Introduction:
Geotechnical investigations are performed to
obtain information on the physical properties of
soil and rock underlying the site to design
earthworks and foundations for proposed
structures, and for repair of damages to
earthworks and structures ,caused by subsurface
conditions
Site Plan
 In-situ Soil Density by Core Cutter Method
 Atterberg Limits
 Sieve Analysis
 Soil Classification by USCS
 Permeability of soil by Constant Head Method
 Apparatus Used:
 Standard: ASTM D2937
 Significance:
 Field Work:
 Soil excavated up to a depth of 3 ft.
 The core cutter is driven inside the soil with the
help of hammer.
 Soil is trimmed around the core cutter and core
cutter is removed.
 Lab Observations:
Internal dia of core cutter = 4 in
Height of core cutter = 5 in
Core cutter cross sectional area =πd2/4 = 12.56 in2
Mass of empty core cutter = 1383.8 g = 3.044 lbs
Mass of core cutter + soil = 3017.7 g = 6.639 lbs
Mass of soil =6.639 – 3.044 = 3.595 lbs
Volume of core cutter = 62.8 in3
Bulk density = ρb= M2 –M1/V = 1588.1907 kg/m3
Dry density = ρd= ρb/1 + m.c = 1489.5202 kg/m3
 Apparatus Used:
 Standard Reference: ASTM D-422
 Significance:
 Field Work:
 Bore holes are drilled with the help of earth augers.
 Holes were drilled at 3 ft interval up to 12 ft and
disturbed samples of the soil were collected.
 Soil samples were collected in the bags and were
transported to the lab for laboratory tests and
observations.
 LABORATORY OBSERVATIONS:
 Sieves were arranged in the order and were tightly held
on the sieve shaker.
 About 500 g of soil disturbed soil sample of depth 3 ft
was placed on the top sieve (sieve no 4).
 Sieve shaker was then turned on and sieves were
shaken for 5 minutes
Gradation Test Results:
 Sample # 1 (3 ft.)
Cu=4.8
Cc=1.5
So soil is Poorly Graded (SP)
 Sample # 2 (6 ft.)
Cu=3.28
Cc=1.2
So soil is Poorly Graded (SP)
 Sample # 3 (9 ft.)
Cu=2.9
Cc=1.0
So soil is Poorly Graded (SP)
 Sample # 4 (12 ft.)
Cu=2.65
Cc=1.1
So soil is Poorly Graded (SP)
 Standard Reference: ASTM D431
 Significance:
 Liquid Limit:
 Apparatus Used:
 Lab Work:
 Soil sample was passed through sieve no. 40.
 Water was added to the taken soil sample gradually in
order to make a paste.
 The soil paste was filled in the Cassagrande apparatus, and
blows were applied.
 No of blows were counted and a graph was made to
determine the intermediate value of m.c at standard 25
blows.
 Lab Observations:
 Sample # 1 (3 ft.)
Trial A:
No of blows = 31
M.C = 29.5 %
Trial B:
No of blows = 23
M.C = 33.5%
 Sample # 2(6 ft.)
Trial A:
No of blows = 23
M.C = 32.8 %
Trial B:
No of blows = 30
M.C = 33.5%
 Sample # 3(9 ft.)
Trial A:
No of blows = 27
M.C = 26.7 %
Trial B:
No of blows = 21
M.C = 29.6%
 Sample # 4(12 ft.)
Trial A:
No of blows = 22
M.C = 29.9 %
Trial B:
No of blows = 30
M.C = 27.2%
 Sample # 1 (3 ft.)
Trial A:
M.C = 21.3 %
Trial B:
M.C = 23.1%
 Sample # 2 (6 ft.)
Trial A:
M.C = 12.5%
Trial B:
M.C =17.6 %
 Sample # 3 (9 ft.)
Trial A:
M.C = 19.3 %
Trial B:
M.C = 16.7%
 Sample # 4 (12 ft.)
Trial A:
M.C = 17.7 %
Trial B:
M.C = 19.3%
 Apparatus Used:
 Significance:
 Lab Work:
 Soil was passed through sieve # 200.
 Soil sample was filled in Permeameter in three fills and
were properly tampered.
 Time period was noted for the water to discharge, in
order to carry out important calculations.
 Laboratory Observations:
h = 41.5 in
L = 7.5 in
Q = 20 ml = 0.02 L
t = 2:30 hr = 9000 sec
A = 75.42 cm2 = 11.69 in2
K = Q L/A h t
K = 5.325 x 10-9 cm/sec
 In-situ Field Density:
 Bulk Density= 1588.19 kg/m3
 Dry Density = 1491.01 kg/m3
For well graded soil, Cu >6
1 < Cc <3
The results of experiment shown that the soil type was “poorly
graded sandy soil” and its symbol is “SP”.
For permeability, if Vale of K is less than 0.0001, than the soil
will be clayey other wise will be sandy.
Our result of experiment was 5.325 x 10^-9, and soil type came
out to be clayey.
 The foundation designing mainly depends upon the
bearing capacity of soil.
 During the test, no water table was intercepted during
the bore holes.
 The previous geotechnical studies shown that the
bearing capacity of the soil in this vicinity is about 1
ton per square feet.

