HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Huawei Training for Dialog Regional
Engineering Staff
 OSP Training
March 13, 2012
Prepared by: F. M. A.Junkeer
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Index
Page 2
2
Construction & Erection of Concrete poles/
Cable Installation
3 OSP Technical Concern
4 Huawei OSP Project Managment
1
Huawei OSP Turnkey Project Experience & Introduction
to Dialog OFN Project
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Dialog Huawei HDPE OFC (micro cable)
Page 3
Solution: one 8-way HDPE bundle Micro duct
Length: 140KM
Duration:11months
Max progress :25 km/month
After the excavation, a 7-way bundle micro duct
had been laid into the trench, and after the laying
of the micro duct, a 48 core micro cable had been
blowing into the micro duct. Because the total
diameter of the micro duct is less than 45mm, so
the excavation width is only 300mm.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
ADSS FOC for Sudan National Electricity Corporation
Page 4
How NEC Benefited
Huawei Solution
Challenges Faced by NEC
 Install FOC along existing electricity cables
 Cross the main road inside the capital
 Cross the main bridge over River Nile inside the capital
 Adopt ADSS FOC to avoid electromagnetism interfere
 Drill PVC pipe to cross road and lay LDPE pipe to protect FOC
 Install steel pipe beside the bridge and lay LDPE pipe to protect FOC
 Save the cost of erecting new poles;
 No need to get the right of the way;
 Build WAN FOC to form its own telecommunication network in
the capital
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Syria Telecommunication Optical Access Network(OAN)
Page 5
How STE Benefited
Huawei Solution
Challenges Faced by STE
 Provide voice/video and internet access to more than 100 small villages
distributing all over the Syria;
 The total length of O.F. is over 1100Km. Unlike backbone O.F. project,
this 1100Km distribute in 7 big province and over 80 small sections/areas.
 Need to install 38 OLTs and 242 ONUs in a very short time;
 Their rival Syriatel is very strong and fast development.
 Professional end-to-end service solution
 Professional delivery management team
 Customized network technology consultant, network evaluation &
optimization including technology support, products & route maintenance
 O.F. access insure the enough bandwidth and later expansion.
 The project is finished 6 months ahead the deadline;
 After optimizing the route and fine management, decreased the road surface
breaking and route length.
 Ahead their rival Syriatel occupy the rural market.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
MTN Nigeria Transmission Project
Page 6
How MTN Benefited
Huawei Solution
Challenges Faced in this project
 3200km cable route with complicated landscapes cause many special
crossing methods and protections;
 The raining season is a bad factor for project implementation in Nigeria;
 A lot of community and government issues ,about 80% interruptions come
from this item;
 Varieties of advanced equipments and techniques for different terrains
 Fast track method to overcome the raining season
 More than 2000 labors work at the same time
 Good relationship with the relevant government department.
 Fast implementation brings more benefit to MTN.
 Rich experience and different solution for different terrains save cost for
MTN;
 Full TK service save project management cost for MTN.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Some of Last Five Years OSP Projects
Project Country Operator
Route
Length
Project Type Start Date
End
Date
Cote d'lvoire MTN Metro Ring Project Cote d'lvoire MTN 137 Km Duct/direct bury Apr-08 Dec-08
Malawi MTL backbone project Malawi MTL 1100 Km Duct/direct bury Apr-08 Dec-09
Senegal E-government backbone project Senegal Governmen
t 630 Km Duct/direct bury Dec-07 Nov-08
Kenya CCK national backbone project Kenya CCK 1112 Km Duct Nov-07 Nov-08
Zambia Zamtel National backbone project Zambia ZAMTEL 3800 Km Duct/direct bury Oct-07 Feb-09
Pakistan PTCL 1465 TURNKEY Pakistan PTCL 300 Km Duct Oct-07 Jun-08
Zambia Zamtel Lusaka Metro project Zambia ZAMTEL 100 Km Duct Aug-07 Dec-07
Cote d'lvoire MTN Fiber Transmission Project Cote d'lvoire MTN 1136 Km Duct/direct bury Apr-07 Dec-07
Kazakhstan Kar-Tel optical transmission project Kazakhstan Kar-Tel 840 Km Duct Mar-07 Nov-07
Ghana E-government backbone project Ghana Governmen
t 526 Km Duct/direct bury Feb-07 Nov-07
Ghana MTN backbone project Ghana MTN 606 Km Duct/direct bury Feb-07 Nov-07
Uganda E-government&National backbone
project Uganda Governmen
t 197 Km Duct Dec-06 Sep-07
Thailand CAT DWDM project Thailand CAT 7200 Km Aerial Oct-06 Dec-07
Angola MST National Optical backbone project Angola MSTelcom 110 Km Duct Aug-06 Dec-07
Pakistan PTCL OFAN TURNKEY Pakistan PTCL 1200 Km Duct Jan-05 Apr-08
Nigeria MTN National backbone project Nigeria MTN 3000 Km Duct/direct bury Nov-04 Feb-07
Page 7
 More than 30,000 Km on time end-to-end Turnkey delivery experiences worldwide!
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Dialog Broadband
Island wide Optical
fibrer Network
Phase 2B
•Routes Under SIERRA
Construction.
1. Katugastota-Hunnas
2. Dambulla-Anuradapura
3. Anuradapura-Jaffna
• Routes under Access
Engineering
1. Peliyagoda-Negamabo
2. Matara-Hambantota
3. Wattegama-Dambulla
Page 8
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9
INTORDUCTION
To cater the ever increasing demand for Bandwidth and to achieve a “high reliable core network”, Dialog decided to expand its Optical Fibre network.
Hence new fibre routes and nodes were identified according to the existing and predicted capacity requirements as well as the identified strategic potentials.
This decision drove Dialog for the option of releasing a Request for Proposal (RFP) to look for bidders who propose solutions for the requirement.
This section covers the technical requirements and expectations of the project.
General Scope
The scope of this document is to describe the Technical Requirements & Specifications that the Bidders shall fulfil with the aim to
provide a complete end to end solution for the implementation of Optical Fibre Network as a turnkey project.
TECHNICAL REQUIREMENTS SPECIFICATION (TRS)
The TRS specifies the technical requirements to be fulfilled in order to implement a complete end-to-end solution
for the Optical Fibre Network.
Following will be key points for the bidders to adhere from the beginning of the project.
•This is an extension of Dialog’s existing Optical Fibre Network (OFN). Hence all the components and solutions proposed by bidders
will be assessed for the compatibility with the existing network and same will be treated as a must.
•The base of the cable network will be aerial and the solution should be designed in a manner that the cable implementation to be
aerial as much as possible. The scenario to choose the other options is described under the civil construction module.
•Dialog reserves the right to suggest the successful bidder/s to change and propose any of the network / project components described
under TRS. Bidders are expected to take this challenge from the beginning.
•Dialog will decide and change its priorities on implementation with respect to the fibre routes even while at the implementation
phase.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10
Dambulla - Anuradhapura 68.33
Kekirawa 18.62 0.50 19.12 63
Galkulama 29.62 0.36 48.60 63
Anuradhapura DBN 9.67 9.56 67.47 504
Anuradhapura - Jaffna 199.96
Medawachchiya 22.03 0.01 22.04 126
Iratteperiyakulam 17.10 0.01 39.14 63
Madukanda 7.95 7.08 54.16 63
Kanagarayankulam 36.42 0.40 83.90 63
Iranamadu 33.80 0.17 117.47 63
Kaithady 62.58 1.09 180.97 63
Jaffna 10.88 0.44 191.20 441
New Sites in Existing Routes
Kurunegala-Kandy Site Connectivity 45.00
Hunnas DBN 25.50 5.00 30.50
Hanthana 12.00 2.50 14.50
Sites Main Road Distance By Road Disatnce
Total Road distance
(Cumilative) Dropping Capacity
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11
Paliyagoda-Negambo 40.13
Hekitta 3.07 1.40 4.47 189
Ragama North 7.34 1.9 12.31 63
Kandana West 1.96 1.60 13.97 63
Ekala 2.95 1.30 16.62 63
JaEla North 2.48 0.68 18.48 63
Seeduwa 3.81 0.11 21.72 567
FTZ South 1.60 2.65 25.86 63
Kurana 4.01 0.13 27.35 63
Katuwapitiya 2.49 0.65 30.36 189
Matara - Hambanthota 97.88
Kakenadura 8.05 4.5 12.55 189
Hakmana 26.04 20 54.09 189
Ambalanthota 28.72 0.20 63.01 126
Hambanthota 10.32 0.05 73.18 252
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12
Dambulla-Trinco 154.70
Habarana 21.28 0.30 21.58 63
*Girithale 31.00 1.65 53.93 126
*Polonnaruwa DBN 12.10 1.59 65.97 189
Agbopura 41.37 0.25 62.90 63
Trinco DBN 43.58 1.58 107.81 315
Trinco- Bati 153.76
Punani 92.69 17.69 110.38 63
Sittandy 16.06 1.12 109.87 63
Eravur 6.88 1.14 116.77 63
Nochchimunai 16.58 0.18 132.39 63
Kattankudy 1.29 0.13 133.63 378
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Index
Page 13
2
Construction & erection of concrete poles/
Optical cable Installation/E to E net work solution
3 OSP Technical Concern
4 Huawei OSP Project Management
1
Huawei OSP Turnkey Project Experience &
Introduction to Dialog OFN Project
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
E2E OSP Network Solution
Page 14
The end-to-end deployment process leads to fast implementation and roll-
out on time, within budget, to the required quality and a quick return on
customer investments. It is also our key measure of success.
For that, Huawei has developed an end-to-end delivery process to ensure
on-time completion of projects. Customer can concentrate on their core
businesses while Huawei takes care of building the infrastructure.
Phase 3 Phase 4Phase 2
End to End
Project Deployment
Project
Initiation
Bidding
Contract
Signing
Manufacturing,
Delivery &
Engineering
Preparation
Maintenance
Service
Implementation,
Testing and
Acceptance
Phase 6
Pre-Sales Post-Sales
Phase 1 Phase 5
Training
Service
Professional
Service
Phase
7
Phase
8
Service Support
Project Management
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Network Planning
Page 15
Fiber
Cable
Network
Planning
 Network structure design
 Existing Fiber Cable resource
investigation
 Fiber Type selection
 Cable Type selection
 Quantity of Core
 Cable Installation
method
Infrastructure
 Node, route and repeat
section design
 Link Budget
Route Telecom
Design
 SDH/DWDM
 Capacity
 Ring/Link Protection
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Infrastructure (Construction Method)
Page 16
Underground
Duct systems
Direct buried
systems
Aerial cabling
systems
Mainly used for urban installation
Used when ever there is existing poles because
of fast installation and easy accessible for
maintenance
Used for suburban installation
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Comparison of Construction Methods
Method Advantages Disadvantages Usage
Underground
Conduit
System
Out of sight, adaptable for
future expansion, easy cable
placement and removal, long
lifetime, protected from most
natural disasters and low
maintenance expense.
High initial cost compared to
other systems.
Mainly used in urban areas.
Direct buried
system
Out of sight, long lifetime,
protected from most natural
disasters.
Capacity cannot be increased,
and maintenance expense is high.
Mainly use in rural areas.
Aerial Cable Low cost, fast installation, easy
maintenance and adaptable for
future expansion.
High risk to damage caused by
natural disasters, accidents or
intentional activities.
Suitable when exiting poles are
available.
Page 17
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Cable Type
Page 18
Figure 1; Cable Design for Duct Fibre Figure 2; Cable Design for Direct Buried Fibre
Figure 3; Cable Design for Aerial Fire Figure 4; Cable Design for Aerial Fire
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Fiber Type
Page 19
Single optical fiber's characteristic
G.652 optical fiber
(SMF)
G.653 optical fiber
(DSF)
G.654 optical fiber
(WSF)
G.655 optical fiber
(NZ-DSF)
The most mature single mode optical fiber, the
minimum attenuation is in different window with
the minimum dispersion
An inter grade type single mode optical fiber,
through shifting optical fiber cutoff wavelength, to
gain the lowest attenuation
An inter grade type single mode optical fiber , the
zero-dispersion point shift to the minimum
attenuation window
Another mature single optical fiber, the minimum
attenuation is in same window with low
dispersion
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Field Survey and ROW
 Collect existing data, maps and drawings for the site to be surveyed.
 Survey the geographical area that needs services to identify the most
