SlideShare a Scribd company logo
1 of 30
© ABSL Power Solutions 2007© STM Quality Limited
STM Quality
Limited
7 Wastes
TOTAL QUALITY MANAGEMENT
7 Wastes
PRESENTED BY:
MD.FURKAN UDDIN JEWEL
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
How often have you used the
expressions:
“That was a waste of time!”
or
“That was a waste of money!”
or
“That was a waste of effort!”
Waste
© STM Quality Limited
STM Quality
LimitedWasted Time
Just imagine if
we could collect
all the time
together that we
have wasted in
the past -
How much time
would that be?
© STM Quality Limited
STM Quality
LimitedWasted Money
Just imagine if
we could collect
all the money
together that we
have wasted in
the past -
How much
money would
that be?
© STM Quality Limited
STM Quality
LimitedWasted Effort
Just imagine if
we could collect
all the effort
together that we
have wasted in
the past -
How much effort
would that be?
© STM Quality Limited
STM Quality
LimitedThe Problem With Waste
The problem with wasted time, money &
effort is:
When it’s gone…
- it’s gone!
© STM Quality Limited
STM Quality
LimitedEliminating Waste
So what can we do to eliminate
waste?
We first need to identify what is &
is not waste, then we can look at
ways of eliminating or at least
reducing waste.
© STM Quality Limited
STM Quality
Limited
Identifying Waste in the
Workplace
Operational Activity
Value added Operations
Any process that changes the nature,
shape or characteristic of the product in
line with customer requirements
e.g. Pressing, welding, heat treatment.
This is where we make a profit!
© STM Quality Limited
STM Quality
Limited
Identifying Waste in the
Workplace
Operational Activity
Non-Value added Operations
Work carried out which is necessary under
current conditions, but does not increase
product value.
e.g. Inspection, tool change, maintenance.
This is where we make a loss!
© STM Quality Limited
STM Quality
Limited
Value Added and
Non-Value Added operations
The objective is to raise the ratio of Value
added operations to non-value added
operations and eliminate waste.
WASTE NON-VALUE ADDED
VALUE
ADDED
OPERATOR TIME
VALUE
ADDED
NON-VALUE
ADDED
MORE TIME FOR
OTHER ACTIVITIES
ELIMINATE
© STM Quality Limited
STM Quality
Limited7W – The Elimination of Waste
So, now we understand the difference in
value added & non-value added
operations, what are the benefits in
eliminating all waste?
• Reduced costs
• Greater Capacity
• Bottlenecks are identified
© STM Quality Limited
STM Quality
Limited7W – 7 Types of Waste
1 Over-production
2 Inventory
3 Transportation
4 Process
5 Idle Time
6 Operator Motion
7 Bad Quality
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
The seven wastes or Muda can be
remembered through the use of either of
the two mnemonics; TIMWOOD
1) Transport
2) Inventory
3) Motion (Operator )
4) Waiting
5) Over-production
6) Over-Processing
7) Defects or Bad Quality
© STM Quality Limited
STM Quality
Limited7W – 1. Over-production
Over-production
Producing more than is needed hides a
multitude of problems. Excessive set-up times,
machine faults, risk of producing obsolete
stock.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 2. Inventory
Inventory
Carrying stock attracts cost & storage problems.
Storage leads to stacking, racking,
sophisticated computers, bar coding &
automation, all for an activity that adds no value
to the product.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 3. Transportation
Transportation
This may appear unnecessary but does add
value. Large transport is easily identified but
small transport such as manual labour may not
be so noticeable. These can be improved by
changes to the work environment.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
7W – 4.
Process
Process
Adds cost but no value - e.g.trimming &
moulding to a level that is beyond the required
standard adds extra time that customers do
not want to pay for.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
7W – 5. Idle
Time
Idle Time
Typically, waiting for products & services from
preceding operations, waiting for work from
their previous set-up or waiting for cycles to
finish, or meetings to start.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 6. Operator Motion
Operator Motion
Typically, single handed operations where
both should be used, stretching unnecessarily
or awkwardly and walking between things. All
of these take time or use time poorly, none
add value.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited7W – 7. Bad Quality
Bad Quality
Rejects are always produced by systems and
procedures created by management. If
operators fail it is because the process allowed
them to fail through inadequate training or
because the process was not capable in the
first place.
© STM Quality Limited
STM Quality
Limited
© STM Quality Limited
STM Quality
Limited
7W – The Elimination of
Waste
So, now we understand the 7 wastes, we can:
• Produce only what is needed;
• Carry only essential stock;
• Use transportation more wisely;
• Produce work to the standard required;
• Plan our production processes;
• Put our efforts to the best possible use;
• Train to make quality work every time!

