2. Airscale Introduction
AirScale OUTDOOR Subrack AMOB
P7 status
Stand-alone AMOB
AMOB stacked with Flexi modules
• IP55 environmental protection for AirScale indoor System Module
• Height: 8 HU and weigh 23kg (bear subrack)
• High performance Heat Exchanger technology for thermal management
• Operating temp range -40C up to +55C without solar radiation
• Cold start from -40°C to -5°C with optional heater(s)
• Compatible with Flexi BTS mechanics stack/wall/pole/rack installation
• Possibility to install AMOB on top of the Flexi stack (3 flexi radios under AMOB in the
stack for Zone 4 and 5 flexi radios for Zone 2)
• Supporting other modules above AMOB with additional stacking kit (under testing)
• Compatible with the 3rd part 19" racks and cabinets if clearances and airflow
requirements are followed
• Possible to install AMOB inside FCOA cabinet
• Service doors on front and rear sides
• Cable entry solution based on conduits/cable glands
HEX 4HU
Box for Air Scale
modules 4HU
Dimensions mm Inches
Height 354 14
Width 487 19
Depth 605 24
Asset
Weight
(Kg)
Weight (lbs)
AMOB Cabinet 23 51
AirScale Common Unit board (ASIA)
(Core Module)
3 7
ABIA (Expansion Module) 2 4
½ Capacity (1 Core + 3 Expansion) 32 70
Full Capacity (2 Core + 6 Expansion) 41 90
AMOB inside FCOA
(3 positions possible)
AMOB on the
pole/wall
Airscale Quality Hand book Ver1.0
3. Height 8U (354.8mm)
Width (front cover) 487mm
Width (cabinet)
448mm (fits into 19 inch rack)
487mm without conduits
Depth
Total 605mm
472mm from rack mounting point
Weight 23 kg (exclude ASMI plug-in modules)
Ingress Protection IP55
Operating Temperature -40°C up to +55°C (without solar radiation)
Installation
Temperature
-20°C up to +55°C
Airflow Direction
Back to front airflow direction supported for Horizontal installation (FCOA, 19” rack, Flexi stack
)
Front to back airflow direction supported for Vertical installation (wall and pole mounting
case)
Cold start
~2h from -40°C to -5°C
*Optional 2nd heater can be added to meet Telcordia GR requirement, cold start from -40°C to
-5°C in 1 hour instead of 2 hours
Nominal supply voltage
Input voltage range
-40.5 … -57 V DC
Extended Service Voltage Range supported -36Vdc .. -60Vdc Floating
Volume 104.5L
Mass capacity Support Max 18Kg inside
Power consumption
135W @ 25°C (fans)
265W (with 40W tolerance) @ +55°C (all fans at highest speed)
Cold start @ -40°C ~600W (1 heater ON 550W (inrush 22A) + fans at low speed)
40W @ 0°C (no heater, fans at low speed)
Conduit cable entry 2x1.5” + 3x 1” on each left and right side (6x1” and 4x1,5” in total)
AMOB - Exploded View
Heat Exchanger cooling contains fluorinated greenhouse gases
Hermetically sealed
Refrigerant: HFC-134a GWP value = 1430
System charge weight = 0.65Kg
Airscale Introduction
Airscale Quality Hand book Ver1.0
4. AMOB – Front view, door removed
AirScale Common Unit board (ASIA) AirScale Common
Module (1-2)
ABIA AirScale Capacity Module (1-6)
FYGM 473394A
GPS Module
and
AMFL 474422A
GPS installation kit
for AMOB
Heater (one by
default, one extra
in option)
AMFI 474419A
Power Distribution Unit
ESD point
Airscale Introduction
Airscale Quality Hand book Ver1.0
5. AMOB - Mounting Options – Wall & Pole
• AMOB can be mounted directly to:
• a wall using: AMFH + FMFA
•A pole using: AMFH + FPKA
•The stack mounting bracket from AMFH kit is not used for wall/pole mounting.