economical and suitable route based on demand, MH/HH locations,
identify obstructions along the routes and the soil types.
 Inside building survey for space planning
and equipment layout. Includes
OSP/ISP Reports and Drawings.
 Identifying material quantities (BOQ).
 Coordination for the approval of necessary
OSP right of way and permits.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Detail Design and planning
 Detailed Network Design construction drawings.
 Special cases solutions.
 Needed Material quantities.
 Cable assignment
 Tools and Equipment.
 Etc.
Page 21
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Construction
Page 22
Route detailed
survey and
design
Trenching
Installation
of Ducts and
Manholes
Backfilling,
Reinstatement
Duct Mandrel Testing
Duct Pressure
Testing
Fibre Splicing
Fibre Cable
Installation
Terminating
and Testing
Site
preparation
Equipment
Installation
Equipment
Testing
Equipment Integration,
& Commissioning
Route detailed
survey and
design
Equipment work
Acquisitions
Underground Fibre ROW and
acquisition
Aerial Fibre
Permission
from
RDA/MC/PS
New pole
installation
Lighting protection
Cable Work
Bracket
installation
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Underground Cables in Duct
 In this method the cables are placed in
underground Duct with manholes or
handholes between the Duct sections.
 There are different types of Duct that can
be used according to requirements.
• 110 mm PVC ducts with sub-ducts installed
into them.
• 55 mm PVC ducts.
• HDPE pipes
Page 23
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Direct Buried Cables
Page 24
 This type of construction is usually
applied on non-urban areas where there
are no existing manholes & conduits.
 Normal burial depth is 1.5m with warning
tapes placed on equal distance to
ground level. Concrete encasement can
be applied where there are external
threats perceive such as soil erosion or
soil condition with high moisture content.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 25
Aerial Cables/Concrete Poles
 Aerial cables are installed on Concrete
poles. Dialog used 8 m poles mainly, 9 m
poles used in road crossings. 5.6 m poles
used in Hunnas, because of the difficulty in
transportation & handling.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Concrete pole specification/design
 The length of the poles which are connected to aerial cables shall be 8.0
meters.
 The buried depth shall be one-fifth of pole length as per standard. In
exceptional cases, where it is technically impossible to keep the above
standard, based on DIALOG approval, the depth may be permissible up to
one-sixth of pole length. The buried depth of poles used for mounting
distribution points shall be always one-fifth of the pole length.
 The poles shall in line with Sri Lanka Standard 363:1975 relating to
reinforced concrete poles for Telecommunication Lines,
Page 26
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Concrete Pole specification/design
 Cement
 All cement used for concrete poles shall be Portland Cement and in accordance with BS
12 or equivalent. The cement shall be stocked in such a manner as to afford easy access
for inspection. Cement shall be kept dry at all times prior to use in order to prevent
deterioration.
 Fine Aggregate
 The fine aggregate for concrete shall consist of natural river sand or equivalent material.
 Coarse Aggregate
 The coarse aggregate for concrete shall consist of gravels and/or crushed stones
having hard, strong and durable pieces free from adherent coatings such as mud or
other foreign materials. The coarse aggregate shall be graded between a maximum
sieve size of 19 mm and a minimum size corresponding to 5 mm sieve size. It must be
free from dirt, floury stone dust, earth or any similar materials.
 Water
 Clean, fresh water which is free from inorganic or organic matter in solution or in
suspension in such amounts that may impair the strength and durability of the concrete
shall be used during both mixing and maturing.
Page 27
•Fine Aggregate
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Placing and curing of concrete
 The concrete shall be used as soon as
possible after being mixed and no material
which has developed an initial set shall be
used in the work. Each mould shall be filled
with concrete in one continuous operation.
After the material has been placed in the
moulds it shall be compacted and shall not be
disturbed during the period of setting. After
placing, concrete shall be protected, during
setting and in the first stage of hardening from
shocks, running of surface water and the
harmful effects of sunshine and drying winds.
The concrete shall be prevented from drying
out for at least 7 days.
Page 28
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Steel form work
Page 29
Reinforcement
Page 30
Reinforcement shall be cleaned and free from
loose Mill scale, loose rust, mud, oil, grease
and any other Coating which could reduce the
bond between the concrete And the steel. A
slight film of rust shall not be regarded
As harmful, but the steel shall not be visibly
pitted by rust.
Longitudinal reinforcing bars shall
where possible be continuous
throughout the length of the pole, but may
contain not more than one lap in each bar
line, subject to the following conditions.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Pole construction
Page 31
Curing & casting
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Pole testing
 Type test
 Unless otherwise specified with the enquiry or
order, a written statement that the number of
poles specified in Table 2-19, identical in all
essential features of design with those provided,
have passed the type test shall be deemed to be
sufficient evidence that the poles comply with
the requirements of this specification. The
statement shall give all tests and state the age
of the poles when tested. The poles selected for
the test shall be tested in accordance with
Clause 2.10.9 The permanent set after removal
of a test load of 60 percent of the minimum
ultimate load specified in Table 2-18 shall not
exceed 10 percent of the deflection at the test
load. The hair cracks produced in testing shall
clearly close up on removal of the test load
specified above.
Page 32
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Pole testing
 Applying load
Page 33
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Pole testing
 Destruction
Page 34
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Pole testing
 Connectivity  Weighing slabs
Page 35
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Ariel Cable Installation
Page 36
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Ariel cable Installation
Page 37
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Pole Numbering
Page 38
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Pole Numbering
Page 39
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Special Construction Cases
Rivers and Canal Crossing:
 Cables are installed in a 4 inch galvanized steel pipe for extra
protection attached to the side of the bridges when ever
bridges are available.
 For small canals the optical fiber cable shall be buried under
the canal.
 HDD technology can also be applied.
Page 40
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Special construction cases
Page 41
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Special Implementation Cases
Crossing Main Roads and Railways:
 The cables are installed in a 4 inch galvanized steel pipe for
extra protection.
 In places were trenching will not be allowed, boring methods
(HDD) under road are used.
Page 42
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Special Implementation Cases
Page 43
Slope protection sketch map
Collapse
Protection slope
Slope Protection:
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
MH/Duct lebels
Page 44
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
 DUCTS:
 The material to be supplied is Permanently Lubricated High Density Polyethylene (PLB
HDPE) duct for use as under-ground cable conduit for optical fiber cables, suitable for cable
installation by blowing technique
 The ducts shall be suitable for both open cut laying as well as HDD (Horizontal Deviation
Drilling) method.
 Specification of Permanently Lubricated High Density
Polyethylene Ducts (PLB HDPE Ducts)
 The PLB HDPE duct shall consist of two concentric layers, the outer layer
being HDPE co-extruded with an inner layer of solid permanent lubricant, to
reduce internal coefficient of friction (CF). The lubricant shall be of solid layer
of uniform thickness so formulated to provide a permanent, low friction
boundary layer between the inner surface of the duct and the optical fibre
cable. The lubricant shall be clearly visible in cross section, concentric with the
outer layer.
Page 45
The ducts shall be suitable for both open cut laying as well as HDD (Horizontal Deviation Drilling) method.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
 Dimension of the duct shall be as under:
 Outer diameter : 40mm+0.4 mm
 Wall thickness : 3.5mm±0.2mm
 Nominal inner diameter : 33mm
 Lubricate inner layer thickness : 0.35mm
 Identification marking on the surface of the duct
 At every 02 meter along the length followings shall be marked
 “Dialog identification” interleaved with
 ‘Manufacturer name and date of manufacture’.
 In addition sequential length marking in every one (01) meter shall be provided.
 The PLB HDPE duct shall be supplied in a continuous length in coil form, suitable for shipping and
handling purpose together with all necessary accessories needed for the proper duct installation.
 The inner layer (solid lubricant) shall be white in colour
 The duct supplier shall be able to supply ducts in different colours and all the accessories related. The
bidder shall provide all the details of the duct supplier including the company profile together with it’s
financial strength, manufacturing capacity, the full range of ducts & accessories with their detailed
specifications. Some of the standard accessories are listed below.
Page 46
1.The duct supplier shall be able to supply ducts in different colours and all the accessories related. The bidder shall provide all the de1.The duct supplier shall be able to supply ducts in different colours and all the accessories related. The bidder shall provide all the de
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
– Plastic Coupler
– Split couplers
– Mandrel
– Pressure testing attachments
– End Plug
– Cable Sealing Plug
– Identification Tags
 Ducts installed shall be in different colours (Other than Black colour) to be able
to identify easily.
Page 47
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Cable connection/Rise up
Page 48
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
View of Inside of MH
Page 49
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Excavators
Page 50
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Air Blowing and Compacting
Page 51
Air Blowing Compacting
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Splicing ,Testing and Acceptance
Page 52
All fiber will be joined by means of the
fusion splice technique.
The jointing point will be contained and
organized in splicing box.
The optical cable will be spliced with
pigtails in the equipment room and
terminated on the ODF.
The optical cable will be tested by
OTDR in double direction to get overall
attenuation and splicing loss.
Splicing
Termination
Test
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
END TO END LOSS MEASUREMENTS BY OPTICAL POWER METER & SOURCE Form No :
ISLANDWIDE OPTICAL FIBER BACKBONE NETWORK PROECT
Road KURUNEGAL-KANDY Sector Date 31/12/2011
Site Sheet No 1 OF 2
Section
From : KULUGAMMANA DIALOG SITE To : HUNNAS DIALOG SITE
(1) Representative Calibration Value of the Power Meter
Description P1/ dB P2/ dB E=P1-P2 (dB) Remarks No of Cores 60
1st -5 -5.24 -0.24 Actual Distance 33.25
2nd -5 -5.16 -0.16 OTDR Distance 33.62
3rd -5 -5.24 -0.24 No of Splicing 20
Rep. Calibration
Value = Sum
(P1-P2)/3 -5 -5.21333 -0.21333 Wave Length 1550
cw
(2) Optical loss of End to End.
Core No P in (1) P out (2)
Rep. Calib.
Value "E" (3)
Optical Loss (1)-
(2)-(3)
Core No P in (1) P out (2)
Rep. Calib. Value
"E" (3)
Optical Loss (1)-
(2)-(3)
37 -5 -19.56 -0.2133 -14.3467 67 -5 -18.95 -0.2133 14.1633
38 -5 -18.86 -0.2133 -13.6467 68 -5 -19.28 -0.2133 14.4933
39 -5 -18.99 -0.2133 -13.7767 69 -5 dis -0.2133 #VALUE!
40 -5 -21.42 -0.2133 -16.2067 70 -5 -21.71 -0.2133 16.9233
41 -5 -19.22 -0.2133 -14.0067 71 -5 -19.61 -0.2133 14.8233
42 -5 -19.25 -0.2133 -14.0367 72 -5 -19.34 -0.2133 14.5533
43 -5 -18.53 -0.2133 -13.3167 73 -5 -20.2 -0.2133 15.4133