More Related Content

What's hot

Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshAriful Islam
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industryzaman parvez
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMVThreadSol
 
Traffic Light System
Traffic Light SystemTraffic Light System
Traffic Light SystemShubham Singh
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsArpan Mahato
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionMomin Uddin
 
Garments production system
Garments production systemGarments production system
Garments production systemPacific Cotton
 
Finishing manual fariha knit
Finishing manual fariha knitFinishing manual fariha knit
Finishing manual fariha knitMizan Rahman
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)Abhishek Kumar
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by LeanANITHA BALA
 

What's hot (20)

Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
Application of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments IndustryApplication of Industrial Engineering in Garments Industry
Application of Industrial Engineering in Garments Industry
 
Lets understand what are SAM and SMV
Lets understand what are SAM and SMVLets understand what are SAM and SMV
Lets understand what are SAM and SMV
 
Traffic Light System
Traffic Light SystemTraffic Light System
Traffic Light System
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Standardization & digitalization of sewing operations
Standardization & digitalization of sewing operationsStandardization & digitalization of sewing operations
Standardization & digitalization of sewing operations
 
Study on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments ProductionStudy on Lean Manufacturing Process in Garments Production
Study on Lean Manufacturing Process in Garments Production
 
Method Study
Method Study Method Study
Method Study
 
GSD Manual For Students
GSD Manual For StudentsGSD Manual For Students
GSD Manual For Students
 
Garments production system
Garments production systemGarments production system
Garments production system
 
Garment production and productivity
Garment production and productivityGarment production and productivity
Garment production and productivity
 
Finishing manual fariha knit
Finishing manual fariha knitFinishing manual fariha knit
Finishing manual fariha knit
 
Flat Knitting Machine
Flat Knitting MachineFlat Knitting Machine
Flat Knitting Machine
 
Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning MillsProductivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
 
Method study(abhishekkumar)
Method study(abhishekkumar)Method study(abhishekkumar)
Method study(abhishekkumar)
 
Fabric & Garments Fault with its remedies
Fabric & Garments Fault with its remediesFabric & Garments Fault with its remedies
Fabric & Garments Fault with its remedies
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
Smv
SmvSmv
Smv
 
Work study
Work studyWork study
Work study
 

Viewers also liked (20)

Coping with GSD: What's the Secret
Coping with GSD: What's the SecretCoping with GSD: What's the Secret
Coping with GSD: What's the Secret
 
Time study ratings&&allowances
Time  study ratings&&allowancesTime  study ratings&&allowances
Time study ratings&&allowances
 
GSD cords
GSD cordsGSD cords
GSD cords
 
total quality management
total quality managementtotal quality management
total quality management
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
7 Deadly Wastes
7 Deadly Wastes7 Deadly Wastes
7 Deadly Wastes
 
Seven Supply Chain Wastes
Seven Supply Chain WastesSeven Supply Chain Wastes
Seven Supply Chain Wastes
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
BIS and ISO
BIS and ISOBIS and ISO
BIS and ISO
 
JIT for manufacturing ppt
JIT for manufacturing pptJIT for manufacturing ppt
JIT for manufacturing ppt
 
Identify 7 Wastes
Identify 7 WastesIdentify 7 Wastes
Identify 7 Wastes
 
Tqm and six sigma
Tqm and six sigmaTqm and six sigma
Tqm and six sigma
 
Kaizen final ppt
Kaizen final pptKaizen final ppt
Kaizen final ppt
 
Quality management system
Quality management system Quality management system
Quality management system
 
Introduction to iso 9001
Introduction to iso 9001 Introduction to iso 9001
Introduction to iso 9001
 
8 Wastes
8 Wastes8 Wastes
8 Wastes
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
ISO 9000 Quality Management System - A Presentation by Akshay Anand
ISO 9000 Quality Management System - A Presentation by Akshay AnandISO 9000 Quality Management System - A Presentation by Akshay Anand
ISO 9000 Quality Management System - A Presentation by Akshay Anand
 
Benchmarking TQM
Benchmarking TQMBenchmarking TQM
Benchmarking TQM
 

Similar to 7 wastages

Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Akhil Yelisetti
 
Operations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_PromotionalOperations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_PromotionalMarc Hoppenbrouwers
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management BasicsUpendra K
 
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsProductivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsSameer Kumar
 
TPM- total productive maintenance
TPM- total productive maintenanceTPM- total productive maintenance
TPM- total productive maintenanceASIF IQBAL
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive MaintenanceDr. John V. Padua
 
