ISTGTemplateRev08.17.04
eSP
Post Implementation Review
(PIR)
2
PPPMC – PM, Version 2.0
Agenda
Learning Objectives
PIR Purpose
Old and New Environments
PIR Process
Exercises
References
New Glossary Terms
Test
3
PPPMC – PM, Version 2.0
Learning Objectives
Describe the importance of performing a
Post Implementation Review (PIR)
Describe the new opportunity for sharing
learnings
Describe the timing and use of the PIR
process
Conduct the PIR process
4
PPPMC – PM, Version 2.0
PIR Purpose
Improve the quality of future products
Make life easier for future project teams
NOT to celebrate
5
PPPMC – PM, Version 2.0
Fulfilling the PIR Purpose
Proliferate proven BKMs
Identify and fix current process gaps
Learn from our mistakes
Identify opportunities for standardization
Identify opportunities for automation
6
PPPMC – PM, Version 2.0
PIR Requirements
Reference
the PIR section
of the OSP
7
PPPMC – PM, Version 2.0
Why is a PIR important?
We want to and need to improve our
methods for developing products
– Better
– Faster
– Cheaper
Sets aside time when we can focus on
process improvement
Provides an efficient way to proliferate
improvements
8
PPPMC – PM, Version 2.0
Old Environment
Learnings
New
project
New
project
New
project
Database
Learning
Learning
Learning
Learning
Learning
Learning
Learnings
Old
Project
9
PPPMC – PM, Version 2.0
New Environment…
…New Opportunities
eSP
Project
Learnings
Project
Learnings
Project
Learnings
10
PPPMC – PM, Version 2.0
PIR Process Development
Requirement - must take advantage of the
new environment
Constraint – PIR meeting must not exceed
2 hours
Due to the constraint, a survey must be
utilized
11
PPPMC – PM, Version 2.0
PIR Process
PIR planning is done during the Planning
Phase
Reference
eBG-PD-23-
Post Implementation Review.doc
12
PPPMC – PM, Version 2.0
Completing the Survey
Reference
eBG-PD-23-
Post Implementation Review.doc
and eBG-PC-42-
Post Implementation Review Survey.doc
Survey intentionally does not have
leading questions and is not constricting
Survey is short so that participants can put
substantial thought into improving methods
13
PPPMC – PM, Version 2.0
Determining the Root Cause
Identify the issue
Ask “Why” the issue occurred
For each of the answers, ask “Why” again
Repeat until you know what actions or
circumstances caused the issue to occur
Limit yourself to 4 levels of causes
Concentrate on resolving the most critical
root causes (what can we do to make sure
this never happens again)
14
PPPMC – PM, Version 2.0
ExerciseExercise
For each issue, determine the root cause(s)
For each root cause, provide a resolution
that is repeatable by every future project
15
PPPMC – PM, Version 2.0
Exercise #1Exercise #1
16. Describe the most crucial issue experienced during the execution of the project.
I bought eggs at the store and we already had eggs.
17. Why did this issue occur (root cause)?
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
16
PPPMC – PM, Version 2.0
Exercise #2Exercise #2
16. Describe the most crucial issue experienced during the execution of the project.
VCR didn’t record because it was programmed incorrectly.
17. Why did this issue occur (root cause)?
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
17
PPPMC – PM, Version 2.0
Exercise #3Exercise #3
16. Describe the most crucial issue experienced during the execution of the project.
Ran out of gas because the gas gauge is still broken.
17. Why did this issue occur (root cause)?
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted, additional
collateral required, training, communication requirements, etc.
18
PPPMC – PM, Version 2.0
Consolidating Survey Results
Extract information from the surveys
Complete root cause analysis and resolution if possible
Record results in the spreadsheet or presentation
Reference
eBG-PD-23-
Post Implementation Review.doc
and
eBG-TP-55-PIR Survey Results.xls
19
PPPMC – PM, Version 2.0
Extracting Process Improvements
Successful activities
– Determine if the item is a valid BKM
– Determine why the BKM is not part of a process
(root cause)
– Is it a tip?
– Determine the resolution (how to make it part of the
process)
Issues
– Ensure root cause(s) is identified and accurate
– Ensure there is a valid resolution for each root
cause
20
PPPMC – PM, Version 2.0
PIR Meeting Preparation
Each ‘Tip’ must have an action plan
The ‘Open Items’ will be dispositioned
during the meeting
Reference
eBG-TP-45-Post Implementation Review
Presentation Template.ppt
21
PPPMC – PM, Version 2.0
ExerciseExercise
For each survey result, determine:
– what action the PM should take; and
– where to document each result in the
presentation template
22
PPPMC – PM, Version 2.0
Exercise #4Exercise #4
16
.
Describe the most crucial issue experienced during the execution of the project.
Though I think our Risks were comprehensive from a detailed level, I think we
missed identifying risks in entire areas, like with regard to integration.
17
.
Why did this issue occur (root cause)?
There are too many possible risks to think of all the different areas where risks
may occur.
18
.
What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
Create a checklist or taxonomy to help with risk identification so we don’t miss
an area like integration, including common attributes of risks within each area.
23
PPPMC – PM, Version 2.0
Exercise #5Exercise #5
1
.
Describe the most successful activity performed by project team members that
provided the most benefit to the project.
Communication Plan was a good tool that provided thorough communication.
2
.
Was the activity performed as a result of strictly
following an existing eSP process? Yes/No
Yes
3
.
If yes to question 2, does the eSP process explicitly
and clearly require that this activity be performed in
the manner that this project performed the activity?
Yes/No
Yes
4
.
If no to question 2, does an eSP process or
template exist where this BKM could be
documented so it could be used by all projects?
Yes/No
5
.
If yes to question 4, which eSP process?
24
PPPMC – PM, Version 2.0
Exercise #6Exercise #6
16
.
Describe the most crucial issue experienced during the execution of the project.
There were a lot of last minute design changes.
17
.
Why did this issue occur (root cause)?
18
.
What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
25
PPPMC – PM, Version 2.0
Exercise #7Exercise #7
16. Describe the most crucial issue experienced during the execution of the project.
Lots of swirl deciding on the best training approach, i.e., 3 day boot camp, 1 day
workshop, WBT. Final 1 day workshop approach worked very well but decision
was painful. Team used Consensus Decision-making.
17. Why did this issue occur (root cause)?
Training lead does not have skills to lead a group through a decision process.
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
26
PPPMC – PM, Version 2.0
Exercise #8Exercise #8
1
.
Describe the most successful activity performed by project team members that
provided the most benefit to the project.
For XP projects, Sharepoint tracking of the build process has greatly reduced
