SlideShare a Scribd company logo
1 of 111
Download to read offline
1
Reference Site
2014. 02. 07
Air Conditioning Marketing Group
SE
2
Reference Site
Equipment SelectionImage
Application Issue
Global Reference Site Map
3
1. Europe
2. South East Asia
3. the Middle East
4. Africa
5. South West Asia
6. Latin America
7. Korea
8. China
Content
4
Reference Site
Equipment SelectionImage
Application Issue
1. Europe
5
Reference Site
Equipment SelectionImage
Application Issue
ORCO Shopping Mall
Project ORCO Project
Location Budapest, Hungary
Date of Completion 2012
Size 12,000 m2
Value € 571K
Shopping Mall
7,000
mm
• Limited installation space for the outdoor units
- High walls surrounding the area
- Samsung provided full CFD simulation analysis
• The investor wanted the most energy efficient solution
with best control solution
Classification Type Q’ty / HP
ODU DVM PLUS 3 HR 52 EA
IDU
4way, Duct, Console
Air Handling Units
300 EA
6 EA
Control S-NET 3, DMS, Power distribution
6
Reference Site
Equipment SelectionImage
Application Issue
IKEA Shopping Complex Mall
Complex Mall
Project IKEA Shopping Complex Mall
Location Valladolid, Spain
Date of Completion AUG, 2012
Size 20,700 m2
Value € 210K
Customer Atil Cobra (Big Installer)
Classification Type Q’ty / HP
ERV RHF***EE 166 EA
Control CO2 Sensor, MWR-WE10
• CO2 sensors to control the multiple ERVs
- HQ developed a special software for customer
• Free cooling with volume damper and energy saving
control
• Extended temperature ratio to ±10℃ with energy saving
control of MWR-WE10
7
Reference Site
Equipment SelectionImage
Application Issue
Parkalgar Radisson Hotel
Project Parkalgar Hotel (5 Star Hotel)
Location Portimão, Portugal
Date of Completion 2011
Size
16,000 m2 (208 rooms & 166
apt.)
Value € 450K
Classification Type Q’ty / HP
ODU
DVM PLUS 4
FJM
19 EA
166 EA
IDU Duct(Hotel), RAC(Appt.) 737 EA
Control DMS 2, LonWorks gateway
• Customer want to provide an overall total solution, such as
air-conditioner, TV, refrigerators, cookers and microwaves.
- Samsung can provide customers with a tailored total
solution.
• LonWorks BMS connection
Hotel & Resort
8
Reference Site
Equipment SelectionImage
Application Issue
Southend Airport
Airport
Project Southend Airport
Location London, UK
Date of Completion JUN, 2011
Size 4,500 m2
Value € 320K
Classification Type Q’ty / HP
ODU DVM PLUS 3 18 EA
IDU Duct, Wall Mounted 47 EA
Control MWR-WH00
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
9
Reference Site
Equipment SelectionImage
Application Issue
Murawa Office Park
Office Park
Project Murawa Office Park
Location Poznan, Poland
Date of Completion December, 2010
Size 7,500 m2
Value € 205k
Classification Type Q’ty / HP
ODU DVM PLUS III HR 10 EA
IDU Duct, 4Way Cassette, RAC 151 EA
Control Lonworks Interface
• Monitor power distribution
• Set room temperature
• Control fan speed
• Zone management
• Lonworks Gateway the best solution to integrate DVM
PLUS system into BMS and control the system
simultaneously
10
Reference Site
Equipment SelectionImage
Application Issue
Sheraton Edinburgh Hotel
Hotel & Resort
Project Sheraton Hotel (5-star hotel)
Location Edinburgh, UK
Date of Completion OCT, 2010
Size 11,500 m2 (269 rooms)
Value € 220K
Classification Type Q’ty / HP
ODU DVM PLUS 2 HR 25 EA
IDU Slim Duct 285 EA
Control DMS 2, MWR-WH00
• Fidelio system application with Samsung AC
- Samsung developed the Fidelio application for customer
• PC based centralized control system (DMS2)
11
Reference Site
Equipment SelectionImage
Application Issue
PFRON
Office Building
Project PFRON
Location Warsaw, Poland
Date of Completion 2010
Size 4,525 m2
Value € 150K
Classification Type Q’ty / HP
ODU DVM PLUS 3 22 EA
IDU 4way, Slim 1way, RAC 215 EA
Control
DMS 2, Window relay, Use restriction by
Control logic management
• PC based centralized control system (DMS2)
• Window contact control for energy saving
• Electric power use limit combined with DMS2 control
logic management
12
Reference Site
Equipment SelectionImage
Application Issue
Pecsa Sanatorium
Sanatorium
Project Pecsa Sanatorium
Location Madrid, Spain
Date of Completion 2010
Size - m2
Value € 230K
• AHU Systems (Heating load 30%)
- AHU system was installed with Solar panels for
corresponding the energy regulation
• PC based centralized control system (DMS2)
Classification Type Q’ty / HP
ODU DVM PLUS 3 HP 16 EA
IDU AHU, 4Way, Duct, 2Way 96 EA
Control DMS2, MWE-WH00
13
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM PLUS II HR 11
IDU Wall mounted / Ceiling 171
Control DMS, Key tag, Fidelio
Holiday Inn Hotel
Project Holiday Inn Hotel
Location Slough, UK
Date of Completion Oct, 2008
Size 9 floors
Value -
• ODU Installation Space
- Group installation on the rooftop
Hotel
• Management of air conditioning system
- DMS
- Fidelio : 3rd Party control system
14
Reference Site
Equipment SelectionImage
Application Issue
VAM Design Center
Art Gallery
Project VAM Design Center (Art Gallery)
Location Budapest, Hungary
Date of Completion 2007
Size 11,500 m2
Value € 286K
Classification Type Q’ty / HP
ODU DVM PLUS 2 24 EA
IDU Duct, Wall Mounted 86 EA
Control DMS, Power Distribution
• PC based centralized control system (DMS)
• Power distribution system (SiM, WHM)
15
2. South East Asia
16
Reference Site
Equipment SelectionImage
Application Issue
RASUNA Tower
Project RASUNA Tower
Location Jakarta, Indonesia
Date of Completion 2014
Size 60 floors
Value 5.0M US$
• Optimize indoor humidity control
• Improved design with DVM +4
• Interlock control with BACnet
• Power distribution
- PIM (WHM interface module - MIM-B16)
- Local watt-hour meter (Pulse type)
Classification Type Q’ty / HP
ODU DVM PLUS IV 380
IDU 4 Way, Duct, ERV+ 1,223
Control BACnet
Office & Residential Building
17
Reference Site
Equipment SelectionImage
Application Issue
Arya Residences
Project Arya Residences
Location Taguig City, philippines
Date of Completion 2013
Size 2 towers
Value 2.0M US$
• LEED-registered residential building
- SAC with high EER
- DVM Mini
- DVM+4 / CAC
• Optimized design for ODU
- Air flow analysis by CFD
- Proposal of optimized ODU space
Classification Type Q’ty / HP
ODU DVM Mini 1720HP
IDU 4 Way & Duct 895
Control Individual remote controller
Luxury Residential Building
18
Reference Site
Equipment SelectionImage
Application Issue
Project Viet Han Tower (Space 21)
Location Hanoi, Vietnam
Date of Completion July, 2011
Size 17 floors
Value 460k US$
Viet Han Tower (Space 21)
• High-rise building
- Level different over 50m
- PDM(Pressure Drop Modulation) Kit
• Countermeasures of region with high humidity
- Reinforced insulator
Office Building
• Power distribution
- PIM (WHM interface module - MIM-B16)
- Local watt-hour meter (Pulse type)
Classification Type Q’ty / HP
ODU DVM PLUS III 65
IDU 4way 222
Control DMS2, Power distribution with PIM
19
Reference Site
Equipment SelectionImage
Application Issue
Kumho Asiana Plaza
Project Kumho Asiana Plaza
Location Hochiminh, Vietnam
Date of Completion 2009
Size Service residential 32th floor
Value 3.2M US$
• PC based centralized control system
- S-Net 3 & DMS
- Function : Monitoring & operation
• Power distribution : SiM, WHM
Luxury Residential Apartment
• Countermeasures of region with high humidity
- Reinforced insulator
Classification Type Q’ty / HP
ODU DVM PLUS III 128
IDU Slim 1way 1,155
Control S-Net 3, DMS, Power distribution with SiM
20
Reference Site
Equipment SelectionImage
Application Issue
Project Imperial Palace
Location Cebu, Philippines
Date of Completion 2009
Size 6 buildings
Value 3.2M US$
• Damage from sea wind (water)
- Install Wall against the wind
- Anticorrosive agent
• Interlock control with BMS system
Classification Type Q’ty / HP
ODU DVM/DVM PLUS 2,3 2850HP
IDU 1way / Slim duct 1355
Control BMS interlock control
Imperial Palace
Resort
21
Reference Site
Equipment SelectionImage
Application Issue
West Sands Resort
Project West Sands Resort
Location Mai Khao Beach, Thailand
Date of Completion 2009
Size 426 villas & residences
Value 1.0M US$
• Prevention from Damage of sea wind (water)
- Install Wall against the wind
- Anticorrosive agent
Resort
• Countermeasures of region with high humidity
- Reinforced insulator
Classification Type Q’ty / HP
ODU DVM PLUS III 984HP
IDU 1 Way / Duct 755
Control DMS
22
Reference Site
Equipment SelectionImage
Application Issue
St. Joseph School
Project St. Joseph School
Location Sydney, Australia
Date of Completion 2011
Size 10 Different Buildings
Value 250K AUD$
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
School
• Refurbishment of HVAC system
- SAC(DVM system) application
Classification Type Q’ty / HP
ODU DVM PLUS III (HP/HR) 500HP
IDU 1 Way / 4 Way 250
Control Central Controller, DMS2
23
Reference Site
Equipment SelectionImage
Application Issue
Rockhampton Aged Care
Project Rockhampton Aged Care
Location Rockhampton, QLD Australia
Date of Completion 2011
Size 100 Beds Aged Care Residents
Value 120K AUD$
• Management of air-conditioning system
- Easy Control : S-NET Mini with touch screen
- Monitoring & Operation
Residence
• Retirement Village
- Emergency Shutdown A/C System in Fire Mode
Classification Type Q’ty / HP
ODU DVM PLUS III 72HP
IDU Wall mounted 100
Control S-NET Mini
24
Reference Site
Equipment SelectionImage
Application Issue
Breakfast Point Apartment
Project Breakfast Point Apartment
Location Sydney, Australia
Date of Completion 2011
Size 3 Buildings each with 5 Levels
Value 450k AUD$
• High end value residential apartment
- System combination : DVM Mini & 2~4 IDUs
Luxury Residential Apartment
• Location of ODU
- Roof & Basement
- Securing air circulation of ODU located in basement
Classification Type Q’ty / HP
ODU DVM Mini 1670HP
IDU Wall mounted 450
Control Individual Wireless Controller
25
Reference Site
Equipment SelectionImage
Application Issue
Thai Hoa Pediatrics Hospital
Project Thai Hoa Pediatrics Hospital
Location Dong Thap, Vietnam
Date of Completion June, 2011
Size 7 floors
Value 249K US$
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
Hospital
• N/A
Classification Type Q’ty / HP
ODU DVM PLUS III 25 / 382HP
IDU 4 Way 213
Control Central Controller, DMS
26
Reference Site
Equipment SelectionImage
Application Issue
Golf Phu My Hotel
Project Golf Phu My Hotel
Location Ba Ria Vung Tau, Vietnam
Date of Completion December, 2011
Size 12 floors
Value 500K US$
• Management of air conditioning system
- Integrated and centralized control system
- DMS + S-Net 3
• Watt-hour Meter interface Module
• ERV
- Interlock with SAC
Classification Type Q’ty / HP
ODU DVM PLUS III 21 / 74HP
IDU 4 Way & Duct 313
Control S-Net 3
Hotel
27
Reference Site
Equipment SelectionImage
Application Issue
Green Boutique Hotel
Project Green Boutique Hotel
Location Puchong, Selangor, Malaysia
Date of Completion Jan, 2011
Size 6 floors
Value 70K US$
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Monitoring & Operation
Hotel
• Interior design
- Compact ducted units
Classification Type Q’ty / HP
ODU DVM PLUS III 3 / 48HP
IDU Duct 57
Control S-Net Mini
28
Reference Site
Equipment SelectionImage
Application Issue
Bangsar Hill Bungalow
Project Bangsar Hill Bungalow
Location Kuala Lumpur, Malaysia
Date of Completion Feb, 2012
Size 4 floors
Value 65K US$
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Simplified remote controller
Bungalow
• Interior design
- Compact ducted units
Classification Type Q’ty / HP
ODU DVM PLUS III 4 / 56HP
IDU Duct 23
Control S-Net Mini
29
Reference Site
Equipment SelectionImage
Application Issue
Plaza Damas 3
Project Plaza Damas 3
Location Kuala Lumpur, Malaysia
Date of Completion May, 2011
Size 10 floors
Value 370K US$
• Management of air conditioning system
- Simplified remote controller
Service Apartment
• Compact 4-way cassette
• Ceiling Concealed Duct
• RAC with Virus doctor
Classification Type Q’ty / HP
ODU CAC 81 / 960HP
IDU 4 Way & Duct 81
Control Individual remote controller
30
Reference Site
Equipment SelectionImage
Application Issue
The Beaufort
Project The Beaufort
Location Taguig City, philippines
Date of Completion December, 2012
Size 42 floors(2 towers)
Value 2.0M US$
• High-rise building
• Complex building
- Office & Residence
Office & Residential Building
• Management of air conditioning system
- Simplified remote controller
Classification Type Q’ty / HP
ODU DVM PLUS III 2000HP
IDU 4 Way & Duct 1,500
Control Individual remote controller
31
Reference Site
Equipment SelectionImage
Application Issue
Trillium tower
Project Trillium tower
Location Surabaya, Indonesia
Date of Completion 2011
Size 110m’s height
Value -
• High-rise building
- Level different over 50m
- PDM(Pressure Drop Modulation) Kit
• Management of air conditioning system
- Simplified remote controller
Classification Type Q’ty / HP
ODU DVM PLUS III 3
IDU Ceiling 50
Control Individual remote controller
Office & Residential Building
32
Reference Site
Equipment SelectionImage
Application Issue
Design Hub
Project Design Hub
Location Singapore
Date of Completion 2011
Size 1428HP
Value -
• Optimized piping design against long piping issue
for storage space.
• CFD analysis for limited outdoor space
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Simplified remote controller
Classification Type Q’ty / HP
ODU DVM PLUS III 119
IDU 4 Way & Duct 334
Control S-Net Mini
Office Building
33
Reference Site
Equipment SelectionImage
Application Issue
The New iLoiLo City Hall
Project The New iLoiLo City Hall
Location iLoiLo City, Philippines
Date of Completion December, 2011
Size 7 floors
Value 0.5M US$
• Energy evaluation in comparison with Chiller.
• Previous building is using chiller.
Office Building
• Management of air conditioning system
- S-Net Mini controller
Classification Type Q’ty / HP
ODU DVM PLUS III 600HP
IDU 4 Way 550HP
Control S-Net Mini controller
34
3. the Middle East
Classification Type Q’ty / HP
ODU DVM PLUS IV HR 79
IDU AHU, Duct, Ceiling 650
Control S-Net 3, DMS, Key-Tag. Wired R/C
Reference Site
Equipment SelectionImage
Application Issue
Project The Hilton Dead Sea Resort
Location Dead Sea, Jordan
Date of Completion 2014
Size 1320 HP
Value 1.0M US$
Hilton Dead Sea Resort
• Powerful Performance in High Ambient Temperature
• Heat Recovery & Technology
- Continuously Simultaneous Heating & Cooling
• Energy Saving & Eco-friendly
- Top Class Energy Efficiency
Hotel
36
Reference Site
Equipment SelectionImage
Application Issue
Mall of Istanbul
Project Mall of Istanbul
Location Istanbul, Turkey
Date of Completion 2012
Size 762,000 m2
Value 1.8M US$
• PC based centralized control system
- S-Net 3 & DMS
- Function : Monitoring & operation
• Power distribution : SiM, WHM
Commercial Complex
• Countermeasures of region with high humidity
- Reinforced insulator
Classification Type Q’ty / HP
ODU DVM PLUS IV 108 EA / 2,080 HP
IDU Slim Duct 2,136 EA
Control S-Net 3, DMS, Power distribution with SiM
37
Reference Site
Equipment SelectionImage
Application Issue
AJMAN One
Luxury Residential Apartment
Project AJMAN One
Location Ajman, UAE
Date of Completion 2012
Size Twelve towers, 26 floors
Value 3.7M US$
Classification Type Q’ty / HP
ODU CAC Camel 6,754 EA
IDU MSP Duct 6,754 EA
Control Wired remote controller
• Design machine room
- Louver for better air circulation
- Exhaust fan and SVC space for
• The Biggest CAC Ref. Site in the GCC Countries.
• Oil trap & additional accumulator
38
Reference Site
Equipment SelectionImage
Application Issue
Titanic Hotel
Project Titanic Hotel
Location Istanbul, Turkey
Date of Completion 2012
Size 331 Rooms
Value 1.2M US$
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
• Interior design
Classification Type Q’ty / HP
ODU DVM PLUS IV
IDU
Control
Hotel
39
Reference Site
