Pile foundations
A pile is as a column inserted in the ground to transmit the structural loads to a lower level of
subsoil or a stable stratum.
They are used when soils of suitable bearing capacity at great depths such that using traditional
deep foundations would become uneconomical
• The natural low bearing capacity of the subsoil.
• Heavy point loads of the structure exceeding the soil bearing capacity.
• Presence of highly compressible soils near the surface e.g. filled, ground and underlying peat
strata.
• Subsoils such as clay, which may be capable of moisture movement or plastic failure
• High water table.
Classification of piles according to the mode of load transfer
Classification according to the method of installation
A. Driven piles: These include the timber piles, steel piles, and precast
piles driven into the soil using various driving techniques, without
excavations.
B. Driven cast in-situ piles: These involve driving (using an auger) a steel
tube with its end closed by a detachable conical tip and at required depth,
concrete is pumped through the tube to detach the tip, and the auger is
removed along with the soil, while concrete is being cast.
C. Bored cast in-situ piles: A bore is dug in the soil to a required depth
and it is concreted with or without reinforcement and with or without a
casing.
Types of piles
I. Timber piles: These are made of treated timber and they are used for short-term requirements. They
cannot carry large loads, and their load carrying capacity is limited to the strength of the wood. Before
driving, the timber head is covered with a zinc coating to avoid brooming
Brooming
II. Precast concrete piles: These are cast at a yard close to the site or transported to site.
They are usually square, octagonal or circular in shape
III. Cast-in-situ concrete piles: These are also called bored piles because they are
constructed by boring a hole in the soil and casting concrete in-situ, usually with
reinforcement.
v. Composite piles: These are made by combining two portions of piles each of a
different material e.g. timber and concrete. They are used when the required pile length
is greater than that achievable by boring. Their disadvantage is the difficulty in forming
a proper joint between the two portions of the piles. For this reason, they are rarely used.
VII. Steel piles: These may be rolled sections such as the H-shape(commonest) or fabricated
shapes (like box shape). Steel H piles are installed by drop hammer or static pressure, after
welding a driving shoe at the tip to avoid end damage.
Methods of pile installation
A. Drop Hammers (Drop hammering)
A hammer with approximately the weight of the pile is raised at a suitable height in or along a guide and
released to strike the pile head. There are three types of drop hammers; Single acting steam of compressed
air hammer, Double-acting pile hammer and Diesel/internal combustion hammer
B. Vibrating/Vibratory hammering
These use a variable speed oscillator attached to the top of the pile. It consists of two counter-rotating weights which
induce vibrations enough to cause a push and pull effect at the pile head, sufficient to break through soil layers. They
are commonly used on sandy or gravelly soil.
C. Jetting piles (water jetting)
These aid pile penetrations into sand or sandy gravel soils. The effect is limited in firm to stiff clay
soils containing much coarse gravel, cobbles or boulders.
D. Jack-in piling
This is a silent (noise free) method used for installing precast piles into the ground with
minimum head damage. The pile is clamped and injected into the ground using hydraulic
cylinders
E. Boring methods
Boring can be done by auguring or percussion drilling and when the required bore depth is achieved, it is
concreted with or without reinforcement and with or without a casing.
Boring Lowering Casing
Lowering rebar Placing treamie
Boring mechanisms
Drilled Pier Foundations
Piles and piers serve the same function with no great difference between them, except for their method of
installation. A pile is installed by driving and a pier by excavation.
A pile cast in-situ with a diameter greater than 0.75m (2.5ft) in the USA is called a drilled pier or drilled shaft, and
in other countries apart from the USA, a large-diameter bored cast-in-situ pile.
Types of drilled piers
May be described in four types similar in construction techniques but different in design assumptions and
mechanism of load transfer.
A. Straight-shaft end-bearing piers
Their load support mechanism is similar to end bearing piles and the soil around the pier perimeter is assumed to
contribute no support to the exerted load.
B. Straight-shaft side wall friction piers
These pass through overburden soils and are assumed to carry none of the load and penetrate far enough to a
bearing stratum to develop design load capacity by side wall friction.
C. Combination of Straight-shaft side wall friction and Straight-shaft end-bearing piers
Both side wall friction and end bearing capacity contribute to the carrying of design load. When the load is
carried into a rock layer, this pier is referred to as a socketed pier or a drilled pier with a rock socket
D. Belled or Undreamed Piers
These are piers with a bottom bell or under ream and a greater percentage of the load is assumed to be carried
by these.
Caisson Foundation
These are prefabricated enclosed structures which may be round, square or rectangular in shape. They are partially or
fully filled with concrete and constructed in-situ or precast and towed to the site.
Function
They have the same function as piles. They can also be sunk through the water or soft soils to provide a
fry working place for other activities.
Caissons for bridge foundations are usually cellular reinforced concrete structures with circular,
rectangular shapes. They are wholly or partially constructed at a high level and sunk in stages to the
desired level through internal excavation assisted by the application of a kentledge.
Types of Caissons
A. Box Caissons (floating caissons)
These are precast concrete boxes that are open at the top and closed at the bottom. They are cast on land and
towed to the site to be sunk slowly by filling the inside with sand, gravel and water or concrete. The bottom is at
times made of wood to make it float during towing.
B. Open caissons (well foundations)
These are open at the top and bottom. Upon reaching the final depth, concrete seal of 2-5m thick is cast
through water (if present) to seal the bottom. After the seal has cured, water present inside is pumped out and
the space filled with concrete.
C. Pneumatic caissons (compressed air caissons)
In this type, the top is sealed and compressed air is used to prevent water from entering the inside working chamber.
This will help in sinking and concreting in dry conditions. On reaching the required depth, the chamber is filled with
concrete. Pneumatic caissons are used in difficult subsoil conditions below water. They are usually designed to form
part of the finished structure.
A. Monolithic Caissons
These are usually rectangular in plan and are divided into a number of voids or wells through which the excavation
is carried out. They are similar to open caissons but are larger and have greater self-weight and wall thickness,
making them suitable for structures which have to resist considerable impact forces.
CHUDLEY, R., & GREENO, R. (2006). ADVANCED CONSTRUCTION TECHNOLOGY.
Edinburgh: Pierson Prentice Hall.
Murty, V. (2002). Geotechnical Engineering: Principles and Practices of Soil Mechanics and
Foundation Engineering. CRC Press.
References