the number of emails flying around, which is good.
2
.
Was the activity performed as a result of strictly
following an existing eSP process? Yes/No
No
3
.
If yes to question 2, does the eSP process explicitly
and clearly require that this activity be performed in
the manner that this project performed the activity?
Yes/No
4
.
If no to question 2, does an eSP process or
template exist where this BKM could be
documented so it could be used by all projects?
Yes/No
No
5
.
If yes to question 4, which eSP process?
27
PPPMC – PM, Version 2.0
Exercise #9Exercise #9
16. Describe the most crucial issue experienced during the execution of the project.
We skipped code reviews because we didn't have time to do them. I think the
quality would have been much better had we actually performed reviews.
17. Why did this issue occur (root cause)?
Process was not followed because the project manager said we didn’t have to.
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
28
PPPMC – PM, Version 2.0
Conducting the PIR Meeting
See QAP for meeting specifications
Most of the meeting is used to develop
process resolutions to complex issues the
project encountered
Reference
eBG-OS-03-Quality Assurance Plan.doc
and eBG-PD-23-
Post Implementation Review.doc
29
PPPMC – PM, Version 2.0
Prioritization Techniques
Don’t spend too much time on this activity
Try to prioritize quickly with simple
discussion
There may be no time to address the lower
priority items
Use a formal technique only if necessary
(more time consuming)
– Nominal Group Technique
– Weighted Multivoting
30
PPPMC – PM, Version 2.0
Root Cause Analysis Technique
Use fishbone diagram
– (a.k.a. cause and effect or Ishikawa diagram)
This should be a quick analysis
– Get to a conclusion quickly
– We are brainstorming - there is no one right answer
– This is not going to get published, so don’t be a
perfectionist
You may only get a couple of these completed
in one hour
Limit yourself to 4 levels of causes
31
PPPMC – PM, Version 2.0
Exercise #10 (optional)Exercise #10 (optional)
 As a class, perform a root cause analysis on the
problem statement listed on the attachment
Root Cause
Template
32
PPPMC – PM, Version 2.0
Closing Out the PIR
Submit process change requests
Complete Action Plans for Tips
Archive presentation and minutes
Communicate results
33
PPPMC – PM, Version 2.0
Summary
Don’t wait until the PIR to submit
process improvements
Project Management skills needed
– Individual and group root cause analysis
– Prioritization
– Process change request extraction and
submission
34
PPPMC – PM, Version 2.0
New Glossary Terms
* A complete list of Glossary Terms & Definitions located at:
http://ebg.intel.com/cmmi/glossaries.htm
Term Definition
35
PPPMC – PM, Version 2.0
References
eBG-OS-01-Organizational Standard
Process.doc
eBG-OS-03-Quality Assurance Plan.doc
eBG-PD-23-Post Implementation Review.doc
eBG-PC-42-Post Implementation Review
Survey.doc
eBG-TP-55-PIR Survey Results.xls
eBG-TP-45-Post Implementation Review
Presentation Template.ppt
36
PPPMC – PM, Version 2.0
YOUR AR: COMPLETE COURSE TESTYOUR AR: COMPLETE COURSE TEST
 Complete course test within two weeks for credit
– A score of 80% is required to pass and receive Intel U
credit
 Where do I find the course test?
– ISTG’s online learning tool CourseTracker
http://elearning.intel.com/ct/default.asp?
– Click Course Catalog
– Click Search
– Enter PIR Test
– Instructors will give you specific course tests to take
 Purpose of a course test?
– Verify knowledge transferred as a result of training
– Measure effectiveness of our training
37
PPPMC – PM, Version 2.0
Backup
38
PPPMC – PM, Version 2.0
Exercise #1Exercise #1
16. Describe the most crucial issue experienced during the execution of the project.
I bought eggs at the store and we already had eggs.
17. Why did this issue occur (root cause)?
• I didn’t check to see if we needed eggs.
• I didn’t have a list.
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
Create a list before I go to the store, checking what we are out of. Perhaps
create a template with standard items and a check box for each to make sure I
consistently check the current inventory of regularly purchased items before I go
to the store.
39
PPPMC – PM, Version 2.0
Exercise #2Exercise #2
16. Describe the most crucial issue experienced during the execution of the project.
VCR didn’t record because it was programmed incorrectly.
17. Why did this issue occur (root cause)?
• I didn’t know how to program it.
o There is no on-screen programming capability.
o I didn’t read the instructions.
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted,
additional collateral required, training, communication requirements, etc.
Always read the instructions of any new appliance or electronics.
40
PPPMC – PM, Version 2.0
Exercise #3Exercise #3
16. Describe the most crucial issue experienced during the execution of the project.
Ran out of gas because the gas gauge is still broken.
17. Why did this issue occur (root cause)?
• Haven’t had the gas gauge fixed.
o Haven’t had time.
o Didn’t think it was important.
• Couldn’t remember the mileage on the odometer when I last filled up the gas tank.
18. What specifically can be done to ensure that the issue will not occur on another
project? Think about which eSP process or collateral would be impacted, additional
collateral required, training, communication requirements, etc.
• (major bullet is not the root cause; see sub-bullets)
o Improve time management (take a time management course)
o Adjust my prioritization criteria because of the high impact (spent 2 hours
getting gas)
• Use odometer that can be reset, OR put paper and pencil in the car to record
mileage.
41
PPPMC – PM, Version 2.0
Exercise #4Exercise #4
This should be the most common type of issue information returned from a survey.
This results in a process change request being submitted from the resolution field.
Exercise #5Exercise #5
This accomplishment results from following an existing process. No action is
required, and simply validates the existing process.
Exercise #6Exercise #6
Not enough information exists to perform a root cause analysis, or even determine if
there is a valid issue. If this appears on multiple surveys, the item may be added to
the Open Items list in the presentation for group root cause analysis. Otherwise, no
action is possible.
42
PPPMC – PM, Version 2.0
Exercise #7Exercise #7
Action must be taken (the right thing to do for Intel, the next project, and the next
project’s team members). However, this should not be documented or included in
the presentation, but should be dealt with offline.
Exercise #8Exercise #8
Since the process does not mandate how to track the build process, this should be
included in the presentation as a Tip, with an appropriate action plan to proliferate
the learning.
Exercise #9Exercise #9
The existing process was not followed, with poor results. No action is required. The
actions taken by the PM should show up during Focal.
43
PPPMC – PM, Version 2.0
Exercise #10 (optional)Exercise #10 (optional)
Sample solution:
Root Cause
Template