Equipment SelectionImage
Application Issue
SBG Plaza
Office Building
Project SBG plaza
Location Muscat, Oman
Date of Completion 2012
Size 3700Ton
Value 1.6M US$
Classification Type Q’ty / HP
CAC MSP Duct (60K) 1500 EA
RAC RAC (18K) 500 EA
Control
• Power distribution
- Local pulse type watt hour meter
• Interior design
- Compact ducted units
40
Reference Site
Equipment SelectionImage
Application Issue
Braka Nuclear Power Plant
Commercial Building
Project Braka Nuclear Power Plant
Location Braka, UAE
Date of Completion 2011
Size
Value 1.25M US$
Classification Type Q’ty / HP
ODU DVM+3 High 137 EA
IDU 4way, MSP Duct 214 EA
Control Centralized controller, DMS, S-Net Mini
• Management of air conditioning system
- Easy Control : S-NET Mini with touch screen
- Simplified remote controller
• Power distribution
- Local pulse type watt hour meter
41
Reference Site
Equipment SelectionImage
Application Issue
Dead Sea Lagoon Hotel
Hotel
Project Lagoon Hotel
Location Dead Sea, Jordan
Date of Completion 2011
Size
Value US$
Classification Type Q’ty / HP
ODU DVM+3 High 44
IDU Duct 760
Control S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Interior design
- Compact ducted units
42
Reference Site
Equipment SelectionImage
Application Issue
Seasons Community
Luxury Residential Apartment
Project Seasons Community
Location UAE
Date of Completion 2009~2012
Size 365 Flats
Value US$
Classification Type Q’ty / HP
ODU CAC 694 EA
IDU MSP Duct 694 EA
Control Wired remote controller
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
43
Reference Site
Equipment SelectionImage
Application Issue
Glozny
Hotel
Project Glozny
Location Glozny, Chechnya
Date of Completion 2011
Size 4.5-hectar (5 building)
Value 1.86M US$
Classification Type Q’ty / HP
ODU DVM +3, Mini DVM, FJM 5248HP
IDU 1 Way / Duct 3526EA
Control DMS, On/Off
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
• Hotel, Shopping center, swimming pool, restaurant
44
Reference Site
Equipment SelectionImage
Application Issue
Princess Resort
Resort
Project Princess Resort
Location Izmir, Turkey
Date of Completion 2004
Size
Value $
Classification Type Q’ty / HP
ODU DVM PLUS
IDU Duct Type
Control
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
45
Reference Site
Equipment SelectionImage
Application Issue
Project Brandium
Location Turkey,İstanbul
Date of Completion 2013
Size 7891 KW (INDOOR)
Value 1.4M$
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 154
IDU AHU, Duct, Ceiling, Wall 2607
Control S-NET3, DMS, Key-tag, Automation
Brandium
Residence and Hotel
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
46
Reference Site
Equipment SelectionImage
Application Issue
Project Sinpaş Ottomare
Location Turkey,İstanbul
Date of Completion 2013
Size 3200 KW (INDOOR)
Value 0.5M$
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 76
IDU AHU, Duct, Ceiling, Wall 2985
Control S-NET3, DMS, Key-tag, Automation
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Limited installation period
Sinpaş Ottomare
Residence and Hotel
47
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 45
IDU AHU, Duct, Ceiling, Wall 849
Control S-NET3, DMS, Key-tag, Automation
Project Terrace Tema
Location Turkey,İstanbul
Date of Completion 2014
Size 3250 KW (INDOOR)
Value 662k$
Terrace Tema
Residence
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
48
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM+4 HP, HR 333
IDU AHU, Duct, Ceiling, Wall 1736
Control S-NET3, DMS, Key-tag, Automation
Project Mandarin Oriental
Location Turkey,İstanbul
Date of Completion 2013
Size 9000 KW (INDOOR)
Value 1.6M$
Mandarin Oriental
• Variety design for the project
Residence
49
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU CAC 262
IDU MSP Duct 262
Control Wired
Project Narges Complex
Location Tehran, Iran
Date of Completion Jul 2013
Size ODU 805 HP
Value 420K USD
Narges Complex
Residence
• Powerful Performance in High Ambient Temperature
50
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU CAC 226
IDU MSP Duct 226
Control Wired
Project Zeytun Complex
Location Tehran, Iran
Date of Completion Jul 2013
Size ODU 813 HP
Value 410K USD
Zeytun Complex
Residence
• Powerful Performance in High Ambient Temperature
51
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM+4 HP 16
IDU 4Way Cassette, Ceiling, Wall 115
Control Wireless, S-Net
Project Commercial Center of Elahiye
Location Tehran, Iran
Date of Completion Aug 2013
Size ODU 222HP
Value 110K USD
Zeytun Complex
Commercial Building
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
52
4. Africa
53
Reference Site
Equipment SelectionImage
Application Issue
Intercontinental Hotel
Luxury Hotel
Project Intercontinental Hotel (5 star)
Location Libreville, Gabon
Date of Completion 2013
Size 714 HP
Value $ 0.5 M
Classification Type Q’ty / HP
ODU DVM+4 714 HP
IDU Slim Duct 394 ea
Control S-NET Mini
• Change the design from chiller to DVM S.
• Winning Factor : Winning through SSA installer co-work in no installation infrastructure country
54
Reference Site
Equipment SelectionImage
Application Issue
Icon Tower (Land Mark)
Luxury Office + Residence
Project ICON Tower
Location Kinshasa, DR Congo
Date of Completion 2013
Size 596 HP
Value 0.5 M$
Classification Type Q’ty / HP
ODU DVM S 596 HP
IDU High wall / Cassette 394 ea
Control S-NET Mini
• Winning Factor
- Customer confidence (Local Manager direct sale activity, SE design support)
- Energy Efficiency of product
55
Reference Site
Equipment SelectionImage
Application Issue
Congo Trade Center (Land Mark)
Luxury Office + Residence
Project CTC (Congo Trade Center)
Location Kinshasa, DR Congo
Date of Completion 2014
Size 690 HP
Value 0.5 M$
Classification Type Q’ty / HP
ODU DVM S, DVM Eco 690 HP
IDU Wall mount 465 ea
Control Wireless RMC
• Change the design from chiller to DVM S.
• Winning Factor :
- Relationship with client
- HQ RPM & SE local support in DVM S launching conference on Sep.2013
- DVM S advertisement in local premium magazine
56
Reference Site
Equipment SelectionImage
Application Issue
Du Grand Palais Des Nations
The National Assembly building
Project Du Grand Palais Des Nations
Location Conakry, Guinea
Date of Completion 2013
Size 340 HP
Value 0.2 M$
Classification Type Q’ty / HP
ODU DVM S 596 HP
IDU High wall / HSP & MSP Duct 113 ea
Control DMS 2, S Net 3
• Management of air conditioning system
- Integrated and centralized control system
- DMS 2 + S-Net 3
• Change the design from 2 among 4 blocks of Competitor air-cooled chiller to DVM S.
57
Reference Site
Equipment SelectionImage
Application Issue
National Security Center
Government office building
Project National Security Center
Location Khartoum, Sudan
Date of Completion 2014
Size 780 HP
Value 0.5 M$
Classification Type Q’ty / HP
ODU DVM S, Desert 780 HP
IDU Slim / MSP Duct 227 ea
Control DMS 2
• Management of air conditioning system
- Integrated and centralized control system
- DMS 2 + S-Net 3
• Winning factor : Samsung brand image., Technical Support.
58
Reference Site
Equipment SelectionImage
Application Issue
Accra Financial Center
Premium office building
Project Accra Financial Center
Location Accra, Ghana
Date of Completion 2014
Size 758 HP
Value 0.4 M$
Classification Type Q’ty / HP
ODU DVM S 758 HP
IDU MSP/HSP Duct, Mini 4W CST 127 ea
Control Wired RMC, Group Controller
• Land mark PJT in Accra
59
Reference Site
Equipment SelectionImage
Application Issue
Hilltop Private Hospital
Hospital
Project Hilltop Private Hospital
Location Lusaka, Zambia
Date of Completion 2014
Size 384 HP, CAC 40 set
Value 0.4 M$
Classification Type Q’ty / HP
ODU DVM S, CAC 384 HP
IDU
Mini 4W CST, Slim Duct,
High-Wall
164 ea
Control Wired RMC, Group Controller
• Winning Factor : Technical Support to new SAC Distributer.
60
Reference Site
Equipment SelectionImage
Application Issue
Department of Military Veterans
Government office building
Project Department of Military Veterans
Location Pretoria, South Africa
Date of Completion 2013
Size 120 HP
Value 0.3 M$
Classification Type Q’ty / HP
ODU DVM S, HR 110 HP
IDU Mini 4W & 4W CST 43 ea
Control Wired RMC, Motion detect sensor
61
Reference Site
Equipment SelectionImage
Application Issue
Venetia Housing Development
Residence
Project Venetia Housing Development
Location Venetia (North Limpopo Province)
Date of Completion 2014
Size 368 HP
Value 0.37 M$
Classification Type Q’ty / HP
ODU DVM S Eco 368 HP
IDU Wall mount 368 ea
Control
• Housing development for open cast diamond mine.
• Winning Factor :
- New Relationship with Consulting Engineer
- Competitiveness
- Design Assistance
X 92
62
Reference Site
Equipment SelectionImage
Application Issue
Sun City Vacation Club
Residence
Project Sun City Vacation Club
Location North West Province (South Africa)
Date of Completion 2014
Size 500 HP
Value 0.4 M$
Classification Type Q’ty / HP
ODU FJM 7kw/10kw 110 HP
IDU Wall mount 43 ea
Control
X 142
• Vacation Time-Share Housing
• Winning Factor
- Relationship with Consulting Engineer
- Design Assistance
- Competitiveness (Budget Constraints)
63
Reference Site
Equipment SelectionImage
Application Issue
English Point Marina
Luxury Town Villa
Project English Point Marina
Location Mombasa, Kenya
Date of Completion 2011. May (Start)
Size 1056HP
Value $ 0.9 M
Classification Type Q’ty / HP
ODU DVM+4 1056HP
IDU 4Way CST, Duct, RAC 734 ea
Control S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Cooling Efficiency
• Anti- Corrosion performance
64
Reference Site
Equipment SelectionImage
Application Issue
The Houghton
Exclusive Residence
Project The Houghton
Location Johannesburg, South Africa
Date of Completion 2012. Mar (Start)
Size 440 HP
Value $ 469 K
Classification Type Q’ty / HP
ODU DVM+4 HR 440HP
IDU Duct 198 ea
Control S-Net 3, DMS2
• PC based centralized control system
- S-Net 3 & DMS 2
- Function : Monitoring & operation
• Energy Efficiency of product
• Relationship with client.
• Design support
65
Reference Site
Equipment SelectionImage
Application Issue
Universal Plaza
Commercial Center
Project Universal Plaza
Location Gaborone, Botswana
Date of Completion 2012. Feb (Start)
Size 928 HP
Value $ 0.7 M
Classification Type Q’ty / HP
ODU DVM+4 928HP
IDU Big Duct, 4W CST 119 ea
Control
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units
• Office Building + Shopping Mall
• Design support
66
Reference Site
Equipment SelectionImage
Application Issue
• Brand Value
• High Efficiency
•Technical Support
Key Tag
Project Tribe Hotel
Location Nairobi, Kenya
Date of Completion 2010
Size 137rooms, 450HP
Value $ 150 K
Classification Type Q’ty / HP
ODU DVM+2,3, Mini 450HP
IDU 4Way CST, Duct 160 ea
Control Wired remote controller, Key Tag
• Brand Value
• High Efficiency
• Technical Support
Tribe Hotel
Hotel
67
5. South West Asia
68
Reference Site
Equipment SelectionImage
Application Issue
Project Yoo Pune
Location Pune in India
Date of Completion 2015 (under construction)
Size 6 buildings( total 228 flats)
Value 2.2M$ (partially bid)
Classification Type Q’ty / HP
ODU DVM S 4500HP
IDU 1Way Cassette
Control Individual control
• Client(Panchshil, developer) prefers Samsung 1way CST.
- Daikin also have 1way CST, but our design is better.
• The Client has been satisfied with previous site. (One North PJT)
- When claiming noise of 1 way CST, HQ visited site and changed S/W to reduce noise.
• CRM with client is good. (HQ directors and executives visited, and visited in Laxmi TF.)
Reason for win
19 floors & 38 flats each building
EON HADAPSAR YOO
Residential Apartment
GSBN ID: IN201305140031
69
Reference Site
Equipment SelectionImage
Application Issue
Project AAMBY VALLEY
Location Lonavala, Maharashtra
Date of Completion December 2014
Size 496 HP
Value 2 M$
Classification Type Q’ty / HP
ODU DVM S
26EA (16HP)
8EA (10HP)
IDU DUCTABLES 132
Control Individual control
• DVM S Technology - We presented DVM S PPT and had detailed discussion with M/s Aamby Valley team and we proved our technology
better than our competition.
• Site Inspections - We requested M/s Aamby Valley team to visit our installed and ongoing project sites in Pune and get the true feedback from
the End users. It has helped us a lot as all the Customer gave positive feedback specially Persistent Systems Ltd.
• Follow up - We have kept close watch on this BO continuously.
• Dealer Support - Dealer supported for Custom clearance and Import duty related concerns.
Aamby Valley City
Residential Apartment
GSBN ID: IN201401071127
Reason for win
70
Reference Site
Equipment SelectionImage
Application Issue
International City
Residential
Project International City
Location Gurugaon in India
Date of Completion 2015 (under construction)
Size 188 Villas
Value 2.3M$
Classification Type Q’ty / HP
ODU DVM S 3500HP
IDU
MSP/HSP 760ea
Mini 4way 294
Control Individual control
• Solution: High efficiency & Prove our superiority over competitors
• Access: Making Sobha developer confident on in-house design team.
Customized control system on controllers for chairman house(special requirement of 16℃)
• Value : DVM S efficiency against other VRFs  save electric charges
• Education : Requirements from client on design, approvals, expectation were taken well promptly.
※ This PJT is phase 1 and Phase 2(4M$) will be start in 2014.
GSBN ID: IN201210120011
Reason for win
71
Reference Site
Equipment SelectionImage
Application Issue
DLF Park Tower
Residential Apartment
Project DLF Park Tower, Park Height
Location Gurgaon, India
Date of Completion 2012
Size 1975 - 2704 Sq.Ft.
Value 4.3M$
Classification Type Q’ty / HP
ODU DVM PLUS III 1,611 EA
IDU 4 Way Cassette, RAC 10,018 EA
Control Wired Remote Controller
• Individual Control System
- Wired Remote Controller
• The Largest contract amount in India
72
6. Latin America
73
Reference Site
Equipment SelectionImage
Application Issue
Novotel Manaus Hotel
Hotel
Project Novotel Manaus Hotel
Location Manaus, Brazil
Date of Completion 2013
Size
Value $ 400 K
Classification Type Q’ty / HP
ODU DVM+4 364HP
IDU EA
Control S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Interior design
- Compact ducted units
74
Reference Site
Equipment SelectionImage
Application Issue
Mexico Secrets Hotel
Hotel
Project Mexico Secrets Hotel
Location Huatulco, Mexico
Date of Completion 2012
Size 25,000㎡ (1,100HP)
Value $750K
Classification Type Q’ty / HP
ODU DVM+2 38 EA / 1,100HP
IDU
4Way Cassette,
4Way Cassette (Interior)
658 EA
Control DMS2, S-NET 3
• Management of air conditioning system
- Integrated and centralized control system
- S-Net 3 : PC, Web based centralized control system
- Monitoring & Operation
• Interior design - 4Way Cassette (Interior)
• Long piping length design (Over 90m)
• Anti- Corrosion performance
75
Reference Site
Equipment SelectionImage
Application Issue
Project Marriot
Location Santiago, Chile
Date of Completion April 2014
Size 230 HP
Value Total 0.25 M$
Classification Type Q’ty / HP
ODU DVM S 20
IDU DUCTABLES 249
Control Central Control BMS.
• DVM S Technology – We presented DVM S PPT to Marriot representatives and they seemed to be pleased with the
reasonable price and top notch technology.
• Technical support – We have good reputation of high quality technical service and 10 years experience on AC business
and for that, other project leaders had recommend our brand to Marriot representatives.
Marriot Hotel
Hotel
Reason for win
GSBN ID: CL201401102979
76
Reference Site
Equipment SelectionImage
Application Issue
Project DRAGAMEX Offices
Location México City
Date of Completion November 2010
Size 700 m2
Value $36K USD
Classification Type Q’ty / HP
ODU DVM PLUS III 4
IDU
High Wall
4 Way Cassette
40
8
Control Wireless Remote Controller
DRAGAMEX Offices
Office Building
• VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image,
dimension, energy saving) to the closer competitors.
• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
Reason for win
77
Reference Site
Equipment SelectionImage
Application Issue
Hotel West Colonia
Hotel
Project Hotel West Colonia
Location Colonia, Uruguay
Date of Completion 2011
Size 5,800 m2
Value $0.2M USD
Classification Type Q’ty / HP
ODU DVM plus IV 15
IDU
Slim Duct
4 Way Cassette
114
25
Control Integrated Management System
• Samsung Products have a good design , image and elegance to the Hotel environment according to the architectural
design.
• Samsung products have a high technology focus in energy saving and environment cares.
78
Reference Site
Equipment SelectionImage
Application Issue
Hotel Orpheo
Hotel
Project Hotel Orpheo
Location Montevideo, Uruguay
Date of Completion 2012
Size 3,300 m2
Value $0.1M USD
Classification Type Q’ty / HP
ODU DVM plus IV 15
IDU Wall-mounted 108
Control Wireless remote controller
• VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image,
dimension, energy saving) to the closer competitors.
• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
79
Reference Site
Equipment SelectionImage
Application Issue
Building Puerto Punta
Residential Building
Project Building Puerto Punta
Location Maldonado, Uruguay
Date of Completion 2012
Size 7,500 m2
Value $0.2M USD
Classification Type Q’ty / HP
ODU DVM plus IV 15
IDU
Slim Duct
Wall-mounted / 4Way
140
4 / 6
Control Wireless, Wired remote controller
• Samsung has better disign for this kind of building (elengant desing)
• Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
80
7. Korea
81
Reference Site
Equipment SelectionImage
Application Issue
SAMSUNG Electronics Semiconductor Research Center - DSR
Project
SAMSUNG Electronics
DSR Project
Location Hwasung, Korea
Date of Completion 2014.1
Size 335,125㎡ (28F ~ B5F)
Value 20M$
• Solar, Geothermal, LED lighting, Eco-friendly, and
Renewable Energy Utilization
• Energy-Saving Design : Partial Load by Use Zoning
• BEMS, FMS system applies
Office Building
• Application of Mixed HVAC in Office Building
- DVM : 52% (7,610RT included Geothermal 713RT)
- Absorption Chiller : 25% (4,000RT)
- Turbo Chiller : 23% (3,600RT)
Classification Type Q’ty / HP
ODU DVM Water II 328 EA
IDU
1Way CST, 4Way CST,
Slim Duct, MSP Duct, AHU
3,983 EA
Control BEMS, FMS
82
Reference Site
Equipment SelectionImage
Application Issue
SAMSUNG Electronics Research Center - R5
Project
SAMSUNG Electronics
R5 Project
Location Suwon, Korea
Date of Completion 2013
Size 275,042㎡ (27F ~ B5F)
Value 16.5M$
• Solar, Geothermal, LED lighting, Eco-friendly, and
Renewable Energy Utilization
• Energy-Saving Design : Partial Load by Use Zoning
• BEMS, FMS system applies
Office Building
• Application of Mixed HVAC in Office Building
- DVM : 58.1% (7,196RT)
- Absorption Chiller : 32.3% (4,000RT)
- Turbo Chiller : 9.7% (1,200RT)
Classification Type Q’ty / HP
ODU DVM Water II 273 EA
IDU
1Way CST, 4Way CST,
Slim Duct, MSP Duct, AHU
3,142 EA
Control BEMS, FMS
83
Reference Site
Equipment SelectionImage
Application Issue
SAMSUNG Electronics Seocho Office
Project
SAMSUNG Electronics
Seocho Office
Location Seoul, Korea
Date of Completion 2008
Size 195,438㎡ (42F ~ B8F)
Value
• Management of air conditioning system
- Centralized controller
• Special room temperature control : 0.1℃ deviation
Office Building
• Application of Mixed HVAC in Office Building
- AHU : 60% (Central)
- DVM : 40% (Individual)
Classification Type Q’ty / HP
ODU DVM PLUS II / DVM Water 75 / 71EA
IDU LSP DUCT (11 ~14kW) 788 EA
Control BMS
84
Reference Site
Equipment SelectionImage
Application Issue
Yoksam K-Office
Project Yoksam K-Office
Location Seoul, Korea
Date of Completion 2013
Size 12,316㎡ (15F ~ B4F)
Value
• All SAC are controlled with DMS
• Apply the PDM kit, RL/RG stand 70m vertically. ODUs were installed on the roof.
Office Building
Classification Type Q’ty / HP
ODU DVM PLUS IV 79EA
IDU 1,4WAY / Duct 180 EA
Control DMS 2
85
Reference Site
Equipment SelectionImage
Application Issue
Tower Palace
Residential Complex
Project Tower Palace
Location Seoul, Korea
Date of Completion 2004
Size
A group of Seven Towers
42-72 Floors
Value 39.4M$
Classification Type Q’ty / HP
ODU DVM 3,614 EA
IDU 1 Way, 4 Way CST, Duct 17,731 EA
Control Centralized Controller, DMS, S-Net 3
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
• Specific air discharge structure for skyscrapers
• Minimize installation space
• Low-noise design
86
Reference Site
Equipment SelectionImage
Application Issue
Hannam The Hill Town
Project Hannam The Hill Town
Location Seoul, Korea
Date of Completion 2011
Size A group of 32 towers, 12 floors
Value -
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
Luxury Residential Apartment
• CFD analysis for indoor selection & location
Classification Type Q’ty / HP
ODU DVM PLUS IV / SLIM 442
IDU Cassette 2,950
Control Centralized controller, Home Network
87
Reference Site
Equipment SelectionImage
Application Issue
Songdo WorldMark
Residential Apartment
Project Songdo World Mark
Location In-cheon, Korea
Date of Completion 2010
Size
A group of 10 towers,
45 floors
Value
Classification Type Q’ty / HP
ODU DVM Water, DVM+4 382
IDU 1 Way / 2 Way / 4 Way 2,388
Control Centralized controller, Home Network
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
•
88
Reference Site
Equipment SelectionImage
Application Issue
Soowan Noble Land 13 Block
Residential Apartment
Project Soowan Noble Land 13 Block
Location Gwang-ju, Korea
Date of Completion 2011
Size
A group of 10 towers,
24 floors
Value
Classification Type Q’ty / HP
ODU DVM+4, DVM Home 659
IDU 1 Way / 2 Way / 4 Way 1,977
Control Centralized controller, Home Network
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
89
Reference Site
Equipment SelectionImage
Application Issue
Jong-am SK View
Residential Apartment
Project Jong-am SK View
Location Seoul, Korea
Date of Completion 2011
Size
A group of 6 towers,
20 floors
Value
Classification Type Q’ty / HP
ODU DVM+4 272
IDU 1 Way / 2 Way / 4 Way 942
Control Centralized controller, Home Network
• Management of air conditioning system
- Centralized controller
- Easy Control : Integrated home network
interlock with air-conditioner
90
Reference Site
Equipment SelectionImage
Application Issue
High-1 Resort
Resort
Project High-1 Resort
Location Gangwon-do, Korea
Date of Completion 2010
Size
A group of 10 towers,
45 floors
Value -
Classification Type Q’ty / HP
ODU DVM+3 , DVM SLIM 596
IDU 1Way / 2W / 4W / Duct 1,952
Control Room Controller
• Management of air conditioning system
- Wired remote controller
• Interior design
- Compact ducted units, Slim 1 Way Cassette
91
Reference Site
Equipment SelectionImage
Application Issue
Reesom Resort
Resort
Project Reesom Resort
Location Chung-cheong, Korea
Date of Completion 2011
Size 50 Private Villa & 1 Hotel Bidg.
Value -
Classification Type Q’ty / HP
ODU DVM+4 114
IDU 1Way / 2W / 4W / Duct 1,224
Control Room Controller
• Whole houses are equipped with SAC
• Management of air conditioning system
- Simplified remote controller
• Interior design
- Compact ducted units, Slim 1 Way Cassette
92
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM PLUS IV 36
IDU Cassette 329
Control DMS 2 , S-NET3
Jongro Pagoda Eng Institute
Project Jongro Pagoda Eng Institute
Location Seoul, Korea
Date of Completion 2011
Size 14 floors
Value -
• PC based centralized control system
- S-Net 3 & DMS 2
- Function : Monitoring & operation
- Fully working during open hour (8AM ~ 10PM)
Commercial Building
93
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM PLUS III 45
IDU Cassette 352
Control DMS
Jamsil Parkrio
Project Jamsil Parkrio
Location Seoul, Korea
Date of Completion July, 2008
Size 5 floors
Value 0.5M US$
• ODU Installation Space
- Group installation on the rooftop
Commercial Building
• Noise from ODU
- Installation of soundproofing walls
94
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM S 437
IDU Cassette & Duct 1308
Control DMS
Lotte Premium Outlet(Shopping mall)
Project Lotte Premium Outlet
Location Gyeong-gi, Korea
Date of Completion 2013
Size 3 floors / 77,000m2
Value 437 EA( 6500HP )
• ODU Installation Space
- Group installation on the rooftop
Commercial Building
• Vapor injection technology for high heating
performance under low temperature
• Energy efficiency with high IPLV 6.6
95
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM S 304
IDU Cassette & Duct 1198
Control DMS
Paju Premium Outlets(Shopping mall)
Project Paju Premium Outlet
Location Gyeng-gi, Korea
Date of Completion 2011
Size 4 floors / 4 blocks
Value 304 EA( 4256HP )
• ODU Installation Space
- Group installation on the rooftop
•Small outdoor unit installation space to save space cost
Commercial Building
• Individual control of 4way cassette louvers
• Long refrigerant piping for flexible design (piping
length 220m, level difference 110m)
96
Reference Site
Equipment SelectionImage
Application Issue
• Rain / Temperature / Humidity sensor for snow detecting
• DVM GEO + Hydro Unit(LT)
• Snow detecting on car entering gate and snow melting system
Raemian Gallery
Gallery
Classification Type Q’ty / HP
ODU DVM +4 23
IDU Cassette & Duct, AHU 97
Hydro Unit LT(Low Temperature) 10 HP
Control DMS BacNet, Wired remote, Central
Project Raemian Gallery
Location Moonjungdong Seoul in Korea
Date of Completion 2012. 7
Size 5 floors
Value
97
8. China
98
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM S 114
IDU Cassette & Duct 1710
Control DMS, S-Net 3
Changsha Greenland Plaza(No.5/6 Building)
Project Changsha Greenland Plaza
Location Changsha, Hunan Province
Date of Completion 2013
Size 33F,36F
Value 4320HP
• Installation of DVM S at middle floors
• Electricity billing system
Commercial Building
• Wide operation temperature range
(Cooling -15-54℃,Heating -23-29℃)
• Air-conditioning electricity billing system for tenants
99
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM S 153
IDU Cassette & Duct 862
Control Wired remote control
Huasheng Advanced Business Park
Project Complex building
Location Chengdu, Sichuan Province
Date of Completion 2013
Size 20F
Value 2946HP
• Installation of DVM S and fresh air intake
unit every floor(4~20F)
Commercial Building
• Small installation area fit into machine room
• Sufficient external static pressure of 80Pa
suitable for small-sized machine room
100
Reference Site
Equipment SelectionImage
Application Issue
Image
Tianqi International Building
Classification Type Q’ty / HP
ODU DVM S 94EA / 4000HP
IDU 4Way CST, Duct 1524EA
Control S-Net 3
Project Tianjin, China
Location
Date of Completion
Size 53,000㎡ (25Floor)
Value 2M$
Commercial Building
• Long refrigerant piping for flexible design (piping length 220m, level difference 110m)
• Designed with Slim Duct indoor unit to install in the narrow ceiling space (199mm)
• Low indoor unit noise level(25dBA)
101
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM S 63
IDU Cassette & Duct 351
Control DMS, S-Net 3
Hangzhou Wantong Center
Project Hangzhou Wantong Center
Location Gongshu District, Hangzhou City
Date of Completion 2013
Size 12020㎡ (17F,12F)
Value 1010HP
Commercial Building
• Installation of all DVM S units on middle floor for machine room
• Sufficient external static pressure of 80Pa to prevent short-circuit air flow in machine room
• Individual indoor unit control to prevent excessive cooling/heating in open space
102
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM S 210
IDU Cassette & Duct 844
Control DMS, S-Net 3
Hangzhou Network Industry & Technology Park
Project
Network Industry & Technology
Park
Location Bingjiang District, Hangzhou City
Date of Completion 2013
Size 47628㎡ (19F)
Value 3402HP
Commercial Building
• Installation of DVM S units on podium and rooftop
• Air ventilation using Fresh Air Intake units
• Vapor injection technology for high heating
• performance under low temperature
• Energy efficiency with high IPLV 6.6
103
Reference Site
Equipment SelectionImage
Application Issue
Qingdao Berlin New City Tower
Commercial Building
Classification Type Q’ty / HP
ODU DVM S 100
IDU Cassette & Duct 1006
Control DMS, S-Net 3
Project Qingdao Berlin New City Tower
Location
Changjiang dong Street,
Qingdao City
Date of Completion 2013
Size
Value 3022HP
• Management of air conditioning system
- Integrated and centralized control system
- DMS : PC, Web based centralized control system
- Monitoring & Operation
104
Reference Site
Equipment SelectionImage
Application Issue
Classification Type Q’ty / HP
ODU DVM S 312
IDU Cassette & Duct 2056
Control DMS, S-Net 3
Project Tianrun Fuxi Dadao
Location
Chaoyang District,
Beijing City
Date of Completion 2013
Size
Value 2216HP
Tianrun Fuxi Dadao, Beijing City
Commercial Building
• Installation of all DVM S units on middle floor
• Backup operation of outdoor unit under emergency status to continue operation
• Small outdoor unit installation space to save space cost
105
Reference Site
Equipment SelectionImage
Application Issue
Dayawan Technological Innovation Building
Office Building
Classification Type Q’ty / HP
ODU DVM S 40
IDU 660
Control Wired remote control
Project
Dayawan Technological
Innovation Building
Location Huizhou, Guangdong Province
Date of Completion
Size 27,200㎡ (23F)
Value M$
• Installation of DVM S units on podium and rooftop
• Combination ratio of 120%
106
Reference Site
Equipment SelectionImage
Application Issue
Binhai International School
Education Building
Classification Type Q’ty / HP
ODU DVM S 25
IDU 4Way CST 120
Control Wired remote control
Project Binhai International School
Location Ningbo, Zhejiang Province
Date of Completion
Size 1,400㎡
Value M$
• Installation of DVM S units on rooftop of
• restaurant and office building
• Air ventilation using Fresh Air Intake units
• Air purification with anti-virus module
107
Reference Site
Equipment SelectionImage
Application Issue
Image
Lasa Hotel
Hotel
Classification Type Q’ty / HP
ODU DVM +3 994HP
IDU
Control
Project Tianjin, China
Location
Date of Completion
Size 30,933㎡
Value 0.6M$
• Management of air conditioning system
- Simplified remote controller
108
Reference Site
Equipment SelectionImage
Application Issue
Samsung Electronics Factory Building
Factory Building
Classification Type Q’ty / HP
ODU DVM S 47
IDU 4Way CST 273
Control Interlock control
Project
Samsung Electronics Factory
Building
Location Tianjin
Date of Completion
Size 10,518㎡ (1072HP)
Value M$
• Installed in machine room on the ground floor
• Adaptive sine wave control technology to reduce harmonic noise
• Snow removal function
109
Reference Site
Equipment SelectionImage
Application Issue
Bo’ao Sports Center
Sports Center
• Installed in machine room on the ground floor
• Combination ratio of no greater than 110%
• Small installation area for good exterior view
Classification Type Q’ty / HP
ODU DVM 34
IDU AHU 247
Control Wired remote control
Project
Samsung Electronics Factory
Building
Location Shaoxing, Zhejiang Province
Date of Completion
Size 12,712㎡ (908HP)
Value M$
110
Reference Site
Equipment SelectionImage
Application Issue
• Individual control of 4way cassette louvers
• RoHs certification for environment protection
Bridge Bray Industrial Park
Office Building
• Installation of DVM S units on rooftop
• Designed with ceiling concealed indoor units
• Combination ratio of no greater than 118%
Classification Type Q’ty / HP
ODU DVM S 87
IDU 4Way CST 910
Control Wired remote control
Project Bridge Bray Industrial Park
Location Ningbo, Zhejiang Province
Date of Completion
Size 18,200㎡ (1300HP)
Value M$
111
Reference Site
Equipment SelectionImage
Application Issue
Thank you

