SlideShare a Scribd company logo
1 of 5
A highly motivated and committed Engineering Professional with a proven ability to effectively
evaluate, organize and prioritize work within a overall project schedule reporting to Project delivery
Manager, a quick learner and passionate about Communication Technologies.
With specialist level of hands on experience on Telecom equipments and be able to perform
post processing, analysis, define optimization actions, trigger the action implementation. Validate the
action implementation and generate report after testing.
Router Series 18xx ,28xx.
Switch Series 29xx,35xx.
Huawei I Manger U-2000,Ericcson Mini Link Craft.
Huawei WDT Tool& ISDN Tool.
Huawei BTS 39xx,RTN 9xx
In depth knowledge in MW Transmission Networks and equipments.
Technology- Wireless TXN Network, 2G , 3G,LTE,RAN network
Remote troubleshooting solutions.
Configuration Of Routing Protocols: – STATIC, RIP, EIGRP, OSPF & BGP.
Extensive Knowledge of Standard & Extended ACL.Extensive Knowledge of NAT & PAT.
Hands On Experience Of Cisco Routers Backup, Recovery & Password Breaking.
Implementing LAN and WAN Connections Using SWITCHES and ROUTERS.Setup Of Layer 2
Switching & STP.Configuring and Troubleshooting PPP, Frame Relay, RIP, EIGRP, OSPF,
VLAN, VPN, TRUNKING, AndHSRP & IP Addressing Issues
CCNA-Cisco Certificated network Associate,May2016(CISCO ID-CSCO12994648)
Qualification Board/University YEAR PERCENTAGE
BE(EEE) Christian college of Eng & Tech 2013 76
DECE Christian polytechnic college 2010 81.24
GOPALAKRISHNAN.R
Contact No- 09087390044,08973867786
E-mail:- saigopalakrishnan.r@gmail.com
Skype ID:saigopalakrishnan.r
SUMMARY
DevicesHandled
Technical Skills
Certification Course
ACADEMIC CREDENTIALS
Huawei:
 Responsible for Handling the Huawei transmission equipments.
 Work experience in Huawei NMS .
 NE Visibility (Static method).
 Transmission activities like Software upgradation, Hop upgradation, Ring activities.
 Support the CORE Engineers. Perform the different RNC activities.
 Implementation of Microwave Links.
 Work experience of Huawei RTN 905,910,950,950A,980
 Work Experience of Huawei Transmission equipments.
 Work Experience in OSN (Optical Switch Network).
 Provisioning bandwidth for the 3G sites in ETHERNET & LTE sites in ETHERNET.
 Planning and Implementation of Transmission activities like POP Optimization,
Media Up gradation for upcoming 3G & LTE
Ericsson:
 Configuring and Maintenance of ERICSSON Service On ElementManager R8 and R10.4 &
MINI-LINK Manager Server Application for NMS.
 Adding network elements in the NMS and analyzing Real time alarms,AGC report of the same,
 Responsible to made NMS Connectivity of the network elements with OSPF or STATIC routing,
and analyzing AGC, G826 report for the same.
 Coordinating for Implementation and troubleshooting of Traffic Node in both Ring and linear
Topology up to STM1 Level.
 Commissioning and troubleshooting of Ericsson Macro and Micro BTS, Expansion of the sites up
to 10+10+10, and cabinet swapping.
 Commissioning and troubleshooting of Point to point High Capacity STM-1 Level Hops in both
Ring and Linear Topology and Maintenance of STM-1 Level MUX for the same, Planning and
Execution of hop up gradation up to STM 1 Level, 75Ω to 120Ω conversion, Electrical to
Optical conversion to increase the quality of the network.
 Software up gradation of Transmission Nodes and Inventory data collection via NMS,
GIS data maintenance of the sites.
 Analyzing the performance alarms of network elements and resolve the same to improve
the network quality and KPI,
 Maintaining site Quality and Quality checking in newly integrated sites and expansion
sites.
 Handling customer complaints like coverage issues, call drop, call quality related issues
and troubleshooting the same by identifying the bad cell with D&P Team.
 Planning regular O & M Activities like Re engineering of Microwave Hops, cascading of
sites, TMA and TMB additions, TRX outage clearance, Fault code clearance and Regular
preventive maintenance of sites.
WORK EXPERIENCES:
CURRENT JOB PROFILE TXN SUPPORT ENGINEER Ericsson India Pvt Ltd June2016 to still Now
 Configuring and Provisioning bandwidth for the 3G sites in ATM and ETHERNET & LTE
sites in ETHERNET.
Experience in iManager U2000 Sever as well as client