More Related Content

What's hot

4 Project Management Challenges and Solutions
4 Project Management Challenges and Solutions4 Project Management Challenges and Solutions
4 Project Management Challenges and SolutionsProjector PSA
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningOpenLearningLab
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...GlobalSkillup
 
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingJustAcademy
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Hussain Bandukwala
 
2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)Nguyen Toan
 
E Commerce Project Charter
E Commerce Project CharterE Commerce Project Charter
E Commerce Project Charterbrianbish10795
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesErin Jones
 
PMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKPMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKskiltful
 
6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)DavidMcLachlan1
 
7 Principles of PRINCE 2
7 Principles of PRINCE 27 Principles of PRINCE 2
7 Principles of PRINCE 2Barry Hodge
 
site design project charter
site design project chartersite design project charter
site design project charterAmr Zoair
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution ProcessC K Vishwakarma
 
PRINCE2 Sample Project by Frank Turley
PRINCE2 Sample Project by Frank TurleyPRINCE2 Sample Project by Frank Turley
PRINCE2 Sample Project by Frank TurleyFrank Turley
 

What's hot (20)

EP Project Charter OpenWells2.3
EP Project Charter OpenWells2.3EP Project Charter OpenWells2.3
EP Project Charter OpenWells2.3
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 
4 Project Management Challenges and Solutions
4 Project Management Challenges and Solutions4 Project Management Challenges and Solutions
4 Project Management Challenges and Solutions
 
PMO - Delivering Business Results
PMO - Delivering Business ResultsPMO - Delivering Business Results
PMO - Delivering Business Results
 
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project PlanningSDPM - Lecture 2 -The STEP WISE Approach to Project Planning
SDPM - Lecture 2 -The STEP WISE Approach to Project Planning
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
 
Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)Setting up a Project Management Office (PMO)
Setting up a Project Management Office (PMO)
 
2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)
 
E Commerce Project Charter
E Commerce Project CharterE Commerce Project Charter
E Commerce Project Charter
 
PMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO CapabilitiesPMO 2.0 - Building PMO Capabilities
PMO 2.0 - Building PMO Capabilities
 
PMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOKPMP Certification Chapter one Summary of PMBOK
PMP Certification Chapter one Summary of PMBOK
 
6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)6.5 The Forward and Backward Pass (Critical Path)
6.5 The Forward and Backward Pass (Critical Path)
 
7 Principles of PRINCE 2
7 Principles of PRINCE 27 Principles of PRINCE 2
7 Principles of PRINCE 2
 
13 project stakeholders management
13 project stakeholders management13 project stakeholders management
13 project stakeholders management
 
site design project charter
site design project chartersite design project charter
site design project charter
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
PRINCE2 Sample Project by Frank Turley
PRINCE2 Sample Project by Frank TurleyPRINCE2 Sample Project by Frank Turley
PRINCE2 Sample Project by Frank Turley
 
Project Charter
Project CharterProject Charter
Project Charter
 

Viewers also liked

Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review TemplateEdmond Cheng
 
eXtreme programming
eXtreme programmingeXtreme programming
eXtreme programmingJean Pаoli
 
Mgmt forum MTC 5
Mgmt forum MTC 5Mgmt forum MTC 5
Mgmt forum MTC 5Jean Pаoli
 
Design patterns intro
Design patterns introDesign patterns intro
Design patterns introJean Pаoli
 
Innovation management speaker notes
Innovation management speaker notesInnovation management speaker notes
Innovation management speaker notesJean Pаoli
 
CMMi 4 techstaff
CMMi 4 techstaffCMMi 4 techstaff
CMMi 4 techstaffJean Pаoli
 
Stress management
Stress managementStress management
Stress managementJean Pаoli
 
SW development process and the leading indicator
SW development process and the leading indicatorSW development process and the leading indicator
SW development process and the leading indicatorJean Pаoli
 
Cohr managing stress training
Cohr managing stress trainingCohr managing stress training
Cohr managing stress trainingJean Pаoli
 
Effective prioritization & zbb
Effective prioritization & zbbEffective prioritization & zbb
Effective prioritization & zbbJean Pаoli
 
Diversity in thinking styles (part 1)
Diversity in thinking styles (part 1)Diversity in thinking styles (part 1)
Diversity in thinking styles (part 1)Jean Pаoli
 

Viewers also liked (20)

Post Implementation Review Template
Post Implementation Review TemplatePost Implementation Review Template
Post Implementation Review Template
 
Lesson Learned Report
Lesson Learned ReportLesson Learned Report
Lesson Learned Report
 
eXtreme programming
eXtreme programmingeXtreme programming
eXtreme programming
 
Mgmt forum MTC 5
Mgmt forum MTC 5Mgmt forum MTC 5
Mgmt forum MTC 5
 
Design patterns
Design patternsDesign patterns
Design patterns
 
Design patterns intro
Design patterns introDesign patterns intro
Design patterns intro
 
Stress
StressStress
Stress
 
Innovation management speaker notes
Innovation management speaker notesInnovation management speaker notes
Innovation management speaker notes
 
