Baltic Sea Offshore Grid
Taavi Veskimägi
CEO of Elering AS
• Electricity and gas transmission
system operator with the primary
task of ensuring a high-quality
energy supply to Estonian
consumers.
• Electricity and gas network consists
internal transmission network and
cross boarder interconnectors
• Elering ensures conditions for well-
functioning, efficient and
transparent electricity market
About Elering Gas transmission
network
Electricity transmission
network
We have a vision-
Common Finnish-Estonian energy market
ESTLINK 1, to the market
Effective day ahead and
intraday market coupling
aFRR is prepared
common flexibility market
platvorm is coming 2021
COMMON WHOLESALE AND RETAIL ENERGY MARKET
data hub’s interlinked ….
Analog and digital
Common offshore grid
BALTICCONNECTOR and
EE_FI_LV common gas market
EST data hub
Estlink 2, to the market
Baltic Sea Offshore
Grid Initiative
WHY?
• Regional energy sector have to be fully decarbonised
and the Baltic Sea wind plays a key role;
• Many studies (Flex4RES, BEMIP Study of Baltic Offshore
Wind ) have shown if we are acting together it makes
energy transition faster and cheaper for all nations.
• converter-based production (onshore and offshore)
brings instability, we need a stronger and more
connected power system
WHAT?
• The dual purpose, simultaneously as interconnectors
between markets and interconnection points for wind
farms.
Baltic Sea Wind potential
STUDY ON BALTIC OFFSHORE WIND ENERGY COOPERATION UNDER BEMIP
Summary of identified potential offshore wind
capacity in the BEMIP member countries
Ambitious scenario
reflecting an achievable
pathway
12.7 GW in 2030
32.1 GW in 2050
6.5 GW in 2030
17 GW in 2050.
2020 expected level of 2.5 GW
Offshore wind power in the Baltic Sea Area
Low deployment scenario
• Converter-based production
(onshore and offshore) speed is
clearly progressive
21TWh 2016 70 TWh 2022
• The location of these
investments creates an energy
surplus that cannot entirely be
conveyed to consumption
centres
• Baltic Sea Offshore Grid is part
of the solution
• The energy system of the future
must cope with greater flexibility
so we need a stronger and more
connected power system
• „Zero-cost“ energy enables
sector coupling e.g power to X
(gas, heat)
Grid cost is lower in the cooperation scenarios than in the
National Policy scenario.
STUDY ON BALTIC OFFSHORE WIND ENERGY COOPERATION UNDER BEMIP
• additional interconnector capacity provided alternative export routes for the power
surplus thus reducing the overall costs related to congestion.
• with coordination, offshore capacity is installed closer to areas where additional
capacity is needed
Annualised social welfare costs of redispatch and grid upgrades across the BEMIP region
Baltic Sea Offshore Grid
Initiative
To start a dialogue „How to prepare grid connections for offshore
wind generation“
• Political Declaration on Offshore Energy cooperation
between Baltic Sea Countries (at least Baltic-Nordic countries)
• Highlight Baltic Sea Offshore Grid Initiative in revised BEMIP
• Baltic Sea Offshore Grid Initiative to conduct pre-feasibility
studies for a joint offshore power network
• Governments should commit TSO-s to take a driver seat,
TSO-s have the skills, existing cooperation network and the
capabilities; Next TYNDP 2022 (not single project based but
integral part of Baltic Sea region power system)
• Highlight the BEMIP region in the EU Offshore Wind Strategy
• With the help of EU (e.g Just Transition Mechanism, CEF etc)
Thank you!
Taavi Veskimägi
CEO of Elering AS

More Related Content

More from Fingrid Oyj

More from Fingrid Oyj (20)

Fingrid Current -tilaisuuden avaus, Jukka Ruusunen
Fingrid Current -tilaisuuden avaus, Jukka RuusunenFingrid Current -tilaisuuden avaus, Jukka Ruusunen
Fingrid Current -tilaisuuden avaus, Jukka Ruusunen
 
Fingrid Current: Future, Baltic Sea region. Jukka Ruusunen
Fingrid Current: Future, Baltic Sea region. Jukka RuusunenFingrid Current: Future, Baltic Sea region. Jukka Ruusunen
Fingrid Current: Future, Baltic Sea region. Jukka Ruusunen
 