More Related Content

Viewers also liked

Samsung sac category catalogue multi fjm tr
Samsung sac category catalogue multi fjm trSamsung sac category catalogue multi fjm tr
Samsung sac category catalogue multi fjm trHaluk TOSUN
 
Презентация компании ADE Project.
Презентация компании ADE Project.Презентация компании ADE Project.
Презентация компании ADE Project.Alexander Vasilyev
 
Samsung cac salesguide_eng
Samsung cac salesguide_engSamsung cac salesguide_eng
Samsung cac salesguide_engHaluk TOSUN
 
[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0Haluk TOSUN
 
Dvm hydro sales Presentation
Dvm hydro sales PresentationDvm hydro sales Presentation
Dvm hydro sales PresentationHaluk TOSUN
 
Samsung dvm s catalogue [60 hz.]
Samsung dvm s catalogue [60 hz.]Samsung dvm s catalogue [60 hz.]
Samsung dvm s catalogue [60 hz.]Haluk TOSUN
 
Samsung 2012 vrf [plus iv] catalog
Samsung 2012 vrf [plus iv] catalogSamsung 2012 vrf [plus iv] catalog
Samsung 2012 vrf [plus iv] catalogHaluk TOSUN
 
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1Haluk TOSUN
 
GADGET STUDIO sponsorship presentation
GADGET STUDIO sponsorship presentationGADGET STUDIO sponsorship presentation
GADGET STUDIO sponsorship presentationNickolay Turubar
 
Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22Haluk TOSUN
 
Samsung 2009 dvm [plus III] catalogue
Samsung 2009 dvm [plus III] catalogueSamsung 2009 dvm [plus III] catalogue
Samsung 2009 dvm [plus III] catalogueHaluk TOSUN
 
STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet FinalKevin J. Lord
 
PROJECT DEVELOPED IN TEKLA
PROJECT DEVELOPED IN TEKLAPROJECT DEVELOPED IN TEKLA
PROJECT DEVELOPED IN TEKLAR.VIJAYA RAJ
 
Ts training eng_drawings_170_enu
Ts training eng_drawings_170_enuTs training eng_drawings_170_enu
Ts training eng_drawings_170_enuimaduddin91
 
Bus duct fabrication
Bus duct fabricationBus duct fabrication
Bus duct fabricationSTUPIDPANDEY
 

Viewers also liked (20)

Samsung sac category catalogue multi fjm tr
Samsung sac category catalogue multi fjm trSamsung sac category catalogue multi fjm tr
Samsung sac category catalogue multi fjm tr
 
Презентация компании ADE Project.
Презентация компании ADE Project.Презентация компании ADE Project.
Презентация компании ADE Project.
 
Boreas AHU [RU]
Boreas AHU [RU]Boreas AHU [RU]
Boreas AHU [RU]
 
Samsung cac salesguide_eng
Samsung cac salesguide_engSamsung cac salesguide_eng
Samsung cac salesguide_eng
 
Boreas Boya
Boreas Boya Boreas Boya
Boreas Boya
 
[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0[Tdb] vrf 360 cst for tk ver 1.0
[Tdb] vrf 360 cst for tk ver 1.0
 
BBC_project_2017
BBC_project_2017BBC_project_2017
BBC_project_2017
 
Dvm hydro sales Presentation
Dvm hydro sales PresentationDvm hydro sales Presentation
Dvm hydro sales Presentation
 
Boreas AHU [EN]
Boreas AHU [EN]Boreas AHU [EN]
Boreas AHU [EN]
 
Boreas AHU [TR]
Boreas AHU [TR]Boreas AHU [TR]
Boreas AHU [TR]
 
Samsung dvm s catalogue [60 hz.]
Samsung dvm s catalogue [60 hz.]Samsung dvm s catalogue [60 hz.]
Samsung dvm s catalogue [60 hz.]
 
Samsung 2012 vrf [plus iv] catalog
Samsung 2012 vrf [plus iv] catalogSamsung 2012 vrf [plus iv] catalog
Samsung 2012 vrf [plus iv] catalog
 
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
Samsung tdb-dvm-s-water e-outdoor_dbeu-13082_da1
 
GADGET STUDIO sponsorship presentation
GADGET STUDIO sponsorship presentationGADGET STUDIO sponsorship presentation
GADGET STUDIO sponsorship presentation
 
Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22Samsung Twin rotary compressor R-410A / R-22
Samsung Twin rotary compressor R-410A / R-22
 
Samsung 2009 dvm [plus III] catalogue
Samsung 2009 dvm [plus III] catalogueSamsung 2009 dvm [plus III] catalogue
Samsung 2009 dvm [plus III] catalogue
 
STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet Final
 
PROJECT DEVELOPED IN TEKLA
PROJECT DEVELOPED IN TEKLAPROJECT DEVELOPED IN TEKLA
PROJECT DEVELOPED IN TEKLA
 
Ts training eng_drawings_170_enu
Ts training eng_drawings_170_enuTs training eng_drawings_170_enu
Ts training eng_drawings_170_enu
 
Bus duct fabrication
Bus duct fabricationBus duct fabrication
Bus duct fabrication
 

Similar to Samsung sac global reference catalogue

IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreDerek Webster
 
Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event Cluster TWEED
 
SLN Terminus redefines the conventional concept of stand-alone work spaces by...
SLN Terminus redefines the conventional concept of stand-alone work spaces by...SLN Terminus redefines the conventional concept of stand-alone work spaces by...
SLN Terminus redefines the conventional concept of stand-alone work spaces by...slnterminushyd
 
Airsys general-expert in ict cooling- history - rev mk
Airsys general-expert in ict cooling- history - rev mkAirsys general-expert in ict cooling- history - rev mk
Airsys general-expert in ict cooling- history - rev mkmirbeas1
 
Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015Telehouse
 
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative coolingTelehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative coolingTelehouse Europe
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2ong93
 
Cio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter OptimisationCio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter Optimisationbslaager
 
Colocation.green presentation
Colocation.green presentationColocation.green presentation
Colocation.green presentationKarl Rabe
 
VASER Control: Smart Energy
VASER Control: Smart EnergyVASER Control: Smart Energy
VASER Control: Smart EnergyESUG
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_FujitsuAgora Group
 
Greensun presentation b2 b eng
Greensun presentation b2 b engGreensun presentation b2 b eng
Greensun presentation b2 b engStephen De Koster
 
TCI 2015 KSB Co. Ltd
TCI 2015 KSB Co. LtdTCI 2015 KSB Co. Ltd
TCI 2015 KSB Co. LtdTCI Network
 
hpf_Redwire Brochure
hpf_Redwire Brochurehpf_Redwire Brochure
hpf_Redwire BrochureGraham Byrne
 
Vejen til lav PUE- optimering og stordrift - Flemming Søeberg, Interxion
Vejen til lav PUE- optimering og stordrift - Flemming Søeberg, InterxionVejen til lav PUE- optimering og stordrift - Flemming Søeberg, Interxion
Vejen til lav PUE- optimering og stordrift - Flemming Søeberg, InterxionMediehuset Ingeniøren Live
 
About Mro Facilities
About Mro FacilitiesAbout Mro Facilities
About Mro Facilitieseidderf91
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Sirris
 
SESEC Training Module 8: Ventilation and Air Conditioning
SESEC Training Module 8: Ventilation and Air ConditioningSESEC Training Module 8: Ventilation and Air Conditioning
SESEC Training Module 8: Ventilation and Air ConditioningDITF Denkendorf
 

Similar to Samsung sac global reference catalogue (20)

IaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data CentreIaaS Trusted Public S5 - The London North Data Centre
IaaS Trusted Public S5 - The London North Data Centre
 
Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event Successful R&I in Europe 2017 - 8th European Networking Event
Successful R&I in Europe 2017 - 8th European Networking Event
 
SLN Terminus redefines the conventional concept of stand-alone work spaces by...
SLN Terminus redefines the conventional concept of stand-alone work spaces by...SLN Terminus redefines the conventional concept of stand-alone work spaces by...
SLN Terminus redefines the conventional concept of stand-alone work spaces by...
 