CMMi 4 techstaff
CMMi 4 techstaffCMMi 4 techstaff
CMMi 4 techstaff
 
08060 c foils
08060 c foils08060 c foils
08060 c foils
 
Stress management
Stress managementStress management
Stress management
 
SW development process and the leading indicator
SW development process and the leading indicatorSW development process and the leading indicator
SW development process and the leading indicator
 
Cohr managing stress training
Cohr managing stress trainingCohr managing stress training
Cohr managing stress training
 
Effective prioritization & zbb
Effective prioritization & zbbEffective prioritization & zbb
Effective prioritization & zbb
 
PMP study TTT
PMP study TTTPMP study TTT
PMP study TTT
 
Diversity in thinking styles (part 1)
Diversity in thinking styles (part 1)Diversity in thinking styles (part 1)
Diversity in thinking styles (part 1)
 
Pmp study: time
Pmp study: timePmp study: time
Pmp study: time
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Unified process
Unified processUnified process
Unified process
 
Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 

Similar to PMC post implementation review

ContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxbobbywlane695641
 
Methodology Patterns (Agile Cambridge 2014)
Methodology Patterns (Agile Cambridge 2014)Methodology Patterns (Agile Cambridge 2014)
Methodology Patterns (Agile Cambridge 2014)Giovanni Asproni
 
DevOPs Transformation Workshop
DevOPs Transformation WorkshopDevOPs Transformation Workshop
DevOPs Transformation WorkshopJules Pierre-Louis
 
Project Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions ManualProject Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions ManualKemppe
 
New pmp exam webinar slide no annotation (No Annotation)
New pmp exam webinar slide  no annotation (No Annotation)New pmp exam webinar slide  no annotation (No Annotation)
New pmp exam webinar slide no annotation (No Annotation)CliffordEgbomeade
 
The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)CliffordEgbomeade
 
How To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement BaselineHow To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement BaselineGlen Alleman
 
How To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement BaselineHow To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement Baselineguest9da059
 
Feedback loops - the second way towards the world of DevOps
Feedback loops - the second way towards the world of DevOpsFeedback loops - the second way towards the world of DevOps
Feedback loops - the second way towards the world of DevOpsTapio Rautonen
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 
Enterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC GroupEnterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC GroupEPC Group
 
Starting a SPC project blog series
Starting a SPC project blog seriesStarting a SPC project blog series
Starting a SPC project blog seriesInfodream
 
Lean Software Development
Lean Software DevelopmentLean Software Development
Lean Software DevelopmentSaqib Raza
 
Brandon LangTIM 105Prof. Desa1272018Final Examination.docx
Brandon LangTIM 105Prof. Desa1272018Final Examination.docxBrandon LangTIM 105Prof. Desa1272018Final Examination.docx
Brandon LangTIM 105Prof. Desa1272018Final Examination.docxjasoninnes20
 
Managing Develop of Large Systems
Managing Develop of Large SystemsManaging Develop of Large Systems
Managing Develop of Large SystemsDaniloPereira341965
 
Sony Ericsson Case Study
Sony Ericsson Case StudySony Ericsson Case Study
Sony Ericsson Case Studyguest8537cf
 

Similar to PMC post implementation review (20)

ContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docxContentsTeam Work Schedule3Team Task Assignment3Project .docx
ContentsTeam Work Schedule3Team Task Assignment3Project .docx
 
Methodology Patterns (Agile Cambridge 2014)
Methodology Patterns (Agile Cambridge 2014)Methodology Patterns (Agile Cambridge 2014)
Methodology Patterns (Agile Cambridge 2014)
 
DevOPs Transformation Workshop
DevOPs Transformation WorkshopDevOPs Transformation Workshop
DevOPs Transformation Workshop
 
Project Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions ManualProject Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions Manual
 
New pmp exam webinar slide no annotation (No Annotation)
New pmp exam webinar slide  no annotation (No Annotation)New pmp exam webinar slide  no annotation (No Annotation)
New pmp exam webinar slide no annotation (No Annotation)
 
The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)The New PMP Exam: Changes and Implications (With Annotation)
The New PMP Exam: Changes and Implications (With Annotation)
 
How To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement BaselineHow To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement Baseline
 
How To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement BaselineHow To Build A Credible Performance Measurement Baseline
How To Build A Credible Performance Measurement Baseline
 
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
 
Pm unit 1,2,3,4,5,6
Pm unit 1,2,3,4,5,6Pm unit 1,2,3,4,5,6
Pm unit 1,2,3,4,5,6
 
Feedback loops - the second way towards the world of DevOps
Feedback loops - the second way towards the world of DevOpsFeedback loops - the second way towards the world of DevOps
Feedback loops - the second way towards the world of DevOps
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Enterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC GroupEnterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC Group
 
Starting a SPC project blog series
Starting a SPC project blog seriesStarting a SPC project blog series
Starting a SPC project blog series
 
agile methods.docx
agile methods.docxagile methods.docx
agile methods.docx
 
Lean Software Development
Lean Software DevelopmentLean Software Development
Lean Software Development
 
Brandon LangTIM 105Prof. Desa1272018Final Examination.docx
Brandon LangTIM 105Prof. Desa1272018Final Examination.docxBrandon LangTIM 105Prof. Desa1272018Final Examination.docx
Brandon LangTIM 105Prof. Desa1272018Final Examination.docx
 
Managing Develop of Large Systems
Managing Develop of Large SystemsManaging Develop of Large Systems
Managing Develop of Large Systems
 
Sony Ericsson Case Study
Sony Ericsson Case StudySony Ericsson Case Study
Sony Ericsson Case Study
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 

