Manager and contributing
where relevant to the tasks assigned by the Project Manager related to specifically:
• Preparation of a Detailed Construction / implementation Schedules and periodic
updating.
• Preparation of staffing schedule.
• Preparation of Quality Control Report.
• Quantity and Cost estimation.
• Rate analysis.
Name of Assignment or Project: Feasibility Study, Detailed Design and Tender
Documents for Magwagwa Multipurpose Dam
Development Project on Sondu River
(World Bank Funded)
From: November 2011 to January 2012
Employer: Engineering General Consultants (Pvt) Ltd
Location: Nairobi, Kenya
Main project Features:
The Feasibility Study, Detailed Design and Tender Documents for 122MW
Page 5 of 14
Muhammad Faisal Wattoo
Magwagwa Multipurpose Dam Development Project under the Ministry of Regional
Development Authorities and the Lake Basin Development Authority of the Republic
of Kenya. The Works are situated on the Sondu River near the town of Magwagwa in
Nyanza Province.
It consists of Construction of a concrete faced rockfill dam (CFRD) dam with a height
of approximately 95 m above river bed level and crest length is 450m.
Position Held: Senior Engineer Quantity and Cost Estimation,
Construction Planning and Contracts
Description of Duties:
Worked as Senior Engineer on Quantity and Cost Estimation, Construction Planning
and Contracts under the guidance of the Project Manager and contributed where
relevant to the tasks assigned by the Project Manager related to specifically:
• Quantity and Cost estimation
• Rate analysis
• Comparison of unit rates with different hydropower projects around the world
• Preparation of Bill of Quantities
• Assistance in the preparation of Technical Specifications for Civil Works
• Preparation of Construction schedule
Name of Assignment or Project: Basic Design for (i) Raising of Full Supply level
of Corumana Dam Project, (ii) Ressano Garcia
Weir for water supply and flow measurement,
(iii) Metuchira Dam for water supply, (iv)
Gorongosa Dam for water supply and small
hydropower generation.
(World Bank Funded)
From: Sept. 2010 to December 2011 (Intermittent)
Employer: Engineering General Consultants (Pvt) Ltd
Location: Maputo (Mozambique)
Main project Features:
(i) Corumana Dam Project having generation capacity of 14.5 MW is proposed to be
raised to its full supply level. The main purpose for constructing the dam was to
supply water for downstream irrigated agriculture while a secondary purpose was
generation of hydroelectric energy (14.5 MW installed capacity).
The National Directorate of Water commissioned this feasibility study (Basic
Design) in order to investigate the economic viability of installing the gates and
constructing the saddle dam and emergency spillway, thereby allowing the full
supply level to be raised to el 117 masl and for the firm water yield and firm
energy yield to be increased.
(ii) Ressano Garcia measuring weir has a crump type crest, a compound weir with
crests at multiple levels ranging from the lowest V notch set. A gauging tower is
also provided to house the controls for the scouring gates, gauging equipment
and the pump station required for water supply to Ressano Garcia. Scour gates
have been provided to flush incoming sediment to minimise the possibility of
silting of the outlets from the weir and intake. A fish ladder is also provided. A
measuring weir is also provided to measure the flow through the fish ladder.
(iii) Metuchira Dam: 3.5m high concrete dam with ogee shaped overflow Spillway.
Basic purpose is to supply water to Metuchira Village.
Page 6 of 14
Muhammad Faisal Wattoo
(iv) Gorongosa Dam: 5.24m high concrete dam with 55m wide ogee shaped overflow
spillway. Basic purpose is to provide Water supply to Gorongosa Village and
power supply to Pump station.
Position Held: Senior Engineer Construction Planning and
Quantity / Cost Estimation
Description of Duties:
Worked as Senior Engineer Quantity / Cost Estimation and Construction Planning
under the guidance of the Project Team Leader and contributed where relevant to
the tasks assigned by the Team Leader related to specifically:
• Preparation of a Detailed Construction / implementation Schedules.
• River diversion works and access routes to project sites.
• Preparation of Implementation and Contract Packaging Reports
• Construction Supervision and Quality Assurance / Quality Control Plan reports.
• Preparation of Detailed Cost Estimate.
Name of Assignment or Project: Feasibility Review, Tender Design and Tender
Documents and Construction Supervision of
14.1MW Naltar – V Hydropower Project.
From: May 2011 to November 2011 (Intermittent)
Employer: Engineering General Consultants (Pvt) Ltd
Location: Gilgit Baltistan Province
Main project Features:
The Feasibility study submitted in 2007 was concluded with the following design
parameters of this project:
• Design Capacity: 14.1 MW
• Annual Energy: 85.16 GWh
• Design Discharge: 5.4 m3/s
• Gross Head: 332 m
• Headrace canal Length: 450 m
• Penstock Length: 4070 m
• Type and Number of Turbine: Pelton, 3
In 2011 Water and Power Department Northern Areas Gilgit, Government of
Pakistan (GOP) hired a joint venture of ACE, SMEC-EGC and TEAM Consultants to
perform Design Review and Construction supervision of Naltar-V project.
Position Held: Senior Engineer Costing and Construction
Planning
Description of Duties:
Worked as Senior Engineer Costing and Construction Planning under the guidance
of the Project Team Leader / Project Coordinator and contributed where relevant to
the tasks assigned by the Team Leader / Project Coordinator related to specifically:
• Preparation of Work / implementation Schedule on MS Project.
• Preparation of Construction Planning, Cost Estimation section for Inception
Report.
• Revision of Cost Estimate in Design Review Stage.
Name of Assignment or Project: Preparation of Technical Proposals as
Engineer Business Development for Various
Page 7 of 14
Muhammad Faisal Wattoo
Dams, Hydropower and Highway Projects in
Pakistan and Abroad
From: April 2010 to date (intermittent)
Employer: Engineering General Consultants (Pvt) Ltd
Location: Pakistan, Nepal, Mauritius, Oman
Main project Features:
The Projects are as follows.
• Preparation of Technical Proposal for Consultancy Services for Design Review
and Construction Supervision of 870MW Suki Kinari HPP in Pakistan
• Preparation of Technical Proposal for Consultancy Services for Feasibility Study,
Detailed Design and Construction Supervision of Flood Protection Scheme in
Wilayat Sadh Dhofar Governorate in Oman.
• Preparation of Technical Proposal for Construction Supervision of 14.4MW Jhing
Hydropower Project in AJK, Pakistan.
• Preparation of Technical Proposal for Project Implementation Supervision
Consultancy Services for Punjab Irrigated-Agriculture Productivity Improvement
Project (PIPIP) in Pakistan funded by the World Bank.
• Preparation of Technical Proposal for Construction supervision of New Khanki
Barrage and Auxiliary works project in Pakistan funded by Asian Development
Bank.
• Preparation of Technical Proposal for Procurement of Consultancy Services for
Facility Management Consultant (FMC) for Power Distribution Enhancement
Investment Program under ADB Loan 2439-PAK.
• Preparation of Technical Proposal for Detailed Design and Supervision of
Rehabilitation / Reconstruction of Flood Damaged Road Sections / Bridges on
National Highways (South and North Packages) in Pakistan.
• Preparation of Technical Proposal for Feasibility Study to increase the capacity of