FMFA - Flexi Mounting kit
(470149A) plinth
FPKA Flexi Pole Kit
(471649A)
Right angle conduits on the top side
2x 1.5” and 2x 1.0”(another 1x 1.0” for backup)
Straight conduits on the bottom side
2x 1.5” and 3x 1.0”
Lift points
AMFH Stack/ Wall/ Pole installation kit
(474418A) includes:
- Stack mounting bracket
- front plastic cover
- Security bracket
Airscale Introduction
Airscale Quality Hand book Ver1.0
6. Right Size Entry Glands for Cable entry
M50
M32
Airscale Quality Hand book Ver1.0
7. S.No Item Specification S.No Item Specification
1 Site Master 23 Drilling Machine and Drill set
2 Screw driver set 1 Set 24 Tool Bag
3 Bit Holder Magnetic, size 1.4 ,Length 100 mm 25 Pulley Block
4 TORX Screw driver set T-10,T-15,T-20,T-25,T-30 26 Rope 1 nos
5 Ball end hex key sets 2-2.5,3,4,5,6,8 27 Krone Tool
6 Combination Pliers 28 ESD Wrist Strap
7 Combination spanners Size-13,15,16,17,19,24,27,30,32 29 Monkey Wrench
8 Tie Cutter 30 RJ 45/RJ11 crimping tool
9 Scissors Fiskars 9891 31 Allen Key Set
10 Utility Knife 32 Electric Soldering Piston W 61C
11 Hacksaw 33 Electrical Soldering Tin 1 mm
12 Co-axial Cable stripper 34 Chisel
13 Wire Stripper 35 Marker Pen or Comparable tool
14 Plastic Head hammer 36 Cleaner Spray
15 File Round 6" and Flat 8" 37 LAN cable Tester
16 Digital Multimeter 38 Power Extension Board
17 Brush 39 Hammer
18 Measuring Tape Upto 35 metre 40 Power Cable cutter
19 Spirit Level 41 Laser Torch
20 Crimping Tool T-2600 or Equivalent 42 Binocular
21 Torque Wrench 1 43 T20 Screw Driver with hole Tip
22 Compass
Tool’s List for Installing AIRSCALE
Airscale Quality Hand book Ver1.0
8. Infra & Power Requirements
• 1 MCB of 63 A required for System Module.
• Space for GPS is required on Sites where ever we are installing / swapping TDD , location open to sky
with 180 degree access.
• Space for RF module is required near the antenna ( for New Installation).
• 1 MCB of 32 A ( 2G, 3G, FD) or 16A ( FZNI or AZNA) required for RF Module.
• 1 Pole for System module is required in Case of New Installation
• In case of Swap we will try to use existing Location of TDD BTS
• Antenna strategy will depend on what is the scope, for swap we don’t have to change anything but in
case of New Deployment 1 Pole per Antenna is required.
• Space for Installing OFDB on pole or tower leg.
