Submit Search
Upload
7 wastages
•
7 likes
•
1,168 views
মোঃ ফুরকান উদ্দিন জুয়েল
Follow
7 deadly wastages in production or manufacturing
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 30
Recommended
IE working procedure
IE working procedure
Safayet Dishan
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
Mazharul Islam
IE Qu & Ans
IE Qu & Ans
shakil tutul
Presentation on time study of apparel industry
Presentation on time study of apparel industry
Tanmoy Antu
How to Improve Productivity
How to Improve Productivity
Sunjib Anwar; MBA,SCSS
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
Khairul Bashar
All in 1 IE
All in 1 IE
shakil tutul
SMV & Benefits
SMV & Benefits
মোঃ ফুরকান উদ্দিন জুয়েল
Recommended
IE working procedure
IE working procedure
Safayet Dishan
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
Mazharul Islam
IE Qu & Ans
IE Qu & Ans
shakil tutul
Presentation on time study of apparel industry
Presentation on time study of apparel industry
Tanmoy Antu
How to Improve Productivity
How to Improve Productivity
Sunjib Anwar; MBA,SCSS
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
Khairul Bashar
All in 1 IE
All in 1 IE
shakil tutul
SMV & Benefits
SMV & Benefits
মোঃ ফুরকান উদ্দিন জুয়েল
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
zaman parvez
Lets understand what are SAM and SMV
Lets understand what are SAM and SMV
ThreadSol
Traffic Light System
Traffic Light System
Shubham Singh
Line Balancing In Garments Industry
Line Balancing In Garments Industry
Md. Mazadul Hasan Shishir
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Disha Pawar
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
Arpan Mahato
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
Momin Uddin
Method Study
Method Study
Ira Tobing
GSD Manual For Students
GSD Manual For Students
মোঃ ফুরকান উদ্দিন জুয়েল
Garments production system
Garments production system
Pacific Cotton
Garment production and productivity
Garment production and productivity
Md Shamsuzzaman Rasel
Finishing manual fariha knit
Finishing manual fariha knit
Mizan Rahman
Flat Knitting Machine
Flat Knitting Machine
Azmir Latif Beg
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
Kanthimathinathan Aramvalarthanathan
Method study(abhishekkumar)
Method study(abhishekkumar)
Abhishek Kumar
Fabric & Garments Fault with its remedies
Fabric & Garments Fault with its remedies
Md. Mazadul Hasan Shishir
Improving Productivity by Lean
Improving Productivity by Lean
ANITHA BALA
Smv
Smv
Mostafa Abd-Alrehim
Work study
Work study
Swapna Bommasamudram
Coping with GSD: What's the Secret
Coping with GSD: What's the Secret
gsdlife
Time study ratings&&allowances
Time study ratings&&allowances
মোঃ ফুরকান উদ্দিন জুয়েল
More Related Content
What's hot
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Ariful Islam
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
zaman parvez
Lets understand what are SAM and SMV
Lets understand what are SAM and SMV
ThreadSol
Traffic Light System
Traffic Light System
Shubham Singh
Line Balancing In Garments Industry
Line Balancing In Garments Industry
Md. Mazadul Hasan Shishir
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Disha Pawar
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
Arpan Mahato
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
Momin Uddin
Method Study
Method Study
Ira Tobing
GSD Manual For Students
GSD Manual For Students
মোঃ ফুরকান উদ্দিন জুয়েল
Garments production system
Garments production system
Pacific Cotton
Garment production and productivity
Garment production and productivity
Md Shamsuzzaman Rasel
Finishing manual fariha knit
Finishing manual fariha knit
Mizan Rahman
Flat Knitting Machine
Flat Knitting Machine
Azmir Latif Beg
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
Kanthimathinathan Aramvalarthanathan
Method study(abhishekkumar)
Method study(abhishekkumar)
Abhishek Kumar
Fabric & Garments Fault with its remedies
Fabric & Garments Fault with its remedies
Md. Mazadul Hasan Shishir
Improving Productivity by Lean
Improving Productivity by Lean
ANITHA BALA
Smv
Smv
Mostafa Abd-Alrehim
Work study
Work study
Swapna Bommasamudram
What's hot
(20)
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
Lets understand what are SAM and SMV
Lets understand what are SAM and SMV
Traffic Light System
Traffic Light System
Line Balancing In Garments Industry
Line Balancing In Garments Industry
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
Method Study
Method Study
GSD Manual For Students
GSD Manual For Students
Garments production system