Sans Souci Dam in Mauritius.
• Preparation of Technical Proposal for Detailed Engineering Design, Tender
Documents and PC-1 of Munda Dam Project in Khuber Pakhtoonkhwa.
• Preparation of Technical Proposal for Design Review and Construction
Supervision and Construction Design Services for Riviere Des Anguilles Dam
Project in Mauritius.
• Preparation of Technical Proposal for Detailed Engineering Design, Tender
Documents, PC 1 and Construction Supervision of Dasu Hydropower Project in
Kohistan.
• Preparation of Technical Proposal for Construction Management and Supervision
of Rahughat Hydropower Project in Nepal.
• Preparation of Technical Proposal for Detailed Engineering Design of Upper Seti
Hydropower Project in Nepal.
• Preparation of Technical Proposal for Tarbela Sedimentation Management
Studies.
• Preparation of Technical Proposal for the Data collection and Construction
supervision of Patrind Hydropower Project.
• Preparation of Technical Proposal for the Feasibility Study, Detailed Engineering
Design, Tender Documents and PC-1 for 10 Small Dams / Water Storage
Schemes.
Page 8 of 14
Muhammad Faisal Wattoo
• Preparation of Technical Proposal for the Feasibility Study of Hydropower
development on 4 Raw Sites on Canals in Punjab.
• Preparation of Technical Proposal for the Feasibility Study, Detailed Engineering
Design, and Tender Documents of 700 KW Daraban Zam Dam Hydropower
Project.
• Preparation of Technical Proposal for the Feasibility Study, Detailed Engineering
Design, Tender Documents and PC-1 of Existing WARSAK Hydroelectric
Project’s Rehabilitation, Upgradation and Modernization.
Position Held: Engineer Business Development /
Construction Planning
Description of Duties:
Activities Include:
• Preparation of Staffing / Manning Schedules
• Preparation of Work Schedules on MS Project.
• Preparation of Project Data Sheets.
• Preparation of Responsibility Matrix.
• Evaluation Criteria for CV’s, Evaluation of Cv’s and Compilation on WB, ADB and
PEC format
• Preparation of Organization charts for Consultancy services
• Compilation of Technical Proposals.
Name of Assignment or Project: Updation of Feasibility Study and Preparation
of Bidding Documents on EPC Contract Basis
for Olympia Hydropower Project.
From: April 2010 to March 2011
Employer: Engineering General Consultants (Pvt) Ltd
Location: Punjab
Main project Features:
Olympia Hydropower Project is a run of river hydropower project having generation
capacity of 11 MW and proposed to be constructed on a link canal. Spillway having
discharge capacity of 425 m3/sec and powerhouse will be constructed on a side
channel. Our task is to update the feasibility report already prepared by another firm
and to propose the alternative solutions.
Position Held: Senior Engineer Contracts, Quantity / Cost
Estimation and Construction Planning
Description of Duties:
Worked as Senior Engineer Contracts, Costing & Construction Planning under the
guidance of the Project Team Leader and contributed where relevant to the tasks
assigned by the Team Leader related to specifically:
• Quantity estimation of Diversion Channel, Powerhouse and appurtenant
structures along with headrace Channel, Tailrace Channel etc and relative Cost
estimation.
• Rate Analysis for different items of Civil Works.
• Preparation of Bill of Quantities.
• Preparation of Construction Schedule.
• Preparation of Technical Specifications and Bidding Document on EPC Contract
Basis.
Name of Assignment or Project: Feasibility Study of Shushghai-Zhendoli &
Page 9 of 14
Muhammad Faisal Wattoo
Shogo-Sin Hydropower Project
(Asian Development Bank Funded)
From: January 2010 to April 2010
Employer: Engineering General Consultants (Pvt) Ltd
Location: NWFP
Main project Features:
The Shogo - Sin Hydropower Project is planned on Lutkho River about 0.5 km
downstream of Shogho village in the area of Chitral region, central place Chitral
located about 365 km from Peshawar. The purpose of the Project is to produce
Electric Power of 131 MW. The reservoir length will be 700 m and area will be 74300
m2
.
The Shushghai-Zhendoli Hydropower Project is planned on Turkho River in the area
of Chitral region, central place Chitral located about 365 km from Peshawar. The
purpose of the Project is to produce Electric Power of 144 MW. The reservoir length
will be 636 m and area will be 5.7687 Hectares.
Position Held: Senior Engineer Cost / Quantity Estimation /
Construction Planning
Description of Duties:
Worked as Senior Quantity / Cost Estimator / Construction Planner Engineer under
the guidance of the Project Team Leader and contributed where relevant to the tasks
assigned by the Team Leader related to specifically:
• Quantity estimation of weir and its appurtenant structures alongwith headrace
tunnel, powerhouse and affiliated structures and relative Cost estimation.
• Rate Analysis for different items of Civil Works.
• Preparation of Detailed Engineering Estimate.
• Preparation of Bill of Quantities.
• Preparation of Construction Schedule.
• Planning of Access Tunnels & Access Roads for Construction Planning
purposes.
• Preparation of Drawings on AutoCad for Construction Planning Report.
Name of Assignment or Project: Feasibility Study, Detailed Engineering Design
and Tender Documents of 1100MW Kohala
Hydropower Project
From: June 2008 to January 2010
Employer: Engineering General Consultants (Pvt) Ltd
Location: Azad Jammu & Kashmir AJK
Main project Features:
The project area of proposed Kohala Hydropower Project (KHPP) lies along the river
Jhelum in Muzaffarabad district of Azad Jammu and Kashmir (AJK). Dam site is
situated 8 km downstream of the Hattian Bala village, whereas it is 31 km upstream
from the Domel Bridge. The Kohala hydropower project consists of dam 52m high,
water conveyance system and underground powerhouse with 17 km twin headrace
tunnels. The water conveyance system includes intake, underground de-sander
tunnels, headrace tunnel, surge chamber, shaft tunnel, and penstock. The basic
purpose of the project is power generation having total installed capacity of 1,100
MW with 4 generation units.
Position Held: Senior Engineer Quantity / Cost Estimation /
Construction Planning / Contracts
Description of Duties:
Page 10 of 14
Muhammad Faisal Wattoo
Worked as Senior Quantity / Cost Estimator / Construction Planner and Contracts
Engineer under the guidance of the Project Team Leader and contributed where
relevant to the tasks assigned by the Team Leader related to specifically:
• Quantity estimation of dam and its appurtenant structures along with headrace
tunnel, powerhouse and affiliated structures and relative Cost estimation.
• Preparation of Detailed Engineering Estimate.
• Preparation of Bill of Quantities.
• Phasing of Project cost into construction period.
• Preparation of Project Planning & Scheduling Report.
• Preparation of Tender Documents for Exploratory Adits at damsite and
powerhouse area.
• Preparation of Tender Documents for Civil Works of Kohala Hydropower Project
and compilation of the Whole Lot of Tender documents for submission to the
Client.
• Preparation of Structure drawings on AutoCad for Feasibility, Detailed
Engineering Design & Tender Documents.
Name of Assignment or Project: Pre-Feasibility Study of Chor Nala & Spat Gah
Hydropower Project
From: February 2007 to May 2008
Employer: ILF Consulting Engineers Pakistan (Pvt) Ltd
Location: Kohistan NWFP
Position Held: Junior Engineer Construction Planning /