Airsys general-expert in ict cooling- history - rev mk
Airsys general-expert in ict cooling- history - rev mkAirsys general-expert in ict cooling- history - rev mk
Airsys general-expert in ict cooling- history - rev mk
 
Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015Telehousenorth2presentationford sd2015
Telehousenorth2presentationford sd2015
 
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative coolingTelehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
Telehouse North Two Presentation 2015 - Adiabatic and Evaporative cooling
 
About eltek valere
About eltek valereAbout eltek valere
About eltek valere
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
 
Cio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter OptimisationCio Summit 2010 Presentation On Pue And Datacenter Optimisation
Cio Summit 2010 Presentation On Pue And Datacenter Optimisation
 
Colocation.green presentation
Colocation.green presentationColocation.green presentation
Colocation.green presentation
 
VASER Control: Smart Energy
VASER Control: Smart EnergyVASER Control: Smart Energy
VASER Control: Smart Energy
 
John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016John_Buckley_CV_Dec 2016
John_Buckley_CV_Dec 2016
 
2009-dec02_Fujitsu
2009-dec02_Fujitsu2009-dec02_Fujitsu
2009-dec02_Fujitsu
 
Greensun presentation b2 b eng
Greensun presentation b2 b engGreensun presentation b2 b eng
Greensun presentation b2 b eng
 
TCI 2015 KSB Co. Ltd
TCI 2015 KSB Co. LtdTCI 2015 KSB Co. Ltd
TCI 2015 KSB Co. Ltd
 
hpf_Redwire Brochure
hpf_Redwire Brochurehpf_Redwire Brochure
hpf_Redwire Brochure
 
Vejen til lav PUE- optimering og stordrift - Flemming Søeberg, Interxion
Vejen til lav PUE- optimering og stordrift - Flemming Søeberg, InterxionVejen til lav PUE- optimering og stordrift - Flemming Søeberg, Interxion
Vejen til lav PUE- optimering og stordrift - Flemming Søeberg, Interxion
 
About Mro Facilities
About Mro FacilitiesAbout Mro Facilities
About Mro Facilities
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
 
SESEC Training Module 8: Ventilation and Air Conditioning
SESEC Training Module 8: Ventilation and Air ConditioningSESEC Training Module 8: Ventilation and Air Conditioning
SESEC Training Module 8: Ventilation and Air Conditioning
 

More from Haluk TOSUN

Rbm brass katalog
Rbm brass katalogRbm brass katalog
Rbm brass katalogHaluk TOSUN
 
The world's largest 250 construction companies - powerPoint
The world's largest 250 construction companies - powerPointThe world's largest 250 construction companies - powerPoint
The world's largest 250 construction companies - powerPointHaluk TOSUN
 
Samsung ehs catalogue
Samsung ehs catalogueSamsung ehs catalogue
Samsung ehs catalogueHaluk TOSUN
 
samsung vrf dvm s 2013 sac catalouge
samsung vrf dvm s 2013 sac catalougesamsung vrf dvm s 2013 sac catalouge
samsung vrf dvm s 2013 sac catalougeHaluk TOSUN
 
Sac usp-catalog-ver.1
Sac usp-catalog-ver.1Sac usp-catalog-ver.1
Sac usp-catalog-ver.1Haluk TOSUN
 
Samsun fjm salesguide_eng
Samsun fjm salesguide_engSamsun fjm salesguide_eng
Samsun fjm salesguide_engHaluk TOSUN
 
Boreas paketleme
Boreas paketlemeBoreas paketleme
Boreas paketlemeHaluk TOSUN
 
Boreas klima santral
Boreas klima santralBoreas klima santral
Boreas klima santralHaluk TOSUN
 
Eurovent sınıfları yurtiçi
Eurovent sınıfları yurtiçiEurovent sınıfları yurtiçi
Eurovent sınıfları yurtiçiHaluk TOSUN
 
Eurovent sınıfları yurtdısı
Eurovent sınıfları yurtdısıEurovent sınıfları yurtdısı
Eurovent sınıfları yurtdısıHaluk TOSUN
 
Dvm s full catalog
Dvm s full catalogDvm s full catalog
Dvm s full catalogHaluk TOSUN
 

More from Haluk TOSUN (14)

Rbm brass katalog
Rbm brass katalogRbm brass katalog
Rbm brass katalog
 
The world's largest 250 construction companies - powerPoint
The world's largest 250 construction companies - powerPointThe world's largest 250 construction companies - powerPoint
The world's largest 250 construction companies - powerPoint
 
Samsung ehs catalogue
Samsung ehs catalogueSamsung ehs catalogue
Samsung ehs catalogue
 
samsung vrf dvm s 2013 sac catalouge
samsung vrf dvm s 2013 sac catalougesamsung vrf dvm s 2013 sac catalouge
samsung vrf dvm s 2013 sac catalouge
 
Sac usp-catalog-ver.1
Sac usp-catalog-ver.1Sac usp-catalog-ver.1
Sac usp-catalog-ver.1
 
Samsun fjm salesguide_eng
Samsun fjm salesguide_engSamsun fjm salesguide_eng
Samsun fjm salesguide_eng
 
Boreas test
Boreas testBoreas test
Boreas test
 
Boreas paketleme
Boreas paketlemeBoreas paketleme
Boreas paketleme
 
Boreas boya
Boreas boya Boreas boya
Boreas boya
 
Boreas klima santral
Boreas klima santralBoreas klima santral
Boreas klima santral
 
Boreas test
Boreas testBoreas test
Boreas test
 
Eurovent sınıfları yurtiçi
Eurovent sınıfları yurtiçiEurovent sınıfları yurtiçi
Eurovent sınıfları yurtiçi
 
Eurovent sınıfları yurtdısı
Eurovent sınıfları yurtdısıEurovent sınıfları yurtdısı
Eurovent sınıfları yurtdısı
 
Dvm s full catalog
Dvm s full catalogDvm s full catalog
Dvm s full catalog
 

Recently uploaded

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Samsung sac global reference catalogue