More Related Content

What's hot

Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...
Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...
Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...CSCJournals
 
Correlation between cbr and index propertys of soil
Correlation between cbr and index propertys of soilCorrelation between cbr and index propertys of soil
Correlation between cbr and index propertys of soilRAJESH JAIN
 
Field compaction methods
Field compaction methodsField compaction methods
Field compaction methodsShivarajteggi
 
Site Investigation and Example of Soil Sampling
Site Investigation and Example of Soil SamplingSite Investigation and Example of Soil Sampling
Site Investigation and Example of Soil SamplingJoana Bain
 
Determination of grain size analysis by hydrometer test
Determination of grain size analysis by hydrometer testDetermination of grain size analysis by hydrometer test
Determination of grain size analysis by hydrometer testSumanHaldar8
 
Chapter 3 soil compaction and field density
Chapter 3 soil compaction and field densityChapter 3 soil compaction and field density
Chapter 3 soil compaction and field densityKENNETHIRVINJAYBARRO
 
Class 4 Soil Compaction ( Geotechnical Engineering )
Class 4    Soil Compaction ( Geotechnical Engineering )Class 4    Soil Compaction ( Geotechnical Engineering )
Class 4 Soil Compaction ( Geotechnical Engineering )Hossam Shafiq I
 
9 soil compaction
9  soil compaction9  soil compaction
9 soil compactionMarvin Ken
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTLatif Hyder Wadho
 
Soil compaction
Soil compaction Soil compaction
Soil compaction kumar9051
 
Compaction tests
Compaction testsCompaction tests
Compaction testsAmi jasani
 
Lecture soil compaction
Lecture  soil compactionLecture  soil compaction
Lecture soil compactionPookodu
 
Geotechnical aspects of highway construction
Geotechnical aspects of highway constructionGeotechnical aspects of highway construction
Geotechnical aspects of highway constructionDaljeet Sidhu
 
3.grain size analysis of soil
3.grain size analysis of soil3.grain size analysis of soil
3.grain size analysis of soilMd. Parvej
 
Class 2 Grain Size Analysis ( Geotechnical Engineering )
Class 2   Grain Size Analysis ( Geotechnical Engineering )Class 2   Grain Size Analysis ( Geotechnical Engineering )
Class 2 Grain Size Analysis ( Geotechnical Engineering )Hossam Shafiq I
 

What's hot (20)

Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...
Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...
Experimental Study to Correlate the Test Results of PBT, UCS, and CBR with Li...
 