Quantity and Cost Estimation / AutoCAD
Design Engineer
Description of Duties:
Worked as Junior Quantity and Cost Estimator / Construction Planner and AutoCAD
Design Engineer under the guidance of the Deputy Project Manager and contributed
where relevant to the tasks assigned by the Deputy Project Manager related to
specifically:
• Preparation of Progress Reports, Work and Time Schedules and relative
estimation of the prepared schedules.
• Assistance in Design of Retaining walls and other structure features.
• Socio – Economic Survey Data entry for the Palas valley – Spat Gah HPP.
• Preparation and Digitization of Geological Maps on AutoCAD.
• Preparation of profiles and Geological-Cross Sections for various locations of
dam sites.
Name of Assignment or Project: Review of Feasibility Study, Detailed
Engineering Design and Tender Documents of
Diamer Bhasha Dam Project
From: April 2006 to February 2007
Employer: Pakistan Engineering Services (Pvt) Ltd
Location: Kohistan NWFP
Main project Features:
The Diamer Basha Dam Project (4,500MW) is located on the Indus River. The
project foresees the construction of a 272 m high concrete gravity dam and two large
underground power schemes located in either flank of the Indus River each with an
installed capacity of 2,250 MW. Estimated Cost (YEAR 2008) was US$12 Billion.
Page 11 of 14
Muhammad Faisal Wattoo
Position Held: Junior Engineer Quantity / Cost Estimation /
Contracts / AutoCAD Design Engineer
Description of Duties:
Worked as Junior Quantity / Cost Estimator, Contracts Engineer and AutoCAD
Designer under the guidance of the Chief Structure Engineer and contributed where
relevant to the tasks assigned by the Chief Engineer Structure related to specifically:
• Assisstance in Quantity Estimation of Dam and Appurtenant Structures like
Diversion Tunnels & Canal, Headrace & Tailrace Tunnels, Surge tanks,
Manifolds, Powerhouse and related features, etc.
• Sizing of Powerhouse.
• Preparation of Structure Drawings as AutoCAD Design Engineer.
• Preparation of Dam Area, Volume Capacity Curves.
• Assistance in preparation of Technical specifications for civil works.
Name of Assignment or Project: Feasibility Study, Detailed Engineering Design
and Tender Documents of Khokhra and LBDC
Hydropower Projects
From: June 2004 to April 2006
Employer: Pakistan Engineering Services (Pvt) Ltd
Location: Punjab
Main project Features:
3.2 MW Khokhra Hydropower Project on Gujrat Branch RD0+000 off taking from
Upper Jhelum Canal RD 245+500. The power will be utilized by Punjab as a captive
power, for operation of pumps for proposed lift irrigation scheme to irrigate areas in
Kharian and Gujrat Tehsil. The powerhouse will generate 23.54 GWh Gwh of energy
annually.
4.8MW LBDC Hydropower Project, has been conceived by utilizing flows of Lower
Bari Doab Canal available at RD 329+058 and head available at falls at RD 329+058
and RD 340+850, by combining the both falls. The installed capacity has been
worked out as 4.8 MW while annual energy expected to be generated is 29.03 Gwh.
The plant factor is 57.5%.
Position Held: Junior Engineer Quantity / Cost Estimation /
Contract Engineer / AutoCAD Design Engineer
Description of Duties:
Worked as Junior Quantity / Cost Estimator, Contract Engineer and AutoCAD Design
Engineer under the guidance of the Project Team Leader and contributed where
relevant to the tasks assigned by the Team Leader related to specifically:
• Quantity Estimation of the respective Hydropower Station including, Head race,
Tail race, Chillianwala Distributary, Powerhouse, Intake and off take, Power
channels, Retaining walls.
• Assistance in Progress Reports Management.
• Assistance in Preparation of Feasibility Reports.
• Assistance in Preparation of Detailed Engineering Drawings.
• Assistance in Preparation of Tender Documents, Tender and Construction
Drawings.
• Assistance in Preparation of Technical Specifications (Civil Works) and BOQ’s.
• Assistance in Preparation of PC-1.
Page 12 of 14
Muhammad Faisal Wattoo
• Assistance in the Evaluation of Contractors.
• Data Collection from the Canal sites for Hydrology Report, Design Reports and
Environmental Impact Assessment Reports.
Name of Assignment or Project: Feasibility Study and Detailed Engineering
Design of Kurram Tangi Dam Project
From: April 2003 to June 2004
Employer: Pakistan Engineering Services (Pvt) Ltd
Location: NWFP
Main project Features:
Concrete face rock filled Dam. Consists of five Power houses which will generate
83.4 MW electricity. The command area of the Project is 362,380 acres. The Project
is located on Kurram River in North Waziristan agency. The location of Dam is 14
Kilometer upstream from Kurram Ghari Head Works
Position Held: Junior Engineer Quantity / Cost Estimation /
AutoCAD Design Engineer / Documentation
Engineer / Environmental Engineer
Description of Duties:
Worked as Junior Quantity / Cost Estimator / AutoCAD Design Engineer and
Documentation Engineer under the guidance of the Project Team Leader and
contributed where relevant to the tasks assigned by the Team Leader related to
specifically:
• Quantity Estimation (Dam, Power Tunnels, Stilling Basin, Silt Excluder, Spillway,
Cofferdams, and Powerhouses).
• Assistance in Preparation of Structure Drawings.
• Management of Irrigation Profiles & Cross-Sections of Spaira Ragha and
Sheratalla canals.
• Assistance in Preparation of BOQ.
• Assistance in Progress Reports Management.
• Assistance in Design of Spillway, Culverts and Retaining walls
• Assistance in Report management i.e Environmental Impact Assessment &
Resettlement Action Plan Studies and Feasibility Report.
Name of Assignment or Project: Construction of Royal Palm Golf & Country
Club
From: May 2002 to March 2003
Employer: Husnain Cotex (Pvt) Ltd
Location: Lahore, Punjab
Main project Features:
Royal Palm Golf and Country Club on 144 acres with multistory buildings, club
facilities including, golf course, swimming pools, banquet halls, restaurants,
gymnasium, saloons etc owned by Maxcorp Malaysia.
Position Held: Junior Engineer Quantity / Cost Estimation /
Site Engineer / Documentation Engineer /
Procurement Engineer
Description of Duties:
Worked as Junior Quantity / Cost Estimator / Site Engineer and Documentation
Engineer under the guidance of the Project Manager and contributed where relevant
to the tasks assigned by the Project Manager related to specifically:
Page 13 of 14
Muhammad Faisal Wattoo
• PM’s Coordinator, Site Engineer’s Coordinator
• Site Inspector, Procurement and Planning Engineer
• Concreting supervisor and management of excavation, foundation treatment,
preparation of footings of columns about 180 in total, floor and roof treatment,
dpc, retaining walls formwork, walls erection, inspection and pouring of roof slabs
of multi storey buildings and the relative procurement of the materials required
and quantity estimation of the works. It also included my coordination with the
Malaysian team during inspections.
• Checking of Bar bending schedules.
• Quality assurance and control.
• Progress Reports Management, Inspection Requests & Coordination with client
& consultant.
Languages:
Speaking Reading Writing
Urdu Excellent Excellent Excellent
English Excellent Excellent Excellent
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these data
correctly describes me, my qualifications and my experience.
_____________________ ____________________________ Date: 01.06.2016
Signature of Staff Member Authorized Representative from the
Consultant
Page 14 of 14