Recently uploaded

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 

Recently uploaded (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 

PMC post implementation review

  • 2. 2 PPPMC – PM, Version 2.0 Agenda Learning Objectives PIR Purpose Old and New Environments PIR Process Exercises References New Glossary Terms Test
  • 3. 3 PPPMC – PM, Version 2.0 Learning Objectives Describe the importance of performing a Post Implementation Review (PIR) Describe the new opportunity for sharing learnings Describe the timing and use of the PIR process Conduct the PIR process
  • 4. 4 PPPMC – PM, Version 2.0 PIR Purpose Improve the quality of future products Make life easier for future project teams NOT to celebrate
  • 5. 5 PPPMC – PM, Version 2.0 Fulfilling the PIR Purpose Proliferate proven BKMs Identify and fix current process gaps Learn from our mistakes Identify opportunities for standardization Identify opportunities for automation
  • 6. 6 PPPMC – PM, Version 2.0 PIR Requirements Reference the PIR section of the OSP
  • 7. 7 PPPMC – PM, Version 2.0 Why is a PIR important? We want to and need to improve our methods for developing products – Better – Faster – Cheaper Sets aside time when we can focus on process improvement Provides an efficient way to proliferate improvements
  • 8. 8 PPPMC – PM, Version 2.0 Old Environment Learnings New project New project New project Database Learning Learning Learning Learning Learning Learning Learnings Old Project
  • 9. 9 PPPMC – PM, Version 2.0 New Environment… …New Opportunities eSP Project Learnings Project Learnings Project Learnings
  • 10. 10 PPPMC – PM, Version 2.0 PIR Process Development Requirement - must take advantage of the new environment Constraint – PIR meeting must not exceed 2 hours Due to the constraint, a survey must be utilized
  • 11. 11 PPPMC – PM, Version 2.0 PIR Process PIR planning is done during the Planning Phase Reference eBG-PD-23- Post Implementation Review.doc
  • 12. 12 PPPMC – PM, Version 2.0 Completing the Survey Reference eBG-PD-23- Post Implementation Review.doc and eBG-PC-42- Post Implementation Review Survey.doc Survey intentionally does not have leading questions and is not constricting Survey is short so that participants can put substantial thought into improving methods
  • 13. 13 PPPMC – PM, Version 2.0 Determining the Root Cause Identify the issue Ask “Why” the issue occurred For each of the answers, ask “Why” again Repeat until you know what actions or circumstances caused the issue to occur Limit yourself to 4 levels of causes Concentrate on resolving the most critical root causes (what can we do to make sure this never happens again)
  • 14. 14 PPPMC – PM, Version 2.0 ExerciseExercise For each issue, determine the root cause(s) For each root cause, provide a resolution that is repeatable by every future project
  • 15. 15 PPPMC – PM, Version 2.0 Exercise #1Exercise #1 16. Describe the most crucial issue experienced during the execution of the project. I bought eggs at the store and we already had eggs. 17. Why did this issue occur (root cause)? 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc.
  • 16. 16 PPPMC – PM, Version 2.0 Exercise #2Exercise #2 16. Describe the most crucial issue experienced during the execution of the project. VCR didn’t record because it was programmed incorrectly. 17. Why did this issue occur (root cause)? 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc.
  • 17. 17 PPPMC – PM, Version 2.0 Exercise #3Exercise #3 16. Describe the most crucial issue experienced during the execution of the project. Ran out of gas because the gas gauge is still broken. 17. Why did this issue occur (root cause)? 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc.
  • 18. 18 PPPMC – PM, Version 2.0 Consolidating Survey Results Extract information from the surveys Complete root cause analysis and resolution if possible Record results in the spreadsheet or presentation Reference eBG-PD-23- Post Implementation Review.doc and eBG-TP-55-PIR Survey Results.xls
  • 19. 19 PPPMC – PM, Version 2.0 Extracting Process Improvements Successful activities – Determine if the item is a valid BKM – Determine why the BKM is not part of a process (root cause) – Is it a tip? – Determine the resolution (how to make it part of the process) Issues – Ensure root cause(s) is identified and accurate – Ensure there is a valid resolution for each root cause
  • 20. 20 PPPMC – PM, Version 2.0 PIR Meeting Preparation Each ‘Tip’ must have an action plan The ‘Open Items’ will be dispositioned during the meeting Reference eBG-TP-45-Post Implementation Review Presentation Template.ppt
  • 21. 21 PPPMC – PM, Version 2.0 ExerciseExercise For each survey result, determine: – what action the PM should take; and – where to document each result in the presentation template
  • 22. 22 PPPMC – PM, Version 2.0 Exercise #4Exercise #4 16 . Describe the most crucial issue experienced during the execution of the project. Though I think our Risks were comprehensive from a detailed level, I think we missed identifying risks in entire areas, like with regard to integration. 17 . Why did this issue occur (root cause)? There are too many possible risks to think of all the different areas where risks may occur. 18 . What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc. Create a checklist or taxonomy to help with risk identification so we don’t miss an area like integration, including common attributes of risks within each area.
  • 23. 23 PPPMC – PM, Version 2.0 Exercise #5Exercise #5 1 . Describe the most successful activity performed by project team members that provided the most benefit to the project. Communication Plan was a good tool that provided thorough communication. 2 . Was the activity performed as a result of strictly following an existing eSP process? Yes/No Yes 3 . If yes to question 2, does the eSP process explicitly and clearly require that this activity be performed in the manner that this project performed the activity? Yes/No Yes 4 . If no to question 2, does an eSP process or template exist where this BKM could be documented so it could be used by all projects? Yes/No 5 . If yes to question 4, which eSP process?
  • 24. 24 PPPMC – PM, Version 2.0 Exercise #6Exercise #6 16 . Describe the most crucial issue experienced during the execution of the project. There were a lot of last minute design changes. 17 . Why did this issue occur (root cause)? 18 . What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc.
  • 25. 25 PPPMC – PM, Version 2.0 Exercise #7Exercise #7 16. Describe the most crucial issue experienced during the execution of the project. Lots of swirl deciding on the best training approach, i.e., 3 day boot camp, 1 day workshop, WBT. Final 1 day workshop approach worked very well but decision was painful. Team used Consensus Decision-making. 17. Why did this issue occur (root cause)? Training lead does not have skills to lead a group through a decision process. 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc.