44 -5 -18.76 -0.2133 -13.5467 74 -5 -22.25 -0.2133 -20.28
45 -5 -40.88 -0.2133 -35.6667 75 -5 -18.71 -0.2133 13.92
46 -5 -21.48 -0.2133 -16.2667 76 -5 -18.12 -0.2133 13.3333
47 -5 -19.36 -0.2133 -14.1467 77 -5 -19.22 -0.2133 14.4333
48 -5 -19.37 -0.2133 -14.1567 78 -5 -33.35 -0.2133 28.5633
49 -5 -19.46 -0.2133 14.6733 79 -5 -18.96 -0.2133 14.17
50 -5 -19.11 -0.2133 14.32 80 -5 -27.87 -0.2133 23.0833
51 -5 -20.93 -0.2133 16.1433 81 -5 -42.07 -0.2133 37.2833
52 -5 -20.28 -0.2133 15.4933 82 -5 -34.54 -0.2133 29.7533
53 -5 -20.55 -0.2133 15.7633 83 -5 -19.01 -0.2133 14.2233
54 -5 -20.35 -0.2133 15.5633 84 -5 -23.35 -0.2133 18.56
55 -5 -19.25 -0.2133 14.4633 85 -5 -19.3 -0.2133 14.51
56 -5 dis -0.2133 #VALUE! 86 -5 -18.89 -0.2133 14.1033
57 -5 -21.65 -0.2133 16.8633 87 -5 -20.46 -0.2133 15.6733
58 -5 -19.47 -0.2133 14.6833 88 -5 -19.15 -0.2133 14.3633
59 -5 -19.73 -0.2133 14.94 89 -5 -18.58 -0.2133 13.7933
60 -5 -19.83 -0.2133 15.0433 90 -5 -29.54 -0.2133 24.7533
61 -5 -19.42 -0.2133 14.6333 91 -5 -19.13 -0.2133 14.3433
62 -5 -19.06 -0.2133 14.2733 92 -5 -20.55 -0.2133 15.7633
63 -5 -19.02 -0.2133 14.2333 93 -5 -19.95 -0.2133 15.1633
64 -5 -18.85 -0.2133 14.06 94 -5 -19.96 -0.2133 15.1733
65 -5 -18.85 -0.2133 14.0633 95 -5 -19.71 -0.2133 14.9233
66 -5 -20 -0.2133 15.2133 96 -5 -19.28 -0.2133 14.4933
AcceptanceCriteria: 3.For G655 (NZDSF) link loss measurement at 1310nm is not applicable.
1 Average Splice loss (both directions) for G655 at 1550nm fiber 0.1 dB 5.Acceptable link loss (0.25 x Fiber length in KM) + 0.1x No. of splices+
2 Attenuation co-ef limits for G655&G652 connectors loss (2 each x 0.5dB) = ………………..dB.
At 1310nm 0.40 dB/km 0.21*33.65+0.1*20+4*0.5 = 11.0665dB
At 1550nm 0.25 dB/km 0.4*33.65+0.1*20+4*0.5 = 17.46 dB
TESTED & SUBMITTED BY ACCEPTED BY
CONTRACTOR DIALOG
NAME
DESIGNATION
SIGNATURE
DATE
Page 53
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Maintenance
Maintenance services ensure that outside plant cable paths are
clear of obstructions and external threats and communication
cables are kept in the optimum condition through:
 Preventive maintenance.
 Scheduled testing for network performance.
 Equipment and spare parts management.
 Cable faults localization.
 Troubleshooting and emergency response.
 Transmission loss allocation.
 Techniques for improvement/reliability.
 Control/updating of plant records
Page 54
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Index
Page 55
2 End to End OSP Network Solution
3 OSP Technical Concern
4 Huawei OSP Project Management
1 Huawei OSP Turnkey Project Case
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
 INSTALLATION AND CONSTRUCTION STANDARD
 Installation/construction of Aerial OF cable for National Backbone Optical Fiber Network shall be carried
out according to the Specifications provided below. Other installation/construction details which are not
specified in this Part shall be proposed by Huawei, for the approval of DIALOG. All installation and
construction standard method statements should be submitted to satisfy these requirements in Technical
Proposal.
 Huawei shall be solely responsible for any claims or damages arising out of the execution of the work.
 Huawei shall obtain all the necessary permissions for excavation of roads from authorities concerned prior
to construction. DIALOG will co-operate with and assist Huawei to obtain the necessary permission.
 AERIAL CABLE INSTALLATION STANDARD
 Aerial cable shall be suspended on the roadside of the pole and new cable shall be suspended underneath
the existing cable on pole line where possible. The aerial cable shall be suspended on the same side of
each pole.
 The aerial cable shall be suspended at 50 cm from the top of each pole.
 The minimum clearance from ground to the lowest point in the span of cable shall be at least 4.5 m along
roads and 5.5 m at road crossing. The minimum clearance from foliage and trees shall not be less than
1.75 m.
 Sags of aerial cable shall not exceed 0.8 m under the worst conditions expected.
Page 56
•The minimum clearance from ground to the lowest point in the span of cable shall be at least 4.5 m along roads and 5.5 m at road crossing. The min
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Aerial OFC
OPGW ADSS ADL/ADW
Page 57
Aerial Optical Fiber Type:
 OPGW (Optical Ground Wire)
 ADL/ADW (All Dielectric Lash)
 ADSS (All Dielectric Self Supporting )
Replacing with existing wire
Can be install on tower
Install on
existing wire
Comparison between Aerial OFC
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Page 58
Installation situations
OPGW:
 Replaces with shield wire (top of
tower)
ADSS :
 It depends on power of electrical
field of line
ADL / ADW:
 This cables installs on shield or
phase conductor
Comparison between OPGW and ADSS
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Comparison between OPGW and ADSS
Page 59
Figure 2; Cable Design of OPGW Figure 2; Cable Design of ADSS
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential
Comparison between OPGW and ADSS
Page 60
Proposal: ADSS is recommended for installation on existing electric pole, but the
existing electric pole and wire height should be considered.
Advantage Disadvantage
ADSS  ADSS cable has higher tensile strength. It is
applicable for long span. The overall thermal
expansion coefficient of ADSS is very low, so
the effect of temperature on ADSS sag is small.
 ADSS is made of non-metallic materials, can
be installed and maintained on live-line
situation. The feature is convenient and safe
for installation and maintenance.
 Anti-track material makes ADSS be able to be
used in strong electric fields.
 ADSS cable has good features, such as small
diameter, light weight, and small load affection
on poles or towers.
 Installed position is under existing electric cable,
the safety distance between cable and ground need
to be considered.
OPGW  Strong Physical feature, can support long span
installation (more than 250m).
 Suitable for new installation power
transmission system to save construction cost.
 Vibration caused by wind, hurricane, ice thickness,
 Unsteady operation caused by temperature,
possible thunder attack, short circuit.
 For existing power line system, the power supply
must be break off
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 61
Comparison between G.652D and G.655
Type
Attenuation(dB/km)
1550nm
Dispersion(ps/nm.km)
1550nm
Window(nm)
PMD
1550nm
G.652 0.17-0.25 17-20 1310/1550 <0.2
G.655 0.19-0.25 1-6 1550 <0.2
G.655(TWRS) 0.19-0.25 1-6 1310/1550 <0.2
G.656 0.19-0.25 8 1550 <0.2
Proposal : G.652D is recommended.
Advantage Disadvantage
G.655  lower dispersion, and it need fewer
DCM
 (Before DCM is high cost, using G.655
save the cost of DCM. But now the DCM
price is lower down, and it is not a
significant advantage)
 Can not be used for 1310 nm laser.
 Significant non-linear effect (SPM, FWM),
not suitable for DWDM system(80*40G e.g)
 Higher Price
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 62
Comparison between Direct Buried/HDPE/Microduct
Land Cable Installation Method
Direct Buried Duct
PVC DuctConcrete Duct HDPE Duct Micro Duct
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 63
Maintenance
Advantage of HDPE Duct Solution
Replacement
• Upgrade capacity
The cable can be
replaced with new
type of OFC
Balance of CAPEX and OPEX
•According to the traditional solution, compared with duct OFC, the direct buried
OFC for the national backbone has low CAPEX, but OPEX is extremely higher.
• Maintenance
• Trouble shooting
• Repair
No need to
excavate again
and again
Expansion
•Expansion
capacity
No need to dig
and lay another
D.B. OFC
Comparison between Direct Buried/HDPE/Microduct
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 64
Construction Process
Survey &
Design
D.B.
HDPE Duct
PVC Duct
Trenching
Duct &
Manhole Backfill
Cable
Installation
Repeating
Section Test
New Cable
Installation
Existing Duct
Treatment
N/a N/a
Pulling
•Different steps: Duct & manhole
•Different installation methodology: laying, blowing, pulling
The distance between the manholes increases to around
1000m compare with 100m in the traditional PVC duct
solution after the popularize of HDPE pipe and cable blowing
technique. The cost of manhole reduces.
Expansion Process
•No expansion capacity for D.B.
•Cable blowing technique makes
the maintenance and upgrade
more rapidly
Micro pipes can be blowing into
the HDPE pipe to use the duct
system more adequately
Blowing
Pulling
Laying
Blowing
Assembly
Laying
Comparison between Direct Buried/HDPE/Microduct
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 65
Solutions Cost of Material Cost of Service
OFC and
joint box
Duct and
manhole
Excavatio
n
Backfill Duct
installation
Manhole
installation
OFC
installation
D.B. High Low (joint pit) Low Low 0 0 Low
40/33 HDPE Low Low Low Low Low Low Low*
110 PVC Low High High High High High High
•Choose the cable blowing methodology
The cost of HDPE pipe solution is quite lower than the traditional
PVC solution. The additional cost of construction is mainly about
the pipe and manhole compare with D.B. solution.
Advantage of HDPE pipe solution: obviously the OFC services
have higher reliability and cost performance. The outside plant part
is more convenient to maintain, and provided with expansion and
upgrade capacity.
Comparison between Direct Buried/HDPE/Microduct
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 66
Comparison between Direct Buried/HDPE/Microduct
Microduct Solution: Projection Duct + Microduct + Microcable
Protection Duct :HDPE duct with dimension from 32mm to 63mm (outer diameter)
Microduct :HDPE duct with dimension less than 16mm (outer diameter)
Microcable: Cable suitable for blowing installation in microduct, cable diameter is 3.0 ~ 10.5 mm.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 67
Comparison between Direct Buried/HDPE/Microduct
Microduct Overview
Microduct Bundles
Microduct
Note: Microduct Bundles is normally used for point to point solution, it’s not easy for branching.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 68
Comparison between Direct Buried/HDPE/Microduct
Type
Inner
Diameter
Minimum Inner
Diameter
Thickness Bending Radius
7mm 5.5mm 5.1 .75 (+.0 -.1) 140mm
10mm 8mm 7.6 1.0 (+.0 -.1) 200mm
12mm 10mm 9.6 1.0 (+.0 -.1) 240mm
Microduct Overview
Normal Microduct Type Reference
Microduct Qty vs. HDPE Duct Diameter Reference
Microduct
HDPE Duct
12/10mm 10/8mm 7/5.5mm
25/21mm (3/4) " - 1 3
32/28mm (1) " 2 3 5
40/33mm (1.25) " 4 5 10
50/42mm (2) " 8 10 20
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 69
Comparison between Direct Buried/HDPE/Microduct
Note:
1. Loose tube type cable is preferred for both normal cable and microcable.
2. Normally one loose tube contains 12 cores fiber.
Fiber Type Cores
Loose Tube
Diameter (mm)
Loose
Tube
Qty
Filling Rope Qty
Cable
Diameter(
mm)
Cable
Weight(kg
/km)
Max Allowed
Working Tension
(N)
Max Allowed
Crush (N/100mm)
GCYFTY-4—l2Xn 4—12 1.7 1 3 5.3 22 120 450
GCYFTY-14—24 Xn 14—24 1.7 2 2 5.3 22 120 450
GCYFTY-26—36 Xn 26—36 1 7 3 1 5.3 22 120 450
GCYFTY-38—48 Xn 38—48 1 7 4 0 5.3 22 120 450
GCYFTY-50—60 Xn 50~60 1 7 5 0 5.6 26 150 450
GCYFTY-62—72 Xn 62~72 1 7 0 6.2 33 180 450
GCYFTY-74—84 Xn 74—84 1 7 7 1 7.3 44 240 450
GCYFTY-76—96 Xn 76—96 1.7 8 0 7.3 44 240 450
Microcable Reference
Normal Duct Type Cable Microcable
Microcable Overview
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 70
Comparison between Direct Buried/HDPE/Microduct
Tools and Accessories
Microduct Blowing Machine Microcable Blowing Machine
Air Compressor Microcable Coilpanel
Splicing Box
Splicing Box
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 71
Comparison between Direct Buried/HDPE/Microduct
Blowing Installation method
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 72
Comparison between Direct Buried/HDPE/Microduct
Blowing Installation method
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 73
Comparison between Direct Buried/HDPE/Microduct
Advantage Disadvantage
Microdu
ct
 Reduce the initial investment, and
easy for expansion.
 Easy to upgrade the fiber cable type.
 Fully utilize the existing duct
resource
 Easy for branching.
 Reduce manhole / handhole
quantities.
 High requirement for the protection in
handhole and manhole.
 Special tools needed for
implementation and maintainence.
 Additional cost for microduct
 The advantage is good for access
network and FTTx senario, but for
backbone network, it not obvious.
Proposal: HDPE with blowing installation method solution is proposed.
Depend on the requirement of SMC, Microduct & Microcable or conventional
cable can be considered to be installed inside HDPE duct.
Microduct vs. Traditional HDPE Duct