Airscale Quality Hand book Ver1.0
9. ASIA Air Scale Common
➢ -One ASIA Card
➢ -One Grounding Cable -with Two
Screws
ASIA
Grounding Cable
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
10. ABIA Air Scale Capacity
➢ One ABIA Card
ABIA
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
11. AMOB AirScale Subrack
➢ One AMOB Cabinet
➢ One Site Bag with Accessories
AMOB
Site Bag
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
12. Accessories supplied with AMOB
Glands Grommets
Lifting handle, Padlock bracket, Key, Anderson power connector with Lugs,
premade Gr cable for ASIA, Gr lugs for AMOB, Plates for covering gland
openings, Hex nut, hexalobular pan Washers
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
13. FSES Flexi Ext. Semi-integrated OVP
➢ One FSES OVP with prefixed Power and
GND Cable
➢ Screw and Bolts
FMFA FLEXI MOUNTING KIT FLOOR/WALL/POLE
➢ One FMFA Plinth
➢ Screw and Bolts
FPKA Flexi Pole Installation Kit
➢ Two FPKA Pole Mounting Kit with
Locking Bracket
OD kit HW Delivery Content
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
14. AMFH Stack installation kit
➢ One Base Plate
➢ One Security Bracket
➢ One Security Thread band
➢ One AMOB Heat Exchanger Front Cover
➢ Screws
Base Plate
Security Bracket
Security Thread band
AMOB Heat Exchanger Front Cover
OD kit HW Delivery Content
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
15. FPIA Flexi Pole Installation Kit
➢ One Pole Fixing Plate
➢ One Hose Clamp
➢ Screws
AMFF Blind panel
➢ One Blank Dummy Plate
OD kit HW Delivery Content
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
16. AMFK Cable glands for AMOB
➢ 1 x Cable glands on the AMOB left side
(2 x 1.5 inch, 3 x 1.0 inch)
Airscale HW Introduction OD kit HW Delivery Content
Airscale Quality Hand book Ver1.0
17. AMFS Glands Rubber Boot for AMOB
Airscale HW Introduction OD kit HW Delivery Content
Airscale Quality Hand book Ver1.0
18. OFDB (FODA)
➢ One FODA for every 12 CPRI Cable
Pl. Note : OFDB is mountable only on wall and Pole
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
19. IM Kit Supplied with Air scale
3G (2100) Label set
LTE (2300/2600) Label set
Airscale mod Label set
2G (900/1800) Label set
Labelling set
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
20. IM Kit Supplied with Air scale
Other IM
Tie, Tape, Saddle, Welcro, Spiral
conduit Grouting bolt &
Washers
FMCA top cover plate C clamp for grounding Lugs – 2.5,10,16,25,35 Sq.mm
Airscale HW Introduction
Airscale Quality Hand book Ver1.0
22. Modules Installed
AMOB with ABIA card and ASIA Card OFDB
OVP
RF Modules
GPS
DCDB
Airscale Quality Hand book Ver1.0
23. Plinth Grounding should be done before installation of AMOB Module
1. Installation - Plinth and Grounding
Wrist Strip to be used while handling module
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use
/Airscale%20Installation%20Videos/Plinth%20%26%20Grounding.mp4
• Plinth should be secured with minimum 4 Hex Bolts.
• Plinth Bolt should be tightened with correct torque.
• Grounding to be done on plinth from nearest grounding point (prefer EGB if nearby)
• Crimping of lugs to be done by hexagonal crimping tool only.
• Always Wear Anti Static Wrist Strap while handling modules
Airscale Quality Hand book Ver1.0
24. 2. AMOB Installation – Padlock, Handle & Cover plates
Padlock Installation with
spanner
Handle Installation with T20 – 4
screws / handle
Cover Plates for Gland holes
Installation for top portion
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20basic%20Installation.mp4
• Security bracket is must to be Installed with AMOB & plinth with min 6 screws
• Padlock working properly, to be ensured after Installation
• Cover plates to be tightened properly on top side in vertical Installation
• AMOB should be grounded with Plinth using supplied double hole lugs
Security bracket should be Installed for
supporting AMOB with Plinth
Airscale Quality Hand book Ver1.0
25. 3. AMOB Installation - FAN unit, Maintenance thread & Airflow
Fan position to be checked Maintenance thread to be
installed for FAN unit front
cover
Airflow should be Front to
Back in Vertical Installation
Airflow Back to Front in
Horizontal Installation
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20basic%20Installation.mp4
• Fan position to be checked as per horizontal or Vertical position
• Airflow should be front to back side in vertical installation
• Airflow should be back to front side in horizontal installation
• Maintenance thread should be installed for FAN unit front cover
• T20 torque driver with hole on tip to be used for changing FAN unit orientation
T20 torque driver with hole on tip
to be used for AMOB & FAN unit
Airscale Quality Hand book Ver1.0
26. 4. AMOB Installation-FAN unit positioning
Change the FAN Position
FAN Remove FAN Position Chnge
FAN Closed FAN Front Cover
https://nokia.sharepoint.com/sites/SiSoQualityI
ndia/SiSo%20Quality%20Documents%20Nokia
%20Internal%20Use/Airscale%20Installation%2
0Videos/Fan%20unit%20position%20change1.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/Fan%20unit%20position%20change2.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/Fan%20unit%20position%20change3.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityI
ndia/SiSo%20Quality%20Documents%20Nokia
%20Internal%20Use/Airscale%20Installation%2
0Videos/Fan%20unit%20position%20change4.
mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/Fan%20Unit.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Q
uality%20Documents%20Nokia%20Internal%20Use/Airscale%2
0Installation%20Videos/FAN%20unit2.mp4
Airscale Quality Hand book Ver1.0
27. 5. AMOB Installation- Security bracket & GND
Grounding to be done on AMOB upper side with
Flat portion of premade LUG
AMOB Installation on Plinth Security bracket should be Installed
for supporting AMOB with Plinth
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Inter
nal%20Use/Airscale%20Installation%20Videos/AMOB%20Installation%20-%20Security%20bracket.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20U
se/Airscale%20Installation%20Videos/AMOB%20grounding.mp4
• AMOB should be Installed on Plinth
• Security bracket should be Installed for supporting AMOB with Plinth
• Grounding should be done on AMOB upper side with Flat portion of premade LUG
Airscale Quality Hand book Ver1.0
28. 6. AMOB Installation - CARD Installation
Installation of ASIA & ABIA card carefully by applying wrist strap on hand and ensure notch is properly tightened
ASIA ABIA
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/AMOB%20card%20Installation.mp4
• Installation of ASIA & ABIA to be ensured with notch is properly tightened
• Grounding should be done for ASIA card on cabinet of AMOB
• All unused slots should be covered with dummy plates
• Wrist strap to be used while card Installation
Airscale Quality Hand book Ver1.0
29. • OVP stands for Over Voltage Protection
• OVP should be installed on FPIA plate available.
• FPIA is to be Installed with help of Hose clamp.
• OVP power inlets & outlets should be sealed properly .
• OVP grounding is necessary & grounding cable should be routed from downward & grounded to AMOB plinth.
• OVP should be installed for System Module where Power cable length exceeds more than 10Mtr
• OVP can be installed backside of AMOB or on different Pole which is parallel or above the AMOB
• LUG must be used on Power cable at OVP power inlets & outlets
• XCMK Shield Grounding must be installed in OVP Grounding with 2.5 mm2 LUG
7. AMOB Installation -OVP Installation
OVP Install on back side of AMOB
with FPIA (using hose clamp)
Power cable termination at OVP
end from DCDB
Power cable OVP towards AMOB
https://nokia.sharepoint.com/sites/SiSoQualityIndia/Si
So%20Quality%20Documents%20Nokia%20Internal%2
0Use/Airscale%20Installation%20Videos/OVP%20Install
ation.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/
SiSo%20Quality%20Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20Videos/OVP%20I
nstallation-2.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/Si
So%20Quality%20Documents%20Nokia%20Internal%2
0Use/Airscale%20Installation%20Videos/OVP%20Install
ation-2.mp4
https://nokia.sharepoint.com/sites/SiSoQualit
yIndia/SiSo%20Quality%20Documents%20No
kia%20Internal%20Use/Airscale%20Installatio
n%20Videos/OVP%20-%20FPIA%20Inst.mp4
Airscale Quality Hand book Ver1.0
30. • OVP to DCDB Power cable should be crimped with Hexagonal crimping tool as per cross sectional area of cable.
• 16 Sqmm Power cable to be used from OVP to AMOB & crimped with 10 sq.mm bit for AMOB
• Insert 16 Sq.mm external power from OVP through M32 suggested gland inside AMOB.
