Introduction to Lean Six Sigma for
Black Belt Candidates
Master Black Belt
Julian Kalac, P.Eng.
1
2
1) Understand and learn how to use Lean Six Sigma
tools and methods at the Black Belt level
1) Be able to apply the process improvement tools and
methods learned to solve problems, improve
performance and achieve desired goals
2) Think more objectively, critically and analytically
using data to make key decisions
4
MEASURE
•Map/measure the process
•Collect lots of data
ANALYZE
•Organize and analyze the data and
information to Identify failure
modes, problems, root causes
CONTROL
•Maintain, monitor and
control variation
•Preventively fix root causes
IMPROVE
•Plan, apply, deploy Improvement Tools
•Correctively fix failure modes
DEFINE
•Identify standards, metrics, objectives, CUSTOMER PROBLEMS
Define
Measure
AnalyzeImprove
Control
Results
Define
Measure
AnalyzeImprove
Control
Results
Applied projects
following the
DMAIC Model
Define
Measure
AnalyzeImprove
Control
Results
Define
Measure
AnalyzeImprove
Control
Results
Applied Learning
Theory Practice
Coached Projects
 Training typically
occurs over a 4-6
month period
using a Learn 
Apply; Learn
Apply; … format.
 Projects that solve
real performance
problems in your
organization are
part of the
certification and
learning process
Recognize:
•Find problems
•Link to organization's needs
•Form teams, define resources
•Understand program req’ts
Deploy:
•Validate
improved
performance
that stays in
place
6
2) Clearly Define your Problem and the Impact
Example:
Too many mistakes in purchase request specifications are causing
rework rates of 34%, high costs and late deliveries (less than 50% on
time) to our customers
1) Find
• Customer Issues
• Performance
Reviews
• Meetings
• New Projects
• Failures, Re-work
• Projects
• Continuous
improvement
activities
• Champions
• Stakeholders
• Employees
• SCOR Maps
• Research
• Brainstorm
• Wait until the
crisis hits you
• Value Stream
Maps
3) Clearly State the Initial Scope for your project
(Set targets and timelines!)
Example:
This first phase of this project – by 3Q 2004 - will identify problems
and root causes in the purchase request process, increase first pass
yield rates to 95%, reduce the cost of poor quality by 50% and
increase on-time deliveries to our customers to greater than 90%
4) Link improvement targets to customer needs and
organizational objectives
5) Project Plan – Charter, Resources, Milestones
7
Process Flow
for Measure Phase
Data
Storage
and
Archiving
What data do we need?
Can we use “old” historical data?
Is old data (still) usable?
How was it collected?
Wisdom
Knowledge
Data
Information
Wisdom
Knowledge
Data
Information
Wisdom
Knowledge
Data
Information
Data Selection
Data Integrity Analysis
Data Collection
Measurement System Analysis
Process Mapping
 Use Statistical tools to analyze data
 Look for significant factors
 Plot your analysis in charts
 Transform the results into action plans
8
86420
Median
Mean
2.502.252.001.751.501.251.00
Anderson-Darling Normality Test
Variance 2.5808
Skewness 1.75512
Kurtosis 3.79022
N 47
Minimum 0.0000
A-Squared
1st Quartile 0.7500
Median 1.5000
3rd Quartile 2.2500
Maximum 7.7500
95% Confidence Interval for Mean
1.3847
1.98
2.3281
95% Confidence Interval for Median
1.0948 2.0000
95% Confidence Interval for StDev
1.3350 2.0177
P-Value < 0.005
Mean 1.8564
StDev 1.6065
95% Confidence Intervals
Summary for 2005 downtime
9
PROBLEM
FINDING
FACT
FINDING
PROBLEM
DEFINITION
IDEA
FINDING
EVAL. &
SELECT
PLAN
ACCEPT
-ANCE
ACTION
1
2
3
4
6
7
8
5
Select
Tool
Analyze Data & Information Apply tools & Make Changes
Six
Sigma
Projects
5S PM/TPM TQM
Rapid Improve-
ment Event
Integrated
Process
Team (IPT)
Establish Baselines/Metrics
Other CI
Tools
Kanban DFSS
ApplytheTool
(1)
(2)
(3)Implement / Deploy Fixes
(0) Identify failure points, bottlenecks and improvement
opportunities from Define-Measure-Analyze Phases
PM = Preventive Maintenance
TPM = Total Productive Maintenance
CI = Continuous Improvement
DFSS = Design for Six Sigma
TQM = Total Quality Management
Maintaining and Improving Control:
 Managing Change
 Quality Management Systems
 What’s Left? What’s Next?
10
Control Tools:
• POKA YOKE
• Statistical Process Control
(SPC)
• “Spec” Control
Document
Procedures and
Best Practices
Create Visual
Controls and
“Dashboards”
Update
Deployment
Plan
Complete
Control
Plan FMEA
Update and Deploy
Communication
Plan
Execute
Deployment Plan
Document Other
Opportunities
Prepare and
Implement
Control Plan
Report out,
Hand-off and
Closure
Prepare and
Implement Training
Plan
Process Flow Diagram for Control Phase:
11
Deploy:
•Validate improved
performance that stays in
place
•Spread improvements
across the enterprise
•Harvest the performance
improvements
•Change the culture
•Where else can you tale the improvements
•Look further upstream
•Look further downstream
•What about other customers
•What about “re-fixing” processes you
already fixed
| | 12
 “Lean” is a Japanese methodology that focuses
on producing high quality products
faster, better and at lowest cost.
 Lean is about eliminating waste (scrap, rework)
and doing things right the 1st time.
 Lean is NOT ELIMINATING JOBS!
 The goal is that “you don’t work harder, but
rather smarter”
| | 14
 Customers demand shorter lead
times, improved quality & reduced prices
 Increase through-put and quality and reduce
time wasted and frustration by working on non-
value add activities.
 Gain new business
| | 15
INSANITY “Doing the
same thing over and
over again and expecting
different results”
Albert Einstein
| | 16 16
Change cycle
How people feel
Keep momentum
moving
MOST CRITICAL
TIME IN CHANGES
After results from
changes are seen
17
Single Piece Flow Just-In-Time Eliminate Waste
•Process parts one-at-a-
time or in small lots
instead of in large
batches or economies of
scale
•Quick changeovers