More Related Content

What's hot

The Huawei Node B Evolution
The Huawei Node B EvolutionThe Huawei Node B Evolution
The Huawei Node B EvolutionAtif Mahmood
 
RDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA Interconnects
RDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA InterconnectsRDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA Interconnects
RDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA Interconnectsinside-BigData.com
 
RISC-Vの基礎、オバービュー(RISC-V basis-overview)
RISC-Vの基礎、オバービュー(RISC-V basis-overview)RISC-Vの基礎、オバービュー(RISC-V basis-overview)
RISC-Vの基礎、オバービュー(RISC-V basis-overview)Takayasu Shibata
 
ガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とは
ガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とはガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とは
ガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とはBrocade
 
IPアドレスのおねだん
IPアドレスのおねだんIPアドレスのおねだん
IPアドレスのおねだんKei Onimaru
 
プログラマ目線から見たRDMAのメリットと その応用例について
プログラマ目線から見たRDMAのメリットとその応用例についてプログラマ目線から見たRDMAのメリットとその応用例について
プログラマ目線から見たRDMAのメリットと その応用例についてMasanori Itoh
 
はじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチーム
はじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチームはじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチーム
はじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチーム勇 黒沢
 
tcolorboxによる装飾表現(TeXユーザの集い2015)
tcolorboxによる装飾表現(TeXユーザの集い2015)tcolorboxによる装飾表現(TeXユーザの集い2015)
tcolorboxによる装飾表現(TeXユーザの集い2015)TeXmedicine
 
Basics Of Minilink Microwave Networks
Basics Of Minilink Microwave NetworksBasics Of Minilink Microwave Networks
Basics Of Minilink Microwave NetworksAtif Mahmood
 
3 Basic Principal Of Fo Installation
3 Basic Principal Of Fo Installation3 Basic Principal Of Fo Installation
3 Basic Principal Of Fo InstallationMrirfan
 

What's hot (14)

The Huawei Node B Evolution
The Huawei Node B EvolutionThe Huawei Node B Evolution
The Huawei Node B Evolution
 
FPGAX2019
FPGAX2019FPGAX2019
FPGAX2019
 
RDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA Interconnects
RDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA InterconnectsRDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA Interconnects
RDMA, Scalable MPI-3 RMA, and Next-Generation Post-RDMA Interconnects
 
RISC-Vの基礎、オバービュー(RISC-V basis-overview)
RISC-Vの基礎、オバービュー(RISC-V basis-overview)RISC-Vの基礎、オバービュー(RISC-V basis-overview)
RISC-Vの基礎、オバービュー(RISC-V basis-overview)
 
ガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とは
ガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とはガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とは
ガチで聞く!ヤフーのOpenStackプライベート・クラウドの実態とは
 
IPアドレスのおねだん
IPアドレスのおねだんIPアドレスのおねだん
IPアドレスのおねだん
 
プログラマ目線から見たRDMAのメリットと その応用例について
プログラマ目線から見たRDMAのメリットとその応用例についてプログラマ目線から見たRDMAのメリットとその応用例について
プログラマ目線から見たRDMAのメリットと その応用例について
 
はじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチーム
はじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチームはじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチーム
はじめよう FinOps クラウドコスト最適化への第一歩とは 日本IBMカスタマーサクセスチーム
 
Mellanox VXLAN Acceleration
Mellanox VXLAN AccelerationMellanox VXLAN Acceleration
Mellanox VXLAN Acceleration
 
tcolorboxによる装飾表現(TeXユーザの集い2015)
tcolorboxによる装飾表現(TeXユーザの集い2015)tcolorboxによる装飾表現(TeXユーザの集い2015)
tcolorboxによる装飾表現(TeXユーザの集い2015)
 
Basics Of Minilink Microwave Networks
Basics Of Minilink Microwave NetworksBasics Of Minilink Microwave Networks
Basics Of Minilink Microwave Networks
 
3 Basic Principal Of Fo Installation
3 Basic Principal Of Fo Installation3 Basic Principal Of Fo Installation
3 Basic Principal Of Fo Installation
 
Intro to IO-Link
Intro to IO-LinkIntro to IO-Link
Intro to IO-Link
 
Wireless LAN & 802.11ac Wi-Fi Fundamentals
Wireless LAN & 802.11ac Wi-Fi FundamentalsWireless LAN & 802.11ac Wi-Fi Fundamentals
Wireless LAN & 802.11ac Wi-Fi Fundamentals
 

Viewers also liked

10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATIONimtfiber
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...van den Dool Dick
 
Fttx planning and design
Fttx planning and designFttx planning and design
Fttx planning and designAhmed Hamdy
 
Gpon Fundamentals
Gpon FundamentalsGpon Fundamentals
Gpon Fundamentalsmansoor_gr8
 
Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...
Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...
Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...Hubbell Power Systems
 
Next-Gen Access Technologies: PON and DSL
Next-Gen Access Technologies: PON and DSLNext-Gen Access Technologies: PON and DSL
Next-Gen Access Technologies: PON and DSLCalix
 
Circuito final vpn mpls movistar mexico proyecto bts
Circuito final vpn mpls movistar mexico   proyecto btsCircuito final vpn mpls movistar mexico   proyecto bts
Circuito final vpn mpls movistar mexico proyecto btsMarco Terrones León
 
GSM 3G Migration
GSM 3G MigrationGSM 3G Migration
GSM 3G Migrationmaddiv
 
2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiataHasitha Neelaka
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentationGangasuthan
 
Mr. Duke Fu's presentation at QITCOM 2011
Mr. Duke Fu's presentation at QITCOM 2011Mr. Duke Fu's presentation at QITCOM 2011
Mr. Duke Fu's presentation at QITCOM 2011QITCOM
 
eLTE Redundant Link Solution ICT Safe City Project
eLTE Redundant Link Solution ICT Safe City ProjecteLTE Redundant Link Solution ICT Safe City Project
eLTE Redundant Link Solution ICT Safe City ProjectKhurram Shafique
 
Quality in fttx deployments
Quality in fttx deploymentsQuality in fttx deployments
Quality in fttx deploymentsdavidrottmayer
 
Micro trenching services by t.t ehsan sdn bhd
Micro trenching services by t.t ehsan sdn bhdMicro trenching services by t.t ehsan sdn bhd
Micro trenching services by t.t ehsan sdn bhdT.T EHSAN SDN BHD
 
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...eieiswe
 
Dialog telekom limite1
Dialog telekom limite1Dialog telekom limite1
Dialog telekom limite1niroshiniz
 

Viewers also liked (20)

10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION10 STAGES OF  FIBER OPTICS PROJECT IMPLEMENTATION
10 STAGES OF FIBER OPTICS PROJECT IMPLEMENTATION
 
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
Real Fibre optic FTTH FTTX network design, engineering & planning software fo...
 