• Tie to be applied on Anderson power connector.
• Power cable should be routed neatly inside cabinet.
8. AMOB Installation – Power cable
OVP to DCDB Power cable to be
crimped with proper crimping tool as
per cross sectional area of power cable
16 Sqmm Power cable to be used from
OVP to AMOB & crimped with 10
sq.mm bit for AMOB
Power cable tapping at AMOB end
Power cable tapping at OVP end
https://nokia.sharepoint.com/sites/
SiSoQualityIndia/SiSo%20Quality%2
0Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20
Videos/OVP%20power1.mp4
https://nokia.sharepoint.com/sites/
SiSoQualityIndia/SiSo%20Quality%2
0Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20
Videos/OVP%20Power2.mp4
https://nokia.sharepoint.com/sites/SiSoQ
ualityIndia/SiSo%20Quality%20Document
s%20Nokia%20Internal%20Use/Airscale%
20Installation%20Videos/AMOB%20Powe
r1.mp4
https://nokia.sharepoint.com/sites/
SiSoQualityIndia/SiSo%20Quality%2
0Documents%20Nokia%20Internal
%20Use/Airscale%20Installation%20
Videos/AMOB%20Power2.mp4
Tie to be applied on
Anderson power connector
Airscale Quality Hand book Ver1.0
31. 9. AMOB Installation - DC power Cable
RF module Power cable tapping at
DCDB end
AMOB power cable from OVP to
DCDB/PP to be given to 63A MCB
All Power Cable XCMK Shield Grounding (OVP, DCDB & RF module end)
should be done with 2.5 mm2 Hole type LUG
• AMOB DC power should be terminated at 63A MCB
• All Power Cable XCMK Shield Grounding (OVP, DCDB & RF module end) should be done with 2.5 mm2 Hole type LUG
• Same color Installation tape to be used for Power cable at lug crimping end
Airscale Quality Hand book Ver1.0
32. 10. AMOB Installation - ASIA power Cable & Grounding
Power cable connectivity from PDU of
AMOB to ASIA
Power taping for ASIA card is done by
Premade cable supplied in AMOB without
lug & is installed by clip
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents
%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ASIA%20power%2
0tapping.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents
%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ASIA%20groundin
g.mp4
ASIA grounded by using premade
grounding cable with grounding point on
AMOB
• Power cable connectivity from PDU of AMOB to ASIA should be routed properly & without hinderance to other cables
• Premade power cable is supplied with AMOB which is to be connected on ASIA without lugs
• The ASIA power cable clip needs to be ensured tightened properly and Power cable strands should not be visible
• All cables should be labelled properly
• 2 Gnd points of ASIA on AMOB should be secured with both grounding cables supplied with AMOB and connected to ASIA with angular end of lug
Airscale Quality Hand book Ver1.0
33. 11. OFDB Installation & GND
OFDB to be Installed nearby AMOB on top position with help of hose
clamp
OFDB grounding point
OFDB grounding cable to be
connected on plinth of AMOB
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia
%20Internal%20Use/Airscale%20Installation%20Videos/ODF%20Installation.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20I
nternal%20Use/Airscale%20Installation%20Videos/ODF%20Installation2.mp4
• OFDB to be Installed nearby AMOB on top position with help of hose clamp
• OFDB grounding should be done on AMOB Plinth
• Optical cable groundings should be terminated at bus bar available with OFDB
• Optical cables from RF modules should be inserted from bottom side and routed through / tightened with screws inside OFDB
Airscale Quality Hand book Ver1.0
34. 12.OFDB Installation-Flower cable
Flower cable – 2 Inlets from left side of OFDB Flower cable – Installation inside OFDB Flower cable – Installation inside AMOB,
Spiral conduit & welcro used for routing