More Related Content

What's hot (19)

Deep foundation
Deep foundationDeep foundation
Deep foundation
 
Foundations grp 1
Foundations grp 1Foundations grp 1
Foundations grp 1
 
Retaining walls
Retaining wallsRetaining walls
Retaining walls
 
Study on foundation in Construction
Study on foundation in ConstructionStudy on foundation in Construction
Study on foundation in Construction
 
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILLDesign and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
 
Chapter 4.3 well foundation-final-ppt
Chapter 4.3   well foundation-final-pptChapter 4.3   well foundation-final-ppt
Chapter 4.3 well foundation-final-ppt
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Trenching & Excavation
Trenching & ExcavationTrenching & Excavation
Trenching & Excavation
 
Theory of structures
Theory of structuresTheory of structures
Theory of structures
 
4 foundation geology
4 foundation geology4 foundation geology
4 foundation geology
 
Shore pile construction
Shore pile constructionShore pile construction
Shore pile construction
 
Lining of tunnel
Lining of tunnelLining of tunnel
Lining of tunnel
 
pile wall
pile wallpile wall
pile wall
 
Micropile
MicropileMicropile
Micropile
 
Shore pile
Shore pileShore pile
Shore pile
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Retaining Walls
Retaining WallsRetaining Walls
Retaining Walls
 
Diaphragm wall construction
Diaphragm wall constructionDiaphragm wall construction
Diaphragm wall construction
 
Theory of structures 002
Theory of structures 002Theory of structures 002
Theory of structures 002
 

Similar to Pile and Caisson Foundations Explained

Types of pile foundation
Types of pile foundationTypes of pile foundation
Types of pile foundationdhruvalsu
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptbryankalindo888
 
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pratik Solanki
 
Bridge foundation
Bridge  foundation Bridge  foundation
Bridge foundation Ghulam Yasin
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniquesShrideviAnil
 
Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )AmiRul AFiq
 
Types Of Foundation
Types Of FoundationTypes Of Foundation
Types Of Foundationstooty s
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSShivananda Roy
 
Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !Ricko Guerrero
 
Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !Ricko Guerrero
 
Foundation 2
Foundation 2Foundation 2
Foundation 2cfdcfd2
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Make Mannan
 
Advance Construction & Equipment
Advance Construction & EquipmentAdvance Construction & Equipment
Advance Construction & EquipmentAditya Mistry
 
Pile foundation power point ptesentation
Pile foundation power point ptesentationPile foundation power point ptesentation
Pile foundation power point ptesentationMohammad zuha
 
316691663 pile-foundations-lecture-note-1-pdf
316691663 pile-foundations-lecture-note-1-pdf316691663 pile-foundations-lecture-note-1-pdf
316691663 pile-foundations-lecture-note-1-pdfReyam AL Mousawi
 

Similar to Pile and Caisson Foundations Explained (20)

Types of pile foundation
Types of pile foundationTypes of pile foundation
Types of pile foundation
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
 
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
Pile Foundation by Pratik Solanki (tes.google.com/site/infodiplomacivil/)
 
Bridge foundation
Bridge  foundation Bridge  foundation
Bridge foundation
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniques
 
Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )Chapter 4 deep foundation ( bi )
Chapter 4 deep foundation ( bi )
 
Types Of Foundation
Types Of FoundationTypes Of Foundation
Types Of Foundation
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
 
Pile footing.pptx
Pile footing.pptxPile footing.pptx
Pile footing.pptx
 
Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !
 