Fttx planning and design
Fttx planning and designFttx planning and design
Fttx planning and design
 
Gpon Fundamentals
Gpon FundamentalsGpon Fundamentals
Gpon Fundamentals
 
PMP Sample Questions Set 5
PMP Sample Questions Set 5PMP Sample Questions Set 5
PMP Sample Questions Set 5
 
Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...
Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...
Cabling Installation and Maintenance Outside Plant (Hubbell Power Systems - C...
 
Next-Gen Access Technologies: PON and DSL
Next-Gen Access Technologies: PON and DSLNext-Gen Access Technologies: PON and DSL
Next-Gen Access Technologies: PON and DSL
 
Circuito final vpn mpls movistar mexico proyecto bts
Circuito final vpn mpls movistar mexico   proyecto btsCircuito final vpn mpls movistar mexico   proyecto bts
Circuito final vpn mpls movistar mexico proyecto bts
 
GSM 3G Migration
GSM 3G MigrationGSM 3G Migration
GSM 3G Migration
 
GSM
GSMGSM
GSM
 
120463N
120463N120463N
120463N
 
2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata2g,3g,4g, technology Dialog axiata
2g,3g,4g, technology Dialog axiata
 
Industrial training presentation
Industrial training presentationIndustrial training presentation
Industrial training presentation
 
Mr. Duke Fu's presentation at QITCOM 2011
Mr. Duke Fu's presentation at QITCOM 2011Mr. Duke Fu's presentation at QITCOM 2011
Mr. Duke Fu's presentation at QITCOM 2011
 
eLTE Redundant Link Solution ICT Safe City Project
eLTE Redundant Link Solution ICT Safe City ProjecteLTE Redundant Link Solution ICT Safe City Project
eLTE Redundant Link Solution ICT Safe City Project
 
Quality in fttx deployments
Quality in fttx deploymentsQuality in fttx deployments
Quality in fttx deployments
 
Micro trenching services by t.t ehsan sdn bhd
Micro trenching services by t.t ehsan sdn bhdMicro trenching services by t.t ehsan sdn bhd
Micro trenching services by t.t ehsan sdn bhd
 
SANTOSH_TELECOM_CV
SANTOSH_TELECOM_CVSANTOSH_TELECOM_CV
SANTOSH_TELECOM_CV
 
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
 
Dialog telekom limite1
Dialog telekom limite1Dialog telekom limite1
Dialog telekom limite1
 

Similar to Huawei Training for Dialog Reginal Staff-1

Similar to Huawei Training for Dialog Reginal Staff-1 (20)

vimal resume
vimal resumevimal resume
vimal resume
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
resume
resumeresume
resume
 
Attique Mahmood_CV
Attique Mahmood_CVAttique Mahmood_CV
Attique Mahmood_CV
 
Bts installation & commisioning
Bts installation & commisioningBts installation & commisioning
Bts installation & commisioning
 
Bunang telecoms profile
Bunang telecoms profileBunang telecoms profile
Bunang telecoms profile
 
Siyad_Pullatt_Engineer_Resume
Siyad_Pullatt_Engineer_ResumeSiyad_Pullatt_Engineer_Resume
Siyad_Pullatt_Engineer_Resume
 
Abdallah Al Sagheir Cv
Abdallah Al Sagheir CvAbdallah Al Sagheir Cv
Abdallah Al Sagheir Cv
 
Telemetry over gprs vico indonesia
Telemetry over gprs vico indonesiaTelemetry over gprs vico indonesia
Telemetry over gprs vico indonesia
 
INDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptxINDUSTRIAL TRAINING SLIDE AFIF.pptx
INDUSTRIAL TRAINING SLIDE AFIF.pptx
 
Cloud Telesol FTTH proposal - India
Cloud Telesol FTTH proposal - IndiaCloud Telesol FTTH proposal - India
Cloud Telesol FTTH proposal - India
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
AHMAD HUSSAIN CV
AHMAD HUSSAIN CVAHMAD HUSSAIN CV
AHMAD HUSSAIN CV
 
NWU and SA Telecoms
NWU and SA TelecomsNWU and SA Telecoms
NWU and SA Telecoms
 
Mark G Quiambao's CV
Mark G Quiambao's CVMark G Quiambao's CV
Mark G Quiambao's CV
 
proposal last.potx
proposal last.potxproposal last.potx
proposal last.potx
 
Mawingu: Ideas for the sustainability of Community Networks
Mawingu: Ideas for the sustainability of Community NetworksMawingu: Ideas for the sustainability of Community Networks
Mawingu: Ideas for the sustainability of Community Networks
 
Cv muditha dasanayake sales engineer
Cv muditha dasanayake sales engineerCv muditha dasanayake sales engineer
Cv muditha dasanayake sales engineer
 
Muditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineer
 

Huawei Training for Dialog Reginal Staff-1

  • 1. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Huawei Training for Dialog Regional Engineering Staff  OSP Training March 13, 2012 Prepared by: F. M. A.Junkeer
  • 2. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Index Page 2 2 Construction & Erection of Concrete poles/ Cable Installation 3 OSP Technical Concern 4 Huawei OSP Project Managment 1 Huawei OSP Turnkey Project Experience & Introduction to Dialog OFN Project
  • 3. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Dialog Huawei HDPE OFC (micro cable) Page 3 Solution: one 8-way HDPE bundle Micro duct Length: 140KM Duration:11months Max progress :25 km/month After the excavation, a 7-way bundle micro duct had been laid into the trench, and after the laying of the micro duct, a 48 core micro cable had been blowing into the micro duct. Because the total diameter of the micro duct is less than 45mm, so the excavation width is only 300mm.
  • 4. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential ADSS FOC for Sudan National Electricity Corporation Page 4 How NEC Benefited Huawei Solution Challenges Faced by NEC  Install FOC along existing electricity cables  Cross the main road inside the capital  Cross the main bridge over River Nile inside the capital  Adopt ADSS FOC to avoid electromagnetism interfere  Drill PVC pipe to cross road and lay LDPE pipe to protect FOC  Install steel pipe beside the bridge and lay LDPE pipe to protect FOC  Save the cost of erecting new poles;  No need to get the right of the way;  Build WAN FOC to form its own telecommunication network in the capital
  • 5. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Syria Telecommunication Optical Access Network(OAN) Page 5 How STE Benefited Huawei Solution Challenges Faced by STE  Provide voice/video and internet access to more than 100 small villages distributing all over the Syria;  The total length of O.F. is over 1100Km. Unlike backbone O.F. project, this 1100Km distribute in 7 big province and over 80 small sections/areas.  Need to install 38 OLTs and 242 ONUs in a very short time;  Their rival Syriatel is very strong and fast development.  Professional end-to-end service solution  Professional delivery management team  Customized network technology consultant, network evaluation & optimization including technology support, products & route maintenance  O.F. access insure the enough bandwidth and later expansion.  The project is finished 6 months ahead the deadline;  After optimizing the route and fine management, decreased the road surface breaking and route length.  Ahead their rival Syriatel occupy the rural market.
  • 6. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential MTN Nigeria Transmission Project Page 6 How MTN Benefited Huawei Solution Challenges Faced in this project  3200km cable route with complicated landscapes cause many special crossing methods and protections;  The raining season is a bad factor for project implementation in Nigeria;  A lot of community and government issues ,about 80% interruptions come from this item;  Varieties of advanced equipments and techniques for different terrains  Fast track method to overcome the raining season  More than 2000 labors work at the same time  Good relationship with the relevant government department.  Fast implementation brings more benefit to MTN.  Rich experience and different solution for different terrains save cost for MTN;  Full TK service save project management cost for MTN.
  • 7. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Some of Last Five Years OSP Projects Project Country Operator Route Length Project Type Start Date End Date Cote d'lvoire MTN Metro Ring Project Cote d'lvoire MTN 137 Km Duct/direct bury Apr-08 Dec-08 Malawi MTL backbone project Malawi MTL 1100 Km Duct/direct bury Apr-08 Dec-09 Senegal E-government backbone project Senegal Governmen t 630 Km Duct/direct bury Dec-07 Nov-08 Kenya CCK national backbone project Kenya CCK 1112 Km Duct Nov-07 Nov-08 Zambia Zamtel National backbone project Zambia ZAMTEL 3800 Km Duct/direct bury Oct-07 Feb-09 Pakistan PTCL 1465 TURNKEY Pakistan PTCL 300 Km Duct Oct-07 Jun-08 Zambia Zamtel Lusaka Metro project Zambia ZAMTEL 100 Km Duct Aug-07 Dec-07 Cote d'lvoire MTN Fiber Transmission Project Cote d'lvoire MTN 1136 Km Duct/direct bury Apr-07 Dec-07 Kazakhstan Kar-Tel optical transmission project Kazakhstan Kar-Tel 840 Km Duct Mar-07 Nov-07 Ghana E-government backbone project Ghana Governmen t 526 Km Duct/direct bury Feb-07 Nov-07 Ghana MTN backbone project Ghana MTN 606 Km Duct/direct bury Feb-07 Nov-07 Uganda E-government&National backbone project Uganda Governmen t 197 Km Duct Dec-06 Sep-07 Thailand CAT DWDM project Thailand CAT 7200 Km Aerial Oct-06 Dec-07 Angola MST National Optical backbone project Angola MSTelcom 110 Km Duct Aug-06 Dec-07 Pakistan PTCL OFAN TURNKEY Pakistan PTCL 1200 Km Duct Jan-05 Apr-08 Nigeria MTN National backbone project Nigeria MTN 3000 Km Duct/direct bury Nov-04 Feb-07 Page 7  More than 30,000 Km on time end-to-end Turnkey delivery experiences worldwide!
  • 8. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Dialog Broadband Island wide Optical fibrer Network Phase 2B •Routes Under SIERRA Construction. 1. Katugastota-Hunnas 2. Dambulla-Anuradapura 3. Anuradapura-Jaffna • Routes under Access Engineering 1. Peliyagoda-Negamabo 2. Matara-Hambantota 3. Wattegama-Dambulla Page 8
  • 9. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9 INTORDUCTION To cater the ever increasing demand for Bandwidth and to achieve a “high reliable core network”, Dialog decided to expand its Optical Fibre network. Hence new fibre routes and nodes were identified according to the existing and predicted capacity requirements as well as the identified strategic potentials. This decision drove Dialog for the option of releasing a Request for Proposal (RFP) to look for bidders who propose solutions for the requirement. This section covers the technical requirements and expectations of the project. General Scope The scope of this document is to describe the Technical Requirements & Specifications that the Bidders shall fulfil with the aim to provide a complete end to end solution for the implementation of Optical Fibre Network as a turnkey project. TECHNICAL REQUIREMENTS SPECIFICATION (TRS) The TRS specifies the technical requirements to be fulfilled in order to implement a complete end-to-end solution for the Optical Fibre Network. Following will be key points for the bidders to adhere from the beginning of the project. •This is an extension of Dialog’s existing Optical Fibre Network (OFN). Hence all the components and solutions proposed by bidders will be assessed for the compatibility with the existing network and same will be treated as a must. •The base of the cable network will be aerial and the solution should be designed in a manner that the cable implementation to be aerial as much as possible. The scenario to choose the other options is described under the civil construction module. •Dialog reserves the right to suggest the successful bidder/s to change and propose any of the network / project components described under TRS. Bidders are expected to take this challenge from the beginning. •Dialog will decide and change its priorities on implementation with respect to the fibre routes even while at the implementation phase.
  • 10. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 10 Dambulla - Anuradhapura 68.33 Kekirawa 18.62 0.50 19.12 63 Galkulama 29.62 0.36 48.60 63 Anuradhapura DBN 9.67 9.56 67.47 504 Anuradhapura - Jaffna 199.96 Medawachchiya 22.03 0.01 22.04 126 Iratteperiyakulam 17.10 0.01 39.14 63 Madukanda 7.95 7.08 54.16 63 Kanagarayankulam 36.42 0.40 83.90 63 Iranamadu 33.80 0.17 117.47 63 Kaithady 62.58 1.09 180.97 63 Jaffna 10.88 0.44 191.20 441 New Sites in Existing Routes Kurunegala-Kandy Site Connectivity 45.00 Hunnas DBN 25.50 5.00 30.50 Hanthana 12.00 2.50 14.50 Sites Main Road Distance By Road Disatnce Total Road distance (Cumilative) Dropping Capacity
  • 11. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11 Paliyagoda-Negambo 40.13 Hekitta 3.07 1.40 4.47 189 Ragama North 7.34 1.9 12.31 63 Kandana West 1.96 1.60 13.97 63 Ekala 2.95 1.30 16.62 63 JaEla North 2.48 0.68 18.48 63 Seeduwa 3.81 0.11 21.72 567 FTZ South 1.60 2.65 25.86 63 Kurana 4.01 0.13 27.35 63 Katuwapitiya 2.49 0.65 30.36 189 Matara - Hambanthota 97.88 Kakenadura 8.05 4.5 12.55 189 Hakmana 26.04 20 54.09 189 Ambalanthota 28.72 0.20 63.01 126 Hambanthota 10.32 0.05 73.18 252
  • 12. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 12 Dambulla-Trinco 154.70 Habarana 21.28 0.30 21.58 63 *Girithale 31.00 1.65 53.93 126 *Polonnaruwa DBN 12.10 1.59 65.97 189 Agbopura 41.37 0.25 62.90 63 Trinco DBN 43.58 1.58 107.81 315 Trinco- Bati 153.76 Punani 92.69 17.69 110.38 63 Sittandy 16.06 1.12 109.87 63 Eravur 6.88 1.14 116.77 63 Nochchimunai 16.58 0.18 132.39 63 Kattankudy 1.29 0.13 133.63 378
  • 13. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Index Page 13 2 Construction & erection of concrete poles/ Optical cable Installation/E to E net work solution 3 OSP Technical Concern 4 Huawei OSP Project Management 1 Huawei OSP Turnkey Project Experience & Introduction to Dialog OFN Project
  • 14. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential E2E OSP Network Solution Page 14 The end-to-end deployment process leads to fast implementation and roll- out on time, within budget, to the required quality and a quick return on customer investments. It is also our key measure of success. For that, Huawei has developed an end-to-end delivery process to ensure on-time completion of projects. Customer can concentrate on their core businesses while Huawei takes care of building the infrastructure. Phase 3 Phase 4Phase 2 End to End Project Deployment Project Initiation Bidding Contract Signing Manufacturing, Delivery & Engineering Preparation Maintenance Service Implementation, Testing and Acceptance Phase 6 Pre-Sales Post-Sales Phase 1 Phase 5 Training Service Professional Service Phase 7 Phase 8 Service Support Project Management
  • 15. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Network Planning Page 15 Fiber Cable Network Planning  Network structure design  Existing Fiber Cable resource investigation  Fiber Type selection  Cable Type selection  Quantity of Core  Cable Installation method Infrastructure  Node, route and repeat section design  Link Budget Route Telecom Design  SDH/DWDM  Capacity  Ring/Link Protection
  • 16. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Infrastructure (Construction Method) Page 16 Underground Duct systems Direct buried systems Aerial cabling systems Mainly used for urban installation Used when ever there is existing poles because of fast installation and easy accessible for maintenance Used for suburban installation
  • 17. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Comparison of Construction Methods Method Advantages Disadvantages Usage Underground Conduit System Out of sight, adaptable for future expansion, easy cable placement and removal, long lifetime, protected from most natural disasters and low maintenance expense. High initial cost compared to other systems. Mainly used in urban areas. Direct buried system Out of sight, long lifetime, protected from most natural disasters. Capacity cannot be increased, and maintenance expense is high. Mainly use in rural areas. Aerial Cable Low cost, fast installation, easy maintenance and adaptable for future expansion. High risk to damage caused by natural disasters, accidents or intentional activities. Suitable when exiting poles are available. Page 17
  • 18. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Cable Type Page 18 Figure 1; Cable Design for Duct Fibre Figure 2; Cable Design for Direct Buried Fibre Figure 3; Cable Design for Aerial Fire Figure 4; Cable Design for Aerial Fire
  • 19. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Fiber Type Page 19 Single optical fiber's characteristic G.652 optical fiber (SMF) G.653 optical fiber (DSF) G.654 optical fiber (WSF) G.655 optical fiber (NZ-DSF) The most mature single mode optical fiber, the minimum attenuation is in different window with the minimum dispersion An inter grade type single mode optical fiber, through shifting optical fiber cutoff wavelength, to gain the lowest attenuation An inter grade type single mode optical fiber , the zero-dispersion point shift to the minimum attenuation window Another mature single optical fiber, the minimum attenuation is in same window with low dispersion
