Introduction
We are given an assignment that involves three modules,
which are Construction Technology 1, Building Materials, and
Measurement 1 by writing a report for our construction site visit.
The construction site visit was organized on Thursday 19th
November 2015. Lecturers have told us about the safety precautions
which we have to obey by wearing safety helmet, proper clothes and
shoes. We gathered at Taylor’s University Lakeside campus around
8am and go to site visit by bus.
The construction site is located at Seksyen2A, Antara Gapi,
Hulu Selangor, Selangor. This project is to construct 96 unit twin
house (40’ x 60’). The contractor of this project is Siak Siong
Construction Sdn Bhd.
The aim of this site visit is to expose us for a better
understanding about what we had learnt in the classroom such as the
construction process,construction equipment and those building
materials and technology on site.
Technical Observation
1.Process of Constructing a Pad Footing
So for this report, we are required to study on pad footing. For
the process of constructing the pad footing, at first the professional
site surveyors will position the location and the size of the pad
footing. And then they will stake out the footprint to mark corner for
the building’s pad footing.
After that, excavation process starts. The depth of the
excavation is determined by the structural engineers. For the project
of the site we visited, the excavation depth of the pad footing which
still in progress is 1.5m.
After the excavation, pour a layer of lean concrete on it.
Then, the workers start to build up the formwork according to the
size and the drawing staked. Add some spacer blocks so to lay the
reinforcement bars with accurate spacing. Next, lay the main rebar
and the transverse rebar. Then, erect the reinforcement for stump
and tied the reinforcement bars with links. Moreover, add more ties
to the formwork. Lastly, pour the concrete in.
The formwork moulds the fresh concrete that will be poured in,
which is in the stage normally viscous, to the shape specified in the
drawing. Generally, the formwork is to be removed after hardening
of the concrete placed. To be noted, the concrete used is Grade 30.
2.Material Used to Construct a Pad Footing
Concrete Grade30, is the main material used for this pad footing.
Concrete is a composite material composed of aggregate bonded
together with fluid cement which hardens over time. The grade of
the concrete means the concrete compression resistance at 28 days.
The proportion for the concrete grade 30 is 1:2:4. This method is
showing the amount of cement, sand and course aggregate in the
concrete.
For the formwork which will be removed after the hardening of
the concrete, material used is timber. This is the most common
material used for bracing members to the form face. Besides that,
timber formwork can be constructed at lower initial cost due to
higher availability and cheaper production cost.
The most important part is the reinforcement bar, it is a common
steel bar that is hot rolled and is used widely in the construction
industry. Steel is strong in tension at the same time being ductile
enough to be shaped or bent. Moreover, the interaction between
reinforcement steel and concrete is free of disadvantages in terms of
chemical and physical disadvantages.
Pad footing on the site
Removing the formwork
Reinforcement bar in the column stump
Colum stump
Fabricated reinforcement bar
Reinforcement bars tied with binder
Excavator at the site
Crane at the site
3 types of proposal of houses
Pad footing layout plan
House layout plan
Cement at the site
Bricks at the site
Constructing the ground beam
Scaffolding on the site
Building the house
Conclusion
After visiting the site, I can truly understand the situation of
the construction site. I realized that working at the construction site
is much more difficult that we used to think, as the terrible hot
weather and the existence of danger.
This site visit gave me a chance to have a better understanding
about the basics of the construction process. Besides that, I have
witness the usage of construction equipment and the mechanical
plants. The most important is, I have explored myself to identify
various types of building materials and technology on site.
In campus, we just learn the knowledge based on slde or books
that given by the lecturers. So site visit is totally different as you can
witness and feel the real life working in the construction site.
I do really appreciate to have the chance to pay a visit to the
construction site. I wish to have more practical knowledge to gain
more experiences as to prepare myself in my future work as a QS. In
overall, it was a great experience for me.
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Bachelor of Quantity Surveying (Honours)
INTEGRATED ASSIGNMENT:
MEASUREMENT I (QSB60104)
CONSTRUCTION TECHNOLOGY I (BLD 60104)
BUILDING MATERIALS (BLD 62003)
SITE VISIT REPORT
STUDENT NAME: Liew Li Wen
STUDENT ID NO.: 0324297
DATE OF SUBMISSION: 26/11/2015
CONTENT
Introduction------------------------------------- 1
Technical Observation------------------------- 2-3
Photos & Description--------------------------- 4-12
Conclusion--------------------------------------- 13

More Related Content

What's hot

CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
Site visit report.
Site visit report.Site visit report.
Site visit report.Man Yee
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1Zi Shan
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING Ram1239
 
Buildng construction report
Buildng construction reportBuildng construction report
Buildng construction reportClara Lee
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1KhangWei Chin
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction siteUmair Ali
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanAnis Rahman Khokan
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential ConstructionMayank Walecha
 