Correlation between cbr and index propertys of soil
Correlation between cbr and index propertys of soilCorrelation between cbr and index propertys of soil
Correlation between cbr and index propertys of soil
 
Field compaction methods
Field compaction methodsField compaction methods
Field compaction methods
 
Site Investigation and Example of Soil Sampling
Site Investigation and Example of Soil SamplingSite Investigation and Example of Soil Sampling
Site Investigation and Example of Soil Sampling
 
Determination of grain size analysis by hydrometer test
Determination of grain size analysis by hydrometer testDetermination of grain size analysis by hydrometer test
Determination of grain size analysis by hydrometer test
 
Chapter 3 soil compaction and field density
Chapter 3 soil compaction and field densityChapter 3 soil compaction and field density
Chapter 3 soil compaction and field density
 
Atterberg limits test
Atterberg limits testAtterberg limits test
Atterberg limits test
 
Class 4 Soil Compaction ( Geotechnical Engineering )
Class 4    Soil Compaction ( Geotechnical Engineering )Class 4    Soil Compaction ( Geotechnical Engineering )
Class 4 Soil Compaction ( Geotechnical Engineering )
 
9 soil compaction
9  soil compaction9  soil compaction
9 soil compaction
 
Bearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPTBearing Capacity of Shallow Foundation SPT
Bearing Capacity of Shallow Foundation SPT
 
upe T99180
upe T99180upe T99180
upe T99180
 
Soil compaction
Soil compaction Soil compaction
Soil compaction
 
Compaction tests
Compaction testsCompaction tests
Compaction tests
 
Lecture soil compaction
Lecture  soil compactionLecture  soil compaction
Lecture soil compaction
 
Geotechnical aspects of highway construction
Geotechnical aspects of highway constructionGeotechnical aspects of highway construction
Geotechnical aspects of highway construction
 
Soil Compaction
Soil Compaction Soil Compaction
Soil Compaction
 
GT Lab Manual
GT Lab ManualGT Lab Manual
GT Lab Manual
 
cone Penetration test
cone Penetration testcone Penetration test
cone Penetration test
 
3.grain size analysis of soil
3.grain size analysis of soil3.grain size analysis of soil
3.grain size analysis of soil
 
Class 2 Grain Size Analysis ( Geotechnical Engineering )
Class 2   Grain Size Analysis ( Geotechnical Engineering )Class 2   Grain Size Analysis ( Geotechnical Engineering )
Class 2 Grain Size Analysis ( Geotechnical Engineering )
 

Viewers also liked

Will Shaddrix Resume
Will Shaddrix ResumeWill Shaddrix Resume
Will Shaddrix ResumeWill Shaddrix
 
LA TDT EN COLOMBIA BRANDON Y NATALY
LA TDT EN COLOMBIA BRANDON Y NATALYLA TDT EN COLOMBIA BRANDON Y NATALY
LA TDT EN COLOMBIA BRANDON Y NATALYAlejandra Gamboa
 
15 Steps to A Happy Life
15 Steps to A Happy Life15 Steps to A Happy Life
15 Steps to A Happy LifeOleg Lions
 
CV Per Giertz 2015
CV Per Giertz 2015CV Per Giertz 2015
CV Per Giertz 2015Per Giertz
 
Top 8 shipping manager resume samples
Top 8 shipping manager resume samplesTop 8 shipping manager resume samples
Top 8 shipping manager resume samplesritrafume
 
ใบงานที่ 2 ความรู้เรื่องบล็อก
ใบงานที่ 2 ความรู้เรื่องบล็อกใบงานที่ 2 ความรู้เรื่องบล็อก
ใบงานที่ 2 ความรู้เรื่องบล็อกWarittha Nokmeerod
 
υτθικ,
υτθικ,υτθικ,
υτθικ,ouran
 
Change management iiba 2011 08-25
Change management iiba 2011 08-25Change management iiba 2011 08-25
Change management iiba 2011 08-25Steve Little
 
báo giá dịch vụ giúp việc gia đình chất lượng cao tại hcm
báo giá dịch vụ giúp việc gia đình chất lượng cao tại hcmbáo giá dịch vụ giúp việc gia đình chất lượng cao tại hcm
báo giá dịch vụ giúp việc gia đình chất lượng cao tại hcmadriene727
 
