11/11/2013

OPERATIONS
MANAGEMENT – 1
ASSIGNMENT
DONNER COMPANY

GROUP V1 (SEC 4)
NAME
ANINDYA GANGULY
ANURAG BOTHRA
HARISH B
PRAGATI CHAUHAN
RENJIT THOMAS

ROLL NO
13406
13411
13419
13435
13440
1) Draw a process flow diagram of Donner’s order processing process (from bids
to releasing the order to the shop floor)?
STEPS:
1. Plummer, President and Altmeyer, Design Engineer estimated labour and
material cost in preparing a bid for customer order
2. If the customer accept the bid, deliver in three weeks for order of less than
1000 boards and five weeks for greater than 1000 boards.
3. Prepare detailed material specifications and factory order showing material
specifications, delivery date, no of circuits and sequence of operations
4. Sent the order details to purchase agent for procuring raw materials at low
price in about 4 days for normal order and just a day for rush orders
5. Enter the order in log and send a blueprint and factor order to supervisor.
6. Schedule the order based on estimation of labour, raw materials, worker shift
and other critical requirements.

Step 1

Step 2

Step 3

Step 4

Step 5

Step 6

• Estimate labor and material cost for bidding

• If bid accepted, delivery promised within deadline

• Prepare detailed material specification and factory order

• Order details sent to purchasing agent

• Order entered into a log. Blueprint and factory order sent to supervisor

• Schedule preparatory work

2) What order size would you schedule on the CNC router? On the punch press?
Breakeven pointis used to decide whether to use the automated CNC router or
manual punch press.
CNC Router

Punch Press

Set up time for 1 order

50

150

Run time for 1 circuit board

1

0.5

Number of circuit boards in 1 order (order N

N

size)
Total time (Setup time + Run time)

50+(1)*(N)

150+(0.5)*(N)

Breakeven point is the point at which the time consumed for CNC router and punch
press would be equal:
50 + 1 * N = 150 + .5 *N
0.5N = 100
N = 200
Conclusion:
 If order size is more than 200, Donner Company should go for CNC Drill.
 If order size is less than 200, Donner Company should go for Punch Press.
 If order size is exactly 200, either CNC Drill or Punch Press could be used.
3. Assuming a normal process flow, how many minutes per board are needed to
produce an order of 8 circuit boards? Of 80 circuit boards? Of 800 circuit boards?
Conditions used in below calculations:
Drilling Process:
(a)
Manual Drill is usedfor order size less than 100
(b)
CNC Drill is used for order size is greater than 100
Profiling Process:
(a)
Punch Press is used for order size is less than 200
(b)
CNC Router is usedfor order size is greater than 200

Operation

Setup Run
Time Time
1. Preparation
Artwork
29
0
Generation

Total Time
(order size = 8)

Total Time
(order size = 80)

Total Time
(order size = 800)

= (29*1)+(0*8)
= 29

= (29*1)+(0*80)
= 29

= (29*1)+(0*800)
= 29
Inspect
20
andShear
Punch
10
Tooling
Holes
2. Image Transfers
a) Drill Holes
Manual Drill 15