•Balanced and
continuous flows instead
of stop and start
processing
•Have just the right
amount of inventory you
need, when you need
it, where you need it
•Optimize the amount of
inventory required
•Ensure that your
resources are ready to
support the flow
•Never knowingly pass
on a defect
•Improve the capability
of your processes
•Fix failure modes when
they occur
•Determine and resolve
the deeper root causes
= =
The Toyota Production System
Model by Michael Kukhta Reference: Senji Niwa, from the Shingijutsu Organization. Niwa-san also worked directly for Toyota’s Taiichi Ohno (TPS creator) for 18 years.
“Classic Lean”
Strength
“Supply Chain
Management” Strength
“Classic Six
Sigma” Strength
 The systematic elimination of waste and re-
alignment of resources to deliver value to the
customer faster, better, & more consistently
 Lean is:
◦ Focus: Eliminate waste, non-value add steps, process
constraints and bottle necks that cause problems in work
throughput
18
Leading to Leading toEliminate
Waste
Reduced
Cycle Times
Increased
Capacity
| | 19
1. Lean training to understand why? and how?
2. Value Stream Mapping -Current & Future State
3. Eliminate waste and non-value add work
4. Identify process bottlenecks and improve
them
5. Cross Functional Training
| | 20
1. Defects-creating wasted (scrap)
2. Reworking fixing mistakes
3. OVERPRODUCING to make up for lost time
4. WAITING for material, people, instructions
5. WALKING looking for tools, material, people,
6. MOVEMENT handling of material, paperwork
7. INVENTORY Inventories of parts more than
needed (WIP)
| | 21
Not utilizing the full capabilities of
employees
Inadequately trained people
Over relying on a select few
High overtime increasing pressure and
stress
| | 22
 High-Level Process Map
 Suppliers, Departments, Custo
mers
 Mid-Level Process Map
 Specific Area ex Production
 Detail-Level Process Map
 Specific process/operation
 (most commonly used)
Stop
Start
Stop
Start
Start
Stop
Stop
SCOR (Supply Chain Operations Reference) Model:
Structured around Five CORE Process Types
SCOR Model
Customer’s
Customer
Supplier’s
Supplier
Supplier
Internal or
External
Customer
Internal or
External
Your Company
Plan
Make DeliverSource Make /
Repair
DeliverMakeSourceDeliver SourceDeliverSource
Return Return Return
Return Return Return Return Return
Plan Plan
Provides Framework for your Transformation / Improvement Projects.
• Defining the boundaries / scope of the supply chain .
• Evaluate the supply chain’s strengths and weaknesses.
• Industry benchmarks, standardized terms, metrics,
Enables a total enterprise view of a supply chain
Customer
Batch
WIP 1
Test
failures
Batch
WIP 2
Production
Defects
detected
Customer
Defects
Late
Orders
QC
I
Rework
Test
Rejects
QC
I2REWORK1
Sub-Assy
Riveting
Shipping
Supplier
Sub-Assy2
WIP2
Final-Assy
Test 2
Hurry Need
To ship!!!
NVA = 38%
Cost = 32%
DLV+Scrap
VA= 62%
| | 25
15 coils/shift 8 20 26 39 31 10 20
4
13
19
20 8 40 20 20 20
20 20 20 20
Start Loop coils
180 deg
twist & prep
Skin Electric
Press
Coil form
Model
check
M/C tapePre-tape
Final Tape
Apply
Mylar
Micalast
Load
Micalastic
Impregnation
Final
Press &
Cure
Remove
Mylar
Final
gauge
ECP
Tape
ECP
oven
cure
Strand &
Final testPack &
Ship
Stop
Rotation schedule:
Based on the cycle times above every 2Hrs, Rotate Final Taping operators
with operators from “Skinning”, Electric Pressing. Coil forming & Model-
checking.
This will increase productivity from 28 Coils/Day to 40 Coils/Day and
ensure max exposure to F/T not more then 2hrs/day.
Needed: Cross-functional training and ~ 1 week
learning curve to achieve 85% operator efficiency
 Increased Coil Productivity by 30% from 28 to 40
Coils/day = $420K/Year
 Increased direct labour utilization by 26%
=$240K/Year
 Reduced in-process scrap from 20% to under 4%
 OEE improvement of 24% (from 62% to 84%)
 Flexible work Cells & cross functionally trained
workers able to help manage bottleneck efficiently
 MOL order on Final Tape exposure complied with
 Total Operational Savings = $ 800K
 Workers can do each others work, help out
when someone is sick, on holidays, quit
 Workers help improve bottleneck
operations by helping out each other
 Variety in work making it more full-filling
 Training new workers
| | 27
| | 28
 Setup Time
◦ Starts when last piece of previous job is complete; ends when
first good piece of next job is complete
 Internal set-up: While machine is shut-down
◦ Strive to minimize this as process is not producing parts
 External set-up: While machine is working
◦ Prepare for set-up, get all tools/parts needed ready and
beside the press before starting set-up
 Level 1 (Workstation Achievements)
◦ Data and reports (hard & soft) are sorted into
piles, sections, drawers and multiple file locations:
Cluttered
 Level 2 (Workstation Achievements)
◦ Data & reports are sorted into files, binders and single
locations
◦ Metrics, basic labelling, some visual controls
◦ Appearance is cleaner and more organized
 Level 3 (Workstation Achievements)
◦ All files, data and reports are organize and labelled
◦ Metrics, information and 5S maps are available and
posted
◦ Maintenance of 5S activities, audits of 5S performance
 Level 4 (Work Group Achievements)
◦ Common standards for metrics, filing, labelling, file
naming
◦ Simple, clear and effective Visual Controls & Driver
Measure Boards
◦ Maintenance of Work Group 5S activities, audits of 5S
performance
 Level 5 (Site and Business Unit (BU) Achievements)
◦ Common standards for metrics, filing, labelling, file
naming
◦ Simple, clear and effective Visual Controls
◦ Maintenance of 5S activities, 5S audits
Can usually find
things
Can find things in
a reasonable
amount of time
Can find any file
or doc. In 30
seconds
Close colleagues
can find any file
or doc. In 30
seconds
Any colleague
can find any file
or doc. In 30
seconds
| | 30