IP Planning for the network & Route IP adding in NMS server
Experience in IP Addressing and sub-netting, Routing concept
Extend the client connectivity as per customer requirement
Configure the IP in Server as well as NEs
Maintain NMS Sever & NEs Collecting alarm report
Remove the IP & NEs conflicts in the Live Network
Configure new GNE and Branch NE in iManager U2000 Server
SDH & ETH trails planning for GNE to NEs
Ping the node IP from Servers
Co–ordinate with Vendor to bring the Nodes Into NMS Server
Alarm clearance in iManager U2000 server as well as all NEs
Creating NEs backup to FTP iManager U2000 server
Managing native SDH & ETH service all NEs via NMS server
Periodically health checking NEs, NMS server as well as NMS client
Creating new service templates as per customer needs
2G Sites migration from one BSC to other BSC with help of Fiber node shifting
3G sites migration from one RNC to other RNC with help of OSS server
Periodically making performance report NMS sever as well as all NEs
Bandwidth increase for Bharti Airtel 3G & 4G FDD
MW (RTN) traffic shifting in LIVE network as per customer needs
Making Clock Synch for NEs
Software Up gradation in iManager U2000 server as well as all NEs
 Troubleshooting and O&M for the Huawei BSS products including BTS (3900 GSM, 3900A
 GSM) DBS (3900 GSM, 3900A GSM) and M2000 Server)
 Supervision of the site installation, integration, commissioning and quality check of Huawei
BTS
 & BSC.
 Expansion activities at BTS 3900 GSM, 3900A GSM.
 Testing, Commissioning. Integration & Troubleshooting of PDH and SDH links in Chain as
well
 Analyzing and troubleshooting of BTS alarms reported at network operation centre (NOC),
which
 includes identifying and replacing of faulty magazine
 Performs call testing in all time slots, fault isolation and alarm troubleshooting on newly
integratedand existing Cell Site BTS
 Co-Ordination with NOC while breakdown maintenance.
NMS Engineer Impact InfoTechPvtLtd NOV2015 To JUNE2016
Engineer Huawei TelecommunicationPvtLtd Jan 2015 to Nov2015
 Quality Checking & Acceptance test for newly commissioned sites in co ordination with
Vendor
 Implemented Cascading E1’s in Huawei Hub
 Commission of NEC SDH & PDH Microwave radios & MUX.
 NMS monitoring attend fault management.
 Worked in NOC in 2G & 3G wireless competence.
 carryout Active Alarm Tracker,health checkup of BSC/RNC regularly.
 BSC/RNC Backup on Weekly & Monthly Basis
 Troubleshooting System Alarms related to BSC and BTS –Ultra, Flexi, and Metro BTS.
 UP gradation of NodeB’s to increase network traffic load capacity
 Commissioning of Huawei make microwave SDH equipments
 Breakdown maintenance and Material handling
 Traffic routing and re-routing our network
 BSC Migration, Ring re structuring & new ring formation.
 24 hours a day work environment.
 Handling project in Airtel 4G network.
Installer of BTS 3900, Node B,RTN 9xx Series.
Globe Alterra Hardware installation.
Conduct standards on antenna system installation
Conduct site survey and site on air and rectification.
Conduct panning antenna and On air site testing.
Conduct tower maintenance and path signal troubleshooting.
Troubleshooting and Maintenance of Huawei BTS Conduct Preliminary Acceptance Test (PAT),
Bringing Into Service (BIS) and Site Clearing.
Installed bracket and monopole for microwave antenna.
Installed of RRU Equipment.
Installation of panel and microwave antenna.
COMPUTER SKILLS: MS Word, Excel, PowerPoint, C++ , Internet ,Autocad,Cisco Packet Tracer
SOFT SKILLS: Leadership, Communication, Team-Building, Organizational, Management.
Ability to rapidly build relationship and set up trust.
Confident and Determined
Ability to cope up with different situations.
Good communication skills
I&C rigger Evolve TelecommunicationsPvtLtd JUN2013 to Jan2015
SUMMARY SKILLS
INTERPERSONAL SKILL
Father’ s Name :M.Ramachandran
Permanent Address : 6/10 b,r.v.nagar first Street
Dindigul-624002
Date of Birth :04-June-1992
Language known : Tamil ,English and Telgu
Marital Status :- Single
Nationality/Religion :- Indian / Hindu
PassPort No :K0582443
Skype id :saigopalakrishnan.r
I do hereby declare that the above information is true to the best of my knowledge.
Place:
Date: (Signature)
(GOPALA KRISHNAN.R)
PERSONAL DETAILS
DECLARATION