  • 1. 1 Reference Site 2014. 02. 07 Air Conditioning Marketing Group SE
  • 3. 3 1. Europe 2. South East Asia 3. the Middle East 4. Africa 5. South West Asia 6. Latin America 7. Korea 8. China Content
  • 5. 5 Reference Site Equipment SelectionImage Application Issue ORCO Shopping Mall Project ORCO Project Location Budapest, Hungary Date of Completion 2012 Size 12,000 m2 Value € 571K Shopping Mall 7,000 mm • Limited installation space for the outdoor units - High walls surrounding the area - Samsung provided full CFD simulation analysis • The investor wanted the most energy efficient solution with best control solution Classification Type Q’ty / HP ODU DVM PLUS 3 HR 52 EA IDU 4way, Duct, Console Air Handling Units 300 EA 6 EA Control S-NET 3, DMS, Power distribution
  • 6. 6 Reference Site Equipment SelectionImage Application Issue IKEA Shopping Complex Mall Complex Mall Project IKEA Shopping Complex Mall Location Valladolid, Spain Date of Completion AUG, 2012 Size 20,700 m2 Value € 210K Customer Atil Cobra (Big Installer) Classification Type Q’ty / HP ERV RHF***EE 166 EA Control CO2 Sensor, MWR-WE10 • CO2 sensors to control the multiple ERVs - HQ developed a special software for customer • Free cooling with volume damper and energy saving control • Extended temperature ratio to ±10℃ with energy saving control of MWR-WE10
  • 7. 7 Reference Site Equipment SelectionImage Application Issue Parkalgar Radisson Hotel Project Parkalgar Hotel (5 Star Hotel) Location Portimão, Portugal Date of Completion 2011 Size 16,000 m2 (208 rooms & 166 apt.) Value € 450K Classification Type Q’ty / HP ODU DVM PLUS 4 FJM 19 EA 166 EA IDU Duct(Hotel), RAC(Appt.) 737 EA Control DMS 2, LonWorks gateway • Customer want to provide an overall total solution, such as air-conditioner, TV, refrigerators, cookers and microwaves. - Samsung can provide customers with a tailored total solution. • LonWorks BMS connection Hotel & Resort
  • 8. 8 Reference Site Equipment SelectionImage Application Issue Southend Airport Airport Project Southend Airport Location London, UK Date of Completion JUN, 2011 Size 4,500 m2 Value € 320K Classification Type Q’ty / HP ODU DVM PLUS 3 18 EA IDU Duct, Wall Mounted 47 EA Control MWR-WH00 • Management of air conditioning system - Simplified remote controller • Interior design - Compact ducted units
  • 9. 9 Reference Site Equipment SelectionImage Application Issue Murawa Office Park Office Park Project Murawa Office Park Location Poznan, Poland Date of Completion December, 2010 Size 7,500 m2 Value € 205k Classification Type Q’ty / HP ODU DVM PLUS III HR 10 EA IDU Duct, 4Way Cassette, RAC 151 EA Control Lonworks Interface • Monitor power distribution • Set room temperature • Control fan speed • Zone management • Lonworks Gateway the best solution to integrate DVM PLUS system into BMS and control the system simultaneously
  • 10. 10 Reference Site Equipment SelectionImage Application Issue Sheraton Edinburgh Hotel Hotel & Resort Project Sheraton Hotel (5-star hotel) Location Edinburgh, UK Date of Completion OCT, 2010 Size 11,500 m2 (269 rooms) Value € 220K Classification Type Q’ty / HP ODU DVM PLUS 2 HR 25 EA IDU Slim Duct 285 EA Control DMS 2, MWR-WH00 • Fidelio system application with Samsung AC - Samsung developed the Fidelio application for customer • PC based centralized control system (DMS2)
  • 11. 11 Reference Site Equipment SelectionImage Application Issue PFRON Office Building Project PFRON Location Warsaw, Poland Date of Completion 2010 Size 4,525 m2 Value € 150K Classification Type Q’ty / HP ODU DVM PLUS 3 22 EA IDU 4way, Slim 1way, RAC 215 EA Control DMS 2, Window relay, Use restriction by Control logic management • PC based centralized control system (DMS2) • Window contact control for energy saving • Electric power use limit combined with DMS2 control logic management
  • 12. 12 Reference Site Equipment SelectionImage Application Issue Pecsa Sanatorium Sanatorium Project Pecsa Sanatorium Location Madrid, Spain Date of Completion 2010 Size - m2 Value € 230K • AHU Systems (Heating load 30%) - AHU system was installed with Solar panels for corresponding the energy regulation • PC based centralized control system (DMS2) Classification Type Q’ty / HP ODU DVM PLUS 3 HP 16 EA IDU AHU, 4Way, Duct, 2Way 96 EA Control DMS2, MWE-WH00
  • 13. 13 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM PLUS II HR 11 IDU Wall mounted / Ceiling 171 Control DMS, Key tag, Fidelio Holiday Inn Hotel Project Holiday Inn Hotel Location Slough, UK Date of Completion Oct, 2008 Size 9 floors Value - • ODU Installation Space - Group installation on the rooftop Hotel • Management of air conditioning system - DMS - Fidelio : 3rd Party control system
  • 14. 14 Reference Site Equipment SelectionImage Application Issue VAM Design Center Art Gallery Project VAM Design Center (Art Gallery) Location Budapest, Hungary Date of Completion 2007 Size 11,500 m2 Value € 286K Classification Type Q’ty / HP ODU DVM PLUS 2 24 EA IDU Duct, Wall Mounted 86 EA Control DMS, Power Distribution • PC based centralized control system (DMS) • Power distribution system (SiM, WHM)
  • 16. 16 Reference Site Equipment SelectionImage Application Issue RASUNA Tower Project RASUNA Tower Location Jakarta, Indonesia Date of Completion 2014 Size 60 floors Value 5.0M US$ • Optimize indoor humidity control • Improved design with DVM +4 • Interlock control with BACnet • Power distribution - PIM (WHM interface module - MIM-B16) - Local watt-hour meter (Pulse type) Classification Type Q’ty / HP ODU DVM PLUS IV 380 IDU 4 Way, Duct, ERV+ 1,223 Control BACnet Office & Residential Building
  • 17. 17 Reference Site Equipment SelectionImage Application Issue Arya Residences Project Arya Residences Location Taguig City, philippines Date of Completion 2013 Size 2 towers Value 2.0M US$ • LEED-registered residential building - SAC with high EER - DVM Mini - DVM+4 / CAC • Optimized design for ODU - Air flow analysis by CFD - Proposal of optimized ODU space Classification Type Q’ty / HP ODU DVM Mini 1720HP IDU 4 Way & Duct 895 Control Individual remote controller Luxury Residential Building
  • 18. 18 Reference Site Equipment SelectionImage Application Issue Project Viet Han Tower (Space 21) Location Hanoi, Vietnam Date of Completion July, 2011 Size 17 floors Value 460k US$ Viet Han Tower (Space 21) • High-rise building - Level different over 50m - PDM(Pressure Drop Modulation) Kit • Countermeasures of region with high humidity - Reinforced insulator Office Building • Power distribution - PIM (WHM interface module - MIM-B16) - Local watt-hour meter (Pulse type) Classification Type Q’ty / HP ODU DVM PLUS III 65 IDU 4way 222 Control DMS2, Power distribution with PIM
  • 19. 19 Reference Site Equipment SelectionImage Application Issue Kumho Asiana Plaza Project Kumho Asiana Plaza Location Hochiminh, Vietnam Date of Completion 2009 Size Service residential 32th floor Value 3.2M US$ • PC based centralized control system - S-Net 3 & DMS - Function : Monitoring & operation • Power distribution : SiM, WHM Luxury Residential Apartment • Countermeasures of region with high humidity - Reinforced insulator Classification Type Q’ty / HP ODU DVM PLUS III 128 IDU Slim 1way 1,155 Control S-Net 3, DMS, Power distribution with SiM
  • 20. 20 Reference Site Equipment SelectionImage Application Issue Project Imperial Palace Location Cebu, Philippines Date of Completion 2009 Size 6 buildings Value 3.2M US$ • Damage from sea wind (water) - Install Wall against the wind - Anticorrosive agent • Interlock control with BMS system Classification Type Q’ty / HP ODU DVM/DVM PLUS 2,3 2850HP IDU 1way / Slim duct 1355 Control BMS interlock control Imperial Palace Resort
  • 21. 21 Reference Site Equipment SelectionImage Application Issue West Sands Resort Project West Sands Resort Location Mai Khao Beach, Thailand Date of Completion 2009 Size 426 villas & residences Value 1.0M US$ • Prevention from Damage of sea wind (water) - Install Wall against the wind - Anticorrosive agent Resort • Countermeasures of region with high humidity - Reinforced insulator Classification Type Q’ty / HP ODU DVM PLUS III 984HP IDU 1 Way / Duct 755 Control DMS
  • 22. 22 Reference Site Equipment SelectionImage Application Issue St. Joseph School Project St. Joseph School Location Sydney, Australia Date of Completion 2011 Size 10 Different Buildings Value 250K AUD$ • Management of air conditioning system - Integrated and centralized control system - DMS : PC, Web based centralized control system - Monitoring & Operation School • Refurbishment of HVAC system - SAC(DVM system) application Classification Type Q’ty / HP ODU DVM PLUS III (HP/HR) 500HP IDU 1 Way / 4 Way 250 Control Central Controller, DMS2
  • 23. 23 Reference Site Equipment SelectionImage Application Issue Rockhampton Aged Care Project Rockhampton Aged Care Location Rockhampton, QLD Australia Date of Completion 2011 Size 100 Beds Aged Care Residents Value 120K AUD$ • Management of air-conditioning system - Easy Control : S-NET Mini with touch screen - Monitoring & Operation Residence • Retirement Village - Emergency Shutdown A/C System in Fire Mode Classification Type Q’ty / HP ODU DVM PLUS III 72HP IDU Wall mounted 100 Control S-NET Mini
  • 24. 24 Reference Site Equipment SelectionImage Application Issue Breakfast Point Apartment Project Breakfast Point Apartment Location Sydney, Australia Date of Completion 2011 Size 3 Buildings each with 5 Levels Value 450k AUD$ • High end value residential apartment - System combination : DVM Mini & 2~4 IDUs Luxury Residential Apartment • Location of ODU - Roof & Basement - Securing air circulation of ODU located in basement Classification Type Q’ty / HP ODU DVM Mini 1670HP IDU Wall mounted 450 Control Individual Wireless Controller
  • 25. 25 Reference Site Equipment SelectionImage Application Issue Thai Hoa Pediatrics Hospital Project Thai Hoa Pediatrics Hospital Location Dong Thap, Vietnam Date of Completion June, 2011 Size 7 floors Value 249K US$ • Management of air conditioning system - Integrated and centralized control system - DMS : PC, Web based centralized control system - Monitoring & Operation Hospital • N/A Classification Type Q’ty / HP ODU DVM PLUS III 25 / 382HP IDU 4 Way 213 Control Central Controller, DMS
  • 26. 26 Reference Site Equipment SelectionImage Application Issue Golf Phu My Hotel Project Golf Phu My Hotel Location Ba Ria Vung Tau, Vietnam Date of Completion December, 2011 Size 12 floors Value 500K US$ • Management of air conditioning system - Integrated and centralized control system - DMS + S-Net 3 • Watt-hour Meter interface Module • ERV - Interlock with SAC Classification Type Q’ty / HP ODU DVM PLUS III 21 / 74HP IDU 4 Way & Duct 313 Control S-Net 3 Hotel
  • 27. 27 Reference Site Equipment SelectionImage Application Issue Green Boutique Hotel Project Green Boutique Hotel Location Puchong, Selangor, Malaysia Date of Completion Jan, 2011 Size 6 floors Value 70K US$ • Management of air conditioning system - Easy Control : S-NET Mini with touch screen - Monitoring & Operation Hotel • Interior design - Compact ducted units Classification Type Q’ty / HP ODU DVM PLUS III 3 / 48HP IDU Duct 57 Control S-Net Mini
  • 28. 28 Reference Site Equipment SelectionImage Application Issue Bangsar Hill Bungalow Project Bangsar Hill Bungalow Location Kuala Lumpur, Malaysia Date of Completion Feb, 2012 Size 4 floors Value 65K US$ • Management of air conditioning system - Easy Control : S-NET Mini with touch screen - Simplified remote controller Bungalow • Interior design - Compact ducted units Classification Type Q’ty / HP ODU DVM PLUS III 4 / 56HP IDU Duct 23 Control S-Net Mini
  • 29. 29 Reference Site Equipment SelectionImage Application Issue Plaza Damas 3 Project Plaza Damas 3 Location Kuala Lumpur, Malaysia Date of Completion May, 2011 Size 10 floors Value 370K US$ • Management of air conditioning system - Simplified remote controller Service Apartment • Compact 4-way cassette • Ceiling Concealed Duct • RAC with Virus doctor Classification Type Q’ty / HP ODU CAC 81 / 960HP IDU 4 Way & Duct 81 Control Individual remote controller
  • 30. 30 Reference Site Equipment SelectionImage Application Issue The Beaufort Project The Beaufort Location Taguig City, philippines Date of Completion December, 2012 Size 42 floors(2 towers) Value 2.0M US$ • High-rise building • Complex building - Office & Residence Office & Residential Building • Management of air conditioning system - Simplified remote controller Classification Type Q’ty / HP ODU DVM PLUS III 2000HP IDU 4 Way & Duct 1,500 Control Individual remote controller
  • 31. 31 Reference Site Equipment SelectionImage Application Issue Trillium tower Project Trillium tower Location Surabaya, Indonesia Date of Completion 2011 Size 110m’s height Value - • High-rise building - Level different over 50m - PDM(Pressure Drop Modulation) Kit • Management of air conditioning system - Simplified remote controller Classification Type Q’ty / HP ODU DVM PLUS III 3 IDU Ceiling 50 Control Individual remote controller Office & Residential Building
  • 32. 32 Reference Site Equipment SelectionImage Application Issue Design Hub Project Design Hub Location Singapore Date of Completion 2011 Size 1428HP Value - • Optimized piping design against long piping issue for storage space. • CFD analysis for limited outdoor space • Management of air conditioning system - Easy Control : S-NET Mini with touch screen - Simplified remote controller Classification Type Q’ty / HP ODU DVM PLUS III 119 IDU 4 Way & Duct 334 Control S-Net Mini Office Building
  • 33. 33 Reference Site Equipment SelectionImage Application Issue The New iLoiLo City Hall Project The New iLoiLo City Hall Location iLoiLo City, Philippines Date of Completion December, 2011 Size 7 floors Value 0.5M US$ • Energy evaluation in comparison with Chiller. • Previous building is using chiller. Office Building • Management of air conditioning system - S-Net Mini controller Classification Type Q’ty / HP ODU DVM PLUS III 600HP IDU 4 Way 550HP Control S-Net Mini controller
  • 35. Classification Type Q’ty / HP ODU DVM PLUS IV HR 79 IDU AHU, Duct, Ceiling 650 Control S-Net 3, DMS, Key-Tag. Wired R/C Reference Site Equipment SelectionImage Application Issue Project The Hilton Dead Sea Resort Location Dead Sea, Jordan Date of Completion 2014 Size 1320 HP Value 1.0M US$ Hilton Dead Sea Resort • Powerful Performance in High Ambient Temperature • Heat Recovery & Technology - Continuously Simultaneous Heating & Cooling • Energy Saving & Eco-friendly - Top Class Energy Efficiency Hotel
  • 36. 36 Reference Site Equipment SelectionImage Application Issue Mall of Istanbul Project Mall of Istanbul Location Istanbul, Turkey Date of Completion 2012 Size 762,000 m2 Value 1.8M US$ • PC based centralized control system - S-Net 3 & DMS - Function : Monitoring & operation • Power distribution : SiM, WHM Commercial Complex • Countermeasures of region with high humidity - Reinforced insulator Classification Type Q’ty / HP ODU DVM PLUS IV 108 EA / 2,080 HP IDU Slim Duct 2,136 EA Control S-Net 3, DMS, Power distribution with SiM
  • 37. 37 Reference Site Equipment SelectionImage Application Issue AJMAN One Luxury Residential Apartment Project AJMAN One Location Ajman, UAE Date of Completion 2012 Size Twelve towers, 26 floors Value 3.7M US$ Classification Type Q’ty / HP ODU CAC Camel 6,754 EA IDU MSP Duct 6,754 EA Control Wired remote controller • Design machine room - Louver for better air circulation - Exhaust fan and SVC space for • The Biggest CAC Ref. Site in the GCC Countries. • Oil trap & additional accumulator
  • 38. 38 Reference Site Equipment SelectionImage Application Issue Titanic Hotel Project Titanic Hotel Location Istanbul, Turkey Date of Completion 2012 Size 331 Rooms Value 1.2M US$ • Management of air conditioning system - Integrated and centralized control system - DMS : PC, Web based centralized control system - Monitoring & Operation • Interior design Classification Type Q’ty / HP ODU DVM PLUS IV IDU Control Hotel