More Related Content

What's hot

DMAIC Methodolgy
DMAIC MethodolgyDMAIC Methodolgy
DMAIC MethodolgyBharath M
 
The Power of Business Process Improvement
The Power of Business Process ImprovementThe Power of Business Process Improvement
The Power of Business Process ImprovementBusiness Book Summaries
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6smadhan0711
 
Lean and six sigma
Lean and six sigmaLean and six sigma
Lean and six sigmaPeter Kelly
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingOperational Excellence Consulting
 
2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigmagueste681ce
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniquesHakeem-Ur- Rehman
 
PROCESS IMPROVEMENT ‎CYCLE
PROCESS IMPROVEMENT ‎CYCLE PROCESS IMPROVEMENT ‎CYCLE
PROCESS IMPROVEMENT ‎CYCLE Libcorpio
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Improvement in Delivery Time of 5G HOD
Improvement in Delivery Time of 5G HODImprovement in Delivery Time of 5G HOD
Improvement in Delivery Time of 5G HODMo'ath Thwapiah
 
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT Firdaus Albarqoni
 
Principles of lean_six_sigma_2012
Principles of lean_six_sigma_2012Principles of lean_six_sigma_2012
Principles of lean_six_sigma_2012Shahzad Danish
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC Julian Kalac P.Eng
 