0.5
0.5

0.08

= (20*1)+(.5*1)
= 20.5
=(10*1)+(.5*1)
=10.5

= (20*1)+(.5*10)
= 25
=(10*1)+(.5*10)
=15

= (20*1)+(.5*100)
= 70
=(10*1)+(.5*100)
=60

=(15*1)+(.08*8*500) =(15*1)+(.08*80*500) NA
= 335
= 3215
CNC Drill
240
0.004 NA
NA
=(240*1)+(.004*800*500)
=1840
Metallization 10
0.75
=(10*1)+(.75*1)
=(10*1)+(.75*10)
=(10*1)+(.75*100)
=10.75
=17.5
=85
b) Dry Film Photoresist (DFPR)
Panel
5
0.2
=(5*1)+(.2*1)
=(5*1)+(.2*10)
=(5*1)+(.2*100)
Preparation
=5.2
=7
=25
Laminate
20
2
=(20*1)+(2*1)
=(20*1)+(2*10)
=(20*1)+(2*100)
and Expose
=22
=40
=220
Develop
20
0.2
=(20*1)+(0.2*1)
=(20*1)+(0.2*10)
=(20*1)+(0.2*100)
=20.2
=22
=40
Electroplate 25
8.5
=(25*1)+(8.5*1)
=(25*1)+(8.5*10)
=(25*1)+(8.5*100)
=33.5
=110
=875
Strip DFPR
5
0.2
=(5*1)+(.2*1)
=(5*1)+(.2*10)
=(5*1)+(.2*100)
=5.2
=7
=25
Etch and Tin 10
0.2
=(10*1)+(.2*1)
=(10*1)+(.2*10)
=(10*1)+(.2*100)
Strip
=10.2
=12
=30
3. Fabrication
Solder Mask 45
1.5
=(45*1)+(1.5*1)
=(45*1)+(1.5*10)
=(45*1)+(1.5*100)
=46.5
=60
=195
Solder Dip
30
0.5
=(30*1)+(0.5*1)
=(30*1)+(0.5*10)
=(30*1)+(0.5*100)
=30.5
=35
=80
4. Punch Press
Punch Press 50
1
=(50*1)+(1*8)
=(50*1)+(1*80)
NA
=58
=130
CNC Router 150
0.5
NA
NA
=(150*1)+(0.5*800)
=550
Inspect and 45
1.5
=(45*1)+(1.5*8)
=(45*1)+(1.5*80)
=(45*1)+(1.5*800)
Pack
=57
=165
=1245
TOTAL
695.05
3890
5369
(mins)
Minutes per
86.88
48.625
6.71
board
4. List three specific actions to reduce the average flow time of jobs. Explain why
they would achieve their outcome.
1) The Platerworked at a desk inspecting panel was kept 18” away from plating
tanks. Altmeyer found that 15% of the time was spent walking between the
desk and the tanks. So the Plater can be placed closer to Plating tank so that
the walking time can be reduced.
2) Assign the workers into various process depending on the nature of the job.
This action will make the processes to be carried out in a more organized
manner and prevent the wastage of time by moving from one job task to
another. The process becomes more efficient and hence saves lot of time in
average work flow
3) Employ a separate team to address telephone calls from the customer’s
engineers who had encountered design problems. Either employ them from
the existing pool of employees or hire/contract new employees. Since one
fourth of the jobs got delayed due to telephone calls, this would help in
reducing job delay and also improve the productivity of employees who are
handling operations job as they can concentrate exclusively on production
process.
5. Is Donner doing too much by accepting small and large orders? What is the
effect of this on the shop floor and various performance measures?
Donner is taking up more orders than what they are capable of handling due to the
varying nature of order size.
Effect on Shop floor:
a) Each order had different circuit designs and order size that lead to workers
being assigned randomly in different activities depending on the work load.
This led to inefficiency and scheduling problems.
b) Workers engaged in manual drilling being run out of work. This is due to
large order sizes of more than 100 boards where CNC drilling is used. It
requires less man power required and many workers remain idle.This leads
to loss of productivity.
c) The return of circuit board by customers had increased from less than 1% to
about 3% due to incomplete operations. This reflects the incapability of
Donner in operating larger order size.
d) Increased number of order returns leads to more reprocessing and shipping
of returned orders. It requires more employees involved in these activities
which will reduce the productivity and affects the operational efficiency of
Donner.
e) Smaller order are supervised by senior employee directly, so its operations
are smooth compared to the larger orders.
f) Since the workers do not have clarity on the exact kind of work they are
expected to do and the time of work, it will become extremely difficult to
assess their performance based on work type and duration of work.
Effects on performance measures:
(a) Average flow time for larger order is more comparable to smaller orders.
Considering 3 weeks for less than 1000 boards, 5 weeks for more than 1000
and 4 days for urgent orders. It implies the incapability of Donner in
handling larger order size.
(b) Shipments for larger order size were delayed by an average 9 days.
(c) Quality of the product has been affected due to large orders. Percentage of
customer returns increased from less than 1% to 3% due to incapability in
handling larger order size.
(d) The time standards used by Donner were substantially above the
standards used in competing firms and it is based on judgement of
Plummer and Altmeyer.