More Related Content

What's hot

Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007sajid hasan
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated ResumeMurugan murugan
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Singh
 
Cv site civil engineer
Cv site civil engineerCv site civil engineer
Cv site civil engineersandeep jangir
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)RAJA KUMAR .R
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEankush kumar
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CVvasant koli
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorabdul shukoor
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )Mumtaz Ahmad
 

What's hot (20)

CIVIL SITE ENGINEER
CIVIL SITE ENGINEERCIVIL SITE ENGINEER
CIVIL SITE ENGINEER
 
Sajid CV BE Civil 2007
Sajid CV BE Civil 2007Sajid CV BE Civil 2007
Sajid CV BE Civil 2007
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Iftekhar Civil Engineer CV
Iftekhar Civil Engineer CVIftekhar Civil Engineer CV
Iftekhar Civil Engineer CV
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
Civil QA&QC Inspector Updated Resume
Civil  QA&QC Inspector Updated ResumeCivil  QA&QC Inspector Updated Resume
Civil QA&QC Inspector Updated Resume
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
Pankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project ManagerPankaj Resume - Construction Project Manager
Pankaj Resume - Construction Project Manager
 
Cv site civil engineer
Cv site civil engineerCv site civil engineer
Cv site civil engineer
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)Raja kumar Resume (Senior Civil Engineer)
Raja kumar Resume (Senior Civil Engineer)
 
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Quantity Surveyor CV
Quantity  Surveyor CVQuantity  Surveyor CV
Quantity Surveyor CV
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
CV Civil
CV CivilCV Civil
CV Civil
 
IMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CVIMRAN PROJECT ENGINEER CV
IMRAN PROJECT ENGINEER CV
 
CV CIVIL ENGINEER
CV CIVIL ENGINEERCV CIVIL ENGINEER
CV CIVIL ENGINEER
 
Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 

Similar to CV - Muhammad Faisal Wattoo

Muhammad Faisal Wattoo - COST OF PROJECTS
Muhammad Faisal Wattoo - COST OF PROJECTSMuhammad Faisal Wattoo - COST OF PROJECTS
Muhammad Faisal Wattoo - COST OF PROJECTSMuhammad Faisal Wattoo
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project reportYogesh Thakur
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Prashant Maulikar
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMB SARKAR
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resumeprasunkishoreroy
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khansikandar Khan
 
Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011Remona Divekar
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)Amanat ali
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updatedAMITAVA DAS
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEHSAN ASGHAR, RE
 

Similar to CV - Muhammad Faisal Wattoo (20)

Muhammad Faisal Wattoo - COST OF PROJECTS
Muhammad Faisal Wattoo - COST OF PROJECTSMuhammad Faisal Wattoo - COST OF PROJECTS
Muhammad Faisal Wattoo - COST OF PROJECTS
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project report
 
FARID CV
FARID CVFARID CV
FARID CV
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
Resume_Darpan Majumder1
Resume_Darpan Majumder1Resume_Darpan Majumder1
Resume_Darpan Majumder1
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
NHPC Training Report
NHPC Training ReportNHPC Training Report
NHPC Training Report
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
C V_PKS (Autosaved)
C V_PKS (Autosaved)C V_PKS (Autosaved)
C V_PKS (Autosaved)
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
nitintripathi
nitintripathinitintripathi
nitintripathi
 
CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
Tnl design
Tnl designTnl design
Tnl design
 
TCExpression Sep'11
TCExpression Sep'11TCExpression Sep'11
TCExpression Sep'11
 
Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011Construction and Architecture Magazine 13 sept oct 2011
Construction and Architecture Magazine 13 sept oct 2011
 
Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updated
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 