More Related Content

What's hot

Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Ketut Widya
 
5g architecture, Industrial Training
5g architecture, Industrial Training5g architecture, Industrial Training
5g architecture, Industrial TrainingSumanPramanik7
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
Nokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheetNokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheetRaafat younis
 
Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Ketut Widya
 
LTE Technical Overview
LTE Technical OverviewLTE Technical Overview
LTE Technical OverviewGoing LTE
 
Top 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation ActionsTop 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation ActionsAbdul Muin
 
2 g planning-optimization-part-5
2 g planning-optimization-part-52 g planning-optimization-part-5
2 g planning-optimization-part-5Rizwan Javed
 
Finding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareFinding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareMuhammad Waqas Akram
 
LTE Fundamentals Training and Certification by TELCOMA Global
LTE Fundamentals Training and Certification by TELCOMA GlobalLTE Fundamentals Training and Certification by TELCOMA Global
LTE Fundamentals Training and Certification by TELCOMA GlobalGaganpreet Singh Walia
 
9 carrier aggregation lte-a new challenges for lab and field
9 carrier aggregation lte-a new challenges for lab and field9 carrier aggregation lte-a new challenges for lab and field
9 carrier aggregation lte-a new challenges for lab and fieldCPqD
 
01 owa200001 3 g overview
01 owa200001 3 g overview01 owa200001 3 g overview
01 owa200001 3 g overviewAdnan Khan
 

What's hot (20)

Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1
 
5g architecture, Industrial Training
5g architecture, Industrial Training5g architecture, Industrial Training
5g architecture, Industrial Training
 
Optimisation project overview
Optimisation project overviewOptimisation project overview
Optimisation project overview
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
Nokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheetNokia siemens-networks-flexi-multiradio-base-station-data-sheet
Nokia siemens-networks-flexi-multiradio-base-station-data-sheet
 
Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5Og 102 site survey and layout of bts issue1.5
Og 102 site survey and layout of bts issue1.5
 
Mts telecom
Mts telecom Mts telecom
Mts telecom
 
LTE Technical Overview
LTE Technical OverviewLTE Technical Overview
LTE Technical Overview
 
Top 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation ActionsTop 10 3 G Radio Optimisation Actions
Top 10 3 G Radio Optimisation Actions
 
Huawei rnp work flow
Huawei rnp work flowHuawei rnp work flow
Huawei rnp work flow
 
2 g planning-optimization-part-5
2 g planning-optimization-part-52 g planning-optimization-part-5
2 g planning-optimization-part-5
 
Finding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization softwareFinding the best Radio Network Planning and Radio Network Optimization software
Finding the best Radio Network Planning and Radio Network Optimization software
 
5G peek
5G peek5G peek
5G peek
 
LTE Fundamentals Training and Certification by TELCOMA Global
LTE Fundamentals Training and Certification by TELCOMA GlobalLTE Fundamentals Training and Certification by TELCOMA Global
LTE Fundamentals Training and Certification by TELCOMA Global
 
Lte questions adv
Lte questions advLte questions adv
Lte questions adv
 
Initial tuning umts (2)
Initial tuning  umts (2)Initial tuning  umts (2)
Initial tuning umts (2)
 
rashid.Dt cv
rashid.Dt cvrashid.Dt cv
rashid.Dt cv
 
5 g core overview
5 g core overview5 g core overview
5 g core overview
 
9 carrier aggregation lte-a new challenges for lab and field
9 carrier aggregation lte-a new challenges for lab and field9 carrier aggregation lte-a new challenges for lab and field
9 carrier aggregation lte-a new challenges for lab and field
 
01 owa200001 3 g overview
01 owa200001 3 g overview01 owa200001 3 g overview
01 owa200001 3 g overview
 