More Related Content

What's hot

Barilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationBarilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationHimadri Singha
 
Bayonne packaging Case Study Analysis
Bayonne packaging Case Study AnalysisBayonne packaging Case Study Analysis
Bayonne packaging Case Study AnalysisPrashanth Sridhar
 
Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)
Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)
Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)Siddharth Barjatya
 
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS Akshay Jain
 
Case study kulicke and soffa industries inc - group 4
Case study   kulicke and soffa industries inc - group 4Case study   kulicke and soffa industries inc - group 4
Case study kulicke and soffa industries inc - group 4Piyush Sogra
 
Dell's Working Capital
Dell's Working CapitalDell's Working Capital
Dell's Working CapitalRohit Patidar
 
Littlefield Simulation
Littlefield Simulation Littlefield Simulation
Littlefield Simulation Kamal Gelya
 
Classic pen company activity based costing
Classic pen company activity based costingClassic pen company activity based costing
Classic pen company activity based costingHarish B
 
Delwarca software remote support unit
Delwarca software  remote support unitDelwarca software  remote support unit
Delwarca software remote support unitSantosh Mishra
 
Bayonne packaging case report
Bayonne packaging case reportBayonne packaging case report
Bayonne packaging case reportKivanc Ozuolmez
 
Som case study - dont bother me i cant cope
Som   case study - dont bother me i cant copeSom   case study - dont bother me i cant cope
Som case study - dont bother me i cant copeRajendra Inani
 
Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain
Hewlett packard company Hewlett Packard Company Deskjet Printer Supply ChainHewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain
Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chainaliyudhi_h
 
Jabong: Balancing the Demads of Customers and Suppliers
Jabong: Balancing the Demads of Customers and SuppliersJabong: Balancing the Demads of Customers and Suppliers
Jabong: Balancing the Demads of Customers and SuppliersSaiteja Pamu
 
Wilkerson Company Case
Wilkerson Company CaseWilkerson Company Case
Wilkerson Company CaseElla Shen
 

What's hot (20)

Barilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationBarilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain Integration
 
Nucor Case Anlaysis
Nucor Case AnlaysisNucor Case Anlaysis
Nucor Case Anlaysis
 
The Cranberry Case
The Cranberry CaseThe Cranberry Case
The Cranberry Case
 
Bayonne packaging Case Study Analysis
Bayonne packaging Case Study AnalysisBayonne packaging Case Study Analysis
Bayonne packaging Case Study Analysis
 
Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)
Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)
Reliance Baking Soda: Optimizing Promotional Spending (HBR Brief Case)
 
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
ATLANTIC COMPUTER: A BUNDLE OF PRICING OPTIONS
 
Case study kulicke and soffa industries inc - group 4
Case study   kulicke and soffa industries inc - group 4Case study   kulicke and soffa industries inc - group 4
Case study kulicke and soffa industries inc - group 4
 
Dell's Working Capital
Dell's Working CapitalDell's Working Capital
Dell's Working Capital
 
Littlefield Simulation
Littlefield Simulation Littlefield Simulation
Littlefield Simulation
 
Classic pen company activity based costing
Classic pen company activity based costingClassic pen company activity based costing
Classic pen company activity based costing
 
Delwarca software remote support unit
Delwarca software  remote support unitDelwarca software  remote support unit
Delwarca software remote support unit
 
Bayonne packaging case report
Bayonne packaging case reportBayonne packaging case report
Bayonne packaging case report
 
Som case study - dont bother me i cant cope
Som   case study - dont bother me i cant copeSom   case study - dont bother me i cant cope
Som case study - dont bother me i cant cope
 
Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain
Hewlett packard company Hewlett Packard Company Deskjet Printer Supply ChainHewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain
Hewlett packard company Hewlett Packard Company Deskjet Printer Supply Chain
 