CV - Muhammad Faisal Wattoo

  • 1. Muhammad Faisal Wattoo CURRICULUM VITAE Designation: Principal Engineer Costing, Planning / Scheduling and Contracts Profession: Civil Engineer Professional Experience: 14 Years Present Employer SMEC-EGC Pvt. Ltd Date of Birth: August 16, 1976 Contact Details: +923004577588, faisal_wattoo843@hotmail.com faisal_wattoo843 (Skype ID) 426-E1, WAPDA Town, Lahore Nationality: Pakistani Membership in Professional Societies: • Pakistan Engineering Council CIVIL/22990. • Pakistan Engineering Congress: 4835 • The Institute of Engineers, Pakistan: M-18363 / LHR-4778 Other Training: • Continuing Professional Development Programme “Process Safety Management course (0.5 CPD Point)” on March 26, 2012 in Lahore, Pakistan. • 2-Days training Work Shop on PEC Contract Documents and PICC Cost Data held in Pearl Continental Lahore on July 19-20, 2011, Pakistan. • Training Course of Project Planning and Scheduling (Primavera P6) from Pakistan Engineering Congress (Nov-2010). • MS Project • AutoCAD Countries of Work Experience: Pakistan, Mozambique, Kenya Detailed Tasks Assigned: • Quantity/Cost Estimation, Planning/Scheduling, Documentation and Contracts Key Qualifications: 14 years experience in Dams and Hydropower projects (funded/financed by World Bank, Asian Development Bank and other funding agencies), infrastructure projects including buildings and residential colonies. Activities include: • Quantities and Cost Estimation (Dams, Spillways, Powerhouse buildings, Stilling basins, Tunnels, Hydropower Stations, Multistorey Buildings etc). • Preparation of Construction Schedules and Construction Planning Report. Page 1 of 14
  • 2. Muhammad Faisal Wattoo • Preparation of Feasibility Reports, Technical Specifications (Civil Works), Detailed Engineering Drawings, Tender Documents, Tender Drawings. • Preparation of Bill of Quantities. • Preparation of Detailed Structure Drawings (Dams and affiliated structures, Hydropower Stations on AutoCad). • Digitization & Preparation of Drawings, Profiles, Cross sections of Dam on AutoCAD. • Progress Reports Management. • Preparation and Compilation of Technical Proposals. • Site Inspection and Execution. • Monitoring and Evaluation of Hydropower Projects. • Concreting Supervision Education: • B.Sc. Civil Engineering, University of Engineering & Technology, Lahore, 2002 Employment Record: Name of Assignment or Project: Consultancy Services for Monitoring and Evaluation (M&E) of Tarbela 4th Extension Hydropower Project in Pakistan From: January 2015 to date Employer: Engineering General Consultants (Pvt.) Ltd Location: KPK, Pakistan Main project Features: The overall Project development objective is enhancement of electricity generation capacity to help reduce power shortages in the country. The Tarbela 4th Extension Project proposes to add additional generation to the existing 3,478 MW hydropower installed at Tarbela. The proposed project would have an installed capacity of 1,410 MW. This would be achieved by installing three (3) new turbines and generators onto the existing irrigation Tunnel 4 which will be converted into power without affecting the existing irrigation release capabilities from Tarbela. Position Held: Planning and Documentation Engineer Description of Duties: Working as Planning and Documentation Engineer under the guidance of the Team Leader and contributing where relevant to the tasks assigned by the TL / DTL related to specifically: • Assisting in preparation of weekly, monthly and quarterly progress reports. • Assisting in the preparation of Performance Monitoring Information System (PMIS) for the Monitoring and Evaluation of the Progress and Key Performance Indicators. • Assisting the Team Leader in resolving the Management and Administration issues arising at site. • Monitoring the Contractor’s Progress, Evaluation of delays and Recommendations. • Liaison with Technical Team and Stakeholders for progress updates and ultimately preparation of reports for the information of the PMU. Page 2 of 14
  • 3. Muhammad Faisal Wattoo • Documentation Control Name of Assignment or Project: Review, Preparation, Evaluation of EPC Tender Documents for 720MW Karot HPP in Pakistan From: July 2014 to January 2015 Employer: Engineering General Consultants (Pvt.) Ltd Location: KPK, Pakistan Main project Features: Karot Hydropower Station is the 4th station in five cascade hydropower stations planed around Jhelum River within Pakistan. The 3rd station is Azad Pattan. The 5th station is Mangla. Controlled drainage area of dam site is 26,700 km2. Long term average runoff is 819m3/s. Long term average annual runoff is 25,830 million m3. The project is the hydropower complex with generating electricity. Full Supply Level of the reservoir is 461m. Installed capacity of the power station is 720 MW (4×180MW) Position Held: Contracts and Costing Engineer Description of Duties: Worked as Contracts Engineer under the guidance of the Team Leader and contributing where relevant to the tasks assigned by the TL / DTL related to specifically: • Assist in review and finalization of EPC Contract bidding criteria and Documents. • Assist in preparation of proposal to carryout EPC Tendering Process • Liaison with Technical Team for preparation of specifications for tender documents on EPC basis • Assist Technical Team in post qualification bid evaluations • Assist the Technical Team in preparation of bid evaluation report Name of Assignment or Project: Feasibility Study of 340MW Gahrait-Swir Lasht HPP, 52MW Isatru Booni HHP and Construction Supervision of 69MW Lawi HPP in Pakistan From: October 2012 to June 2014 Employer: Engineering General Consultants (Pvt.) Ltd Location: KPK, Pakistan Main project Features: For 340MW Gahrait Swir Lasht HPP, the weir site is proposed about 35 km downstream of Chitral Town. The project layout is proposed on the right bank of Chitral Valley with weir site about 35 km downstream of Chitral and powerhouse site about 8 km downstream of Drosh Town near Swir Lasht Village. The national grid at Chakdara is in a distance of about 170 km from the powerhouse site. The proposed 52MW Istaru-Booni Hydropower Project (IB HPP) has its weir site located on Turkho River about 2 km downstream of Istaru Village. The powerhouse site is proposed on the right bank of Mastuj River near Booni Town. Both weir and powerhouse sites are accessible from Booni Town by a jeepable road. Page 3 of 14
  • 4. Muhammad Faisal Wattoo Management Consultancy Services for Construction of Lawi Hydropower Project (69mw) District Chitral (Lower).” Lawi Hydropower Project is located about 40 km short of Chitral city in the northern most district of Khyber Pakhtunkhwa Province of Pakistan. Chitral lies from 35°-15' to 36°- 55' North and 71°-12' to 73°-55' East. Lawi Hydropower Project (69MW) is aimed to develop indigenous, non-polluting and renewable source of energy to help meet KP’s power shortage and improve the quality and reliability of the power system, especially in surrounding areas of Chitral. Position Held: Principal Engineer Quantity/Cost Estimation, Planning, Contracts and Head Documentation Description of Duties: Worked as Principal Engineer Quantity and Cost Estimation, Planning, Contracts and Head Documentation under the guidance of the Team Leader and Deputy Team Leader and contributing where relevant to the tasks assigned by the TL / DTL related to specifically: • Bi-Monthly, Quarterly Progress Reports Management • Compilation and Management of Technical Memorandums, Field Investigations Reports, Feasibility Study Reports etc • Manning Schedules and Work Plans Updations • Preparation of Construction Schedule • Rate analysis • Quantities and cost estimation • Preparation of Bill of Quantities • Assistance in preparation of Contact documents for Geotechnical Investigations and evaluation of Contractors Name of Assignment or Project: Review of Feasibility Study, Detailed Engineering Design, Tender Documents and PC-1 for 740MW Munda Dam Project in Pakistan From: June 2012 to date Employer: Engineering General Consultants (Pvt) Ltd Location: KPK, Pakistan Main project Features: Munda Dam site and its reservoir area is located in Swat River basin, about 5 km upstream of existing Munda Headworks at Abazai near Shabqadar Deri, in NWFP, 37 km north of Peshawar. A concrete face rock-fill dam containing 16.5 million cubic metres of rock-fill with maximum height of 213 m above the lowest point of foundation, River diversion intake structure on left bank of Swat River, concrete spillway structure on left side of the dam with a discharge capacity of 19,390 m3/s, power intake structure on right bank of Swat River, normal surface powerhouse containing four 185 MW turbine generators on right bank of river and downstream of dam, re-regulation weir to store water released from the power station during the peak generation for 4 hours a day, and to regulate the river flow releasing the stored water constantly downstream the weir, Transmission System, Irrigation Facilities for Right and Left Irrigation System. Position Held: Senior Engineer Quantity and Cost Estimation, Construction Planning, Contract Documents and Documentation Page 4 of 14