Chớ xem thường các cơn đau nửa đầu, nhức đầu
Chớ xem thường các cơn đau nửa đầu, nhức đầuChớ xem thường các cơn đau nửa đầu, nhức đầu
Chớ xem thường các cơn đau nửa đầu, nhức đầuadriene727
 
Chcesz zmieniać innych? Zacznij od siebie. Jak zmotywować siebie i Zespół do...
Chcesz zmieniać innych? Zacznij od siebie.  Jak zmotywować siebie i Zespół do...Chcesz zmieniać innych? Zacznij od siebie.  Jak zmotywować siebie i Zespół do...
Chcesz zmieniać innych? Zacznij od siebie. Jak zmotywować siebie i Zespół do...Certes
 

Viewers also liked (20)

Ayman Khan CV
Ayman Khan CVAyman Khan CV
Ayman Khan CV
 
Kimia dasar I
Kimia dasar IKimia dasar I
Kimia dasar I
 
Will Shaddrix Resume
Will Shaddrix ResumeWill Shaddrix Resume
Will Shaddrix Resume
 
LA TDT EN COLOMBIA BRANDON Y NATALY
LA TDT EN COLOMBIA BRANDON Y NATALYLA TDT EN COLOMBIA BRANDON Y NATALY
LA TDT EN COLOMBIA BRANDON Y NATALY
 
Mohamed Adel2
Mohamed Adel2Mohamed Adel2
Mohamed Adel2
 
15 Steps to A Happy Life
15 Steps to A Happy Life15 Steps to A Happy Life
15 Steps to A Happy Life
 
Bermuda triangle
Bermuda triangleBermuda triangle
Bermuda triangle
 
Vgi ppt
Vgi pptVgi ppt
Vgi ppt
 
CV Per Giertz 2015
CV Per Giertz 2015CV Per Giertz 2015
CV Per Giertz 2015
 
academic transcript
academic transcriptacademic transcript
academic transcript
 
Top 8 shipping manager resume samples
Top 8 shipping manager resume samplesTop 8 shipping manager resume samples
Top 8 shipping manager resume samples
 
How
HowHow
How
 
ใบงานที่ 2 ความรู้เรื่องบล็อก
ใบงานที่ 2 ความรู้เรื่องบล็อกใบงานที่ 2 ความรู้เรื่องบล็อก
ใบงานที่ 2 ความรู้เรื่องบล็อก
 
LA TDT EN COLOMBIA
LA TDT EN COLOMBIALA TDT EN COLOMBIA
LA TDT EN COLOMBIA
 
υτθικ,
υτθικ,υτθικ,
υτθικ,
 
My fantasy world
My fantasy worldMy fantasy world
My fantasy world
 
Change management iiba 2011 08-25
Change management iiba 2011 08-25Change management iiba 2011 08-25
Change management iiba 2011 08-25
 
báo giá dịch vụ giúp việc gia đình chất lượng cao tại hcm
báo giá dịch vụ giúp việc gia đình chất lượng cao tại hcmbáo giá dịch vụ giúp việc gia đình chất lượng cao tại hcm
báo giá dịch vụ giúp việc gia đình chất lượng cao tại hcm
 
Chớ xem thường các cơn đau nửa đầu, nhức đầu
Chớ xem thường các cơn đau nửa đầu, nhức đầuChớ xem thường các cơn đau nửa đầu, nhức đầu
Chớ xem thường các cơn đau nửa đầu, nhức đầu
 
Chcesz zmieniać innych? Zacznij od siebie. Jak zmotywować siebie i Zespół do...
Chcesz zmieniać innych? Zacznij od siebie.  Jak zmotywować siebie i Zespół do...Chcesz zmieniać innych? Zacznij od siebie.  Jak zmotywować siebie i Zespół do...
Chcesz zmieniać innych? Zacznij od siebie. Jak zmotywować siebie i Zespół do...
 