Garments production system
Garment production and productivity
Garment production and productivity
Finishing manual fariha knit
Finishing manual fariha knit
Flat Knitting Machine
Flat Knitting Machine
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
Method study(abhishekkumar)
Method study(abhishekkumar)
Fabric & Garments Fault with its remedies
Fabric & Garments Fault with its remedies
Improving Productivity by Lean
Improving Productivity by Lean
Smv
Smv
Work study
Work study
Viewers also liked
Coping with GSD: What's the Secret
Coping with GSD: What's the Secret
gsdlife
Time study ratings&&allowances
Time study ratings&&allowances
মোঃ ফুরকান উদ্দিন জুয়েল
GSD cords
GSD cords
মোঃ ফুরকান উদ্দিন জুয়েল
total quality management
total quality management
Neeraj Sharma
Total quality management
Total quality management
Abdullah Al Noman Faraji
7 Deadly Wastes
7 Deadly Wastes
Madhusudan Partani
Seven Supply Chain Wastes
Seven Supply Chain Wastes
joelsutherland
Benchmarking
Benchmarking
Debashish Banerjee
BIS and ISO
BIS and ISO
Hiran Patel
JIT for manufacturing ppt
JIT for manufacturing ppt
nguyendongoc quynh
Identify 7 Wastes
Identify 7 Wastes
Lean for U
Tqm and six sigma
Tqm and six sigma
Madhu Chauhan
Kaizen final ppt
Kaizen final ppt
Minutha Shriyan
Quality management system
Quality management system
Muhammad Assad Fahim Khan
Introduction to iso 9001
Introduction to iso 9001
norsaidatul_akmar
8 Wastes
8 Wastes
Harold Philbrick
tpm presentation
tpm presentation
Ozge Bulunaz
Benchmarking
Benchmarking
Ramesh Babu Paladugu
ISO 9000 Quality Management System - A Presentation by Akshay Anand
ISO 9000 Quality Management System - A Presentation by Akshay Anand
Akshay Anand
Benchmarking TQM
Benchmarking TQM
amarjeetgorai
Viewers also liked
(20)
Coping with GSD: What's the Secret
Coping with GSD: What's the Secret
Time study ratings&&allowances
Time study ratings&&allowances
GSD cords
GSD cords
total quality management
total quality management
Total quality management
Total quality management
7 Deadly Wastes
7 Deadly Wastes
Seven Supply Chain Wastes
Seven Supply Chain Wastes
Benchmarking
Benchmarking
BIS and ISO
BIS and ISO
JIT for manufacturing ppt
JIT for manufacturing ppt
Identify 7 Wastes
Identify 7 Wastes
Tqm and six sigma
Tqm and six sigma
Kaizen final ppt
Kaizen final ppt
Quality management system
Quality management system
Introduction to iso 9001
Introduction to iso 9001
8 Wastes
8 Wastes
tpm presentation
tpm presentation
Benchmarking
Benchmarking
ISO 9000 Quality Management System - A Presentation by Akshay Anand
ISO 9000 Quality Management System - A Presentation by Akshay Anand
Benchmarking TQM
Benchmarking TQM
Similar to 7 wastages
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Akhil Yelisetti
Operations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_Promotional
Marc Hoppenbrouwers
Lean Management Basics
Lean Management Basics
Upendra K
Office_Lean_sample
Office_Lean_sample
ahmad bassiouny
Office Lean Sample
Office Lean Sample
ahmad bassiouny
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulations
Sameer Kumar
TPM
TPM
abbinnaya
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
Operational Excellence Consulting
TPM- total productive maintenance
TPM- total productive maintenance
ASIF IQBAL
Just In Time
Just In Time
Yesica Adicondro
PQT - Total Productive Maintenance
PQT - Total Productive Maintenance
Dr. John V. Padua
Six sigma
Six sigma
Prakash Dev
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Operational Excellence Consulting
Making Lean Work in Your Company
Making Lean Work in Your Company
UBMCanon
TPM: Planned Maintenance
TPM: Planned Maintenance
Operational Excellence Consulting
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdf
Edgar V Macapili
Identifying Waste
Identifying Waste
Operational Excellence Consulting
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization
Max Krug
Introduction To TPM by Ashish Trivedi.pptx
Introduction To TPM by Ashish Trivedi.pptx
AshishTrivedi65
Identifying Lean Waste
Identifying Lean Waste
Operational Excellence Consulting
Similar to 7 wastages
(20)
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Operations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_Promotional
Lean Management Basics
Lean Management Basics
Office_Lean_sample
Office_Lean_sample
Office Lean Sample
Office Lean Sample
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulations
TPM
TPM
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
TPM- total productive maintenance
TPM- total productive maintenance