  • 5. Muhammad Faisal Wattoo Description of Duties: Working as Senior Engineer on Quantity and Cost Estimation, Contracts Engineer and Construction Planning under the guidance of the Project Manager and contributing where relevant to the tasks assigned by the Project Manager related to specifically: • Progress Reports Management • Quantities calculation and Cost estimation. • Rate analysis. • Preparation of Bill of quantities. • Preparation of cost estimation report. • Preparation of Construction Planning Report. • Preparation of a Construction / implementation Schedules. • Assistance in preparation of technical specifications for Civil works, Tender documents for contractors Name of Assignment or Project: Feasibility Study to increase the capacity of Sans Souci Dam in Mauritius From: February 2012 to June 2012 Employer: Engineering General Consultants (Pvt) Ltd Location: Mauritius Main project Features: The Feasibility Study to increase the capacity of Sans Souci Dam in Mauritius under the Central Electricity Board, Republic of Mauritius. It consists of a 35.5m high Rockfill Dam with Central Clay Core having crest Length of 350m, Power Tunnel 3000 m long, fully lined with inner diameter of 2,5 m, Surface powerhouse with 2 x 15 MW Francis turbines with horizontal axis with 66 kV Transmission Line. Position Held: Senior Engineer Quantity and Cost Estimation, Construction Planning and Contracts Description of Duties: Worked as Senior Engineer on Quantity and Cost Estimation, Contracts and Construction Planning under the guidance of the Project Manager and contributing where relevant to the tasks assigned by the Project Manager related to specifically: • Preparation of a Detailed Construction / implementation Schedules and periodic updating. • Preparation of staffing schedule. • Preparation of Quality Control Report. • Quantity and Cost estimation. • Rate analysis. Name of Assignment or Project: Feasibility Study, Detailed Design and Tender Documents for Magwagwa Multipurpose Dam Development Project on Sondu River (World Bank Funded) From: November 2011 to January 2012 Employer: Engineering General Consultants (Pvt) Ltd Location: Nairobi, Kenya Main project Features: The Feasibility Study, Detailed Design and Tender Documents for 122MW Page 5 of 14
  • 6. Muhammad Faisal Wattoo Magwagwa Multipurpose Dam Development Project under the Ministry of Regional Development Authorities and the Lake Basin Development Authority of the Republic of Kenya. The Works are situated on the Sondu River near the town of Magwagwa in Nyanza Province. It consists of Construction of a concrete faced rockfill dam (CFRD) dam with a height of approximately 95 m above river bed level and crest length is 450m. Position Held: Senior Engineer Quantity and Cost Estimation, Construction Planning and Contracts Description of Duties: Worked as Senior Engineer on Quantity and Cost Estimation, Construction Planning and Contracts under the guidance of the Project Manager and contributed where relevant to the tasks assigned by the Project Manager related to specifically: • Quantity and Cost estimation • Rate analysis • Comparison of unit rates with different hydropower projects around the world • Preparation of Bill of Quantities • Assistance in the preparation of Technical Specifications for Civil Works • Preparation of Construction schedule Name of Assignment or Project: Basic Design for (i) Raising of Full Supply level of Corumana Dam Project, (ii) Ressano Garcia Weir for water supply and flow measurement, (iii) Metuchira Dam for water supply, (iv) Gorongosa Dam for water supply and small hydropower generation. (World Bank Funded) From: Sept. 2010 to December 2011 (Intermittent) Employer: Engineering General Consultants (Pvt) Ltd Location: Maputo (Mozambique) Main project Features: (i) Corumana Dam Project having generation capacity of 14.5 MW is proposed to be raised to its full supply level. The main purpose for constructing the dam was to supply water for downstream irrigated agriculture while a secondary purpose was generation of hydroelectric energy (14.5 MW installed capacity). The National Directorate of Water commissioned this feasibility study (Basic Design) in order to investigate the economic viability of installing the gates and constructing the saddle dam and emergency spillway, thereby allowing the full supply level to be raised to el 117 masl and for the firm water yield and firm energy yield to be increased. (ii) Ressano Garcia measuring weir has a crump type crest, a compound weir with crests at multiple levels ranging from the lowest V notch set. A gauging tower is also provided to house the controls for the scouring gates, gauging equipment and the pump station required for water supply to Ressano Garcia. Scour gates have been provided to flush incoming sediment to minimise the possibility of silting of the outlets from the weir and intake. A fish ladder is also provided. A measuring weir is also provided to measure the flow through the fish ladder. (iii) Metuchira Dam: 3.5m high concrete dam with ogee shaped overflow Spillway. Basic purpose is to supply water to Metuchira Village. Page 6 of 14
  • 7. Muhammad Faisal Wattoo (iv) Gorongosa Dam: 5.24m high concrete dam with 55m wide ogee shaped overflow spillway. Basic purpose is to provide Water supply to Gorongosa Village and power supply to Pump station. Position Held: Senior Engineer Construction Planning and Quantity / Cost Estimation Description of Duties: Worked as Senior Engineer Quantity / Cost Estimation and Construction Planning under the guidance of the Project Team Leader and contributed where relevant to the tasks assigned by the Team Leader related to specifically: • Preparation of a Detailed Construction / implementation Schedules. • River diversion works and access routes to project sites. • Preparation of Implementation and Contract Packaging Reports • Construction Supervision and Quality Assurance / Quality Control Plan reports. • Preparation of Detailed Cost Estimate. Name of Assignment or Project: Feasibility Review, Tender Design and Tender Documents and Construction Supervision of 14.1MW Naltar – V Hydropower Project. From: May 2011 to November 2011 (Intermittent) Employer: Engineering General Consultants (Pvt) Ltd Location: Gilgit Baltistan Province Main project Features: The Feasibility study submitted in 2007 was concluded with the following design parameters of this project: • Design Capacity: 14.1 MW • Annual Energy: 85.16 GWh • Design Discharge: 5.4 m3/s • Gross Head: 332 m • Headrace canal Length: 450 m • Penstock Length: 4070 m • Type and Number of Turbine: Pelton, 3 In 2011 Water and Power Department Northern Areas Gilgit, Government of Pakistan (GOP) hired a joint venture of ACE, SMEC-EGC and TEAM Consultants to perform Design Review and Construction supervision of Naltar-V project. Position Held: Senior Engineer Costing and Construction Planning Description of Duties: Worked as Senior Engineer Costing and Construction Planning under the guidance of the Project Team Leader / Project Coordinator and contributed where relevant to the tasks assigned by the Team Leader / Project Coordinator related to specifically: • Preparation of Work / implementation Schedule on MS Project. • Preparation of Construction Planning, Cost Estimation section for Inception Report. • Revision of Cost Estimate in Design Review Stage. Name of Assignment or Project: Preparation of Technical Proposals as Engineer Business Development for Various Page 7 of 14