Viewers also liked

NUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИ
NUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИNUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИ
NUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИNUKON BG
 
Bloque 5.metodología
Bloque 5.metodologíaBloque 5.metodología
Bloque 5.metodologíajoseblog
 
Venturosity Development DECK
Venturosity Development DECKVenturosity Development DECK
Venturosity Development DECKChris Faraday
 
DeltaX Search Media Buying Platform
DeltaX Search Media Buying PlatformDeltaX Search Media Buying Platform
DeltaX Search Media Buying PlatformSourabh Agrawal
 
High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...
High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...
High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...Jonathan DeLaBruere
 
Rio 2016 Olympic Golf Tournament Infographic
Rio 2016 Olympic Golf Tournament InfographicRio 2016 Olympic Golf Tournament Infographic
Rio 2016 Olympic Golf Tournament InfographicPressReleases.Golf
 
Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...
Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...
Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...Gcazo14
 
Automatic Emergency Light and Remote SMS System in case of Fire
Automatic Emergency Light and Remote SMS System in case of FireAutomatic Emergency Light and Remote SMS System in case of Fire
Automatic Emergency Light and Remote SMS System in case of FireUnforgiven Antar
 
job analysis of product development manager in KFC
job analysis of product development manager in KFCjob analysis of product development manager in KFC
job analysis of product development manager in KFCsreedharsree07
 

Viewers also liked (13)

NUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИ
NUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИNUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИ
NUKON - СИСМТЕМИ ЗА АВТОМАТИЗАЦИЯ НА ФИБЕР ЛАЗЕРНИ МЕТАЛОРЕЖЕЩИ МАШИНИ
 
Bloque 5.metodología
Bloque 5.metodologíaBloque 5.metodología
Bloque 5.metodología
 
Venturosity Development DECK
Venturosity Development DECKVenturosity Development DECK
Venturosity Development DECK
 
10 15 lesson-01
10 15 lesson-0110 15 lesson-01
10 15 lesson-01
 
DeltaX Search Media Buying Platform
DeltaX Search Media Buying PlatformDeltaX Search Media Buying Platform
DeltaX Search Media Buying Platform
 
High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...
High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...
High Performance Modular Housing for Vermonters: Net-Zero Ready for the 21st ...
 
Rio 2016 Olympic Golf Tournament Infographic
Rio 2016 Olympic Golf Tournament InfographicRio 2016 Olympic Golf Tournament Infographic
Rio 2016 Olympic Golf Tournament Infographic
 
Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...
Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...
Domenico Dentoni: Introduction to Agri-Food Chain Management, University of P...
 
Coto3周年プレゼン 地域貢献
Coto3周年プレゼン 地域貢献Coto3周年プレゼン 地域貢献
Coto3周年プレゼン 地域貢献
 
Automatic Emergency Light and Remote SMS System in case of Fire
Automatic Emergency Light and Remote SMS System in case of FireAutomatic Emergency Light and Remote SMS System in case of Fire
Automatic Emergency Light and Remote SMS System in case of Fire
 
job analysis of product development manager in KFC
job analysis of product development manager in KFCjob analysis of product development manager in KFC
job analysis of product development manager in KFC
 
New i20
New i20New i20
New i20
 
Dolor Oncologico
Dolor OncologicoDolor Oncologico
Dolor Oncologico
 

Similar to Versatile Telecom Engineer with Hands-On Experience

Similar to Versatile Telecom Engineer with Hands-On Experience (20)

priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
Resume from bhupathi ramu
Resume from bhupathi ramuResume from bhupathi ramu
Resume from bhupathi ramu
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
shriram2016
shriram2016shriram2016
shriram2016
 
CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
LOKESH YADAV RESUME
LOKESH YADAV  RESUMELOKESH YADAV  RESUME
LOKESH YADAV RESUME
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
Engr M Ali
Engr M AliEngr M Ali
Engr M Ali
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
My_CV
My_CV My_CV
My_CV
 
resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
Resume
ResumeResume
Resume
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
RichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-TelecomRichardLaca-Resume-Associate Engineer-Telecom
RichardLaca-Resume-Associate Engineer-Telecom
 