Similar to Civil Engineer's Geotechnical Report for Hyderabad Project

Determination of mechanical properties of soil by Vane Shear Test, Direct sh...
Determination of mechanical properties of soil by  Vane Shear Test, Direct sh...Determination of mechanical properties of soil by  Vane Shear Test, Direct sh...
Determination of mechanical properties of soil by Vane Shear Test, Direct sh...MdAbdullahAlAslam
 
Foundation Engineering Lab Manual
Foundation Engineering Lab ManualFoundation Engineering Lab Manual
Foundation Engineering Lab ManualErankajKumar
 
Ex 6 a field density by core cutter
Ex 6 a field density by core cutterEx 6 a field density by core cutter
Ex 6 a field density by core cutterbhimaji40
 
Experiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdfExperiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdftonyfrank17
 
Experiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdfExperiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdftonyfrank17
 
DETERMINATION OF SOIL CONSISTANCY LIMITS
DETERMINATION OF SOIL CONSISTANCY LIMITSDETERMINATION OF SOIL CONSISTANCY LIMITS
DETERMINATION OF SOIL CONSISTANCY LIMITSMdAbdullahAlAslam
 
Ex 2 water content by calcium carbide method
Ex 2 water content by calcium carbide methodEx 2 water content by calcium carbide method
Ex 2 water content by calcium carbide methodbhimaji40
 
Ex 6 b field density by sand replacement method
Ex 6 b field density by sand replacement methodEx 6 b field density by sand replacement method
Ex 6 b field density by sand replacement methodbhimaji40
 
DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:MdAbdullahAlAslam
 
Foundation engineering
Foundation engineeringFoundation engineering
Foundation engineeringShaker Krupa
 
Engineering Site investigation
 Engineering Site investigation Engineering Site investigation
Engineering Site investigationVasu Goel
 
compaction test
compaction testcompaction test
compaction testBahzad5
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor testbhimaji40
 
soil classification lab
soil classification labsoil classification lab
soil classification labahmed fouad
 
Cyclic swelling behavior of clay Geotechnology
Cyclic swelling behavior of clay GeotechnologyCyclic swelling behavior of clay Geotechnology
Cyclic swelling behavior of clay GeotechnologyVinay S D Preetham
 
Site inveswtigation vandana miss
Site inveswtigation vandana missSite inveswtigation vandana miss
Site inveswtigation vandana missSHAMJITH KM
 

Similar to Civil Engineer's Geotechnical Report for Hyderabad Project (20)

Determination of mechanical properties of soil by Vane Shear Test, Direct sh...
Determination of mechanical properties of soil by  Vane Shear Test, Direct sh...Determination of mechanical properties of soil by  Vane Shear Test, Direct sh...
Determination of mechanical properties of soil by Vane Shear Test, Direct sh...
 
Foundation Engineering Lab Manual
Foundation Engineering Lab ManualFoundation Engineering Lab Manual
Foundation Engineering Lab Manual
 
Ex 6 a field density by core cutter
Ex 6 a field density by core cutterEx 6 a field density by core cutter
Ex 6 a field density by core cutter
 
Experiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdfExperiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdf
 
Experiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdfExperiment 7-Atterberg Limits.pdf
Experiment 7-Atterberg Limits.pdf
 
GE Lab manual.pdf
GE Lab manual.pdfGE Lab manual.pdf
GE Lab manual.pdf
 
DETERMINATION OF SOIL CONSISTANCY LIMITS
DETERMINATION OF SOIL CONSISTANCY LIMITSDETERMINATION OF SOIL CONSISTANCY LIMITS
DETERMINATION OF SOIL CONSISTANCY LIMITS
 
Ex 2 water content by calcium carbide method
Ex 2 water content by calcium carbide methodEx 2 water content by calcium carbide method
Ex 2 water content by calcium carbide method
 
Ex 6 b field density by sand replacement method
Ex 6 b field density by sand replacement methodEx 6 b field density by sand replacement method
Ex 6 b field density by sand replacement method
 
DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:DETERMINATION OF SOIL RESISTANCES:
DETERMINATION OF SOIL RESISTANCES:
 