Jukka ruusunen wind_finland_2019
Jukka ruusunen wind_finland_2019Jukka ruusunen wind_finland_2019
Jukka ruusunen wind_finland_2019
 
Jukka ruusunen 2019_rsc_conference
Jukka ruusunen 2019_rsc_conferenceJukka ruusunen 2019_rsc_conference
Jukka ruusunen 2019_rsc_conference
 
Hs2 e forum_europe_karri_koskinen
Hs2 e forum_europe_karri_koskinenHs2 e forum_europe_karri_koskinen
Hs2 e forum_europe_karri_koskinen
 
Women in tech in Fingrid
Women in tech in FingridWomen in tech in Fingrid
Women in tech in Fingrid
 
Sähkön käyttövarmuus ja varautuminen, 12.9.2019. Reima Päivinen.
Sähkön käyttövarmuus ja varautuminen, 12.9.2019. Reima Päivinen.Sähkön käyttövarmuus ja varautuminen, 12.9.2019. Reima Päivinen.
Sähkön käyttövarmuus ja varautuminen, 12.9.2019. Reima Päivinen.
 
Maailman paras kantaverkkobrändi. Energia-alan viestijöiden tapaaminen 12.9.
Maailman paras kantaverkkobrändi. Energia-alan viestijöiden tapaaminen 12.9.Maailman paras kantaverkkobrändi. Energia-alan viestijöiden tapaaminen 12.9.
Maailman paras kantaverkkobrändi. Energia-alan viestijöiden tapaaminen 12.9.
 
Valmistaudu datahubin tuloon. Minna Arffman 120919
Valmistaudu datahubin tuloon. Minna Arffman 120919Valmistaudu datahubin tuloon. Minna Arffman 120919
Valmistaudu datahubin tuloon. Minna Arffman 120919
 
Sähkömarkkinamurros kantaverkkoyhtiön näkökulmasta
Sähkömarkkinamurros kantaverkkoyhtiön näkökulmastaSähkömarkkinamurros kantaverkkoyhtiön näkökulmasta
Sähkömarkkinamurros kantaverkkoyhtiön näkökulmasta
 
Tunnetalouden valuutat: vaikuttaminen ja vapaus
Tunnetalouden valuutat: vaikuttaminen ja vapausTunnetalouden valuutat: vaikuttaminen ja vapaus
Tunnetalouden valuutat: vaikuttaminen ja vapaus
 
Jukka Ruusunen Sähkötehon riittävyys
Jukka Ruusunen Sähkötehon riittävyysJukka Ruusunen Sähkötehon riittävyys
Jukka Ruusunen Sähkötehon riittävyys
 
Työsuojelupäivät 2018: Yhteinen työpaikka ja urakoitsijoiden työturvallisuus
Työsuojelupäivät 2018: Yhteinen työpaikka ja urakoitsijoiden työturvallisuusTyösuojelupäivät 2018: Yhteinen työpaikka ja urakoitsijoiden työturvallisuus
Työsuojelupäivät 2018: Yhteinen työpaikka ja urakoitsijoiden työturvallisuus
 
Jukka ruusunen siemens digi_day2018
Jukka ruusunen siemens digi_day2018 Jukka ruusunen siemens digi_day2018
Jukka ruusunen siemens digi_day2018
 
Sähköjärjestelmä murroksessa - mitä tarkoittaa huoltovarmuudelle?
Sähköjärjestelmä murroksessa - mitä tarkoittaa huoltovarmuudelle?Sähköjärjestelmä murroksessa - mitä tarkoittaa huoltovarmuudelle?
Sähköjärjestelmä murroksessa - mitä tarkoittaa huoltovarmuudelle?
 
Suomalaisen energian päivä - Jukka Ruususen esitys
Suomalaisen energian päivä - Jukka Ruususen esitysSuomalaisen energian päivä - Jukka Ruususen esitys
Suomalaisen energian päivä - Jukka Ruususen esitys
 
Electricity system where are you going - Michael Weinhold, CTO Siemens Energy...
Electricity system where are you going - Michael Weinhold, CTO Siemens Energy...Electricity system where are you going - Michael Weinhold, CTO Siemens Energy...
Electricity system where are you going - Michael Weinhold, CTO Siemens Energy...
 