Making Lean Work in Your Company
Making Lean Work in Your CompanyMaking Lean Work in Your Company
Making Lean Work in Your CompanyUBMCanon
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfEdgar V Macapili
 
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing OrganizationMax Krug
 
Introduction To TPM by Ashish Trivedi.pptx
Introduction To TPM by Ashish Trivedi.pptxIntroduction To TPM by Ashish Trivedi.pptx
Introduction To TPM by Ashish Trivedi.pptxAshishTrivedi65
 

Similar to 7 wastages (20)

Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Operations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_PromotionalOperations_Excellence_Presentation_Promotional
Operations_Excellence_Presentation_Promotional
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
 
Office_Lean_sample
Office_Lean_sampleOffice_Lean_sample
Office_Lean_sample
 
Office Lean Sample
Office Lean SampleOffice Lean Sample
Office Lean Sample
 
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsProductivity related Vital Measures through simulations
Productivity related Vital Measures through simulations
 
TPM
TPMTPM
TPM
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
TPM- total productive maintenance
TPM- total productive maintenanceTPM- total productive maintenance
TPM- total productive maintenance
 
Just In Time
Just In Time Just In Time
Just In Time
 
PQT - Total Productive Maintenance
PQT - Total Productive MaintenancePQT - Total Productive Maintenance
PQT - Total Productive Maintenance
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Making Lean Work in Your Company
Making Lean Work in Your CompanyMaking Lean Work in Your Company
Making Lean Work in Your Company
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
reliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdfreliabilitycenteredmaintenancemadesimple.pdf
reliabilitycenteredmaintenancemadesimple.pdf
 
Identifying Waste
Identifying WasteIdentifying Waste
Identifying Waste
 
160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization160407 Operational Excellence - Creating a High Performing Organization
160407 Operational Excellence - Creating a High Performing Organization
 
Introduction To TPM by Ashish Trivedi.pptx
Introduction To TPM by Ashish Trivedi.pptxIntroduction To TPM by Ashish Trivedi.pptx
Introduction To TPM by Ashish Trivedi.pptx
 
Identifying Lean Waste
Identifying Lean WasteIdentifying Lean Waste
Identifying Lean Waste
 

More from মোঃ ফুরকান উদ্দিন জুয়েল

More from মোঃ ফুরকান উদ্দিন জুয়েল (19)

Paradigm shift
Paradigm shiftParadigm shift
Paradigm shift
 
Journey begins
Journey beginsJourney begins
Journey begins
 
Teamwork
TeamworkTeamwork
Teamwork
 
Attitude
AttitudeAttitude
Attitude
 
Why why analysis
Why why analysisWhy why analysis
Why why analysis
 
Line balancing & EOQ
Line balancing & EOQLine balancing & EOQ
Line balancing & EOQ
 
Kaizen
KaizenKaizen
Kaizen
 
Bangladesh labor law'2006
Bangladesh labor law'2006Bangladesh labor law'2006
Bangladesh labor law'2006
 
VSM
VSMVSM
VSM
 
New gazzettee 10
New gazzettee   10New gazzettee   10
New gazzettee 10
 
Basic concepts on lean manufacturing
Basic concepts on lean manufacturingBasic concepts on lean manufacturing
Basic concepts on lean manufacturing
 
Work measurement
Work measurementWork measurement
Work measurement
 
Motion Economy
Motion EconomyMotion Economy
Motion Economy
 
Kanban
KanbanKanban
Kanban
 
Industrial engineer
Industrial engineerIndustrial engineer
Industrial engineer
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
Different types of Production Layout
Different types of Production LayoutDifferent types of Production Layout
Different types of Production Layout
 
pre- determined time standard of work measurement
pre- determined time standard of work measurement pre- determined time standard of work measurement
pre- determined time standard of work measurement
 
Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...Industrial Engineering Tools of Motion economy principles for developing manu...
Industrial Engineering Tools of Motion economy principles for developing manu...
 

Recently uploaded

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Recently uploaded (20)

Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

7 wastages

  • 1. © ABSL Power Solutions 2007© STM Quality Limited STM Quality Limited 7 Wastes TOTAL QUALITY MANAGEMENT 7 Wastes PRESENTED BY: MD.FURKAN UDDIN JEWEL
  • 2. © STM Quality Limited STM Quality Limited
  • 3. © STM Quality Limited STM Quality Limited How often have you used the expressions: “That was a waste of time!” or “That was a waste of money!” or “That was a waste of effort!” Waste
  • 4. © STM Quality Limited STM Quality LimitedWasted Time Just imagine if we could collect all the time together that we have wasted in the past - How much time would that be?
  • 5. © STM Quality Limited STM Quality LimitedWasted Money Just imagine if we could collect all the money together that we have wasted in the past - How much money would that be?
  • 6. © STM Quality Limited STM Quality LimitedWasted Effort Just imagine if we could collect all the effort together that we have wasted in the past - How much effort would that be?
  • 7. © STM Quality Limited STM Quality LimitedThe Problem With Waste The problem with wasted time, money & effort is: When it’s gone… - it’s gone!
  • 8. © STM Quality Limited STM Quality LimitedEliminating Waste So what can we do to eliminate waste? We first need to identify what is & is not waste, then we can look at ways of eliminating or at least reducing waste.
  • 9. © STM Quality Limited STM Quality Limited Identifying Waste in the Workplace Operational Activity Value added Operations Any process that changes the nature, shape or characteristic of the product in line with customer requirements e.g. Pressing, welding, heat treatment. This is where we make a profit!
  • 10. © STM Quality Limited STM Quality Limited Identifying Waste in the Workplace Operational Activity Non-Value added Operations Work carried out which is necessary under current conditions, but does not increase product value. e.g. Inspection, tool change, maintenance. This is where we make a loss!
  • 11. © STM Quality Limited STM Quality Limited Value Added and Non-Value Added operations The objective is to raise the ratio of Value added operations to non-value added operations and eliminate waste. WASTE NON-VALUE ADDED VALUE ADDED OPERATOR TIME VALUE ADDED NON-VALUE ADDED MORE TIME FOR OTHER ACTIVITIES ELIMINATE
  • 12. © STM Quality Limited STM Quality Limited7W – The Elimination of Waste So, now we understand the difference in value added & non-value added operations, what are the benefits in eliminating all waste? • Reduced costs • Greater Capacity • Bottlenecks are identified
  • 13. © STM Quality Limited STM Quality Limited7W – 7 Types of Waste 1 Over-production 2 Inventory 3 Transportation 4 Process 5 Idle Time 6 Operator Motion 7 Bad Quality
  • 14. © STM Quality Limited STM Quality Limited
  • 15. © STM Quality Limited STM Quality Limited The seven wastes or Muda can be remembered through the use of either of the two mnemonics; TIMWOOD 1) Transport 2) Inventory 3) Motion (Operator ) 4) Waiting 5) Over-production 6) Over-Processing 7) Defects or Bad Quality
  • 16. © STM Quality Limited STM Quality Limited7W – 1. Over-production Over-production Producing more than is needed hides a multitude of problems. Excessive set-up times, machine faults, risk of producing obsolete stock.
  • 17. © STM Quality Limited STM Quality Limited
  • 18. © STM Quality Limited STM Quality Limited7W – 2. Inventory Inventory Carrying stock attracts cost & storage problems. Storage leads to stacking, racking, sophisticated computers, bar coding & automation, all for an activity that adds no value to the product.
  • 19. © STM Quality Limited STM Quality Limited
  • 20. © STM Quality Limited STM Quality Limited7W – 3. Transportation Transportation This may appear unnecessary but does add value. Large transport is easily identified but small transport such as manual labour may not be so noticeable. These can be improved by changes to the work environment.
  • 21. © STM Quality Limited STM Quality Limited
  • 22. © STM Quality Limited STM Quality Limited 7W – 4. Process Process Adds cost but no value - e.g.trimming & moulding to a level that is beyond the required standard adds extra time that customers do not want to pay for.
  • 23. © STM Quality Limited STM Quality Limited
  • 24. © STM Quality Limited STM Quality Limited 7W – 5. Idle Time Idle Time Typically, waiting for products & services from preceding operations, waiting for work from their previous set-up or waiting for cycles to finish, or meetings to start.
  • 25. © STM Quality Limited STM Quality Limited
  • 26. © STM Quality Limited STM Quality Limited7W – 6. Operator Motion Operator Motion Typically, single handed operations where both should be used, stretching unnecessarily or awkwardly and walking between things. All of these take time or use time poorly, none add value.
  • 27. © STM Quality Limited STM Quality Limited
  • 28. © STM Quality Limited STM Quality Limited7W – 7. Bad Quality Bad Quality Rejects are always produced by systems and procedures created by management. If operators fail it is because the process allowed them to fail through inadequate training or because the process was not capable in the first place.
  • 29. © STM Quality Limited STM Quality Limited
  • 30. © STM Quality Limited STM Quality Limited 7W – The Elimination of Waste So, now we understand the 7 wastes, we can: • Produce only what is needed; • Carry only essential stock; • Use transportation more wisely; • Produce work to the standard required; • Plan our production processes; • Put our efforts to the best possible use; • Train to make quality work every time!