The Complete Lean Enterprise
The Complete Lean EnterpriseThe Complete Lean Enterprise
The Complete Lean EnterpriseYucika Kalvari
 

What's hot (18)

DMAIC Methodolgy
DMAIC MethodolgyDMAIC Methodolgy
DMAIC Methodolgy
 
The Power of Business Process Improvement
The Power of Business Process ImprovementThe Power of Business Process Improvement
The Power of Business Process Improvement
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6s
 
Lean and six sigma
Lean and six sigmaLean and six sigma
Lean and six sigma
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence Consulting
 
2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma2 Brian Hudson Lean 6 Sigma
2 Brian Hudson Lean 6 Sigma
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniques
 
PROCESS IMPROVEMENT ‎CYCLE
PROCESS IMPROVEMENT ‎CYCLE PROCESS IMPROVEMENT ‎CYCLE
PROCESS IMPROVEMENT ‎CYCLE
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Leading a Lean Implementation
Leading a Lean ImplementationLeading a Lean Implementation
Leading a Lean Implementation
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
Improvement in Delivery Time of 5G HOD
Improvement in Delivery Time of 5G HODImprovement in Delivery Time of 5G HOD
Improvement in Delivery Time of 5G HOD
 
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
APPLYING LEAN SIX SIGMA FOR WASTE REDUCTION IN A MANUFACTURING ENVIRONMENT
 
Principles of lean_six_sigma_2012
Principles of lean_six_sigma_2012Principles of lean_six_sigma_2012
Principles of lean_six_sigma_2012
 
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
LEAN SPEED vs SIX SIGMA QUALITY by JULIAN KALAC
 
(1) 2014 process mapping 3
(1) 2014 process mapping 3(1) 2014 process mapping 3
(1) 2014 process mapping 3
 
The Complete Lean Enterprise
The Complete Lean EnterpriseThe Complete Lean Enterprise
The Complete Lean Enterprise
 

Viewers also liked

MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...KaiNexus
 
The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)KaiNexus
 
Lean Six Sigma - Executive Overview Introduction Brochure
Lean Six Sigma - Executive Overview  Introduction  BrochureLean Six Sigma - Executive Overview  Introduction  Brochure
Lean Six Sigma - Executive Overview Introduction BrochurePartner
 
Creating a Culture of Continuous Improvement
Creating a Culture of Continuous ImprovementCreating a Culture of Continuous Improvement
Creating a Culture of Continuous ImprovementAaron Silvers
 
A CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality ImprovementA CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality ImprovementHealth Catalyst
 
Administration of Continuous Improvement Initiative
Administration of Continuous Improvement InitiativeAdministration of Continuous Improvement Initiative
Administration of Continuous Improvement InitiativeMaurice Spann, LSSBB
 
00 Vital Links Lean Six Sigma Change Acceleration 38 Pgs
00 Vital Links Lean Six Sigma Change Acceleration 38 Pgs00 Vital Links Lean Six Sigma Change Acceleration 38 Pgs
00 Vital Links Lean Six Sigma Change Acceleration 38 Pgsfreelean
 
Continuous Decision Improvement: Decisive Leadership for Complex Environments
Continuous Decision Improvement: Decisive Leadership for Complex EnvironmentsContinuous Decision Improvement: Decisive Leadership for Complex Environments
Continuous Decision Improvement: Decisive Leadership for Complex EnvironmentsTomas J. Aragon
 
Welcome to lean six sigma for executives(1)
Welcome to lean six sigma for executives(1)Welcome to lean six sigma for executives(1)
Welcome to lean six sigma for executives(1)patdineley
 
Summary of Lean Six Sigma
Summary of Lean Six SigmaSummary of Lean Six Sigma
Summary of Lean Six Sigmalearnsigma
 
Continuous Improvement is Broken - Scrum Gathering Atlanta
Continuous Improvement is Broken - Scrum Gathering AtlantaContinuous Improvement is Broken - Scrum Gathering Atlanta
Continuous Improvement is Broken - Scrum Gathering AtlantaYuval Yeret
 
Creating a Culture of Continuous Improvement at Avvo
Creating a Culture of Continuous Improvement at AvvoCreating a Culture of Continuous Improvement at Avvo
Creating a Culture of Continuous Improvement at AvvoKevin Goldsmith
 
Six sigma an overview | Online Mini MBA (Free)
Six sigma  an overview | Online Mini MBA (Free)Six sigma  an overview | Online Mini MBA (Free)
Six sigma an overview | Online Mini MBA (Free)mybskool-online-courses
 
Accenture lean six_sigma 65pages
Accenture lean six_sigma 65pagesAccenture lean six_sigma 65pages
Accenture lean six_sigma 65pagestrongctm2011
 
Equable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English PresentationEquable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English Presentationfranckstrub
 

Viewers also liked (20)

MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
MORE Leadership Behaviors That Create a Culture of Continuous Improvement (Ka...
 