  • 39. 39 Reference Site Equipment SelectionImage Application Issue SBG Plaza Office Building Project SBG plaza Location Muscat, Oman Date of Completion 2012 Size 3700Ton Value 1.6M US$ Classification Type Q’ty / HP CAC MSP Duct (60K) 1500 EA RAC RAC (18K) 500 EA Control • Power distribution - Local pulse type watt hour meter • Interior design - Compact ducted units
  • 40. 40 Reference Site Equipment SelectionImage Application Issue Braka Nuclear Power Plant Commercial Building Project Braka Nuclear Power Plant Location Braka, UAE Date of Completion 2011 Size Value 1.25M US$ Classification Type Q’ty / HP ODU DVM+3 High 137 EA IDU 4way, MSP Duct 214 EA Control Centralized controller, DMS, S-Net Mini • Management of air conditioning system - Easy Control : S-NET Mini with touch screen - Simplified remote controller • Power distribution - Local pulse type watt hour meter
  • 41. 41 Reference Site Equipment SelectionImage Application Issue Dead Sea Lagoon Hotel Hotel Project Lagoon Hotel Location Dead Sea, Jordan Date of Completion 2011 Size Value US$ Classification Type Q’ty / HP ODU DVM+3 High 44 IDU Duct 760 Control S-NET 3 • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation • Interior design - Compact ducted units
  • 42. 42 Reference Site Equipment SelectionImage Application Issue Seasons Community Luxury Residential Apartment Project Seasons Community Location UAE Date of Completion 2009~2012 Size 365 Flats Value US$ Classification Type Q’ty / HP ODU CAC 694 EA IDU MSP Duct 694 EA Control Wired remote controller • Management of air conditioning system - Simplified remote controller • Interior design - Compact ducted units
  • 43. 43 Reference Site Equipment SelectionImage Application Issue Glozny Hotel Project Glozny Location Glozny, Chechnya Date of Completion 2011 Size 4.5-hectar (5 building) Value 1.86M US$ Classification Type Q’ty / HP ODU DVM +3, Mini DVM, FJM 5248HP IDU 1 Way / Duct 3526EA Control DMS, On/Off • Management of air conditioning system - Integrated and centralized control system - DMS : PC, Web based centralized control system - Monitoring & Operation • Hotel, Shopping center, swimming pool, restaurant
  • 44. 44 Reference Site Equipment SelectionImage Application Issue Princess Resort Resort Project Princess Resort Location Izmir, Turkey Date of Completion 2004 Size Value $ Classification Type Q’ty / HP ODU DVM PLUS IDU Duct Type Control • Management of air conditioning system - Simplified remote controller • Interior design - Compact ducted units
  • 45. 45 Reference Site Equipment SelectionImage Application Issue Project Brandium Location Turkey,İstanbul Date of Completion 2013 Size 7891 KW (INDOOR) Value 1.4M$ Classification Type Q’ty / HP ODU DVM+4 HP, HR 154 IDU AHU, Duct, Ceiling, Wall 2607 Control S-NET3, DMS, Key-tag, Automation Brandium Residence and Hotel • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation
  • 46. 46 Reference Site Equipment SelectionImage Application Issue Project Sinpaş Ottomare Location Turkey,İstanbul Date of Completion 2013 Size 3200 KW (INDOOR) Value 0.5M$ Classification Type Q’ty / HP ODU DVM+4 HP, HR 76 IDU AHU, Duct, Ceiling, Wall 2985 Control S-NET3, DMS, Key-tag, Automation • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation • Limited installation period Sinpaş Ottomare Residence and Hotel
  • 47. 47 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM+4 HP, HR 45 IDU AHU, Duct, Ceiling, Wall 849 Control S-NET3, DMS, Key-tag, Automation Project Terrace Tema Location Turkey,İstanbul Date of Completion 2014 Size 3250 KW (INDOOR) Value 662k$ Terrace Tema Residence • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation
  • 48. 48 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM+4 HP, HR 333 IDU AHU, Duct, Ceiling, Wall 1736 Control S-NET3, DMS, Key-tag, Automation Project Mandarin Oriental Location Turkey,İstanbul Date of Completion 2013 Size 9000 KW (INDOOR) Value 1.6M$ Mandarin Oriental • Variety design for the project Residence
  • 49. 49 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU CAC 262 IDU MSP Duct 262 Control Wired Project Narges Complex Location Tehran, Iran Date of Completion Jul 2013 Size ODU 805 HP Value 420K USD Narges Complex Residence • Powerful Performance in High Ambient Temperature
  • 50. 50 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU CAC 226 IDU MSP Duct 226 Control Wired Project Zeytun Complex Location Tehran, Iran Date of Completion Jul 2013 Size ODU 813 HP Value 410K USD Zeytun Complex Residence • Powerful Performance in High Ambient Temperature
  • 51. 51 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM+4 HP 16 IDU 4Way Cassette, Ceiling, Wall 115 Control Wireless, S-Net Project Commercial Center of Elahiye Location Tehran, Iran Date of Completion Aug 2013 Size ODU 222HP Value 110K USD Zeytun Complex Commercial Building • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation
  • 53. 53 Reference Site Equipment SelectionImage Application Issue Intercontinental Hotel Luxury Hotel Project Intercontinental Hotel (5 star) Location Libreville, Gabon Date of Completion 2013 Size 714 HP Value $ 0.5 M Classification Type Q’ty / HP ODU DVM+4 714 HP IDU Slim Duct 394 ea Control S-NET Mini • Change the design from chiller to DVM S. • Winning Factor : Winning through SSA installer co-work in no installation infrastructure country
  • 54. 54 Reference Site Equipment SelectionImage Application Issue Icon Tower (Land Mark) Luxury Office + Residence Project ICON Tower Location Kinshasa, DR Congo Date of Completion 2013 Size 596 HP Value 0.5 M$ Classification Type Q’ty / HP ODU DVM S 596 HP IDU High wall / Cassette 394 ea Control S-NET Mini • Winning Factor - Customer confidence (Local Manager direct sale activity, SE design support) - Energy Efficiency of product
  • 55. 55 Reference Site Equipment SelectionImage Application Issue Congo Trade Center (Land Mark) Luxury Office + Residence Project CTC (Congo Trade Center) Location Kinshasa, DR Congo Date of Completion 2014 Size 690 HP Value 0.5 M$ Classification Type Q’ty / HP ODU DVM S, DVM Eco 690 HP IDU Wall mount 465 ea Control Wireless RMC • Change the design from chiller to DVM S. • Winning Factor : - Relationship with client - HQ RPM & SE local support in DVM S launching conference on Sep.2013 - DVM S advertisement in local premium magazine
  • 56. 56 Reference Site Equipment SelectionImage Application Issue Du Grand Palais Des Nations The National Assembly building Project Du Grand Palais Des Nations Location Conakry, Guinea Date of Completion 2013 Size 340 HP Value 0.2 M$ Classification Type Q’ty / HP ODU DVM S 596 HP IDU High wall / HSP & MSP Duct 113 ea Control DMS 2, S Net 3 • Management of air conditioning system - Integrated and centralized control system - DMS 2 + S-Net 3 • Change the design from 2 among 4 blocks of Competitor air-cooled chiller to DVM S.
  • 57. 57 Reference Site Equipment SelectionImage Application Issue National Security Center Government office building Project National Security Center Location Khartoum, Sudan Date of Completion 2014 Size 780 HP Value 0.5 M$ Classification Type Q’ty / HP ODU DVM S, Desert 780 HP IDU Slim / MSP Duct 227 ea Control DMS 2 • Management of air conditioning system - Integrated and centralized control system - DMS 2 + S-Net 3 • Winning factor : Samsung brand image., Technical Support.
  • 58. 58 Reference Site Equipment SelectionImage Application Issue Accra Financial Center Premium office building Project Accra Financial Center Location Accra, Ghana Date of Completion 2014 Size 758 HP Value 0.4 M$ Classification Type Q’ty / HP ODU DVM S 758 HP IDU MSP/HSP Duct, Mini 4W CST 127 ea Control Wired RMC, Group Controller • Land mark PJT in Accra
  • 59. 59 Reference Site Equipment SelectionImage Application Issue Hilltop Private Hospital Hospital Project Hilltop Private Hospital Location Lusaka, Zambia Date of Completion 2014 Size 384 HP, CAC 40 set Value 0.4 M$ Classification Type Q’ty / HP ODU DVM S, CAC 384 HP IDU Mini 4W CST, Slim Duct, High-Wall 164 ea Control Wired RMC, Group Controller • Winning Factor : Technical Support to new SAC Distributer.
  • 60. 60 Reference Site Equipment SelectionImage Application Issue Department of Military Veterans Government office building Project Department of Military Veterans Location Pretoria, South Africa Date of Completion 2013 Size 120 HP Value 0.3 M$ Classification Type Q’ty / HP ODU DVM S, HR 110 HP IDU Mini 4W & 4W CST 43 ea Control Wired RMC, Motion detect sensor
  • 61. 61 Reference Site Equipment SelectionImage Application Issue Venetia Housing Development Residence Project Venetia Housing Development Location Venetia (North Limpopo Province) Date of Completion 2014 Size 368 HP Value 0.37 M$ Classification Type Q’ty / HP ODU DVM S Eco 368 HP IDU Wall mount 368 ea Control • Housing development for open cast diamond mine. • Winning Factor : - New Relationship with Consulting Engineer - Competitiveness - Design Assistance X 92
  • 62. 62 Reference Site Equipment SelectionImage Application Issue Sun City Vacation Club Residence Project Sun City Vacation Club Location North West Province (South Africa) Date of Completion 2014 Size 500 HP Value 0.4 M$ Classification Type Q’ty / HP ODU FJM 7kw/10kw 110 HP IDU Wall mount 43 ea Control X 142 • Vacation Time-Share Housing • Winning Factor - Relationship with Consulting Engineer - Design Assistance - Competitiveness (Budget Constraints)
  • 63. 63 Reference Site Equipment SelectionImage Application Issue English Point Marina Luxury Town Villa Project English Point Marina Location Mombasa, Kenya Date of Completion 2011. May (Start) Size 1056HP Value $ 0.9 M Classification Type Q’ty / HP ODU DVM+4 1056HP IDU 4Way CST, Duct, RAC 734 ea Control S-NET 3 • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation • Cooling Efficiency • Anti- Corrosion performance
  • 64. 64 Reference Site Equipment SelectionImage Application Issue The Houghton Exclusive Residence Project The Houghton Location Johannesburg, South Africa Date of Completion 2012. Mar (Start) Size 440 HP Value $ 469 K Classification Type Q’ty / HP ODU DVM+4 HR 440HP IDU Duct 198 ea Control S-Net 3, DMS2 • PC based centralized control system - S-Net 3 & DMS 2 - Function : Monitoring & operation • Energy Efficiency of product • Relationship with client. • Design support
  • 65. 65 Reference Site Equipment SelectionImage Application Issue Universal Plaza Commercial Center Project Universal Plaza Location Gaborone, Botswana Date of Completion 2012. Feb (Start) Size 928 HP Value $ 0.7 M Classification Type Q’ty / HP ODU DVM+4 928HP IDU Big Duct, 4W CST 119 ea Control • Management of air conditioning system - Simplified remote controller • Interior design - Compact ducted units • Office Building + Shopping Mall • Design support
  • 66. 66 Reference Site Equipment SelectionImage Application Issue • Brand Value • High Efficiency •Technical Support Key Tag Project Tribe Hotel Location Nairobi, Kenya Date of Completion 2010 Size 137rooms, 450HP Value $ 150 K Classification Type Q’ty / HP ODU DVM+2,3, Mini 450HP IDU 4Way CST, Duct 160 ea Control Wired remote controller, Key Tag • Brand Value • High Efficiency • Technical Support Tribe Hotel Hotel
  • 68. 68 Reference Site Equipment SelectionImage Application Issue Project Yoo Pune Location Pune in India Date of Completion 2015 (under construction) Size 6 buildings( total 228 flats) Value 2.2M$ (partially bid) Classification Type Q’ty / HP ODU DVM S 4500HP IDU 1Way Cassette Control Individual control • Client(Panchshil, developer) prefers Samsung 1way CST. - Daikin also have 1way CST, but our design is better. • The Client has been satisfied with previous site. (One North PJT) - When claiming noise of 1 way CST, HQ visited site and changed S/W to reduce noise. • CRM with client is good. (HQ directors and executives visited, and visited in Laxmi TF.) Reason for win 19 floors & 38 flats each building EON HADAPSAR YOO Residential Apartment GSBN ID: IN201305140031
  • 69. 69 Reference Site Equipment SelectionImage Application Issue Project AAMBY VALLEY Location Lonavala, Maharashtra Date of Completion December 2014 Size 496 HP Value 2 M$ Classification Type Q’ty / HP ODU DVM S 26EA (16HP) 8EA (10HP) IDU DUCTABLES 132 Control Individual control • DVM S Technology - We presented DVM S PPT and had detailed discussion with M/s Aamby Valley team and we proved our technology better than our competition. • Site Inspections - We requested M/s Aamby Valley team to visit our installed and ongoing project sites in Pune and get the true feedback from the End users. It has helped us a lot as all the Customer gave positive feedback specially Persistent Systems Ltd. • Follow up - We have kept close watch on this BO continuously. • Dealer Support - Dealer supported for Custom clearance and Import duty related concerns. Aamby Valley City Residential Apartment GSBN ID: IN201401071127 Reason for win
  • 70. 70 Reference Site Equipment SelectionImage Application Issue International City Residential Project International City Location Gurugaon in India Date of Completion 2015 (under construction) Size 188 Villas Value 2.3M$ Classification Type Q’ty / HP ODU DVM S 3500HP IDU MSP/HSP 760ea Mini 4way 294 Control Individual control • Solution: High efficiency & Prove our superiority over competitors • Access: Making Sobha developer confident on in-house design team. Customized control system on controllers for chairman house(special requirement of 16℃) • Value : DVM S efficiency against other VRFs  save electric charges • Education : Requirements from client on design, approvals, expectation were taken well promptly. ※ This PJT is phase 1 and Phase 2(4M$) will be start in 2014. GSBN ID: IN201210120011 Reason for win
  • 71. 71 Reference Site Equipment SelectionImage Application Issue DLF Park Tower Residential Apartment Project DLF Park Tower, Park Height Location Gurgaon, India Date of Completion 2012 Size 1975 - 2704 Sq.Ft. Value 4.3M$ Classification Type Q’ty / HP ODU DVM PLUS III 1,611 EA IDU 4 Way Cassette, RAC 10,018 EA Control Wired Remote Controller • Individual Control System - Wired Remote Controller • The Largest contract amount in India
  • 73. 73 Reference Site Equipment SelectionImage Application Issue Novotel Manaus Hotel Hotel Project Novotel Manaus Hotel Location Manaus, Brazil Date of Completion 2013 Size Value $ 400 K Classification Type Q’ty / HP ODU DVM+4 364HP IDU EA Control S-NET 3 • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation • Interior design - Compact ducted units
  • 74. 74 Reference Site Equipment SelectionImage Application Issue Mexico Secrets Hotel Hotel Project Mexico Secrets Hotel Location Huatulco, Mexico Date of Completion 2012 Size 25,000㎡ (1,100HP) Value $750K Classification Type Q’ty / HP ODU DVM+2 38 EA / 1,100HP IDU 4Way Cassette, 4Way Cassette (Interior) 658 EA Control DMS2, S-NET 3 • Management of air conditioning system - Integrated and centralized control system - S-Net 3 : PC, Web based centralized control system - Monitoring & Operation • Interior design - 4Way Cassette (Interior) • Long piping length design (Over 90m) • Anti- Corrosion performance
  • 75. 75 Reference Site Equipment SelectionImage Application Issue Project Marriot Location Santiago, Chile Date of Completion April 2014 Size 230 HP Value Total 0.25 M$ Classification Type Q’ty / HP ODU DVM S 20 IDU DUCTABLES 249 Control Central Control BMS. • DVM S Technology – We presented DVM S PPT to Marriot representatives and they seemed to be pleased with the reasonable price and top notch technology. • Technical support – We have good reputation of high quality technical service and 10 years experience on AC business and for that, other project leaders had recommend our brand to Marriot representatives. Marriot Hotel Hotel Reason for win GSBN ID: CL201401102979
  • 76. 76 Reference Site Equipment SelectionImage Application Issue Project DRAGAMEX Offices Location México City Date of Completion November 2010 Size 700 m2 Value $36K USD Classification Type Q’ty / HP ODU DVM PLUS III 4 IDU High Wall 4 Way Cassette 40 8 Control Wireless Remote Controller DRAGAMEX Offices Office Building • VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image, dimension, energy saving) to the closer competitors. • Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.) Reason for win