Versatile Telecom Engineer with Hands-On Experience

  • 1. A highly motivated and committed Engineering Professional with a proven ability to effectively evaluate, organize and prioritize work within a overall project schedule reporting to Project delivery Manager, a quick learner and passionate about Communication Technologies. With specialist level of hands on experience on Telecom equipments and be able to perform post processing, analysis, define optimization actions, trigger the action implementation. Validate the action implementation and generate report after testing. Router Series 18xx ,28xx. Switch Series 29xx,35xx. Huawei I Manger U-2000,Ericcson Mini Link Craft. Huawei WDT Tool& ISDN Tool. Huawei BTS 39xx,RTN 9xx In depth knowledge in MW Transmission Networks and equipments. Technology- Wireless TXN Network, 2G , 3G,LTE,RAN network Remote troubleshooting solutions. Configuration Of Routing Protocols: – STATIC, RIP, EIGRP, OSPF & BGP. Extensive Knowledge of Standard & Extended ACL.Extensive Knowledge of NAT & PAT. Hands On Experience Of Cisco Routers Backup, Recovery & Password Breaking. Implementing LAN and WAN Connections Using SWITCHES and ROUTERS.Setup Of Layer 2 Switching & STP.Configuring and Troubleshooting PPP, Frame Relay, RIP, EIGRP, OSPF, VLAN, VPN, TRUNKING, AndHSRP & IP Addressing Issues CCNA-Cisco Certificated network Associate,May2016(CISCO ID-CSCO12994648) Qualification Board/University YEAR PERCENTAGE BE(EEE) Christian college of Eng & Tech 2013 76 DECE Christian polytechnic college 2010 81.24 GOPALAKRISHNAN.R Contact No- 09087390044,08973867786 E-mail:- saigopalakrishnan.r@gmail.com Skype ID:saigopalakrishnan.r SUMMARY DevicesHandled Technical Skills Certification Course ACADEMIC CREDENTIALS
  • 2. Huawei:  Responsible for Handling the Huawei transmission equipments.  Work experience in Huawei NMS .  NE Visibility (Static method).  Transmission activities like Software upgradation, Hop upgradation, Ring activities.  Support the CORE Engineers. Perform the different RNC activities.  Implementation of Microwave Links.  Work experience of Huawei RTN 905,910,950,950A,980  Work Experience of Huawei Transmission equipments.  Work Experience in OSN (Optical Switch Network).  Provisioning bandwidth for the 3G sites in ETHERNET & LTE sites in ETHERNET.  Planning and Implementation of Transmission activities like POP Optimization, Media Up gradation for upcoming 3G & LTE Ericsson:  Configuring and Maintenance of ERICSSON Service On ElementManager R8 and R10.4 & MINI-LINK Manager Server Application for NMS.  Adding network elements in the NMS and analyzing Real time alarms,AGC report of the same,  Responsible to made NMS Connectivity of the network elements with OSPF or STATIC routing, and analyzing AGC, G826 report for the same.  Coordinating for Implementation and troubleshooting of Traffic Node in both Ring and linear Topology up to STM1 Level.  Commissioning and troubleshooting of Ericsson Macro and Micro BTS, Expansion of the sites up to 10+10+10, and cabinet swapping.  Commissioning and troubleshooting of Point to point High Capacity STM-1 Level Hops in both Ring and Linear Topology and Maintenance of STM-1 Level MUX for the same, Planning and Execution of hop up gradation up to STM 1 Level, 75Ω to 120Ω conversion, Electrical to Optical conversion to increase the quality of the network.  Software up gradation of Transmission Nodes and Inventory data collection via NMS, GIS data maintenance of the sites.  Analyzing the performance alarms of network elements and resolve the same to improve the network quality and KPI,  Maintaining site Quality and Quality checking in newly integrated sites and expansion sites.  Handling customer complaints like coverage issues, call drop, call quality related issues and troubleshooting the same by identifying the bad cell with D&P Team.  Planning regular O & M Activities like Re engineering of Microwave Hops, cascading of sites, TMA and TMB additions, TRX outage clearance, Fault code clearance and Regular preventive maintenance of sites. WORK EXPERIENCES: CURRENT JOB PROFILE TXN SUPPORT ENGINEER Ericsson India Pvt Ltd June2016 to still Now