  • 20. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Field Survey and ROW  Collect existing data, maps and drawings for the site to be surveyed.  Survey the geographical area that needs services to identify the most economical and suitable route based on demand, MH/HH locations, identify obstructions along the routes and the soil types.  Inside building survey for space planning and equipment layout. Includes OSP/ISP Reports and Drawings.  Identifying material quantities (BOQ).  Coordination for the approval of necessary OSP right of way and permits.
  • 21. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Detail Design and planning  Detailed Network Design construction drawings.  Special cases solutions.  Needed Material quantities.  Cable assignment  Tools and Equipment.  Etc. Page 21
  • 22. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Construction Page 22 Route detailed survey and design Trenching Installation of Ducts and Manholes Backfilling, Reinstatement Duct Mandrel Testing Duct Pressure Testing Fibre Splicing Fibre Cable Installation Terminating and Testing Site preparation Equipment Installation Equipment Testing Equipment Integration, & Commissioning Route detailed survey and design Equipment work Acquisitions Underground Fibre ROW and acquisition Aerial Fibre Permission from RDA/MC/PS New pole installation Lighting protection Cable Work Bracket installation
  • 23. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Underground Cables in Duct  In this method the cables are placed in underground Duct with manholes or handholes between the Duct sections.  There are different types of Duct that can be used according to requirements. • 110 mm PVC ducts with sub-ducts installed into them. • 55 mm PVC ducts. • HDPE pipes Page 23
  • 24. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Direct Buried Cables Page 24  This type of construction is usually applied on non-urban areas where there are no existing manholes & conduits.  Normal burial depth is 1.5m with warning tapes placed on equal distance to ground level. Concrete encasement can be applied where there are external threats perceive such as soil erosion or soil condition with high moisture content.
  • 25. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 25 Aerial Cables/Concrete Poles  Aerial cables are installed on Concrete poles. Dialog used 8 m poles mainly, 9 m poles used in road crossings. 5.6 m poles used in Hunnas, because of the difficulty in transportation & handling.
  • 26. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Concrete pole specification/design  The length of the poles which are connected to aerial cables shall be 8.0 meters.  The buried depth shall be one-fifth of pole length as per standard. In exceptional cases, where it is technically impossible to keep the above standard, based on DIALOG approval, the depth may be permissible up to one-sixth of pole length. The buried depth of poles used for mounting distribution points shall be always one-fifth of the pole length.  The poles shall in line with Sri Lanka Standard 363:1975 relating to reinforced concrete poles for Telecommunication Lines, Page 26
  • 27. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Concrete Pole specification/design  Cement  All cement used for concrete poles shall be Portland Cement and in accordance with BS 12 or equivalent. The cement shall be stocked in such a manner as to afford easy access for inspection. Cement shall be kept dry at all times prior to use in order to prevent deterioration.  Fine Aggregate  The fine aggregate for concrete shall consist of natural river sand or equivalent material.  Coarse Aggregate  The coarse aggregate for concrete shall consist of gravels and/or crushed stones having hard, strong and durable pieces free from adherent coatings such as mud or other foreign materials. The coarse aggregate shall be graded between a maximum sieve size of 19 mm and a minimum size corresponding to 5 mm sieve size. It must be free from dirt, floury stone dust, earth or any similar materials.  Water  Clean, fresh water which is free from inorganic or organic matter in solution or in suspension in such amounts that may impair the strength and durability of the concrete shall be used during both mixing and maturing. Page 27 •Fine Aggregate
  • 28. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Placing and curing of concrete  The concrete shall be used as soon as possible after being mixed and no material which has developed an initial set shall be used in the work. Each mould shall be filled with concrete in one continuous operation. After the material has been placed in the moulds it shall be compacted and shall not be disturbed during the period of setting. After placing, concrete shall be protected, during setting and in the first stage of hardening from shocks, running of surface water and the harmful effects of sunshine and drying winds. The concrete shall be prevented from drying out for at least 7 days. Page 28
  • 29. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Steel form work Page 29
  • 30. Reinforcement Page 30 Reinforcement shall be cleaned and free from loose Mill scale, loose rust, mud, oil, grease and any other Coating which could reduce the bond between the concrete And the steel. A slight film of rust shall not be regarded As harmful, but the steel shall not be visibly pitted by rust. Longitudinal reinforcing bars shall where possible be continuous throughout the length of the pole, but may contain not more than one lap in each bar line, subject to the following conditions.
  • 31. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Pole construction Page 31 Curing & casting
  • 32. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Pole testing  Type test  Unless otherwise specified with the enquiry or order, a written statement that the number of poles specified in Table 2-19, identical in all essential features of design with those provided, have passed the type test shall be deemed to be sufficient evidence that the poles comply with the requirements of this specification. The statement shall give all tests and state the age of the poles when tested. The poles selected for the test shall be tested in accordance with Clause 2.10.9 The permanent set after removal of a test load of 60 percent of the minimum ultimate load specified in Table 2-18 shall not exceed 10 percent of the deflection at the test load. The hair cracks produced in testing shall clearly close up on removal of the test load specified above. Page 32
  • 33. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Pole testing  Applying load Page 33
  • 34. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Pole testing  Destruction Page 34
  • 35. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Pole testing  Connectivity  Weighing slabs Page 35
  • 36. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Ariel Cable Installation Page 36
  • 37. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Ariel cable Installation Page 37
  • 38. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Pole Numbering Page 38
  • 39. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Pole Numbering Page 39
  • 40. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Special Construction Cases Rivers and Canal Crossing:  Cables are installed in a 4 inch galvanized steel pipe for extra protection attached to the side of the bridges when ever bridges are available.  For small canals the optical fiber cable shall be buried under the canal.  HDD technology can also be applied. Page 40
  • 41. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Special construction cases Page 41
  • 42. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Special Implementation Cases Crossing Main Roads and Railways:  The cables are installed in a 4 inch galvanized steel pipe for extra protection.  In places were trenching will not be allowed, boring methods (HDD) under road are used. Page 42
  • 43. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Special Implementation Cases Page 43 Slope protection sketch map Collapse Protection slope Slope Protection:
  • 44. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential MH/Duct lebels Page 44
  • 45. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential  DUCTS:  The material to be supplied is Permanently Lubricated High Density Polyethylene (PLB HDPE) duct for use as under-ground cable conduit for optical fiber cables, suitable for cable installation by blowing technique  The ducts shall be suitable for both open cut laying as well as HDD (Horizontal Deviation Drilling) method.  Specification of Permanently Lubricated High Density Polyethylene Ducts (PLB HDPE Ducts)  The PLB HDPE duct shall consist of two concentric layers, the outer layer being HDPE co-extruded with an inner layer of solid permanent lubricant, to reduce internal coefficient of friction (CF). The lubricant shall be of solid layer of uniform thickness so formulated to provide a permanent, low friction boundary layer between the inner surface of the duct and the optical fibre cable. The lubricant shall be clearly visible in cross section, concentric with the outer layer. Page 45 The ducts shall be suitable for both open cut laying as well as HDD (Horizontal Deviation Drilling) method.
  • 46. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential  Dimension of the duct shall be as under:  Outer diameter : 40mm+0.4 mm  Wall thickness : 3.5mm±0.2mm  Nominal inner diameter : 33mm  Lubricate inner layer thickness : 0.35mm  Identification marking on the surface of the duct  At every 02 meter along the length followings shall be marked  “Dialog identification” interleaved with  ‘Manufacturer name and date of manufacture’.  In addition sequential length marking in every one (01) meter shall be provided.  The PLB HDPE duct shall be supplied in a continuous length in coil form, suitable for shipping and handling purpose together with all necessary accessories needed for the proper duct installation.  The inner layer (solid lubricant) shall be white in colour  The duct supplier shall be able to supply ducts in different colours and all the accessories related. The bidder shall provide all the details of the duct supplier including the company profile together with it’s financial strength, manufacturing capacity, the full range of ducts & accessories with their detailed specifications. Some of the standard accessories are listed below. Page 46 1.The duct supplier shall be able to supply ducts in different colours and all the accessories related. The bidder shall provide all the de1.The duct supplier shall be able to supply ducts in different colours and all the accessories related. The bidder shall provide all the de
  • 47. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential – Plastic Coupler – Split couplers – Mandrel – Pressure testing attachments – End Plug – Cable Sealing Plug – Identification Tags  Ducts installed shall be in different colours (Other than Black colour) to be able to identify easily. Page 47
  • 48. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Cable connection/Rise up Page 48
  • 49. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential View of Inside of MH Page 49
  • 50. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Excavators Page 50
  • 51. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Air Blowing and Compacting Page 51 Air Blowing Compacting
  • 52. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Splicing ,Testing and Acceptance Page 52 All fiber will be joined by means of the fusion splice technique. The jointing point will be contained and organized in splicing box. The optical cable will be spliced with pigtails in the equipment room and terminated on the ODF. The optical cable will be tested by OTDR in double direction to get overall attenuation and splicing loss. Splicing Termination Test