Toyota- HBS case
Toyota- HBS caseToyota- HBS case
Toyota- HBS case
 
Jabong: Balancing the Demads of Customers and Suppliers
Jabong: Balancing the Demads of Customers and SuppliersJabong: Balancing the Demads of Customers and Suppliers
Jabong: Balancing the Demads of Customers and Suppliers
 
Xerox & Fuji Xerox
Xerox & Fuji XeroxXerox & Fuji Xerox
Xerox & Fuji Xerox
 
Clean edge razor case study
Clean edge razor case studyClean edge razor case study
Clean edge razor case study
 
Tru earth case study
Tru earth case studyTru earth case study
Tru earth case study
 
Wilkerson Company Case
Wilkerson Company CaseWilkerson Company Case
Wilkerson Company Case
 

Viewers also liked

Operation management
Operation managementOperation management
Operation managementShanta Mishra
 
Kristen cookie case
Kristen cookie caseKristen cookie case
Kristen cookie casejldolan1
 
1. kristen cookie (x)
1. kristen cookie (x)1. kristen cookie (x)
1. kristen cookie (x)PTF
 
Kristen's cookie company
Kristen's cookie companyKristen's cookie company
Kristen's cookie companyRahul Biradar
 
An Introduction to Operations Management
An Introduction to Operations ManagementAn Introduction to Operations Management
An Introduction to Operations ManagementChristian Reinboth
 
Kristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case studyKristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case studyArfan Afzal
 
Kristen Project 10
Kristen Project 10Kristen Project 10
Kristen Project 10angsprague
 
Red Brand Canners
Red Brand CannersRed Brand Canners
Red Brand Cannersjindalm
 
Private Equity and Foreign Investments in the Dairy Industry in India
Private Equity and Foreign Investments  in the Dairy Industry in IndiaPrivate Equity and Foreign Investments  in the Dairy Industry in India
Private Equity and Foreign Investments in the Dairy Industry in IndiaAurum Equity Partners LLP
 
Solución de las preguntas del caso kristen
Solución de las preguntas del caso kristenSolución de las preguntas del caso kristen
Solución de las preguntas del caso kristenNeCris Ram
 
Dragonfly Case study
Dragonfly Case studyDragonfly Case study
Dragonfly Case studyAshuvyas2128
 
Forecasting room demand
Forecasting room demandForecasting room demand
Forecasting room demandUtpal Meena
 
pizza-hut-operations-operations-management
 pizza-hut-operations-operations-management pizza-hut-operations-operations-management
pizza-hut-operations-operations-managementZahoor Soomro
 
Occupancy calculation form
Occupancy calculation formOccupancy calculation form
Occupancy calculation formFrankie Jones
 
Toyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyToyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyIshan Parekh
 

Viewers also liked (20)

Operation management
Operation managementOperation management
Operation management
 
Kristen cookie case
Kristen cookie caseKristen cookie case
Kristen cookie case
 
1. kristen cookie (x)
1. kristen cookie (x)1. kristen cookie (x)
1. kristen cookie (x)
 
Kristen's cookie company
Kristen's cookie companyKristen's cookie company
Kristen's cookie company
 
An Introduction to Operations Management
An Introduction to Operations ManagementAn Introduction to Operations Management
An Introduction to Operations Management
 
Kristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case studyKristin’s Cookie Company Production process and analysis case study
Kristin’s Cookie Company Production process and analysis case study
 
Kristen Project 10
Kristen Project 10Kristen Project 10
Kristen Project 10
 
Red Brand Canners
Red Brand CannersRed Brand Canners
Red Brand Canners
 
Private Equity and Foreign Investments in the Dairy Industry in India
Private Equity and Foreign Investments  in the Dairy Industry in IndiaPrivate Equity and Foreign Investments  in the Dairy Industry in India
Private Equity and Foreign Investments in the Dairy Industry in India
 
Solución de las preguntas del caso kristen
Solución de las preguntas del caso kristenSolución de las preguntas del caso kristen
Solución de las preguntas del caso kristen
 
Dragonfly Case study
Dragonfly Case studyDragonfly Case study
Dragonfly Case study
 