Just In Time
Just In Time
PQT - Total Productive Maintenance
PQT - Total Productive Maintenance
Six sigma
Six sigma
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
Making Lean Work in Your Company
Making Lean Work in Your Company
TPM: Planned Maintenance
TPM: Planned Maintenance
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdf
Identifying Waste
Identifying Waste
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization
Introduction To TPM by Ashish Trivedi.pptx
Introduction To TPM by Ashish Trivedi.pptx
Identifying Lean Waste
Identifying Lean Waste
More from মোঃ ফুরকান উদ্দিন জুয়েল
Paradigm shift
Paradigm shift
মোঃ ফুরকান উদ্দিন জুয়েল
Journey begins
Journey begins
মোঃ ফুরকান উদ্দিন জুয়েল
Teamwork
Teamwork
মোঃ ফুরকান উদ্দিন জুয়েল
Attitude
Attitude
মোঃ ফুরকান উদ্দিন জুয়েল
Why why analysis
Why why analysis
মোঃ ফুরকান উদ্দিন জুয়েল
Line balancing & EOQ
Line balancing & EOQ
মোঃ ফুরকান উদ্দিন জুয়েল
Kaizen
Kaizen
মোঃ ফুরকান উদ্দিন জুয়েল
Bangladesh labor law'2006
Bangladesh labor law'2006
মোঃ ফুরকান উদ্দিন জুয়েল
VSM
VSM
মোঃ ফুরকান উদ্দিন জুয়েল
New gazzettee 10
New gazzettee 10
মোঃ ফুরকান উদ্দিন জুয়েল
Basic concepts on lean manufacturing
Basic concepts on lean manufacturing
মোঃ ফুরকান উদ্দিন জুয়েল
Work measurement
Work measurement
মোঃ ফুরকান উদ্দিন জুয়েল
Motion Economy
Motion Economy
মোঃ ফুরকান উদ্দিন জুয়েল
Kanban
Kanban
মোঃ ফুরকান উদ্দিন জুয়েল
Industrial engineer
Industrial engineer
মোঃ ফুরকান উদ্দিন জুয়েল
Work study Training Manual
Work study Training Manual
মোঃ ফুরকান উদ্দিন জুয়েল
Different types of Production Layout
Different types of Production Layout
মোঃ ফুরকান উদ্দিন জুয়েল
pre- determined time standard of work measurement
pre- determined time standard of work measurement
মোঃ ফুরকান উদ্দিন জুয়েল
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
মোঃ ফুরকান উদ্দিন জুয়েল
More from মোঃ ফুরকান উদ্দিন জুয়েল
(19)
Paradigm shift
Paradigm shift
Journey begins
Journey begins
Teamwork
Teamwork
Attitude
Attitude
Why why analysis
Why why analysis
Line balancing & EOQ
Line balancing & EOQ
Kaizen
Kaizen
Bangladesh labor law'2006
Bangladesh labor law'2006
VSM
VSM
New gazzettee 10
New gazzettee 10
Basic concepts on lean manufacturing
Basic concepts on lean manufacturing
Work measurement
Work measurement
Motion Economy
Motion Economy
Kanban
Kanban
Industrial engineer
Industrial engineer
Work study Training Manual
Work study Training Manual
Different types of Production Layout
Different types of Production Layout
pre- determined time standard of work measurement
pre- determined time standard of work measurement
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
Recently uploaded
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls in Nagpur High Profile
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Suhani Kapoor
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Call Girls in Nagpur High Profile
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
Asutosh Ranjan
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
ranjana rawat
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
ranjana rawat
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Suman Mia
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
roncy bisnoi
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
upamatechverse
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
RajkumarAkumalla
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Dr.Costas Sachpazis
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
rknatarajan
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
upamatechverse
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
Suhani Kapoor
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Soham Mondal
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
M Maged Hegazy, LLM, MBA, CCP, P3O
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Call Girls in Nagpur High Profile
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
Recently uploaded
(20)
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
7 wastages
1.
© ABSL Power
Solutions 2007© STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes PRESENTED BY: MD.FURKAN UDDIN JEWEL
2.
© STM Quality
Limited STM Quality Limited
3.
© STM Quality
Limited STM Quality Limited How often have you used the expressions: “That was a waste of time!” or “That was a waste of money!” or “That was a waste of effort!” Waste
4.
© STM Quality
Limited STM Quality LimitedWasted Time Just imagine if we could collect all the time together that we have wasted in the past - How much time would that be?
5.