  • 53. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential END TO END LOSS MEASUREMENTS BY OPTICAL POWER METER & SOURCE Form No : ISLANDWIDE OPTICAL FIBER BACKBONE NETWORK PROECT Road KURUNEGAL-KANDY Sector Date 31/12/2011 Site Sheet No 1 OF 2 Section From : KULUGAMMANA DIALOG SITE To : HUNNAS DIALOG SITE (1) Representative Calibration Value of the Power Meter Description P1/ dB P2/ dB E=P1-P2 (dB) Remarks No of Cores 60 1st -5 -5.24 -0.24 Actual Distance 33.25 2nd -5 -5.16 -0.16 OTDR Distance 33.62 3rd -5 -5.24 -0.24 No of Splicing 20 Rep. Calibration Value = Sum (P1-P2)/3 -5 -5.21333 -0.21333 Wave Length 1550 cw (2) Optical loss of End to End. Core No P in (1) P out (2) Rep. Calib. Value "E" (3) Optical Loss (1)- (2)-(3) Core No P in (1) P out (2) Rep. Calib. Value "E" (3) Optical Loss (1)- (2)-(3) 37 -5 -19.56 -0.2133 -14.3467 67 -5 -18.95 -0.2133 14.1633 38 -5 -18.86 -0.2133 -13.6467 68 -5 -19.28 -0.2133 14.4933 39 -5 -18.99 -0.2133 -13.7767 69 -5 dis -0.2133 #VALUE! 40 -5 -21.42 -0.2133 -16.2067 70 -5 -21.71 -0.2133 16.9233 41 -5 -19.22 -0.2133 -14.0067 71 -5 -19.61 -0.2133 14.8233 42 -5 -19.25 -0.2133 -14.0367 72 -5 -19.34 -0.2133 14.5533 43 -5 -18.53 -0.2133 -13.3167 73 -5 -20.2 -0.2133 15.4133 44 -5 -18.76 -0.2133 -13.5467 74 -5 -22.25 -0.2133 -20.28 45 -5 -40.88 -0.2133 -35.6667 75 -5 -18.71 -0.2133 13.92 46 -5 -21.48 -0.2133 -16.2667 76 -5 -18.12 -0.2133 13.3333 47 -5 -19.36 -0.2133 -14.1467 77 -5 -19.22 -0.2133 14.4333 48 -5 -19.37 -0.2133 -14.1567 78 -5 -33.35 -0.2133 28.5633 49 -5 -19.46 -0.2133 14.6733 79 -5 -18.96 -0.2133 14.17 50 -5 -19.11 -0.2133 14.32 80 -5 -27.87 -0.2133 23.0833 51 -5 -20.93 -0.2133 16.1433 81 -5 -42.07 -0.2133 37.2833 52 -5 -20.28 -0.2133 15.4933 82 -5 -34.54 -0.2133 29.7533 53 -5 -20.55 -0.2133 15.7633 83 -5 -19.01 -0.2133 14.2233 54 -5 -20.35 -0.2133 15.5633 84 -5 -23.35 -0.2133 18.56 55 -5 -19.25 -0.2133 14.4633 85 -5 -19.3 -0.2133 14.51 56 -5 dis -0.2133 #VALUE! 86 -5 -18.89 -0.2133 14.1033 57 -5 -21.65 -0.2133 16.8633 87 -5 -20.46 -0.2133 15.6733 58 -5 -19.47 -0.2133 14.6833 88 -5 -19.15 -0.2133 14.3633 59 -5 -19.73 -0.2133 14.94 89 -5 -18.58 -0.2133 13.7933 60 -5 -19.83 -0.2133 15.0433 90 -5 -29.54 -0.2133 24.7533 61 -5 -19.42 -0.2133 14.6333 91 -5 -19.13 -0.2133 14.3433 62 -5 -19.06 -0.2133 14.2733 92 -5 -20.55 -0.2133 15.7633 63 -5 -19.02 -0.2133 14.2333 93 -5 -19.95 -0.2133 15.1633 64 -5 -18.85 -0.2133 14.06 94 -5 -19.96 -0.2133 15.1733 65 -5 -18.85 -0.2133 14.0633 95 -5 -19.71 -0.2133 14.9233 66 -5 -20 -0.2133 15.2133 96 -5 -19.28 -0.2133 14.4933 AcceptanceCriteria: 3.For G655 (NZDSF) link loss measurement at 1310nm is not applicable. 1 Average Splice loss (both directions) for G655 at 1550nm fiber 0.1 dB 5.Acceptable link loss (0.25 x Fiber length in KM) + 0.1x No. of splices+ 2 Attenuation co-ef limits for G655&G652 connectors loss (2 each x 0.5dB) = ………………..dB. At 1310nm 0.40 dB/km 0.21*33.65+0.1*20+4*0.5 = 11.0665dB At 1550nm 0.25 dB/km 0.4*33.65+0.1*20+4*0.5 = 17.46 dB TESTED & SUBMITTED BY ACCEPTED BY CONTRACTOR DIALOG NAME DESIGNATION SIGNATURE DATE Page 53
  • 54. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Maintenance Maintenance services ensure that outside plant cable paths are clear of obstructions and external threats and communication cables are kept in the optimum condition through:  Preventive maintenance.  Scheduled testing for network performance.  Equipment and spare parts management.  Cable faults localization.  Troubleshooting and emergency response.  Transmission loss allocation.  Techniques for improvement/reliability.  Control/updating of plant records Page 54
  • 55. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Index Page 55 2 End to End OSP Network Solution 3 OSP Technical Concern 4 Huawei OSP Project Management 1 Huawei OSP Turnkey Project Case
  • 56. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential  INSTALLATION AND CONSTRUCTION STANDARD  Installation/construction of Aerial OF cable for National Backbone Optical Fiber Network shall be carried out according to the Specifications provided below. Other installation/construction details which are not specified in this Part shall be proposed by Huawei, for the approval of DIALOG. All installation and construction standard method statements should be submitted to satisfy these requirements in Technical Proposal.  Huawei shall be solely responsible for any claims or damages arising out of the execution of the work.  Huawei shall obtain all the necessary permissions for excavation of roads from authorities concerned prior to construction. DIALOG will co-operate with and assist Huawei to obtain the necessary permission.  AERIAL CABLE INSTALLATION STANDARD  Aerial cable shall be suspended on the roadside of the pole and new cable shall be suspended underneath the existing cable on pole line where possible. The aerial cable shall be suspended on the same side of each pole.  The aerial cable shall be suspended at 50 cm from the top of each pole.  The minimum clearance from ground to the lowest point in the span of cable shall be at least 4.5 m along roads and 5.5 m at road crossing. The minimum clearance from foliage and trees shall not be less than 1.75 m.  Sags of aerial cable shall not exceed 0.8 m under the worst conditions expected. Page 56 •The minimum clearance from ground to the lowest point in the span of cable shall be at least 4.5 m along roads and 5.5 m at road crossing. The min
  • 57. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Aerial OFC OPGW ADSS ADL/ADW Page 57 Aerial Optical Fiber Type:  OPGW (Optical Ground Wire)  ADL/ADW (All Dielectric Lash)  ADSS (All Dielectric Self Supporting ) Replacing with existing wire Can be install on tower Install on existing wire Comparison between Aerial OFC
  • 58. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 58 Installation situations OPGW:  Replaces with shield wire (top of tower) ADSS :  It depends on power of electrical field of line ADL / ADW:  This cables installs on shield or phase conductor Comparison between OPGW and ADSS
  • 59. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Comparison between OPGW and ADSS Page 59 Figure 2; Cable Design of OPGW Figure 2; Cable Design of ADSS
  • 60. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Comparison between OPGW and ADSS Page 60 Proposal: ADSS is recommended for installation on existing electric pole, but the existing electric pole and wire height should be considered. Advantage Disadvantage ADSS  ADSS cable has higher tensile strength. It is applicable for long span. The overall thermal expansion coefficient of ADSS is very low, so the effect of temperature on ADSS sag is small.  ADSS is made of non-metallic materials, can be installed and maintained on live-line situation. The feature is convenient and safe for installation and maintenance.  Anti-track material makes ADSS be able to be used in strong electric fields.  ADSS cable has good features, such as small diameter, light weight, and small load affection on poles or towers.  Installed position is under existing electric cable, the safety distance between cable and ground need to be considered. OPGW  Strong Physical feature, can support long span installation (more than 250m).  Suitable for new installation power transmission system to save construction cost.  Vibration caused by wind, hurricane, ice thickness,  Unsteady operation caused by temperature, possible thunder attack, short circuit.  For existing power line system, the power supply must be break off
  • 61. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 61 Comparison between G.652D and G.655 Type Attenuation(dB/km) 1550nm Dispersion(ps/nm.km) 1550nm Window(nm) PMD 1550nm G.652 0.17-0.25 17-20 1310/1550 <0.2 G.655 0.19-0.25 1-6 1550 <0.2 G.655(TWRS) 0.19-0.25 1-6 1310/1550 <0.2 G.656 0.19-0.25 8 1550 <0.2 Proposal : G.652D is recommended. Advantage Disadvantage G.655  lower dispersion, and it need fewer DCM  (Before DCM is high cost, using G.655 save the cost of DCM. But now the DCM price is lower down, and it is not a significant advantage)  Can not be used for 1310 nm laser.  Significant non-linear effect (SPM, FWM), not suitable for DWDM system(80*40G e.g)  Higher Price
  • 62. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 62 Comparison between Direct Buried/HDPE/Microduct Land Cable Installation Method Direct Buried Duct PVC DuctConcrete Duct HDPE Duct Micro Duct
  • 63. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 63 Maintenance Advantage of HDPE Duct Solution Replacement • Upgrade capacity The cable can be replaced with new type of OFC Balance of CAPEX and OPEX •According to the traditional solution, compared with duct OFC, the direct buried OFC for the national backbone has low CAPEX, but OPEX is extremely higher. • Maintenance • Trouble shooting • Repair No need to excavate again and again Expansion •Expansion capacity No need to dig and lay another D.B. OFC Comparison between Direct Buried/HDPE/Microduct
  • 64. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 64 Construction Process Survey & Design D.B. HDPE Duct PVC Duct Trenching Duct & Manhole Backfill Cable Installation Repeating Section Test New Cable Installation Existing Duct Treatment N/a N/a Pulling •Different steps: Duct & manhole •Different installation methodology: laying, blowing, pulling The distance between the manholes increases to around 1000m compare with 100m in the traditional PVC duct solution after the popularize of HDPE pipe and cable blowing technique. The cost of manhole reduces. Expansion Process •No expansion capacity for D.B. •Cable blowing technique makes the maintenance and upgrade more rapidly Micro pipes can be blowing into the HDPE pipe to use the duct system more adequately Blowing Pulling Laying Blowing Assembly Laying Comparison between Direct Buried/HDPE/Microduct
  • 65. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 65 Solutions Cost of Material Cost of Service OFC and joint box Duct and manhole Excavatio n Backfill Duct installation Manhole installation OFC installation D.B. High Low (joint pit) Low Low 0 0 Low 40/33 HDPE Low Low Low Low Low Low Low* 110 PVC Low High High High High High High •Choose the cable blowing methodology The cost of HDPE pipe solution is quite lower than the traditional PVC solution. The additional cost of construction is mainly about the pipe and manhole compare with D.B. solution. Advantage of HDPE pipe solution: obviously the OFC services have higher reliability and cost performance. The outside plant part is more convenient to maintain, and provided with expansion and upgrade capacity. Comparison between Direct Buried/HDPE/Microduct
  • 66. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 66 Comparison between Direct Buried/HDPE/Microduct Microduct Solution: Projection Duct + Microduct + Microcable Protection Duct :HDPE duct with dimension from 32mm to 63mm (outer diameter) Microduct :HDPE duct with dimension less than 16mm (outer diameter) Microcable: Cable suitable for blowing installation in microduct, cable diameter is 3.0 ~ 10.5 mm.
  • 67. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 67 Comparison between Direct Buried/HDPE/Microduct Microduct Overview Microduct Bundles Microduct Note: Microduct Bundles is normally used for point to point solution, it’s not easy for branching.
  • 68. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 68 Comparison between Direct Buried/HDPE/Microduct Type Inner Diameter Minimum Inner Diameter Thickness Bending Radius 7mm 5.5mm 5.1 .75 (+.0 -.1) 140mm 10mm 8mm 7.6 1.0 (+.0 -.1) 200mm 12mm 10mm 9.6 1.0 (+.0 -.1) 240mm Microduct Overview Normal Microduct Type Reference Microduct Qty vs. HDPE Duct Diameter Reference Microduct HDPE Duct 12/10mm 10/8mm 7/5.5mm 25/21mm (3/4) " - 1 3 32/28mm (1) " 2 3 5 40/33mm (1.25) " 4 5 10 50/42mm (2) " 8 10 20
  • 69. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 69 Comparison between Direct Buried/HDPE/Microduct Note: 1. Loose tube type cable is preferred for both normal cable and microcable. 2. Normally one loose tube contains 12 cores fiber. Fiber Type Cores Loose Tube Diameter (mm) Loose Tube Qty Filling Rope Qty Cable Diameter( mm) Cable Weight(kg /km) Max Allowed Working Tension (N) Max Allowed Crush (N/100mm) GCYFTY-4—l2Xn 4—12 1.7 1 3 5.3 22 120 450 GCYFTY-14—24 Xn 14—24 1.7 2 2 5.3 22 120 450 GCYFTY-26—36 Xn 26—36 1 7 3 1 5.3 22 120 450 GCYFTY-38—48 Xn 38—48 1 7 4 0 5.3 22 120 450 GCYFTY-50—60 Xn 50~60 1 7 5 0 5.6 26 150 450 GCYFTY-62—72 Xn 62~72 1 7 0 6.2 33 180 450 GCYFTY-74—84 Xn 74—84 1 7 7 1 7.3 44 240 450 GCYFTY-76—96 Xn 76—96 1.7 8 0 7.3 44 240 450 Microcable Reference Normal Duct Type Cable Microcable Microcable Overview
  • 70. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 70 Comparison between Direct Buried/HDPE/Microduct Tools and Accessories Microduct Blowing Machine Microcable Blowing Machine Air Compressor Microcable Coilpanel Splicing Box Splicing Box
  • 71. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 71 Comparison between Direct Buried/HDPE/Microduct Blowing Installation method
  • 72. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 72 Comparison between Direct Buried/HDPE/Microduct Blowing Installation method
  • 73. HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 73 Comparison between Direct Buried/HDPE/Microduct Advantage Disadvantage Microdu ct  Reduce the initial investment, and easy for expansion.  Easy to upgrade the fiber cable type.  Fully utilize the existing duct resource  Easy for branching.  Reduce manhole / handhole quantities.  High requirement for the protection in handhole and manhole.  Special tools needed for implementation and maintainence.  Additional cost for microduct  The advantage is good for access network and FTTx senario, but for backbone network, it not obvious. Proposal: HDPE with blowing installation method solution is proposed. Depend on the requirement of SMC, Microduct & Microcable or conventional cable can be considered to be installed inside HDPE duct. Microduct vs. Traditional HDPE Duct