Forecasting room demand
Forecasting room demandForecasting room demand
Forecasting room demand
 
エクセル統計の使い方(重回帰分析編)
エクセル統計の使い方(重回帰分析編)エクセル統計の使い方(重回帰分析編)
エクセル統計の使い方(重回帰分析編)
 
Case Dragonfly
Case DragonflyCase Dragonfly
Case Dragonfly
 
Dore Dore case study
Dore Dore case studyDore Dore case study
Dore Dore case study
 
Marriott hotels case study
Marriott hotels case studyMarriott hotels case study
Marriott hotels case study
 
Industry Analysis - Airlines
Industry Analysis - AirlinesIndustry Analysis - Airlines
Industry Analysis - Airlines
 
pizza-hut-operations-operations-management
 pizza-hut-operations-operations-management pizza-hut-operations-operations-management
pizza-hut-operations-operations-management
 
Occupancy calculation form
Occupancy calculation formOccupancy calculation form
Occupancy calculation form
 
Toyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case StudyToyota Motor Manufacturing Inc - Case Study
Toyota Motor Manufacturing Inc - Case Study
 

Similar to Donner case Operations Management

Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industryGanesh TN
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study ChallengeNikhil Kejriwal
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryijmech
 
Chapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.pptChapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.pptKuvaneshWaran
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019sserwaniko
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineLaukik Raut
 
Operations Management power point Chapter Five
Operations Management power point Chapter FiveOperations Management power point Chapter Five
Operations Management power point Chapter FiveAYNETUTEREFE1
 
Thango© : Extrusion cost savings and die making improvement
Thango© : Extrusion cost savings and die making improvementThango© : Extrusion cost savings and die making improvement
Thango© : Extrusion cost savings and die making improvementThango
 
David Nedohin (Scope AR): Enterprise AR: Delivering on the Promise
David Nedohin (Scope AR): Enterprise AR: Delivering on the PromiseDavid Nedohin (Scope AR): Enterprise AR: Delivering on the Promise
David Nedohin (Scope AR): Enterprise AR: Delivering on the PromiseAugmentedWorldExpo
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineParth Patel
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineDhruvShah202
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainPrakhar Jain
 
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
 CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docxarnit1
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturingJitesh Gaurav
 

Similar to Donner case Operations Management (20)

Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industry
 
Schneider Case Study Challenge
Schneider Case Study ChallengeSchneider Case Study Challenge
Schneider Case Study Challenge
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
Application of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industryApplication of value stream mapping tool to reduce wastes in bearing industry
Application of value stream mapping tool to reduce wastes in bearing industry
 
om
omom
om
 
Chapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.pptChapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.ppt
 
Diecraft Australia
Diecraft AustraliaDiecraft Australia
Diecraft Australia
 
Process analysis
Process analysisProcess analysis
Process analysis
 
Production planning and control 2019
Production planning and control 2019Production planning and control 2019
Production planning and control 2019
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
 
Operations Management power point Chapter Five
Operations Management power point Chapter FiveOperations Management power point Chapter Five
Operations Management power point Chapter Five
 
Thango© : Extrusion cost savings and die making improvement
Thango© : Extrusion cost savings and die making improvementThango© : Extrusion cost savings and die making improvement
Thango© : Extrusion cost savings and die making improvement
 
David Nedohin (Scope AR): Enterprise AR: Delivering on the Promise
David Nedohin (Scope AR): Enterprise AR: Delivering on the PromiseDavid Nedohin (Scope AR): Enterprise AR: Delivering on the Promise
David Nedohin (Scope AR): Enterprise AR: Delivering on the Promise
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
Smed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping lineSmed implementation on manufacturing stamping line
Smed implementation on manufacturing stamping line
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar Jain
 
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
 CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
CENTRE FOR CONTINUING EDUCATION EXECUTIVE MBA (OIL & .docx
 
bpr (2).pdf
bpr (2).pdfbpr (2).pdf
bpr (2).pdf
 
Cellular manufacturing
Cellular manufacturingCellular manufacturing
Cellular manufacturing
 