Geological Site Investigation Methods
Geological Site Investigation MethodsGeological Site Investigation Methods
Geological Site Investigation Methods
 
Foundation engineering
Foundation engineeringFoundation engineering
Foundation engineering
 
Engineering Site investigation
 Engineering Site investigation Engineering Site investigation
Engineering Site investigation
 
compaction test
compaction testcompaction test
compaction test
 
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
CT-233 SOIL MECHANICS LAB MANUAL BSC Civil
 
SPT and VST- By Daanyal Umar.pptx
SPT and VST- By Daanyal Umar.pptxSPT and VST- By Daanyal Umar.pptx
SPT and VST- By Daanyal Umar.pptx
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor test
 
soil classification lab
soil classification labsoil classification lab
soil classification lab
 
Cyclic swelling behavior of clay Geotechnology
Cyclic swelling behavior of clay GeotechnologyCyclic swelling behavior of clay Geotechnology
Cyclic swelling behavior of clay Geotechnology
 
Site inveswtigation vandana miss
Site inveswtigation vandana missSite inveswtigation vandana miss
Site inveswtigation vandana miss
 

Recently uploaded

Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
Livre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdf
Livre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdfLivre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdf
Livre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdfsaad175691
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Ayisha586983
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunicationnovrain7111
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...Amil baba
 
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...shreenathji26
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...gerogepatton
 
input buffering in lexical analysis in CD
input buffering in lexical analysis in CDinput buffering in lexical analysis in CD
input buffering in lexical analysis in CDHeadOfDepartmentComp1
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxPavan Mohan Neelamraju
 

Recently uploaded (20)

Versatile Engineering Construction Firms
Versatile Engineering Construction FirmsVersatile Engineering Construction Firms
Versatile Engineering Construction Firms
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
Livre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdf
Livre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdfLivre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdf
Livre Implementing_Six_Sigma_and_Lean_A_prac([Ron_Basu]_).pdf
 
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
Submerged Combustion, Explosion Flame Combustion, Pulsating Combustion, and E...
 
The Satellite applications in telecommunication
The Satellite applications in telecommunicationThe Satellite applications in telecommunication
The Satellite applications in telecommunication
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
Uk-NO1 kala jadu karne wale ka contact number kala jadu karne wale baba kala ...
 
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
Introduction to Artificial Intelligence: Intelligent Agents, State Space Sear...
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
 
input buffering in lexical analysis in CD
input buffering in lexical analysis in CDinput buffering in lexical analysis in CD
input buffering in lexical analysis in CD
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Introduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptxIntroduction to Machine Learning Part1.pptx
Introduction to Machine Learning Part1.pptx
 