The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)The ROI of Continuous Improvement (KaiNexus Webinar)
The ROI of Continuous Improvement (KaiNexus Webinar)
 
Lean Six Sigma - Executive Overview Introduction Brochure
Lean Six Sigma - Executive Overview  Introduction  BrochureLean Six Sigma - Executive Overview  Introduction  Brochure
Lean Six Sigma - Executive Overview Introduction Brochure
 
Creating a Culture of Continuous Improvement
Creating a Culture of Continuous ImprovementCreating a Culture of Continuous Improvement
Creating a Culture of Continuous Improvement
 
A CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality ImprovementA CEO's Keys to Continuous Quality Improvement
A CEO's Keys to Continuous Quality Improvement
 
Administration of Continuous Improvement Initiative
Administration of Continuous Improvement InitiativeAdministration of Continuous Improvement Initiative
Administration of Continuous Improvement Initiative
 
Lean And Six Sigma
Lean And Six SigmaLean And Six Sigma
Lean And Six Sigma
 
00 Vital Links Lean Six Sigma Change Acceleration 38 Pgs
00 Vital Links Lean Six Sigma Change Acceleration 38 Pgs00 Vital Links Lean Six Sigma Change Acceleration 38 Pgs
00 Vital Links Lean Six Sigma Change Acceleration 38 Pgs
 
Continuous Decision Improvement: Decisive Leadership for Complex Environments
Continuous Decision Improvement: Decisive Leadership for Complex EnvironmentsContinuous Decision Improvement: Decisive Leadership for Complex Environments
Continuous Decision Improvement: Decisive Leadership for Complex Environments
 
Six sigma for managers
Six sigma for managersSix sigma for managers
Six sigma for managers
 
Welcome to lean six sigma for executives(1)
Welcome to lean six sigma for executives(1)Welcome to lean six sigma for executives(1)
Welcome to lean six sigma for executives(1)
 
152-3 Lean six sigma gets you from coping to solving operational problems
152-3 Lean six sigma gets you from coping to solving operational problems152-3 Lean six sigma gets you from coping to solving operational problems
152-3 Lean six sigma gets you from coping to solving operational problems
 
Summary of Lean Six Sigma
Summary of Lean Six SigmaSummary of Lean Six Sigma
Summary of Lean Six Sigma
 
Continuous Improvement is Broken - Scrum Gathering Atlanta
Continuous Improvement is Broken - Scrum Gathering AtlantaContinuous Improvement is Broken - Scrum Gathering Atlanta
Continuous Improvement is Broken - Scrum Gathering Atlanta
 
Lean Continuous Improvement Overview
Lean Continuous Improvement OverviewLean Continuous Improvement Overview
Lean Continuous Improvement Overview
 
Creating a Culture of Continuous Improvement at Avvo
Creating a Culture of Continuous Improvement at AvvoCreating a Culture of Continuous Improvement at Avvo
Creating a Culture of Continuous Improvement at Avvo
 
Six sigma an overview | Online Mini MBA (Free)
Six sigma  an overview | Online Mini MBA (Free)Six sigma  an overview | Online Mini MBA (Free)
Six sigma an overview | Online Mini MBA (Free)
 
Accenture lean six_sigma 65pages
Accenture lean six_sigma 65pagesAccenture lean six_sigma 65pages
Accenture lean six_sigma 65pages
 
Equable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English PresentationEquable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English Presentation
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 

Similar to Lean Six Sigma overview Julian Kalac

'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de BurgtTEST Huddle
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizenGopala P.
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizenpgopala
 
[Pem Zhipeng Xie] project management: lean six sigma
[Pem Zhipeng Xie] project management: lean six sigma[Pem Zhipeng Xie] project management: lean six sigma
[Pem Zhipeng Xie] project management: lean six sigmaPem Zhipeng Xie
 
Quality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhQuality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhAMIT KUMAR SINGH singh
 
Lean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxLean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxDebashishDolon
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerSamantha Abalos
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picshaganone
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxRoopaDNDandally
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality managementAnitha Velusamy
 
An Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxAn Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxDrmahmoudAhmedabdeen1
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigmaRahul Singh
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigmaRashil Shah
 
Lean 6 Sigma On Line Training From Searchtec
Lean 6 Sigma  On Line Training From SearchtecLean 6 Sigma  On Line Training From Searchtec
Lean 6 Sigma On Line Training From Searchtecsearchtec
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhrammanoharjharupnaga
 
UAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
UAS Manajemen Kualitas dan Standar Mutu - Total Quality ManagementUAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
UAS Manajemen Kualitas dan Standar Mutu - Total Quality ManagementCandy Chua
 
Total quality management
Total quality managementTotal quality management
Total quality managementAanand Gajjar
 

Similar to Lean Six Sigma overview Julian Kalac (20)

'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
 
Six sigma vs kaizen
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
 
Six Sigma Vs Kaizen
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
 
[Pem Zhipeng Xie] project management: lean six sigma
[Pem Zhipeng Xie] project management: lean six sigma[Pem Zhipeng Xie] project management: lean six sigma
[Pem Zhipeng Xie] project management: lean six sigma
 
Quality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singhQuality management principles operation management-amit kumar singh
Quality management principles operation management-amit kumar singh
 
Tqm
TqmTqm
Tqm
 
Lean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptxLean Six Sigma- Internal Training Slides-2.pptx
Lean Six Sigma- Internal Training Slides-2.pptx
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 Reviewer
 
Lci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no picsLci la chapter lean intro 071410 no pics
Lci la chapter lean intro 071410 no pics
 
CPI Training overview
CPI Training overviewCPI Training overview
CPI Training overview
 
3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality management
 
An Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptxAn Introduction to Lean Six Sigma.pptx
An Introduction to Lean Six Sigma.pptx
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigma
 
An introduction to lean six sigma
An introduction to lean six sigmaAn introduction to lean six sigma
An introduction to lean six sigma
 
Lean 6 Sigma On Line Training From Searchtec
Lean 6 Sigma  On Line Training From SearchtecLean 6 Sigma  On Line Training From Searchtec
Lean 6 Sigma On Line Training From Searchtec
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
 
UAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
UAS Manajemen Kualitas dan Standar Mutu - Total Quality ManagementUAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
UAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
 
Total quality management
Total quality managementTotal quality management
Total quality management
 

More from Julian Kalac P.Eng

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.EngJulian Kalac P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Julian Kalac P.Eng
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment Julian Kalac P.Eng
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS Julian Kalac P.Eng
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVERJulian Kalac P.Eng
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutJulian Kalac P.Eng
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverJulian Kalac P.Eng
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHJulian Kalac P.Eng
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over timeJulian Kalac P.Eng
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACJulian Kalac P.Eng
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian KalacJulian Kalac P.Eng
 

More from Julian Kalac P.Eng (20)

VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 

Recently uploaded

Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 

Recently uploaded (20)

Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 

Lean Six Sigma overview Julian Kalac

  • 1. Introduction to Lean Six Sigma for Black Belt Candidates Master Black Belt Julian Kalac, P.Eng. 1
  • 2. 2 1) Understand and learn how to use Lean Six Sigma tools and methods at the Black Belt level 1) Be able to apply the process improvement tools and methods learned to solve problems, improve performance and achieve desired goals 2) Think more objectively, critically and analytically using data to make key decisions
  • 3.
  • 4. 4 MEASURE •Map/measure the process •Collect lots of data ANALYZE •Organize and analyze the data and information to Identify failure modes, problems, root causes CONTROL •Maintain, monitor and control variation •Preventively fix root causes IMPROVE •Plan, apply, deploy Improvement Tools •Correctively fix failure modes DEFINE •Identify standards, metrics, objectives, CUSTOMER PROBLEMS Define Measure AnalyzeImprove Control Results Define Measure AnalyzeImprove Control Results Applied projects following the DMAIC Model
  • 5. Define Measure AnalyzeImprove Control Results Define Measure AnalyzeImprove Control Results Applied Learning Theory Practice Coached Projects  Training typically occurs over a 4-6 month period using a Learn  Apply; Learn Apply; … format.  Projects that solve real performance problems in your organization are part of the certification and learning process Recognize: •Find problems •Link to organization's needs •Form teams, define resources •Understand program req’ts Deploy: •Validate improved performance that stays in place
  • 6. 6 2) Clearly Define your Problem and the Impact Example: Too many mistakes in purchase request specifications are causing rework rates of 34%, high costs and late deliveries (less than 50% on time) to our customers 1) Find • Customer Issues • Performance Reviews • Meetings • New Projects • Failures, Re-work • Projects • Continuous improvement activities • Champions • Stakeholders • Employees • SCOR Maps • Research • Brainstorm • Wait until the crisis hits you • Value Stream Maps 3) Clearly State the Initial Scope for your project (Set targets and timelines!) Example: This first phase of this project – by 3Q 2004 - will identify problems and root causes in the purchase request process, increase first pass yield rates to 95%, reduce the cost of poor quality by 50% and increase on-time deliveries to our customers to greater than 90% 4) Link improvement targets to customer needs and organizational objectives 5) Project Plan – Charter, Resources, Milestones
  • 7. 7 Process Flow for Measure Phase Data Storage and Archiving What data do we need? Can we use “old” historical data? Is old data (still) usable? How was it collected? Wisdom Knowledge Data Information Wisdom Knowledge Data Information Wisdom Knowledge Data Information Data Selection Data Integrity Analysis Data Collection Measurement System Analysis Process Mapping
  • 8.  Use Statistical tools to analyze data  Look for significant factors  Plot your analysis in charts  Transform the results into action plans 8 86420 Median Mean 2.502.252.001.751.501.251.00 Anderson-Darling Normality Test Variance 2.5808 Skewness 1.75512 Kurtosis 3.79022 N 47 Minimum 0.0000 A-Squared 1st Quartile 0.7500 Median 1.5000 3rd Quartile 2.2500 Maximum 7.7500 95% Confidence Interval for Mean 1.3847 1.98 2.3281 95% Confidence Interval for Median 1.0948 2.0000 95% Confidence Interval for StDev 1.3350 2.0177 P-Value < 0.005 Mean 1.8564 StDev 1.6065 95% Confidence Intervals Summary for 2005 downtime
  • 9. 9 PROBLEM FINDING FACT FINDING PROBLEM DEFINITION IDEA FINDING EVAL. & SELECT PLAN ACCEPT -ANCE ACTION 1 2 3 4 6 7 8 5 Select Tool Analyze Data & Information Apply tools & Make Changes Six Sigma Projects 5S PM/TPM TQM Rapid Improve- ment Event Integrated Process Team (IPT) Establish Baselines/Metrics Other CI Tools Kanban DFSS ApplytheTool (1) (2) (3)Implement / Deploy Fixes (0) Identify failure points, bottlenecks and improvement opportunities from Define-Measure-Analyze Phases PM = Preventive Maintenance TPM = Total Productive Maintenance CI = Continuous Improvement DFSS = Design for Six Sigma TQM = Total Quality Management
  • 10. Maintaining and Improving Control:  Managing Change  Quality Management Systems  What’s Left? What’s Next? 10 Control Tools: • POKA YOKE • Statistical Process Control (SPC) • “Spec” Control Document Procedures and Best Practices Create Visual Controls and “Dashboards” Update Deployment Plan Complete Control Plan FMEA Update and Deploy Communication Plan Execute Deployment Plan Document Other Opportunities Prepare and Implement Control Plan Report out, Hand-off and Closure Prepare and Implement Training Plan Process Flow Diagram for Control Phase:
  • 11. 11 Deploy: •Validate improved performance that stays in place •Spread improvements across the enterprise •Harvest the performance improvements •Change the culture •Where else can you tale the improvements •Look further upstream •Look further downstream •What about other customers •What about “re-fixing” processes you already fixed
  • 13.  “Lean” is a Japanese methodology that focuses on producing high quality products faster, better and at lowest cost.  Lean is about eliminating waste (scrap, rework) and doing things right the 1st time.  Lean is NOT ELIMINATING JOBS!  The goal is that “you don’t work harder, but rather smarter”
  • 14. | | 14  Customers demand shorter lead times, improved quality & reduced prices  Increase through-put and quality and reduce time wasted and frustration by working on non- value add activities.  Gain new business
  • 15. | | 15 INSANITY “Doing the same thing over and over again and expecting different results” Albert Einstein
  • 16. | | 16 16 Change cycle How people feel Keep momentum moving MOST CRITICAL TIME IN CHANGES After results from changes are seen