What's hot (20)

CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report.
Site visit report.Site visit report.
Site visit report.
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Buildng construction report
Buildng construction reportBuildng construction report
Buildng construction report
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Internship review (Civil Engineering)
Internship review (Civil Engineering)Internship review (Civil Engineering)
Internship review (Civil Engineering)
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Site report
Site reportSite report
Site report
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Civil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman KhokanCivil Engineering Internship Presentation-Anis Rahman Khokan
Civil Engineering Internship Presentation-Anis Rahman Khokan
 
Report on Residential Construction
Report on Residential ConstructionReport on Residential Construction
Report on Residential Construction
 

Viewers also liked

Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013
Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013
Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013Business of Software Conference
 
International business sweden trip
International business sweden tripInternational business sweden trip
International business sweden triptpoynton
 
Geography final presentation
Geography final presentationGeography final presentation
Geography final presentationjordancadena1
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part BPang Shuen
 
Report on field work to salt range by tariq aziz
Report on field work to salt range by tariq azizReport on field work to salt range by tariq aziz
Report on field work to salt range by tariq aziztariq aziz
 
Internship report on ptcl 2014 final
Internship report on ptcl 2014 finalInternship report on ptcl 2014 final
Internship report on ptcl 2014 finalImran Malik
 
Field trip report writeup
Field trip report writeupField trip report writeup
Field trip report writeupAmake
 
A project report on retail industry in india
A project report on retail industry in indiaA project report on retail industry in india
A project report on retail industry in indiaProjects Kart
 
project-report-on-big-bazaar
 project-report-on-big-bazaar project-report-on-big-bazaar
project-report-on-big-bazaarTajinder Singh
 
A project report on hr practice in hotel industry
A project report on hr practice in hotel industryA project report on hr practice in hotel industry
A project report on hr practice in hotel industryProjects Kart
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building ConstructionEsmael Aragaw
 

Viewers also liked (20)

Trip Report
Trip ReportTrip Report
Trip Report
 
London trip
London tripLondon trip
London trip
 
0722 System of Rice Intensification: Group I Field Report. Tripura, India
0722 System of Rice Intensification: Group I Field Report. Tripura, India0722 System of Rice Intensification: Group I Field Report. Tripura, India
0722 System of Rice Intensification: Group I Field Report. Tripura, India
 
Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013
Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013
Business of Software Conference Kevin Davis Yammer Trip Report BoS 2013
 
International business sweden trip
International business sweden tripInternational business sweden trip
International business sweden trip
 
Project brief
Project briefProject brief
Project brief
 
Geography final presentation
Geography final presentationGeography final presentation
Geography final presentation
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part B
 
Report on field work to salt range by tariq aziz
Report on field work to salt range by tariq azizReport on field work to salt range by tariq aziz
Report on field work to salt range by tariq aziz
 
Internship report on ptcl 2014 final
Internship report on ptcl 2014 finalInternship report on ptcl 2014 final
Internship report on ptcl 2014 final
 
Traditional & online banking
Traditional & online bankingTraditional & online banking
Traditional & online banking
 
Field Trips
Field TripsField Trips
Field Trips
 
Field trip report writeup
Field trip report writeupField trip report writeup
Field trip report writeup
 
A project report on retail industry in india
A project report on retail industry in indiaA project report on retail industry in india
A project report on retail industry in india
 
Field Trip
Field TripField Trip
Field Trip
 
Retail project report
Retail project reportRetail project report
Retail project report
 
project-report-on-big-bazaar
 project-report-on-big-bazaar project-report-on-big-bazaar
project-report-on-big-bazaar
 
A project report on hr practice in hotel industry
A project report on hr practice in hotel industryA project report on hr practice in hotel industry
A project report on hr practice in hotel industry
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 

Similar to Site visit-report-nov2015

Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site reportw ss
 
Site visit report
Site visit reportSite visit report
Site visit reportshensin1015
 
Site report algel
Site report algelSite report algel
Site report algelAlgel Yee
 
individual site report sem 1 degree
individual site report sem 1 degreeindividual site report sem 1 degree
individual site report sem 1 degreeLam Wee
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorKai Yun Pang
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docxShze Hwa Lee
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visitPui San
 
Site report
Site reportSite report
Site reportvaylu
 
Introduction
IntroductionIntroduction
IntroductionLam Yu
 

Similar to Site visit-report-nov2015 (20)

Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Site report
Site reportSite report
Site report
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site report
Site reportSite report
Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report algel
Site report algelSite report algel
Site report algel
 
individual site report sem 1 degree
individual site report sem 1 degreeindividual site report sem 1 degree
individual site report sem 1 degree
 
