The document summarizes the modernization of the University of Bristol's existing data center and plans for a new second data center. It discusses how the existing data center was upgraded from legacy switches to Cisco Nexus switches with copper and fiber connectivity. It also addresses challenges in configuring the legacy switches and moving from Fibre Channel storage to iSCSI. Plans for the new data center include geographic diversity, sub-2ms connectivity between sites to allow for synchronous storage, and architecting services to work across multiple data centers. The future plans include using Nexus 9k switches with APIC and integrating F5 load balancers and Hyper-V into the network architecture.