  • 3.  Configuring and Provisioning bandwidth for the 3G sites in ATM and ETHERNET & LTE sites in ETHERNET. Experience in iManager U2000 Sever as well as client IP Planning for the network & Route IP adding in NMS server Experience in IP Addressing and sub-netting, Routing concept Extend the client connectivity as per customer requirement Configure the IP in Server as well as NEs Maintain NMS Sever & NEs Collecting alarm report Remove the IP & NEs conflicts in the Live Network Configure new GNE and Branch NE in iManager U2000 Server SDH & ETH trails planning for GNE to NEs Ping the node IP from Servers Co–ordinate with Vendor to bring the Nodes Into NMS Server Alarm clearance in iManager U2000 server as well as all NEs Creating NEs backup to FTP iManager U2000 server Managing native SDH & ETH service all NEs via NMS server Periodically health checking NEs, NMS server as well as NMS client Creating new service templates as per customer needs 2G Sites migration from one BSC to other BSC with help of Fiber node shifting 3G sites migration from one RNC to other RNC with help of OSS server Periodically making performance report NMS sever as well as all NEs Bandwidth increase for Bharti Airtel 3G & 4G FDD MW (RTN) traffic shifting in LIVE network as per customer needs Making Clock Synch for NEs Software Up gradation in iManager U2000 server as well as all NEs  Troubleshooting and O&M for the Huawei BSS products including BTS (3900 GSM, 3900A  GSM) DBS (3900 GSM, 3900A GSM) and M2000 Server)  Supervision of the site installation, integration, commissioning and quality check of Huawei BTS  & BSC.  Expansion activities at BTS 3900 GSM, 3900A GSM.  Testing, Commissioning. Integration & Troubleshooting of PDH and SDH links in Chain as well  Analyzing and troubleshooting of BTS alarms reported at network operation centre (NOC), which  includes identifying and replacing of faulty magazine  Performs call testing in all time slots, fault isolation and alarm troubleshooting on newly integratedand existing Cell Site BTS  Co-Ordination with NOC while breakdown maintenance. NMS Engineer Impact InfoTechPvtLtd NOV2015 To JUNE2016 Engineer Huawei TelecommunicationPvtLtd Jan 2015 to Nov2015
  • 4.  Quality Checking & Acceptance test for newly commissioned sites in co ordination with Vendor  Implemented Cascading E1’s in Huawei Hub  Commission of NEC SDH & PDH Microwave radios & MUX.  NMS monitoring attend fault management.  Worked in NOC in 2G & 3G wireless competence.  carryout Active Alarm Tracker,health checkup of BSC/RNC regularly.  BSC/RNC Backup on Weekly & Monthly Basis  Troubleshooting System Alarms related to BSC and BTS –Ultra, Flexi, and Metro BTS.  UP gradation of NodeB’s to increase network traffic load capacity  Commissioning of Huawei make microwave SDH equipments  Breakdown maintenance and Material handling  Traffic routing and re-routing our network  BSC Migration, Ring re structuring & new ring formation.  24 hours a day work environment.  Handling project in Airtel 4G network. Installer of BTS 3900, Node B,RTN 9xx Series. Globe Alterra Hardware installation. Conduct standards on antenna system installation Conduct site survey and site on air and rectification. Conduct panning antenna and On air site testing. Conduct tower maintenance and path signal troubleshooting. Troubleshooting and Maintenance of Huawei BTS Conduct Preliminary Acceptance Test (PAT), Bringing Into Service (BIS) and Site Clearing. Installed bracket and monopole for microwave antenna. Installed of RRU Equipment. Installation of panel and microwave antenna. COMPUTER SKILLS: MS Word, Excel, PowerPoint, C++ , Internet ,Autocad,Cisco Packet Tracer SOFT SKILLS: Leadership, Communication, Team-Building, Organizational, Management. Ability to rapidly build relationship and set up trust. Confident and Determined Ability to cope up with different situations. Good communication skills I&C rigger Evolve TelecommunicationsPvtLtd JUN2013 to Jan2015 SUMMARY SKILLS INTERPERSONAL SKILL
  • 5. Father’ s Name :M.Ramachandran Permanent Address : 6/10 b,r.v.nagar first Street Dindigul-624002 Date of Birth :04-June-1992 Language known : Tamil ,English and Telgu Marital Status :- Single Nationality/Religion :- Indian / Hindu PassPort No :K0582443 Skype id :saigopalakrishnan.r I do hereby declare that the above information is true to the best of my knowledge. Place: Date: (Signature) (GOPALA KRISHNAN.R) PERSONAL DETAILS DECLARATION