  • 26. 26 PPPMC – PM, Version 2.0 Exercise #8Exercise #8 1 . Describe the most successful activity performed by project team members that provided the most benefit to the project. For XP projects, Sharepoint tracking of the build process has greatly reduced the number of emails flying around, which is good. 2 . Was the activity performed as a result of strictly following an existing eSP process? Yes/No No 3 . If yes to question 2, does the eSP process explicitly and clearly require that this activity be performed in the manner that this project performed the activity? Yes/No 4 . If no to question 2, does an eSP process or template exist where this BKM could be documented so it could be used by all projects? Yes/No No 5 . If yes to question 4, which eSP process?
  • 27. 27 PPPMC – PM, Version 2.0 Exercise #9Exercise #9 16. Describe the most crucial issue experienced during the execution of the project. We skipped code reviews because we didn't have time to do them. I think the quality would have been much better had we actually performed reviews. 17. Why did this issue occur (root cause)? Process was not followed because the project manager said we didn’t have to. 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc.
  • 28. 28 PPPMC – PM, Version 2.0 Conducting the PIR Meeting See QAP for meeting specifications Most of the meeting is used to develop process resolutions to complex issues the project encountered Reference eBG-OS-03-Quality Assurance Plan.doc and eBG-PD-23- Post Implementation Review.doc
  • 29. 29 PPPMC – PM, Version 2.0 Prioritization Techniques Don’t spend too much time on this activity Try to prioritize quickly with simple discussion There may be no time to address the lower priority items Use a formal technique only if necessary (more time consuming) – Nominal Group Technique – Weighted Multivoting
  • 30. 30 PPPMC – PM, Version 2.0 Root Cause Analysis Technique Use fishbone diagram – (a.k.a. cause and effect or Ishikawa diagram) This should be a quick analysis – Get to a conclusion quickly – We are brainstorming - there is no one right answer – This is not going to get published, so don’t be a perfectionist You may only get a couple of these completed in one hour Limit yourself to 4 levels of causes
  • 31. 31 PPPMC – PM, Version 2.0 Exercise #10 (optional)Exercise #10 (optional)  As a class, perform a root cause analysis on the problem statement listed on the attachment Root Cause Template
  • 32. 32 PPPMC – PM, Version 2.0 Closing Out the PIR Submit process change requests Complete Action Plans for Tips Archive presentation and minutes Communicate results
  • 33. 33 PPPMC – PM, Version 2.0 Summary Don’t wait until the PIR to submit process improvements Project Management skills needed – Individual and group root cause analysis – Prioritization – Process change request extraction and submission
  • 34. 34 PPPMC – PM, Version 2.0 New Glossary Terms * A complete list of Glossary Terms & Definitions located at: http://ebg.intel.com/cmmi/glossaries.htm Term Definition
  • 35. 35 PPPMC – PM, Version 2.0 References eBG-OS-01-Organizational Standard Process.doc eBG-OS-03-Quality Assurance Plan.doc eBG-PD-23-Post Implementation Review.doc eBG-PC-42-Post Implementation Review Survey.doc eBG-TP-55-PIR Survey Results.xls eBG-TP-45-Post Implementation Review Presentation Template.ppt
  • 36. 36 PPPMC – PM, Version 2.0 YOUR AR: COMPLETE COURSE TESTYOUR AR: COMPLETE COURSE TEST  Complete course test within two weeks for credit – A score of 80% is required to pass and receive Intel U credit  Where do I find the course test? – ISTG’s online learning tool CourseTracker http://elearning.intel.com/ct/default.asp? – Click Course Catalog – Click Search – Enter PIR Test – Instructors will give you specific course tests to take  Purpose of a course test? – Verify knowledge transferred as a result of training – Measure effectiveness of our training
  • 37. 37 PPPMC – PM, Version 2.0 Backup
  • 38. 38 PPPMC – PM, Version 2.0 Exercise #1Exercise #1 16. Describe the most crucial issue experienced during the execution of the project. I bought eggs at the store and we already had eggs. 17. Why did this issue occur (root cause)? • I didn’t check to see if we needed eggs. • I didn’t have a list. 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc. Create a list before I go to the store, checking what we are out of. Perhaps create a template with standard items and a check box for each to make sure I consistently check the current inventory of regularly purchased items before I go to the store.
  • 39. 39 PPPMC – PM, Version 2.0 Exercise #2Exercise #2 16. Describe the most crucial issue experienced during the execution of the project. VCR didn’t record because it was programmed incorrectly. 17. Why did this issue occur (root cause)? • I didn’t know how to program it. o There is no on-screen programming capability. o I didn’t read the instructions. 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc. Always read the instructions of any new appliance or electronics.
  • 40. 40 PPPMC – PM, Version 2.0 Exercise #3Exercise #3 16. Describe the most crucial issue experienced during the execution of the project. Ran out of gas because the gas gauge is still broken. 17. Why did this issue occur (root cause)? • Haven’t had the gas gauge fixed. o Haven’t had time. o Didn’t think it was important. • Couldn’t remember the mileage on the odometer when I last filled up the gas tank. 18. What specifically can be done to ensure that the issue will not occur on another project? Think about which eSP process or collateral would be impacted, additional collateral required, training, communication requirements, etc. • (major bullet is not the root cause; see sub-bullets) o Improve time management (take a time management course) o Adjust my prioritization criteria because of the high impact (spent 2 hours getting gas) • Use odometer that can be reset, OR put paper and pencil in the car to record mileage.
  • 41. 41 PPPMC – PM, Version 2.0 Exercise #4Exercise #4 This should be the most common type of issue information returned from a survey. This results in a process change request being submitted from the resolution field. Exercise #5Exercise #5 This accomplishment results from following an existing process. No action is required, and simply validates the existing process. Exercise #6Exercise #6 Not enough information exists to perform a root cause analysis, or even determine if there is a valid issue. If this appears on multiple surveys, the item may be added to the Open Items list in the presentation for group root cause analysis. Otherwise, no action is possible.
  • 42. 42 PPPMC – PM, Version 2.0 Exercise #7Exercise #7 Action must be taken (the right thing to do for Intel, the next project, and the next project’s team members). However, this should not be documented or included in the presentation, but should be dealt with offline. Exercise #8Exercise #8 Since the process does not mandate how to track the build process, this should be included in the presentation as a Tip, with an appropriate action plan to proliferate the learning. Exercise #9Exercise #9 The existing process was not followed, with poor results. No action is required. The actions taken by the PM should show up during Focal.
  • 43. 43 PPPMC – PM, Version 2.0 Exercise #10 (optional)Exercise #10 (optional) Sample solution: Root Cause Template