  • 8. Muhammad Faisal Wattoo Dams, Hydropower and Highway Projects in Pakistan and Abroad From: April 2010 to date (intermittent) Employer: Engineering General Consultants (Pvt) Ltd Location: Pakistan, Nepal, Mauritius, Oman Main project Features: The Projects are as follows. • Preparation of Technical Proposal for Consultancy Services for Design Review and Construction Supervision of 870MW Suki Kinari HPP in Pakistan • Preparation of Technical Proposal for Consultancy Services for Feasibility Study, Detailed Design and Construction Supervision of Flood Protection Scheme in Wilayat Sadh Dhofar Governorate in Oman. • Preparation of Technical Proposal for Construction Supervision of 14.4MW Jhing Hydropower Project in AJK, Pakistan. • Preparation of Technical Proposal for Project Implementation Supervision Consultancy Services for Punjab Irrigated-Agriculture Productivity Improvement Project (PIPIP) in Pakistan funded by the World Bank. • Preparation of Technical Proposal for Construction supervision of New Khanki Barrage and Auxiliary works project in Pakistan funded by Asian Development Bank. • Preparation of Technical Proposal for Procurement of Consultancy Services for Facility Management Consultant (FMC) for Power Distribution Enhancement Investment Program under ADB Loan 2439-PAK. • Preparation of Technical Proposal for Detailed Design and Supervision of Rehabilitation / Reconstruction of Flood Damaged Road Sections / Bridges on National Highways (South and North Packages) in Pakistan. • Preparation of Technical Proposal for Feasibility Study to increase the capacity of Sans Souci Dam in Mauritius. • Preparation of Technical Proposal for Detailed Engineering Design, Tender Documents and PC-1 of Munda Dam Project in Khuber Pakhtoonkhwa. • Preparation of Technical Proposal for Design Review and Construction Supervision and Construction Design Services for Riviere Des Anguilles Dam Project in Mauritius. • Preparation of Technical Proposal for Detailed Engineering Design, Tender Documents, PC 1 and Construction Supervision of Dasu Hydropower Project in Kohistan. • Preparation of Technical Proposal for Construction Management and Supervision of Rahughat Hydropower Project in Nepal. • Preparation of Technical Proposal for Detailed Engineering Design of Upper Seti Hydropower Project in Nepal. • Preparation of Technical Proposal for Tarbela Sedimentation Management Studies. • Preparation of Technical Proposal for the Data collection and Construction supervision of Patrind Hydropower Project. • Preparation of Technical Proposal for the Feasibility Study, Detailed Engineering Design, Tender Documents and PC-1 for 10 Small Dams / Water Storage Schemes. Page 8 of 14
  • 9. Muhammad Faisal Wattoo • Preparation of Technical Proposal for the Feasibility Study of Hydropower development on 4 Raw Sites on Canals in Punjab. • Preparation of Technical Proposal for the Feasibility Study, Detailed Engineering Design, and Tender Documents of 700 KW Daraban Zam Dam Hydropower Project. • Preparation of Technical Proposal for the Feasibility Study, Detailed Engineering Design, Tender Documents and PC-1 of Existing WARSAK Hydroelectric Project’s Rehabilitation, Upgradation and Modernization. Position Held: Engineer Business Development / Construction Planning Description of Duties: Activities Include: • Preparation of Staffing / Manning Schedules • Preparation of Work Schedules on MS Project. • Preparation of Project Data Sheets. • Preparation of Responsibility Matrix. • Evaluation Criteria for CV’s, Evaluation of Cv’s and Compilation on WB, ADB and PEC format • Preparation of Organization charts for Consultancy services • Compilation of Technical Proposals. Name of Assignment or Project: Updation of Feasibility Study and Preparation of Bidding Documents on EPC Contract Basis for Olympia Hydropower Project. From: April 2010 to March 2011 Employer: Engineering General Consultants (Pvt) Ltd Location: Punjab Main project Features: Olympia Hydropower Project is a run of river hydropower project having generation capacity of 11 MW and proposed to be constructed on a link canal. Spillway having discharge capacity of 425 m3/sec and powerhouse will be constructed on a side channel. Our task is to update the feasibility report already prepared by another firm and to propose the alternative solutions. Position Held: Senior Engineer Contracts, Quantity / Cost Estimation and Construction Planning Description of Duties: Worked as Senior Engineer Contracts, Costing & Construction Planning under the guidance of the Project Team Leader and contributed where relevant to the tasks assigned by the Team Leader related to specifically: • Quantity estimation of Diversion Channel, Powerhouse and appurtenant structures along with headrace Channel, Tailrace Channel etc and relative Cost estimation. • Rate Analysis for different items of Civil Works. • Preparation of Bill of Quantities. • Preparation of Construction Schedule. • Preparation of Technical Specifications and Bidding Document on EPC Contract Basis. Name of Assignment or Project: Feasibility Study of Shushghai-Zhendoli & Page 9 of 14
  • 10. Muhammad Faisal Wattoo Shogo-Sin Hydropower Project (Asian Development Bank Funded) From: January 2010 to April 2010 Employer: Engineering General Consultants (Pvt) Ltd Location: NWFP Main project Features: The Shogo - Sin Hydropower Project is planned on Lutkho River about 0.5 km downstream of Shogho village in the area of Chitral region, central place Chitral located about 365 km from Peshawar. The purpose of the Project is to produce Electric Power of 131 MW. The reservoir length will be 700 m and area will be 74300 m2 . The Shushghai-Zhendoli Hydropower Project is planned on Turkho River in the area of Chitral region, central place Chitral located about 365 km from Peshawar. The purpose of the Project is to produce Electric Power of 144 MW. The reservoir length will be 636 m and area will be 5.7687 Hectares. Position Held: Senior Engineer Cost / Quantity Estimation / Construction Planning Description of Duties: Worked as Senior Quantity / Cost Estimator / Construction Planner Engineer under the guidance of the Project Team Leader and contributed where relevant to the tasks assigned by the Team Leader related to specifically: • Quantity estimation of weir and its appurtenant structures alongwith headrace tunnel, powerhouse and affiliated structures and relative Cost estimation. • Rate Analysis for different items of Civil Works. • Preparation of Detailed Engineering Estimate. • Preparation of Bill of Quantities. • Preparation of Construction Schedule. • Planning of Access Tunnels & Access Roads for Construction Planning purposes. • Preparation of Drawings on AutoCad for Construction Planning Report. Name of Assignment or Project: Feasibility Study, Detailed Engineering Design and Tender Documents of 1100MW Kohala Hydropower Project From: June 2008 to January 2010 Employer: Engineering General Consultants (Pvt) Ltd Location: Azad Jammu & Kashmir AJK Main project Features: The project area of proposed Kohala Hydropower Project (KHPP) lies along the river Jhelum in Muzaffarabad district of Azad Jammu and Kashmir (AJK). Dam site is situated 8 km downstream of the Hattian Bala village, whereas it is 31 km upstream from the Domel Bridge. The Kohala hydropower project consists of dam 52m high, water conveyance system and underground powerhouse with 17 km twin headrace tunnels. The water conveyance system includes intake, underground de-sander tunnels, headrace tunnel, surge chamber, shaft tunnel, and penstock. The basic purpose of the project is power generation having total installed capacity of 1,100 MW with 4 generation units. Position Held: Senior Engineer Quantity / Cost Estimation / Construction Planning / Contracts Description of Duties: Page 10 of 14