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality
%20Documents%20Nokia%20Internal%20Use/Airscale%20Installatio
n%20Videos/ODF%20flower%20cable%20Installation1.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%
20Quality%20Documents%20Nokia%20Internal%20Use/Ai
rscale%20Installation%20Videos/ODF%20flower%20cable
%20Installation2.mp4
https://nokia.sharepoint.com/sites/SiSo
QualityIndia/SiSo%20Quality%20Docum
ents%20Nokia%20Internal%20Use/Airsc
ale%20Installation%20Videos/ODF%20fl
ower%20cable%20Installation3.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiS
o%20Quality%20Documents%20Nokia%20Internal%20U
se/Airscale%20Installation%20Videos/AMOB%20flower
%20cable%20Installation.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiS
o%20Quality%20Documents%20Nokia%20Internal%20U
se/Airscale%20Installation%20Videos/AMOB%20flower
%20cable%20Installation1.mp4
https://nokia.sharepoint.com/s
ites/SiSoQualityIndia/SiSo%20
Quality%20Documents%20Nok
ia%20Internal%20Use/Airscale
%20Installation%20Videos/AM
OB%20flower%20cable%20Inst
allation3.mp4
Upper cable entry used for Vertical port and extra cable should be role in 2nd roller
Lower cable entry used for horizontal port and extra cable should be role in 1st roller
• Flower cable – 2 Inlets from left side of OFDB
• Flower cable – Installation inside AMOB, Spiral conduit & Velcro to be used for routing
• Unused Optical ports IP cap to be secured
Airscale Quality Hand book Ver1.0
35. 13.OFDB Installation-Optical cable
Optical cable Installation inside OFDB
12 Optical cable Inlet points and grounding
points in OFDB
Optical cable grounding Installation at OFDB
end – Y point to be covered by additional
tape to avoid water ingress
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use
/Airscale%20Installation%20Videos/ODF%20-%20Opt%20cable%20Connectivity1%20.mp4
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%
20Nokia%20Internal%20Use/Airscale%20Installation%20Videos/ODF%20-
%20Opt%20cable%20Connectivity2%20.mp4
Optical cable should be insert from bottom
right of OFDB and Grounding of Optical cable
connected on back side of OFDB
z
Left bottom cable entry used for horizontal
port and right bottom cable entry used for
vertical port and should secured with nut on
bottom side
• Optical cable grounding should be done on OFDB grounding points.
• Optical cable should be insert from bottom right of OFDB and tightened with nuts on bottom side inside OFDB.
• Left bottom cable entry to be used for horizontal port connectivity of OFDB and right bottom cable entry to be used for vertical port
• Grounding of Optical cable should be connected on back side bus bar of OFDB
Airscale Quality Hand book Ver1.0
37. 14. AMOB Installation - Cable Entry Glands
GPS and Alarm cable entry
through M32 glands
Optical Flower cable in through
M50 gland
Power cable entry to be done
through M32
LMP and Ethernet Media cable
entry through M32 glands
https://nokia.sharepoint.com/sites/SiSoQualityIndia/SiSo%20Quality%20Documents%20Nokia%20Internal%20Use/Airscale%20Installation%20Videos
/Gland%20%26%20Grommets%20Cable%20entry%20AMOB.mp4 Airscale Quality Hand book Ver1.0
38. FMCA cover should be cover with Plate for RF module
15. Installation of FMCA and LMP Jumper
LMP Jumper cable installed in AMOB for
login without opening door of AMOB
• FMCA top cover should be cover with Plate for RF module
Airscale Quality Hand book Ver1.0
39. 16. Installation of RF modules with Torque Wrench
All jumpers should be tightened with Torque Wrench R
RF module Installation & Its grounding
• All jumper should be tightened with correct torque 25NM
• Power cable should be terminated at correct rated MCB
• Ensure labelling is done for all the cables Installed at RF module end.