  • 77. 77 Reference Site Equipment SelectionImage Application Issue Hotel West Colonia Hotel Project Hotel West Colonia Location Colonia, Uruguay Date of Completion 2011 Size 5,800 m2 Value $0.2M USD Classification Type Q’ty / HP ODU DVM plus IV 15 IDU Slim Duct 4 Way Cassette 114 25 Control Integrated Management System • Samsung Products have a good design , image and elegance to the Hotel environment according to the architectural design. • Samsung products have a high technology focus in energy saving and environment cares.
  • 78. 78 Reference Site Equipment SelectionImage Application Issue Hotel Orpheo Hotel Project Hotel Orpheo Location Montevideo, Uruguay Date of Completion 2012 Size 3,300 m2 Value $0.1M USD Classification Type Q’ty / HP ODU DVM plus IV 15 IDU Wall-mounted 108 Control Wireless remote controller • VRF system it's a European Concept and Samsung DVM provides to the customer more advantages (image, dimension, energy saving) to the closer competitors. • Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
  • 79. 79 Reference Site Equipment SelectionImage Application Issue Building Puerto Punta Residential Building Project Building Puerto Punta Location Maldonado, Uruguay Date of Completion 2012 Size 7,500 m2 Value $0.2M USD Classification Type Q’ty / HP ODU DVM plus IV 15 IDU Slim Duct Wall-mounted / 4Way 140 4 / 6 Control Wireless, Wired remote controller • Samsung has better disign for this kind of building (elengant desing) • Samsung products quality is better than Chilled Water System (compressor, coils, piping distribution, etc.)
  • 81. 81 Reference Site Equipment SelectionImage Application Issue SAMSUNG Electronics Semiconductor Research Center - DSR Project SAMSUNG Electronics DSR Project Location Hwasung, Korea Date of Completion 2014.1 Size 335,125㎡ (28F ~ B5F) Value 20M$ • Solar, Geothermal, LED lighting, Eco-friendly, and Renewable Energy Utilization • Energy-Saving Design : Partial Load by Use Zoning • BEMS, FMS system applies Office Building • Application of Mixed HVAC in Office Building - DVM : 52% (7,610RT included Geothermal 713RT) - Absorption Chiller : 25% (4,000RT) - Turbo Chiller : 23% (3,600RT) Classification Type Q’ty / HP ODU DVM Water II 328 EA IDU 1Way CST, 4Way CST, Slim Duct, MSP Duct, AHU 3,983 EA Control BEMS, FMS
  • 82. 82 Reference Site Equipment SelectionImage Application Issue SAMSUNG Electronics Research Center - R5 Project SAMSUNG Electronics R5 Project Location Suwon, Korea Date of Completion 2013 Size 275,042㎡ (27F ~ B5F) Value 16.5M$ • Solar, Geothermal, LED lighting, Eco-friendly, and Renewable Energy Utilization • Energy-Saving Design : Partial Load by Use Zoning • BEMS, FMS system applies Office Building • Application of Mixed HVAC in Office Building - DVM : 58.1% (7,196RT) - Absorption Chiller : 32.3% (4,000RT) - Turbo Chiller : 9.7% (1,200RT) Classification Type Q’ty / HP ODU DVM Water II 273 EA IDU 1Way CST, 4Way CST, Slim Duct, MSP Duct, AHU 3,142 EA Control BEMS, FMS
  • 83. 83 Reference Site Equipment SelectionImage Application Issue SAMSUNG Electronics Seocho Office Project SAMSUNG Electronics Seocho Office Location Seoul, Korea Date of Completion 2008 Size 195,438㎡ (42F ~ B8F) Value • Management of air conditioning system - Centralized controller • Special room temperature control : 0.1℃ deviation Office Building • Application of Mixed HVAC in Office Building - AHU : 60% (Central) - DVM : 40% (Individual) Classification Type Q’ty / HP ODU DVM PLUS II / DVM Water 75 / 71EA IDU LSP DUCT (11 ~14kW) 788 EA Control BMS
  • 84. 84 Reference Site Equipment SelectionImage Application Issue Yoksam K-Office Project Yoksam K-Office Location Seoul, Korea Date of Completion 2013 Size 12,316㎡ (15F ~ B4F) Value • All SAC are controlled with DMS • Apply the PDM kit, RL/RG stand 70m vertically. ODUs were installed on the roof. Office Building Classification Type Q’ty / HP ODU DVM PLUS IV 79EA IDU 1,4WAY / Duct 180 EA Control DMS 2
  • 85. 85 Reference Site Equipment SelectionImage Application Issue Tower Palace Residential Complex Project Tower Palace Location Seoul, Korea Date of Completion 2004 Size A group of Seven Towers 42-72 Floors Value 39.4M$ Classification Type Q’ty / HP ODU DVM 3,614 EA IDU 1 Way, 4 Way CST, Duct 17,731 EA Control Centralized Controller, DMS, S-Net 3 • Management of air conditioning system - Integrated and centralized control system - DMS : PC, Web based centralized control system - Monitoring & Operation • Specific air discharge structure for skyscrapers • Minimize installation space • Low-noise design
  • 86. 86 Reference Site Equipment SelectionImage Application Issue Hannam The Hill Town Project Hannam The Hill Town Location Seoul, Korea Date of Completion 2011 Size A group of 32 towers, 12 floors Value - • Management of air conditioning system - Centralized controller - Easy Control : Integrated home network interlock with air-conditioner Luxury Residential Apartment • CFD analysis for indoor selection & location Classification Type Q’ty / HP ODU DVM PLUS IV / SLIM 442 IDU Cassette 2,950 Control Centralized controller, Home Network
  • 87. 87 Reference Site Equipment SelectionImage Application Issue Songdo WorldMark Residential Apartment Project Songdo World Mark Location In-cheon, Korea Date of Completion 2010 Size A group of 10 towers, 45 floors Value Classification Type Q’ty / HP ODU DVM Water, DVM+4 382 IDU 1 Way / 2 Way / 4 Way 2,388 Control Centralized controller, Home Network • Management of air conditioning system - Centralized controller - Easy Control : Integrated home network interlock with air-conditioner •
  • 88. 88 Reference Site Equipment SelectionImage Application Issue Soowan Noble Land 13 Block Residential Apartment Project Soowan Noble Land 13 Block Location Gwang-ju, Korea Date of Completion 2011 Size A group of 10 towers, 24 floors Value Classification Type Q’ty / HP ODU DVM+4, DVM Home 659 IDU 1 Way / 2 Way / 4 Way 1,977 Control Centralized controller, Home Network • Management of air conditioning system - Centralized controller - Easy Control : Integrated home network interlock with air-conditioner
  • 89. 89 Reference Site Equipment SelectionImage Application Issue Jong-am SK View Residential Apartment Project Jong-am SK View Location Seoul, Korea Date of Completion 2011 Size A group of 6 towers, 20 floors Value Classification Type Q’ty / HP ODU DVM+4 272 IDU 1 Way / 2 Way / 4 Way 942 Control Centralized controller, Home Network • Management of air conditioning system - Centralized controller - Easy Control : Integrated home network interlock with air-conditioner
  • 90. 90 Reference Site Equipment SelectionImage Application Issue High-1 Resort Resort Project High-1 Resort Location Gangwon-do, Korea Date of Completion 2010 Size A group of 10 towers, 45 floors Value - Classification Type Q’ty / HP ODU DVM+3 , DVM SLIM 596 IDU 1Way / 2W / 4W / Duct 1,952 Control Room Controller • Management of air conditioning system - Wired remote controller • Interior design - Compact ducted units, Slim 1 Way Cassette
  • 91. 91 Reference Site Equipment SelectionImage Application Issue Reesom Resort Resort Project Reesom Resort Location Chung-cheong, Korea Date of Completion 2011 Size 50 Private Villa & 1 Hotel Bidg. Value - Classification Type Q’ty / HP ODU DVM+4 114 IDU 1Way / 2W / 4W / Duct 1,224 Control Room Controller • Whole houses are equipped with SAC • Management of air conditioning system - Simplified remote controller • Interior design - Compact ducted units, Slim 1 Way Cassette
  • 92. 92 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM PLUS IV 36 IDU Cassette 329 Control DMS 2 , S-NET3 Jongro Pagoda Eng Institute Project Jongro Pagoda Eng Institute Location Seoul, Korea Date of Completion 2011 Size 14 floors Value - • PC based centralized control system - S-Net 3 & DMS 2 - Function : Monitoring & operation - Fully working during open hour (8AM ~ 10PM) Commercial Building
  • 93. 93 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM PLUS III 45 IDU Cassette 352 Control DMS Jamsil Parkrio Project Jamsil Parkrio Location Seoul, Korea Date of Completion July, 2008 Size 5 floors Value 0.5M US$ • ODU Installation Space - Group installation on the rooftop Commercial Building • Noise from ODU - Installation of soundproofing walls
  • 94. 94 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM S 437 IDU Cassette & Duct 1308 Control DMS Lotte Premium Outlet(Shopping mall) Project Lotte Premium Outlet Location Gyeong-gi, Korea Date of Completion 2013 Size 3 floors / 77,000m2 Value 437 EA( 6500HP ) • ODU Installation Space - Group installation on the rooftop Commercial Building • Vapor injection technology for high heating performance under low temperature • Energy efficiency with high IPLV 6.6
  • 95. 95 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM S 304 IDU Cassette & Duct 1198 Control DMS Paju Premium Outlets(Shopping mall) Project Paju Premium Outlet Location Gyeng-gi, Korea Date of Completion 2011 Size 4 floors / 4 blocks Value 304 EA( 4256HP ) • ODU Installation Space - Group installation on the rooftop •Small outdoor unit installation space to save space cost Commercial Building • Individual control of 4way cassette louvers • Long refrigerant piping for flexible design (piping length 220m, level difference 110m)
  • 96. 96 Reference Site Equipment SelectionImage Application Issue • Rain / Temperature / Humidity sensor for snow detecting • DVM GEO + Hydro Unit(LT) • Snow detecting on car entering gate and snow melting system Raemian Gallery Gallery Classification Type Q’ty / HP ODU DVM +4 23 IDU Cassette & Duct, AHU 97 Hydro Unit LT(Low Temperature) 10 HP Control DMS BacNet, Wired remote, Central Project Raemian Gallery Location Moonjungdong Seoul in Korea Date of Completion 2012. 7 Size 5 floors Value
  • 98. 98 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM S 114 IDU Cassette & Duct 1710 Control DMS, S-Net 3 Changsha Greenland Plaza(No.5/6 Building) Project Changsha Greenland Plaza Location Changsha, Hunan Province Date of Completion 2013 Size 33F,36F Value 4320HP • Installation of DVM S at middle floors • Electricity billing system Commercial Building • Wide operation temperature range (Cooling -15-54℃,Heating -23-29℃) • Air-conditioning electricity billing system for tenants
  • 99. 99 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM S 153 IDU Cassette & Duct 862 Control Wired remote control Huasheng Advanced Business Park Project Complex building Location Chengdu, Sichuan Province Date of Completion 2013 Size 20F Value 2946HP • Installation of DVM S and fresh air intake unit every floor(4~20F) Commercial Building • Small installation area fit into machine room • Sufficient external static pressure of 80Pa suitable for small-sized machine room
  • 100. 100 Reference Site Equipment SelectionImage Application Issue Image Tianqi International Building Classification Type Q’ty / HP ODU DVM S 94EA / 4000HP IDU 4Way CST, Duct 1524EA Control S-Net 3 Project Tianjin, China Location Date of Completion Size 53,000㎡ (25Floor) Value 2M$ Commercial Building • Long refrigerant piping for flexible design (piping length 220m, level difference 110m) • Designed with Slim Duct indoor unit to install in the narrow ceiling space (199mm) • Low indoor unit noise level(25dBA)
  • 101. 101 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM S 63 IDU Cassette & Duct 351 Control DMS, S-Net 3 Hangzhou Wantong Center Project Hangzhou Wantong Center Location Gongshu District, Hangzhou City Date of Completion 2013 Size 12020㎡ (17F,12F) Value 1010HP Commercial Building • Installation of all DVM S units on middle floor for machine room • Sufficient external static pressure of 80Pa to prevent short-circuit air flow in machine room • Individual indoor unit control to prevent excessive cooling/heating in open space
  • 102. 102 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM S 210 IDU Cassette & Duct 844 Control DMS, S-Net 3 Hangzhou Network Industry & Technology Park Project Network Industry & Technology Park Location Bingjiang District, Hangzhou City Date of Completion 2013 Size 47628㎡ (19F) Value 3402HP Commercial Building • Installation of DVM S units on podium and rooftop • Air ventilation using Fresh Air Intake units • Vapor injection technology for high heating • performance under low temperature • Energy efficiency with high IPLV 6.6
  • 103. 103 Reference Site Equipment SelectionImage Application Issue Qingdao Berlin New City Tower Commercial Building Classification Type Q’ty / HP ODU DVM S 100 IDU Cassette & Duct 1006 Control DMS, S-Net 3 Project Qingdao Berlin New City Tower Location Changjiang dong Street, Qingdao City Date of Completion 2013 Size Value 3022HP • Management of air conditioning system - Integrated and centralized control system - DMS : PC, Web based centralized control system - Monitoring & Operation
  • 104. 104 Reference Site Equipment SelectionImage Application Issue Classification Type Q’ty / HP ODU DVM S 312 IDU Cassette & Duct 2056 Control DMS, S-Net 3 Project Tianrun Fuxi Dadao Location Chaoyang District, Beijing City Date of Completion 2013 Size Value 2216HP Tianrun Fuxi Dadao, Beijing City Commercial Building • Installation of all DVM S units on middle floor • Backup operation of outdoor unit under emergency status to continue operation • Small outdoor unit installation space to save space cost
  • 105. 105 Reference Site Equipment SelectionImage Application Issue Dayawan Technological Innovation Building Office Building Classification Type Q’ty / HP ODU DVM S 40 IDU 660 Control Wired remote control Project Dayawan Technological Innovation Building Location Huizhou, Guangdong Province Date of Completion Size 27,200㎡ (23F) Value M$ • Installation of DVM S units on podium and rooftop • Combination ratio of 120%
  • 106. 106 Reference Site Equipment SelectionImage Application Issue Binhai International School Education Building Classification Type Q’ty / HP ODU DVM S 25 IDU 4Way CST 120 Control Wired remote control Project Binhai International School Location Ningbo, Zhejiang Province Date of Completion Size 1,400㎡ Value M$ • Installation of DVM S units on rooftop of • restaurant and office building • Air ventilation using Fresh Air Intake units • Air purification with anti-virus module
  • 107. 107 Reference Site Equipment SelectionImage Application Issue Image Lasa Hotel Hotel Classification Type Q’ty / HP ODU DVM +3 994HP IDU Control Project Tianjin, China Location Date of Completion Size 30,933㎡ Value 0.6M$ • Management of air conditioning system - Simplified remote controller
  • 108. 108 Reference Site Equipment SelectionImage Application Issue Samsung Electronics Factory Building Factory Building Classification Type Q’ty / HP ODU DVM S 47 IDU 4Way CST 273 Control Interlock control Project Samsung Electronics Factory Building Location Tianjin Date of Completion Size 10,518㎡ (1072HP) Value M$ • Installed in machine room on the ground floor • Adaptive sine wave control technology to reduce harmonic noise • Snow removal function
  • 109. 109 Reference Site Equipment SelectionImage Application Issue Bo’ao Sports Center Sports Center • Installed in machine room on the ground floor • Combination ratio of no greater than 110% • Small installation area for good exterior view Classification Type Q’ty / HP ODU DVM 34 IDU AHU 247 Control Wired remote control Project Samsung Electronics Factory Building Location Shaoxing, Zhejiang Province Date of Completion Size 12,712㎡ (908HP) Value M$
  • 110. 110 Reference Site Equipment SelectionImage Application Issue • Individual control of 4way cassette louvers • RoHs certification for environment protection Bridge Bray Industrial Park Office Building • Installation of DVM S units on rooftop • Designed with ceiling concealed indoor units • Combination ratio of no greater than 118% Classification Type Q’ty / HP ODU DVM S 87 IDU 4Way CST 910 Control Wired remote control Project Bridge Bray Industrial Park Location Ningbo, Zhejiang Province Date of Completion Size 18,200㎡ (1300HP) Value M$