Editor's Notes

  1. The quality of future products can be improved by improving the way the products are developed. WLE (Work Life Effectiveness) Help future projects avoid pitfalls Help future projects avoid long hours Help future projects succeed This is NOT where we celebrate our success. The celebration needs to be a separate event. The PIR is hard work. Need to stay focused on the task. Requires considerable thought. Celebrating our success should not be work.
  2. What have we proven to work that should be repeated by future projects? Where do the existing processes not meet our needs? What do we want to make sure future projects don’t do? Where can we standardize – the benefits here are the same as those for driving us toward having standard processes across the organization? Where can we automate tasks? Simple tasks that are repeated many times Complex tasks that are prone to error
  3. (Last 2 sentences in the OSP will be discussed during the review of the process) Notice the timing – “prior to closure”. PLC project closure has the successful completion of a PIR as an entry criteria. Known by many names – retrospective, post mortem, post implementation review. Our PIR is different than any other at Intel due to our new opportunities (to be described later).
  4. If we want to remain competitive, we must improve quality and efficiency. We must continually move forward. CMMI is a process improvement framework. Insanity: doing the same thing over and over again and expecting different results. - Albert Einstein
  5. This is the environment that most all of Intel is currently in. Once learnings are identified, the trick is to be able to effectively pass these learnings along to future projects. The people from the old project go on to new projects and hopefully will take at least some of the learnings with them. This usually limits the learnings passed along to the domains of the personnel passed along. If you are fortunate enough to have a database or website where learnings can be archived (the shaded part of the picture), new projects can find relevant learnings to apply to their project. This relies on a pull system (the end user having the desire and time to go get the information), and a structure that allows a person to find relevant learnings within a large database. Hopefully the project personnel will have the time, desire, and mechanisms to sift through the information and find something meaningful to his/her project. Relying on ‘hope’ for the foundation for process improvement is not very reassuring (hope people take learnings with them; hope new projects have experienced people on them; hope PMs will/can find applicable learnings in a large database; hope new projects are aware of pitfalls experienced by past projects; hope the word gets passed along). The Intel retrospective web site states that incorporating BKMs/Key Learning’s into subsequent projects is the most challenging part of the process! And that having no closed loop to require key learning’s to be considered for subsequent projects is a major issue. WE HAVE AN OPPORTUNITY TO RESOLVE THIS.
  6. This is the environment that ISTG is in. This provides us with a huge advantage that affords us some great opportunities. All projects use the standard processes. Each project incorporates its learnings back into the standard processes. This enables a project to share its learnings (using a push system) with the entire organization, all geographies, and all applications. So the objective of the PIR is to improve future projects by identifying and sharing learnings, preferably by using the process change control procedures.
  7. The JAD that developed the PIR process decided that the PIR meeting must not exceed 2 hours, which meant that a survey taken prior to the meeting must be used to collect information from which to derive the learnings.
  8. Review tables 3.1 and 3.2, including notes. Table 3.1: Planning is done early in the life cycle (during the Planning Phase), immediately after the entry criteria has been met. Entry criteria – names do not necessarily have to be assigned to roles, as long as you know which roles need to participate (including any stakeholder who uses the processes). The PIR must be conducted at the end of the project. However, the PIR process may be utilized at additional points in the life cycle (e.g., at the end of a phase, or after an event like a delivery by a supplier). Table 3.2: Go to the survey tool and walk through how to set up a survey. Survey tool provides anonymity if that is important (some groups find this important, other groups want to know who sent the information – this can vary by country and is dependent on the culture). Notice the timing of the PIR in the Notes. A completed PIR is an entry criteria to PLC Closure. The standard survey MUST be used, and CANNOT be modified, but CAN be appended with additional questions if desired.
  9. Review table 3.3, including notes. Table 3.3: Survey participants must include the project manager, all personnel attending the PIR meeting, and those stakeholders who will not attend the PIR meeting but have used the processes. These individuals are identified in the PMP. Notice the objective in step 1. Review eBG-PC-42-Post Implementation Review Survey.doc. Survey: Survey asks for 3 most successful activities, and 3 biggest pain points. This is the team’s opportunity to improve the next project and fix what is broken. Describe the successful activity in enough detail that the process can be updated with the information. ‘Enough detail’ means that future projects can execute these successful BKMs. The description of the crucial issue and its root causes are steps to the objective, which is the resolution and hence the process improvement/learning. The expectation of those surveyed is that substantial thought be put into what went well and what didn’t. Substantial thought must be put into the root cause and resolution for the PIR activity to add any value. Quality (process) improvement must be a way of life for us, and this takes a concerted effort. The resolution of each root cause of an issue is the process improvement. The root cause and resolution must be in enough detail to effectively initiate a process change.
  10. Take time to really think about ‘why’ the issue occurred. Make this an informal analysis. Use paper and pencil if necessary, but this may be able to be done in your head if the issue is simple enough. There is no “right” answer, so don’t worry about getting it wrong. Think about what could have existed so that this issue would not have occurred on your project. This is the process improvement. Please document this as the resolution. You may have several resolutions, especially if there is more than one root cause. If you can’t figure out the resolution, just document the issue and root cause(s), leaving the resolution blank. If you can’t figure out the root cause, just document the issue and leave the rest blank (but make sure you put forward a legitimate attempt at identifying the root cause). FOR THE RESOLUTION: Think about the existing process. What would have helped prevent this from occurring? Add a template (checklist; taxonomy; email template; etc.). Add a field to a template. Add descriptive/instructional text (in italics) to the field of a form. Add a comment with instructions to an Excel cell. Add an item to a list (a role to the R&R org standard; an item to an existing checklist; etc.). Clarify a process step. Assign a different role to a process step. Process should require that a record be archived. Etc., etc., etc.