© STM Quality
Limited STM Quality LimitedWasted Money Just imagine if we could collect all the money together that we have wasted in the past - How much money would that be?
6.
© STM Quality
Limited STM Quality LimitedWasted Effort Just imagine if we could collect all the effort together that we have wasted in the past - How much effort would that be?
7.
© STM Quality
Limited STM Quality LimitedThe Problem With Waste The problem with wasted time, money & effort is: When it’s gone… - it’s gone!
8.
© STM Quality
Limited STM Quality LimitedEliminating Waste So what can we do to eliminate waste? We first need to identify what is & is not waste, then we can look at ways of eliminating or at least reducing waste.
9.
© STM Quality
Limited STM Quality Limited Identifying Waste in the Workplace Operational Activity Value added Operations Any process that changes the nature, shape or characteristic of the product in line with customer requirements e.g. Pressing, welding, heat treatment. This is where we make a profit!
10.
© STM Quality
Limited STM Quality Limited Identifying Waste in the Workplace Operational Activity Non-Value added Operations Work carried out which is necessary under current conditions, but does not increase product value. e.g. Inspection, tool change, maintenance. This is where we make a loss!
11.
© STM Quality
Limited STM Quality Limited Value Added and Non-Value Added operations The objective is to raise the ratio of Value added operations to non-value added operations and eliminate waste. WASTE NON-VALUE ADDED VALUE ADDED OPERATOR TIME VALUE ADDED NON-VALUE ADDED MORE TIME FOR OTHER ACTIVITIES ELIMINATE
12.
© STM Quality
Limited STM Quality Limited7W – The Elimination of Waste So, now we understand the difference in value added & non-value added operations, what are the benefits in eliminating all waste? • Reduced costs • Greater Capacity • Bottlenecks are identified
13.
© STM Quality
Limited STM Quality Limited7W – 7 Types of Waste 1 Over-production 2 Inventory 3 Transportation 4 Process 5 Idle Time 6 Operator Motion 7 Bad Quality
14.
© STM Quality
Limited STM Quality Limited
15.
© STM Quality
Limited STM Quality Limited The seven wastes or Muda can be remembered through the use of either of the two mnemonics; TIMWOOD 1) Transport 2) Inventory 3) Motion (Operator ) 4) Waiting 5) Over-production 6) Over-Processing 7) Defects or Bad Quality
16.
© STM Quality
Limited STM Quality Limited7W – 1. Over-production Over-production Producing more than is needed hides a multitude of problems. Excessive set-up times, machine faults, risk of producing obsolete stock.
17.
© STM Quality
Limited STM Quality Limited
18.
© STM Quality
Limited STM Quality Limited7W – 2. Inventory Inventory Carrying stock attracts cost & storage problems. Storage leads to stacking, racking, sophisticated computers, bar coding & automation, all for an activity that adds no value to the product.
19.
© STM Quality
Limited STM Quality Limited
20.
© STM Quality
Limited STM Quality Limited7W – 3. Transportation Transportation This may appear unnecessary but does add value. Large transport is easily identified but small transport such as manual labour may not be so noticeable. These can be improved by changes to the work environment.
21.
© STM Quality
Limited STM Quality Limited
22.
© STM Quality
Limited STM Quality Limited 7W – 4. Process Process Adds cost but no value - e.g.trimming & moulding to a level that is beyond the required standard adds extra time that customers do not want to pay for.
23.
© STM Quality
Limited STM Quality Limited
24.
© STM Quality
Limited STM Quality Limited 7W – 5. Idle Time Idle Time Typically, waiting for products & services from preceding operations, waiting for work from their previous set-up or waiting for cycles to finish, or meetings to start.
25.
© STM Quality
Limited STM Quality Limited
26.
© STM Quality
Limited STM Quality Limited7W – 6. Operator Motion Operator Motion Typically, single handed operations where both should be used, stretching unnecessarily or awkwardly and walking between things. All of these take time or use time poorly, none add value.
27.
© STM Quality
Limited STM Quality Limited
28.
© STM Quality
Limited STM Quality Limited7W – 7. Bad Quality Bad Quality Rejects are always produced by systems and procedures created by management. If operators fail it is because the process allowed them to fail through inadequate training or because the process was not capable in the first place.
29.
© STM Quality
Limited STM Quality Limited
30.
© STM Quality
Limited STM Quality Limited 7W – The Elimination of Waste So, now we understand the 7 wastes, we can: • Produce only what is needed; • Carry only essential stock; • Use transportation more wisely; • Produce work to the standard required; • Plan our production processes; • Put our efforts to the best possible use; • Train to make quality work every time!