Electricity markets: past, present and digital future - Stephen Woodhouse/Pöyry
Electricity markets: past, present and digital future - Stephen Woodhouse/PöyryElectricity markets: past, present and digital future - Stephen Woodhouse/Pöyry
Electricity markets: past, present and digital future - Stephen Woodhouse/Pöyry
 
Ohjelmistorobotti vapauttaa rutiinitöistä
Ohjelmistorobotti vapauttaa rutiinitöistäOhjelmistorobotti vapauttaa rutiinitöistä
Ohjelmistorobotti vapauttaa rutiinitöistä
 
Omaisuuden hallinnan ajankohtaisseminaari 2018 esitykset
Omaisuuden hallinnan ajankohtaisseminaari 2018 esityksetOmaisuuden hallinnan ajankohtaisseminaari 2018 esitykset
Omaisuuden hallinnan ajankohtaisseminaari 2018 esitykset
 

Recently uploaded

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 

Fingrid Current: Taavi Veskimägi, CEO of Elering AS

  • 1. Baltic Sea Offshore Grid Taavi Veskimägi CEO of Elering AS
  • 2. • Electricity and gas transmission system operator with the primary task of ensuring a high-quality energy supply to Estonian consumers. • Electricity and gas network consists internal transmission network and cross boarder interconnectors • Elering ensures conditions for well- functioning, efficient and transparent electricity market About Elering Gas transmission network Electricity transmission network
  • 3. We have a vision- Common Finnish-Estonian energy market ESTLINK 1, to the market Effective day ahead and intraday market coupling aFRR is prepared common flexibility market platvorm is coming 2021 COMMON WHOLESALE AND RETAIL ENERGY MARKET data hub’s interlinked …. Analog and digital Common offshore grid BALTICCONNECTOR and EE_FI_LV common gas market EST data hub Estlink 2, to the market
  • 4. Baltic Sea Offshore Grid Initiative WHY? • Regional energy sector have to be fully decarbonised and the Baltic Sea wind plays a key role; • Many studies (Flex4RES, BEMIP Study of Baltic Offshore Wind ) have shown if we are acting together it makes energy transition faster and cheaper for all nations. • converter-based production (onshore and offshore) brings instability, we need a stronger and more connected power system WHAT? • The dual purpose, simultaneously as interconnectors between markets and interconnection points for wind farms.
  • 5. Baltic Sea Wind potential STUDY ON BALTIC OFFSHORE WIND ENERGY COOPERATION UNDER BEMIP Summary of identified potential offshore wind capacity in the BEMIP member countries Ambitious scenario reflecting an achievable pathway 12.7 GW in 2030 32.1 GW in 2050 6.5 GW in 2030 17 GW in 2050. 2020 expected level of 2.5 GW Offshore wind power in the Baltic Sea Area Low deployment scenario
  • 6. • Converter-based production (onshore and offshore) speed is clearly progressive 21TWh 2016 70 TWh 2022 • The location of these investments creates an energy surplus that cannot entirely be conveyed to consumption centres • Baltic Sea Offshore Grid is part of the solution • The energy system of the future must cope with greater flexibility so we need a stronger and more connected power system • „Zero-cost“ energy enables sector coupling e.g power to X (gas, heat)
  • 7. Grid cost is lower in the cooperation scenarios than in the National Policy scenario. STUDY ON BALTIC OFFSHORE WIND ENERGY COOPERATION UNDER BEMIP • additional interconnector capacity provided alternative export routes for the power surplus thus reducing the overall costs related to congestion. • with coordination, offshore capacity is installed closer to areas where additional capacity is needed Annualised social welfare costs of redispatch and grid upgrades across the BEMIP region
  • 8. Baltic Sea Offshore Grid Initiative To start a dialogue „How to prepare grid connections for offshore wind generation“ • Political Declaration on Offshore Energy cooperation between Baltic Sea Countries (at least Baltic-Nordic countries) • Highlight Baltic Sea Offshore Grid Initiative in revised BEMIP • Baltic Sea Offshore Grid Initiative to conduct pre-feasibility studies for a joint offshore power network • Governments should commit TSO-s to take a driver seat, TSO-s have the skills, existing cooperation network and the capabilities; Next TYNDP 2022 (not single project based but integral part of Baltic Sea region power system) • Highlight the BEMIP region in the EU Offshore Wind Strategy • With the help of EU (e.g Just Transition Mechanism, CEF etc)