  11. As a class, complete these exercises. Complete the survey table for each example with the root cause(s) and resolution(s). Do not spend more than 3-4 minutes on each exercise (1-2 minutes may suffice).
  12. Assumption: No known errors were made during programming (so you didn’t know how to program it).
  13. Review table 3.4, EXCLUDING notes. Table 3.4: eBG-TP-45-Post Implementation Review Presentation Template.ppt will be reviewed in a subsequent slide. Concentrate only on extracting the results from the surveys and recording them on either the survey results spreadsheet (for process change requests) or the presentation template (either as learnings/tips that are not process improvements, or as open items to be analyzed during the PIR meeting). This step is to organize the feedback from the surveys. Combine duplicate issues or successes. The root causes may not be identical, so list all unique root causes and resolutions that are valid. This will require a new mindset. Try to apply every resolution and BKM to processes since this is the most effective way to proliferate the learnings. Most all learnings will be able to be applied to a process, and very few will need to be tips.
  14. Review the notes in table 3.4. Survey (eBG-PC-42-Post Implementation Review Survey.doc): Successful activities If question 2/7/12 is answered “no”, determine if the BKM is truly better than the existing process, and why the process was not followed (root cause). If questions 3/8/13 is answered “yes”, then there is no further action required. The BKM is already required. If question 3/8/13 is answered “no”, then the BKM is not included, or is not clear, in the existing process and needs a process change request. If question 4/9/14 is answered either “yes” or “no”, a process change request is needed. The answer to questions 4 and 5 help determine the resolution. Issues For questions 17/19/22, verify that these are the root causes. Complete the root cause analysis if incomplete or missing. For questions 18/20/23, verify that the resolution will prevent the issue from occurring in the future, and correct or embellish if necessary. Ensure that each root cause has a resolution.
  15. Complete the template through the ‘Open Items’ page. The remainder of the template is to be used to document the decisions made during the meeting, and to document meeting minutes. Any ‘Tip’ without an action plan probably will not be able to be used in the future. Sensitive issues (e.g., human resource issues) may be dealt with offline and not documented. The time-boxed agenda provided is only a guideline. Make a best-guess as to the priority of the Open Issues and list them in order of importance, highest importance first.
  16. As a class, discuss what action the PM should take. Refer to the speaker notes on the previous slide to help disposition each example. Do not spend more than 3-4 minutes on each exercise (1-2 minutes will be all that is needed on most).
  17. Assumption: the process does not mandate how to track the build process.
  18. Review table 3.5. Table 3.5: Open the process change request spreadsheet (eBG-TP-55-PIR Survey Results.xls embedded in the presentation) and validate the proposed change requests that will be submitted. Validate the ‘Tips’ and corresponding ‘Action Plans’.
  19. When addressing the Open Issues, take a little time (but not too long) to prioritize them since analysis time is limited. Start by asking if there are any disagreements with the order in which they appear, with the highest priority being listed first. Try to come to a quick resolution as to the priority. If agreement cannot be reached, use a more formal technique. THIS IS NOT A SKILLS CLASS. Nominal Group Technique Assign a letter to each item (first item is A, second item is B,…). Assume 5 items on the list. The most important item receives a 5, the next most important receives a 4, … and the least important receives a 1. The highest priority MUST have the highest value so a non-vote (equating to 0) does not increase an items priority. Each participant ranks the items and assigns a score, 5 through 1. The project manager adds the rankings for each item. The sum for each item indicates is priority, with the highest sum receiving the highest priority. Limit the number of rankings to 10, even if there are more than 10 items. Each participant only ranks the top 10 items, with all other items receiving a 0 from that participant. Weighted Multivoting Assign a letter to each item (first item is A, second item is B,…). Assume 5 items on the list. Each participant has 100 votes to distribute among the items. A participant may give all 100 votes to a single item, or spread the votes among several items depending on their relative importance. The project manager adds the ratings for each item. The sum for each item indicates is priority, with the highest sum receiving the highest priority. If the sums are close, another round may be performed between the items with close vote totals.
  20. THIS IS NOT A SKILLS CLASS. Use fishbone diagram (a.k.a. cause and effect or Ishikawa diagram). You may only get a couple of these completed in one hour, so make sure you prioritize. Make sure everyone agrees on the problem statement. Include as much information as possible on the “what,” “where,” “when,” and “how much” of the problem. Use data to specify the problem. Modify the categories of the major bones to fit the situation. Keep asking “why” until you have reached the root cause (go no more than 4 levels deep). A root cause may appear multiple times. These root causes may be more critical than others. Visio has a root cause template (see attachment).
  21. Perform the root cause analysis as a class. Using a white board would be easiest, but this can also be done via NetMeeting by completing the Visio attachment above. This exercise will take approximately 10-15 minutes).
  22. Review tables 3.6 and 3.7. Table 3.6: Process Coach will submit the process change requests. Table 3.7: Archive the PIR presentation/minutes in the project records repository.
  23. Students should be referred to the web site for the most current list of terms and definitions.
  24. Write the test codes on the board and be prepared to give them to the students.
  25. There are 2 resolutions, one for each root cause. Both root cause resolutions could be a combination of a process and a template.
  26. There are 2 root causes. The first root cause has no resolution (unless we want to buy a new VCR). Some root causes will not have resolutions. Notice that the second root cause resolution does NOT state that I should go back and read the VCR instructions. This only addresses the symptom, and is a bandage. We need to ensure we fix the root cause for future project, which in this case needs to address ALL appliances and electronics so I know how to use them.
  27. It is important to precisely state the issue. Notice that the “gas gauge is STILL broken”, putting the issue in context. So the gas gauge did not JUST break. Also notice that this is a compound issue signified by ‘because’, so there are actually 2 related issues. If one issue is resolved, the other goes away, but both may need to be resolved due to the length of time to fix the primary issue. There are 3 root causes, and 3 resolutions. The last resolution has 2 alternatives. The EPG may choose one, or may include tailoring criteria if both are accepted.