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, SelangorAssignment 1 - Antara Gapi, Hulu Selangor, Selangor
Assignment 1 - Antara Gapi, Hulu Selangor, Selangor
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docx
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Site report
Site reportSite report
Site report
 
site report
site reportsite report
site report
 
Introduction
IntroductionIntroduction
Introduction
 
Site report
Site reportSite report
Site report
 
Site Report
Site ReportSite Report
Site Report
 
Case Study Report
Case Study ReportCase Study Report
Case Study Report
 

Recently uploaded

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substationstephanwindworld
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 

Recently uploaded (20)

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Earthing details of Electrical Substation
Earthing details of Electrical SubstationEarthing details of Electrical Substation
Earthing details of Electrical Substation
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 

Site visit-report-nov2015

  • 1. Introduction We are given an assignment that involves three modules, which are Construction Technology 1, Building Materials, and Measurement 1 by writing a report for our construction site visit. The construction site visit was organized on Thursday 19th November 2015. Lecturers have told us about the safety precautions which we have to obey by wearing safety helmet, proper clothes and shoes. We gathered at Taylor’s University Lakeside campus around 8am and go to site visit by bus. The construction site is located at Seksyen2A, Antara Gapi, Hulu Selangor, Selangor. This project is to construct 96 unit twin house (40’ x 60’). The contractor of this project is Siak Siong Construction Sdn Bhd. The aim of this site visit is to expose us for a better understanding about what we had learnt in the classroom such as the construction process,construction equipment and those building materials and technology on site.
  • 2. Technical Observation 1.Process of Constructing a Pad Footing So for this report, we are required to study on pad footing. For the process of constructing the pad footing, at first the professional site surveyors will position the location and the size of the pad footing. And then they will stake out the footprint to mark corner for the building’s pad footing. After that, excavation process starts. The depth of the excavation is determined by the structural engineers. For the project of the site we visited, the excavation depth of the pad footing which still in progress is 1.5m. After the excavation, pour a layer of lean concrete on it. Then, the workers start to build up the formwork according to the size and the drawing staked. Add some spacer blocks so to lay the reinforcement bars with accurate spacing. Next, lay the main rebar and the transverse rebar. Then, erect the reinforcement for stump and tied the reinforcement bars with links. Moreover, add more ties to the formwork. Lastly, pour the concrete in. The formwork moulds the fresh concrete that will be poured in, which is in the stage normally viscous, to the shape specified in the drawing. Generally, the formwork is to be removed after hardening of the concrete placed. To be noted, the concrete used is Grade 30.
  • 3. 2.Material Used to Construct a Pad Footing Concrete Grade30, is the main material used for this pad footing. Concrete is a composite material composed of aggregate bonded together with fluid cement which hardens over time. The grade of the concrete means the concrete compression resistance at 28 days. The proportion for the concrete grade 30 is 1:2:4. This method is showing the amount of cement, sand and course aggregate in the concrete. For the formwork which will be removed after the hardening of the concrete, material used is timber. This is the most common material used for bracing members to the form face. Besides that, timber formwork can be constructed at lower initial cost due to higher availability and cheaper production cost. The most important part is the reinforcement bar, it is a common steel bar that is hot rolled and is used widely in the construction industry. Steel is strong in tension at the same time being ductile enough to be shaped or bent. Moreover, the interaction between reinforcement steel and concrete is free of disadvantages in terms of chemical and physical disadvantages.
  • 4. Pad footing on the site Removing the formwork
  • 5. Reinforcement bar in the column stump Colum stump
  • 7. Excavator at the site Crane at the site
  • 8. 3 types of proposal of houses
  • 9. Pad footing layout plan House layout plan
  • 10. Cement at the site Bricks at the site
  • 11. Constructing the ground beam Scaffolding on the site
  • 13. Conclusion After visiting the site, I can truly understand the situation of the construction site. I realized that working at the construction site is much more difficult that we used to think, as the terrible hot weather and the existence of danger. This site visit gave me a chance to have a better understanding about the basics of the construction process. Besides that, I have witness the usage of construction equipment and the mechanical plants. The most important is, I have explored myself to identify various types of building materials and technology on site. In campus, we just learn the knowledge based on slde or books that given by the lecturers. So site visit is totally different as you can witness and feel the real life working in the construction site. I do really appreciate to have the chance to pay a visit to the construction site. I wish to have more practical knowledge to gain more experiences as to prepare myself in my future work as a QS. In overall, it was a great experience for me.
  • 14. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) INTEGRATED ASSIGNMENT: MEASUREMENT I (QSB60104) CONSTRUCTION TECHNOLOGY I (BLD 60104) BUILDING MATERIALS (BLD 62003) SITE VISIT REPORT STUDENT NAME: Liew Li Wen STUDENT ID NO.: 0324297 DATE OF SUBMISSION: 26/11/2015
  • 15. CONTENT Introduction------------------------------------- 1 Technical Observation------------------------- 2-3 Photos & Description--------------------------- 4-12 Conclusion--------------------------------------- 13