Airscale Quality Hand book Ver1.0
40. 17. Installation of Antenna & Jumper
R Antenna Installation with locknuts to be ensured Jumper routing should be done properly with tie
• Ensure ring washer on clamps
• Lock nut must be used for tightening GSM clamps
• Connectors must be properly weatherproofed
Airscale Quality Hand book Ver1.0
41. 18. Installation of GPS & DDF
GPS to be installed with 180 deg open to sky DDF with Back mount frame grounding
• GPS to be installed with 180 deg open to sky
• DDF with Back mount frame grounding to be done
• Alarm cable shield grounding to be done at DDF end
Airscale Quality Hand book Ver1.0
42. 19. LABELING-PLN,OVP and OFDB GND at Plinth
Air scale PLN GND
Air scale ODF GND
Air scale OVP GND
Airscale Quality Hand book Ver1.0
43. 20. LABELING-POWER ,ALM,GPS and LAN at AMOB end
GPS-Air scale ASIx GPS
EAC-Air scale ASIx
ALM
LAN-Air scale ASIx TX
ASIA Power(Black)+ve –Air
Scale AMOB to ASIA PP
ASIA Power(Blue) (-ve) -Air
scale AMOB to ASIA PP
Airscale Quality Hand book Ver1.0
44. 21. LABELING-Flower Optical cable at OFDB end
Flower OPT cable
1-Air scale FMS-
ASM-A
Flower OPT cable 2
-Air scale FMS-
ASM-B
Airscale Quality Hand book Ver1.0
45. Flower OPT cable
1-Air scale FMS-
ASM-A
Flower OPT cable 2
-Air scale FMS-
ASM-B
22. LABELING-Flower Optical cable at AMOB
Airscale Quality Hand book Ver1.0
46. 23. LABELING-OVP Power Cable
OVP Output cable-Air scale OVP –
AMOB PDU
OVP input cable-Air scale OVP-PP
Airscale Quality Hand book Ver1.0
47. 24. Labeling - AMOB PDU Power
OVP Output cable to AMOB cable-Air
scale OVP –AMOB PDU
AMOB MSB –Airscale AMOB OVP-
PP
Airscale Quality Hand book Ver1.0
48. 25. LABELING-ALM at DDF
ALARM GND-Airscale DDF GND ALARM CABLE-Air scale ASIx ALM-1
Airscale Quality Hand book Ver1.0
49. 26. LABELING- OPT at OFDB
OPT GND-CIPRI 1800-FR1/2-PLN
GND-SM-GND
OPTICAL CABLE-CIPRI SM-ABIx 1800-
FR1/2/3
Airscale Quality Hand book Ver1.0
50. 27. LABELING-RF GND
RF Module gnd-1800-FR1/2/3-GND RF Module plinth gnd-1800-FR1/2/3-
PLN-GND
Airscale Quality Hand book Ver1.0
51. 28. LABELING-RF Power and OPT
RF Module Power cable-1800-
FR1/2/3-PP
RF Module OPTICAL CABLE-CIPRI SM-
ABIx 1800-FR1/2/3
Airscale Quality Hand book Ver1.0
52. 29. LABELING – Jumpers at RF end
RF Module to Antenna Jumper sector
1/2/3 TX- 1800-SEC1/2/3-ANTLN 1
RF Module to Antenna Jumper sector
1/2/3 RX- 1800-SEC1/2/3-ANTLN 2
Airscale Quality Hand book Ver1.0
53. RF Module to Antenna Jumper sector
1/2/3 TX- 1800-SEC1/2/3-ANTLN 1
RF Module to Antenna Jumper sector
1/2/3 RX- 1800-SEC1/2/3-ANTLN 2
WHITE -1ST SECTOR
RED-2ND SECTOR
BLUE -3RD SECOR
ANTLN 1 –TX
ANTLN2 -RX
30. LABELING – Jumpers at Antenna end
Airscale Quality Hand book Ver1.0
54. 31. LABLING- RF POWER and GPS
GPS-Air scale ASIx GPS
AMOB Cable Routing (Grounding
& Power Cables)
Airscale Quality Hand book Ver1.0