Civil Engineer's Geotechnical Report for Hyderabad Project

  • 1.
  • 2. Haider Ali Jafferi Civil Engineer Hyderabad, Sindh
  • 3. Introduction: Geotechnical investigations are performed to obtain information on the physical properties of soil and rock underlying the site to design earthworks and foundations for proposed structures, and for repair of damages to earthworks and structures ,caused by subsurface conditions
  • 4.
  • 6.  In-situ Soil Density by Core Cutter Method  Atterberg Limits  Sieve Analysis  Soil Classification by USCS  Permeability of soil by Constant Head Method
  • 7.  Apparatus Used:  Standard: ASTM D2937  Significance:  Field Work:  Soil excavated up to a depth of 3 ft.  The core cutter is driven inside the soil with the help of hammer.  Soil is trimmed around the core cutter and core cutter is removed.
  • 8.  Lab Observations: Internal dia of core cutter = 4 in Height of core cutter = 5 in Core cutter cross sectional area =πd2/4 = 12.56 in2 Mass of empty core cutter = 1383.8 g = 3.044 lbs Mass of core cutter + soil = 3017.7 g = 6.639 lbs Mass of soil =6.639 – 3.044 = 3.595 lbs Volume of core cutter = 62.8 in3 Bulk density = ρb= M2 –M1/V = 1588.1907 kg/m3 Dry density = ρd= ρb/1 + m.c = 1489.5202 kg/m3
  • 9.  Apparatus Used:  Standard Reference: ASTM D-422  Significance:  Field Work:  Bore holes are drilled with the help of earth augers.  Holes were drilled at 3 ft interval up to 12 ft and disturbed samples of the soil were collected.  Soil samples were collected in the bags and were transported to the lab for laboratory tests and observations.
  • 10.  LABORATORY OBSERVATIONS:  Sieves were arranged in the order and were tightly held on the sieve shaker.  About 500 g of soil disturbed soil sample of depth 3 ft was placed on the top sieve (sieve no 4).  Sieve shaker was then turned on and sieves were shaken for 5 minutes
  • 11. Gradation Test Results:  Sample # 1 (3 ft.) Cu=4.8 Cc=1.5 So soil is Poorly Graded (SP)  Sample # 2 (6 ft.) Cu=3.28 Cc=1.2 So soil is Poorly Graded (SP)
  • 12.  Sample # 3 (9 ft.) Cu=2.9 Cc=1.0 So soil is Poorly Graded (SP)  Sample # 4 (12 ft.) Cu=2.65 Cc=1.1 So soil is Poorly Graded (SP)
  • 13.  Standard Reference: ASTM D431  Significance:  Liquid Limit:  Apparatus Used:  Lab Work:  Soil sample was passed through sieve no. 40.  Water was added to the taken soil sample gradually in order to make a paste.  The soil paste was filled in the Cassagrande apparatus, and blows were applied.  No of blows were counted and a graph was made to determine the intermediate value of m.c at standard 25 blows.
  • 14.  Lab Observations:  Sample # 1 (3 ft.) Trial A: No of blows = 31 M.C = 29.5 % Trial B: No of blows = 23 M.C = 33.5%  Sample # 2(6 ft.) Trial A: No of blows = 23 M.C = 32.8 % Trial B: No of blows = 30 M.C = 33.5%
  • 15.  Sample # 3(9 ft.) Trial A: No of blows = 27 M.C = 26.7 % Trial B: No of blows = 21 M.C = 29.6%  Sample # 4(12 ft.) Trial A: No of blows = 22 M.C = 29.9 % Trial B: No of blows = 30 M.C = 27.2%
  • 16.  Sample # 1 (3 ft.) Trial A: M.C = 21.3 % Trial B: M.C = 23.1%  Sample # 2 (6 ft.) Trial A: M.C = 12.5% Trial B: M.C =17.6 %  Sample # 3 (9 ft.) Trial A: M.C = 19.3 % Trial B: M.C = 16.7%  Sample # 4 (12 ft.) Trial A: M.C = 17.7 % Trial B: M.C = 19.3%
  • 17.  Apparatus Used:  Significance:  Lab Work:  Soil was passed through sieve # 200.  Soil sample was filled in Permeameter in three fills and were properly tampered.  Time period was noted for the water to discharge, in order to carry out important calculations.
  • 18.  Laboratory Observations: h = 41.5 in L = 7.5 in Q = 20 ml = 0.02 L t = 2:30 hr = 9000 sec A = 75.42 cm2 = 11.69 in2 K = Q L/A h t K = 5.325 x 10-9 cm/sec
  • 19.  In-situ Field Density:  Bulk Density= 1588.19 kg/m3  Dry Density = 1491.01 kg/m3 For well graded soil, Cu >6 1 < Cc <3 The results of experiment shown that the soil type was “poorly graded sandy soil” and its symbol is “SP”. For permeability, if Vale of K is less than 0.0001, than the soil will be clayey other wise will be sandy. Our result of experiment was 5.325 x 10^-9, and soil type came out to be clayey.
  • 20.  The foundation designing mainly depends upon the bearing capacity of soil.  During the test, no water table was intercepted during the bore holes.  The previous geotechnical studies shown that the bearing capacity of the soil in this vicinity is about 1 ton per square feet.