Recently uploaded

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsGOKUL JS
 

Recently uploaded (20)

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Supercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebsSupercharge Your eCommerce Stores-acowebs
Supercharge Your eCommerce Stores-acowebs
 

Donner case Operations Management

  • 1. 11/11/2013 OPERATIONS MANAGEMENT – 1 ASSIGNMENT DONNER COMPANY GROUP V1 (SEC 4) NAME ANINDYA GANGULY ANURAG BOTHRA HARISH B PRAGATI CHAUHAN RENJIT THOMAS ROLL NO 13406 13411 13419 13435 13440
  • 2. 1) Draw a process flow diagram of Donner’s order processing process (from bids to releasing the order to the shop floor)? STEPS: 1. Plummer, President and Altmeyer, Design Engineer estimated labour and material cost in preparing a bid for customer order 2. If the customer accept the bid, deliver in three weeks for order of less than 1000 boards and five weeks for greater than 1000 boards. 3. Prepare detailed material specifications and factory order showing material specifications, delivery date, no of circuits and sequence of operations 4. Sent the order details to purchase agent for procuring raw materials at low price in about 4 days for normal order and just a day for rush orders 5. Enter the order in log and send a blueprint and factor order to supervisor. 6. Schedule the order based on estimation of labour, raw materials, worker shift and other critical requirements. Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 • Estimate labor and material cost for bidding • If bid accepted, delivery promised within deadline • Prepare detailed material specification and factory order • Order details sent to purchasing agent • Order entered into a log. Blueprint and factory order sent to supervisor • Schedule preparatory work 2) What order size would you schedule on the CNC router? On the punch press? Breakeven pointis used to decide whether to use the automated CNC router or manual punch press.
  • 3. CNC Router Punch Press Set up time for 1 order 50 150 Run time for 1 circuit board 1 0.5 Number of circuit boards in 1 order (order N N size) Total time (Setup time + Run time) 50+(1)*(N) 150+(0.5)*(N) Breakeven point is the point at which the time consumed for CNC router and punch press would be equal: 50 + 1 * N = 150 + .5 *N 0.5N = 100 N = 200 Conclusion:  If order size is more than 200, Donner Company should go for CNC Drill.  If order size is less than 200, Donner Company should go for Punch Press.  If order size is exactly 200, either CNC Drill or Punch Press could be used. 3. Assuming a normal process flow, how many minutes per board are needed to produce an order of 8 circuit boards? Of 80 circuit boards? Of 800 circuit boards? Conditions used in below calculations: Drilling Process: (a) Manual Drill is usedfor order size less than 100 (b) CNC Drill is used for order size is greater than 100 Profiling Process: (a) Punch Press is used for order size is less than 200 (b) CNC Router is usedfor order size is greater than 200 Operation Setup Run Time Time 1. Preparation Artwork 29 0 Generation Total Time (order size = 8) Total Time (order size = 80) Total Time (order size = 800) = (29*1)+(0*8) = 29 = (29*1)+(0*80) = 29 = (29*1)+(0*800) = 29
  • 4. Inspect 20 andShear Punch 10 Tooling Holes 2. Image Transfers a) Drill Holes Manual Drill 15 0.5 0.5 0.08 = (20*1)+(.5*1) = 20.5 =(10*1)+(.5*1) =10.5 = (20*1)+(.5*10) = 25 =(10*1)+(.5*10) =15 = (20*1)+(.5*100) = 70 =(10*1)+(.5*100) =60 =(15*1)+(.08*8*500) =(15*1)+(.08*80*500) NA = 335 = 3215 CNC Drill 240 0.004 NA NA =(240*1)+(.004*800*500) =1840 Metallization 10 0.75 =(10*1)+(.75*1) =(10*1)+(.75*10) =(10*1)+(.75*100) =10.75 =17.5 =85 b) Dry Film Photoresist (DFPR) Panel 5 0.2 =(5*1)+(.2*1) =(5*1)+(.2*10) =(5*1)+(.2*100) Preparation =5.2 =7 =25 Laminate 20 2 =(20*1)+(2*1) =(20*1)+(2*10) =(20*1)+(2*100) and Expose =22 =40 =220 Develop 20 0.2 =(20*1)+(0.2*1) =(20*1)+(0.2*10) =(20*1)+(0.2*100) =20.2 =22 =40 Electroplate 25 8.5 =(25*1)+(8.5*1) =(25*1)+(8.5*10) =(25*1)+(8.5*100) =33.5 =110 =875 Strip DFPR 5 0.2 =(5*1)+(.2*1) =(5*1)+(.2*10) =(5*1)+(.2*100) =5.2 =7 =25 Etch and Tin 10 0.2 =(10*1)+(.2*1) =(10*1)+(.2*10) =(10*1)+(.2*100) Strip =10.2 =12 =30 3. Fabrication Solder Mask 45 1.5 =(45*1)+(1.5*1) =(45*1)+(1.5*10) =(45*1)+(1.5*100) =46.5 =60 =195 Solder Dip 30 0.5 =(30*1)+(0.5*1) =(30*1)+(0.5*10) =(30*1)+(0.5*100) =30.5 =35 =80 4. Punch Press Punch Press 50 1 =(50*1)+(1*8) =(50*1)+(1*80) NA =58 =130 CNC Router 150 0.5 NA NA =(150*1)+(0.5*800) =550 Inspect and 45 1.5 =(45*1)+(1.5*8) =(45*1)+(1.5*80) =(45*1)+(1.5*800) Pack =57 =165 =1245 TOTAL 695.05 3890 5369 (mins) Minutes per 86.88 48.625 6.71 board
  • 5. 4. List three specific actions to reduce the average flow time of jobs. Explain why they would achieve their outcome. 1) The Platerworked at a desk inspecting panel was kept 18” away from plating tanks. Altmeyer found that 15% of the time was spent walking between the desk and the tanks. So the Plater can be placed closer to Plating tank so that the walking time can be reduced. 2) Assign the workers into various process depending on the nature of the job. This action will make the processes to be carried out in a more organized manner and prevent the wastage of time by moving from one job task to another. The process becomes more efficient and hence saves lot of time in average work flow 3) Employ a separate team to address telephone calls from the customer’s engineers who had encountered design problems. Either employ them from the existing pool of employees or hire/contract new employees. Since one fourth of the jobs got delayed due to telephone calls, this would help in reducing job delay and also improve the productivity of employees who are handling operations job as they can concentrate exclusively on production process. 5. Is Donner doing too much by accepting small and large orders? What is the effect of this on the shop floor and various performance measures? Donner is taking up more orders than what they are capable of handling due to the varying nature of order size. Effect on Shop floor: a) Each order had different circuit designs and order size that lead to workers being assigned randomly in different activities depending on the work load. This led to inefficiency and scheduling problems. b) Workers engaged in manual drilling being run out of work. This is due to large order sizes of more than 100 boards where CNC drilling is used. It requires less man power required and many workers remain idle.This leads to loss of productivity. c) The return of circuit board by customers had increased from less than 1% to about 3% due to incomplete operations. This reflects the incapability of Donner in operating larger order size. d) Increased number of order returns leads to more reprocessing and shipping of returned orders. It requires more employees involved in these activities which will reduce the productivity and affects the operational efficiency of Donner. e) Smaller order are supervised by senior employee directly, so its operations are smooth compared to the larger orders.
  • 6. f) Since the workers do not have clarity on the exact kind of work they are expected to do and the time of work, it will become extremely difficult to assess their performance based on work type and duration of work. Effects on performance measures: (a) Average flow time for larger order is more comparable to smaller orders. Considering 3 weeks for less than 1000 boards, 5 weeks for more than 1000 and 4 days for urgent orders. It implies the incapability of Donner in handling larger order size. (b) Shipments for larger order size were delayed by an average 9 days. (c) Quality of the product has been affected due to large orders. Percentage of customer returns increased from less than 1% to 3% due to incapability in handling larger order size. (d) The time standards used by Donner were substantially above the standards used in competing firms and it is based on judgement of Plummer and Altmeyer.