  • 11. Muhammad Faisal Wattoo Worked as Senior Quantity / Cost Estimator / Construction Planner and Contracts Engineer under the guidance of the Project Team Leader and contributed where relevant to the tasks assigned by the Team Leader related to specifically: • Quantity estimation of dam and its appurtenant structures along with headrace tunnel, powerhouse and affiliated structures and relative Cost estimation. • Preparation of Detailed Engineering Estimate. • Preparation of Bill of Quantities. • Phasing of Project cost into construction period. • Preparation of Project Planning & Scheduling Report. • Preparation of Tender Documents for Exploratory Adits at damsite and powerhouse area. • Preparation of Tender Documents for Civil Works of Kohala Hydropower Project and compilation of the Whole Lot of Tender documents for submission to the Client. • Preparation of Structure drawings on AutoCad for Feasibility, Detailed Engineering Design & Tender Documents. Name of Assignment or Project: Pre-Feasibility Study of Chor Nala & Spat Gah Hydropower Project From: February 2007 to May 2008 Employer: ILF Consulting Engineers Pakistan (Pvt) Ltd Location: Kohistan NWFP Position Held: Junior Engineer Construction Planning / Quantity and Cost Estimation / AutoCAD Design Engineer Description of Duties: Worked as Junior Quantity and Cost Estimator / Construction Planner and AutoCAD Design Engineer under the guidance of the Deputy Project Manager and contributed where relevant to the tasks assigned by the Deputy Project Manager related to specifically: • Preparation of Progress Reports, Work and Time Schedules and relative estimation of the prepared schedules. • Assistance in Design of Retaining walls and other structure features. • Socio – Economic Survey Data entry for the Palas valley – Spat Gah HPP. • Preparation and Digitization of Geological Maps on AutoCAD. • Preparation of profiles and Geological-Cross Sections for various locations of dam sites. Name of Assignment or Project: Review of Feasibility Study, Detailed Engineering Design and Tender Documents of Diamer Bhasha Dam Project From: April 2006 to February 2007 Employer: Pakistan Engineering Services (Pvt) Ltd Location: Kohistan NWFP Main project Features: The Diamer Basha Dam Project (4,500MW) is located on the Indus River. The project foresees the construction of a 272 m high concrete gravity dam and two large underground power schemes located in either flank of the Indus River each with an installed capacity of 2,250 MW. Estimated Cost (YEAR 2008) was US$12 Billion. Page 11 of 14
  • 12. Muhammad Faisal Wattoo Position Held: Junior Engineer Quantity / Cost Estimation / Contracts / AutoCAD Design Engineer Description of Duties: Worked as Junior Quantity / Cost Estimator, Contracts Engineer and AutoCAD Designer under the guidance of the Chief Structure Engineer and contributed where relevant to the tasks assigned by the Chief Engineer Structure related to specifically: • Assisstance in Quantity Estimation of Dam and Appurtenant Structures like Diversion Tunnels & Canal, Headrace & Tailrace Tunnels, Surge tanks, Manifolds, Powerhouse and related features, etc. • Sizing of Powerhouse. • Preparation of Structure Drawings as AutoCAD Design Engineer. • Preparation of Dam Area, Volume Capacity Curves. • Assistance in preparation of Technical specifications for civil works. Name of Assignment or Project: Feasibility Study, Detailed Engineering Design and Tender Documents of Khokhra and LBDC Hydropower Projects From: June 2004 to April 2006 Employer: Pakistan Engineering Services (Pvt) Ltd Location: Punjab Main project Features: 3.2 MW Khokhra Hydropower Project on Gujrat Branch RD0+000 off taking from Upper Jhelum Canal RD 245+500. The power will be utilized by Punjab as a captive power, for operation of pumps for proposed lift irrigation scheme to irrigate areas in Kharian and Gujrat Tehsil. The powerhouse will generate 23.54 GWh Gwh of energy annually. 4.8MW LBDC Hydropower Project, has been conceived by utilizing flows of Lower Bari Doab Canal available at RD 329+058 and head available at falls at RD 329+058 and RD 340+850, by combining the both falls. The installed capacity has been worked out as 4.8 MW while annual energy expected to be generated is 29.03 Gwh. The plant factor is 57.5%. Position Held: Junior Engineer Quantity / Cost Estimation / Contract Engineer / AutoCAD Design Engineer Description of Duties: Worked as Junior Quantity / Cost Estimator, Contract Engineer and AutoCAD Design Engineer under the guidance of the Project Team Leader and contributed where relevant to the tasks assigned by the Team Leader related to specifically: • Quantity Estimation of the respective Hydropower Station including, Head race, Tail race, Chillianwala Distributary, Powerhouse, Intake and off take, Power channels, Retaining walls. • Assistance in Progress Reports Management. • Assistance in Preparation of Feasibility Reports. • Assistance in Preparation of Detailed Engineering Drawings. • Assistance in Preparation of Tender Documents, Tender and Construction Drawings. • Assistance in Preparation of Technical Specifications (Civil Works) and BOQ’s. • Assistance in Preparation of PC-1. Page 12 of 14
  • 13. Muhammad Faisal Wattoo • Assistance in the Evaluation of Contractors. • Data Collection from the Canal sites for Hydrology Report, Design Reports and Environmental Impact Assessment Reports. Name of Assignment or Project: Feasibility Study and Detailed Engineering Design of Kurram Tangi Dam Project From: April 2003 to June 2004 Employer: Pakistan Engineering Services (Pvt) Ltd Location: NWFP Main project Features: Concrete face rock filled Dam. Consists of five Power houses which will generate 83.4 MW electricity. The command area of the Project is 362,380 acres. The Project is located on Kurram River in North Waziristan agency. The location of Dam is 14 Kilometer upstream from Kurram Ghari Head Works Position Held: Junior Engineer Quantity / Cost Estimation / AutoCAD Design Engineer / Documentation Engineer / Environmental Engineer Description of Duties: Worked as Junior Quantity / Cost Estimator / AutoCAD Design Engineer and Documentation Engineer under the guidance of the Project Team Leader and contributed where relevant to the tasks assigned by the Team Leader related to specifically: • Quantity Estimation (Dam, Power Tunnels, Stilling Basin, Silt Excluder, Spillway, Cofferdams, and Powerhouses). • Assistance in Preparation of Structure Drawings. • Management of Irrigation Profiles & Cross-Sections of Spaira Ragha and Sheratalla canals. • Assistance in Preparation of BOQ. • Assistance in Progress Reports Management. • Assistance in Design of Spillway, Culverts and Retaining walls • Assistance in Report management i.e Environmental Impact Assessment & Resettlement Action Plan Studies and Feasibility Report. Name of Assignment or Project: Construction of Royal Palm Golf & Country Club From: May 2002 to March 2003 Employer: Husnain Cotex (Pvt) Ltd Location: Lahore, Punjab Main project Features: Royal Palm Golf and Country Club on 144 acres with multistory buildings, club facilities including, golf course, swimming pools, banquet halls, restaurants, gymnasium, saloons etc owned by Maxcorp Malaysia. Position Held: Junior Engineer Quantity / Cost Estimation / Site Engineer / Documentation Engineer / Procurement Engineer Description of Duties: Worked as Junior Quantity / Cost Estimator / Site Engineer and Documentation Engineer under the guidance of the Project Manager and contributed where relevant to the tasks assigned by the Project Manager related to specifically: Page 13 of 14
  • 14. Muhammad Faisal Wattoo • PM’s Coordinator, Site Engineer’s Coordinator • Site Inspector, Procurement and Planning Engineer • Concreting supervisor and management of excavation, foundation treatment, preparation of footings of columns about 180 in total, floor and roof treatment, dpc, retaining walls formwork, walls erection, inspection and pouring of roof slabs of multi storey buildings and the relative procurement of the materials required and quantity estimation of the works. It also included my coordination with the Malaysian team during inspections. • Checking of Bar bending schedules. • Quality assurance and control. • Progress Reports Management, Inspection Requests & Coordination with client & consultant. Languages: Speaking Reading Writing Urdu Excellent Excellent Excellent English Excellent Excellent Excellent Certification: I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describes me, my qualifications and my experience. _____________________ ____________________________ Date: 01.06.2016 Signature of Staff Member Authorized Representative from the Consultant Page 14 of 14