  • 17. 17 Single Piece Flow Just-In-Time Eliminate Waste •Process parts one-at-a- time or in small lots instead of in large batches or economies of scale •Quick changeovers •Balanced and continuous flows instead of stop and start processing •Have just the right amount of inventory you need, when you need it, where you need it •Optimize the amount of inventory required •Ensure that your resources are ready to support the flow •Never knowingly pass on a defect •Improve the capability of your processes •Fix failure modes when they occur •Determine and resolve the deeper root causes = = The Toyota Production System Model by Michael Kukhta Reference: Senji Niwa, from the Shingijutsu Organization. Niwa-san also worked directly for Toyota’s Taiichi Ohno (TPS creator) for 18 years. “Classic Lean” Strength “Supply Chain Management” Strength “Classic Six Sigma” Strength
  • 18.  The systematic elimination of waste and re- alignment of resources to deliver value to the customer faster, better, & more consistently  Lean is: ◦ Focus: Eliminate waste, non-value add steps, process constraints and bottle necks that cause problems in work throughput 18 Leading to Leading toEliminate Waste Reduced Cycle Times Increased Capacity
  • 19. | | 19 1. Lean training to understand why? and how? 2. Value Stream Mapping -Current & Future State 3. Eliminate waste and non-value add work 4. Identify process bottlenecks and improve them 5. Cross Functional Training
  • 20. | | 20 1. Defects-creating wasted (scrap) 2. Reworking fixing mistakes 3. OVERPRODUCING to make up for lost time 4. WAITING for material, people, instructions 5. WALKING looking for tools, material, people, 6. MOVEMENT handling of material, paperwork 7. INVENTORY Inventories of parts more than needed (WIP)
  • 21. | | 21 Not utilizing the full capabilities of employees Inadequately trained people Over relying on a select few High overtime increasing pressure and stress
  • 22. | | 22  High-Level Process Map  Suppliers, Departments, Custo mers  Mid-Level Process Map  Specific Area ex Production  Detail-Level Process Map  Specific process/operation  (most commonly used) Stop Start Stop Start Start Stop Stop
  • 23. SCOR (Supply Chain Operations Reference) Model: Structured around Five CORE Process Types SCOR Model Customer’s Customer Supplier’s Supplier Supplier Internal or External Customer Internal or External Your Company Plan Make DeliverSource Make / Repair DeliverMakeSourceDeliver SourceDeliverSource Return Return Return Return Return Return Return Return Plan Plan Provides Framework for your Transformation / Improvement Projects. • Defining the boundaries / scope of the supply chain . • Evaluate the supply chain’s strengths and weaknesses. • Industry benchmarks, standardized terms, metrics, Enables a total enterprise view of a supply chain
  • 25. | | 25 15 coils/shift 8 20 26 39 31 10 20 4 13 19 20 8 40 20 20 20 20 20 20 20 Start Loop coils 180 deg twist & prep Skin Electric Press Coil form Model check M/C tapePre-tape Final Tape Apply Mylar Micalast Load Micalastic Impregnation Final Press & Cure Remove Mylar Final gauge ECP Tape ECP oven cure Strand & Final testPack & Ship Stop Rotation schedule: Based on the cycle times above every 2Hrs, Rotate Final Taping operators with operators from “Skinning”, Electric Pressing. Coil forming & Model- checking. This will increase productivity from 28 Coils/Day to 40 Coils/Day and ensure max exposure to F/T not more then 2hrs/day. Needed: Cross-functional training and ~ 1 week learning curve to achieve 85% operator efficiency
  • 26.  Increased Coil Productivity by 30% from 28 to 40 Coils/day = $420K/Year  Increased direct labour utilization by 26% =$240K/Year  Reduced in-process scrap from 20% to under 4%  OEE improvement of 24% (from 62% to 84%)  Flexible work Cells & cross functionally trained workers able to help manage bottleneck efficiently  MOL order on Final Tape exposure complied with  Total Operational Savings = $ 800K
  • 27.  Workers can do each others work, help out when someone is sick, on holidays, quit  Workers help improve bottleneck operations by helping out each other  Variety in work making it more full-filling  Training new workers | | 27
  • 28. | | 28  Setup Time ◦ Starts when last piece of previous job is complete; ends when first good piece of next job is complete  Internal set-up: While machine is shut-down ◦ Strive to minimize this as process is not producing parts  External set-up: While machine is working ◦ Prepare for set-up, get all tools/parts needed ready and beside the press before starting set-up
  • 29.  Level 1 (Workstation Achievements) ◦ Data and reports (hard & soft) are sorted into piles, sections, drawers and multiple file locations: Cluttered  Level 2 (Workstation Achievements) ◦ Data & reports are sorted into files, binders and single locations ◦ Metrics, basic labelling, some visual controls ◦ Appearance is cleaner and more organized  Level 3 (Workstation Achievements) ◦ All files, data and reports are organize and labelled ◦ Metrics, information and 5S maps are available and posted ◦ Maintenance of 5S activities, audits of 5S performance  Level 4 (Work Group Achievements) ◦ Common standards for metrics, filing, labelling, file naming ◦ Simple, clear and effective Visual Controls & Driver Measure Boards ◦ Maintenance of Work Group 5S activities, audits of 5S performance  Level 5 (Site and Business Unit (BU) Achievements) ◦ Common standards for metrics, filing, labelling, file naming ◦ Simple, clear and effective Visual Controls ◦ Maintenance of 5S activities, 5S audits Can usually find things Can find things in a reasonable amount of time Can find any file or doc. In 30 seconds Close colleagues can find any file or doc. In 30 seconds Any colleague can find any file or doc. In 30 seconds