Foundation 2
Foundation 2Foundation 2
Foundation 2
 
Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)Pile foundation ppt 2 (usefulsearch.org) (useful search)
Pile foundation ppt 2 (usefulsearch.org) (useful search)
 
Different types of pile
Different types of pile Different types of pile
Different types of pile
 
Advance Construction & Equipment
Advance Construction & EquipmentAdvance Construction & Equipment
Advance Construction & Equipment
 
2.foundation
2.foundation2.foundation
2.foundation
 
Chapter 15
Chapter 15Chapter 15
Chapter 15
 
Pile foundation power point ptesentation
Pile foundation power point ptesentationPile foundation power point ptesentation
Pile foundation power point ptesentation
 
316691663 pile-foundations-lecture-note-1-pdf
316691663 pile-foundations-lecture-note-1-pdf316691663 pile-foundations-lecture-note-1-pdf
316691663 pile-foundations-lecture-note-1-pdf
 

More from Kalokwera Samuel

More from Kalokwera Samuel (8)

Bitumen
BitumenBitumen
Bitumen
 
Floors
FloorsFloors
Floors
 
Piles, Piers and Caissons
Piles, Piers and CaissonsPiles, Piers and Caissons
Piles, Piers and Caissons
 
Air Conditioning and Security Installations
Air Conditioning and Security InstallationsAir Conditioning and Security Installations
Air Conditioning and Security Installations
 
Cement- presentation
Cement- presentationCement- presentation
Cement- presentation
 
Timber
TimberTimber
Timber
 
Paint and varnish . presentation
Paint and varnish . presentationPaint and varnish . presentation
Paint and varnish . presentation
 
Communication and change
Communication and change  Communication and change
Communication and change
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 

Pile and Caisson Foundations Explained

  • 1. Pile foundations A pile is as a column inserted in the ground to transmit the structural loads to a lower level of subsoil or a stable stratum. They are used when soils of suitable bearing capacity at great depths such that using traditional deep foundations would become uneconomical • The natural low bearing capacity of the subsoil. • Heavy point loads of the structure exceeding the soil bearing capacity. • Presence of highly compressible soils near the surface e.g. filled, ground and underlying peat strata. • Subsoils such as clay, which may be capable of moisture movement or plastic failure • High water table.
  • 2. Classification of piles according to the mode of load transfer
  • 3.
  • 4. Classification according to the method of installation A. Driven piles: These include the timber piles, steel piles, and precast piles driven into the soil using various driving techniques, without excavations. B. Driven cast in-situ piles: These involve driving (using an auger) a steel tube with its end closed by a detachable conical tip and at required depth, concrete is pumped through the tube to detach the tip, and the auger is removed along with the soil, while concrete is being cast. C. Bored cast in-situ piles: A bore is dug in the soil to a required depth and it is concreted with or without reinforcement and with or without a casing.
  • 5. Types of piles I. Timber piles: These are made of treated timber and they are used for short-term requirements. They cannot carry large loads, and their load carrying capacity is limited to the strength of the wood. Before driving, the timber head is covered with a zinc coating to avoid brooming Brooming
  • 6. II. Precast concrete piles: These are cast at a yard close to the site or transported to site. They are usually square, octagonal or circular in shape
  • 7. III. Cast-in-situ concrete piles: These are also called bored piles because they are constructed by boring a hole in the soil and casting concrete in-situ, usually with reinforcement.
  • 8. v. Composite piles: These are made by combining two portions of piles each of a different material e.g. timber and concrete. They are used when the required pile length is greater than that achievable by boring. Their disadvantage is the difficulty in forming a proper joint between the two portions of the piles. For this reason, they are rarely used.
  • 9. VII. Steel piles: These may be rolled sections such as the H-shape(commonest) or fabricated shapes (like box shape). Steel H piles are installed by drop hammer or static pressure, after welding a driving shoe at the tip to avoid end damage.
  • 10. Methods of pile installation A. Drop Hammers (Drop hammering) A hammer with approximately the weight of the pile is raised at a suitable height in or along a guide and released to strike the pile head. There are three types of drop hammers; Single acting steam of compressed air hammer, Double-acting pile hammer and Diesel/internal combustion hammer
  • 11. B. Vibrating/Vibratory hammering These use a variable speed oscillator attached to the top of the pile. It consists of two counter-rotating weights which induce vibrations enough to cause a push and pull effect at the pile head, sufficient to break through soil layers. They are commonly used on sandy or gravelly soil.
  • 12. C. Jetting piles (water jetting) These aid pile penetrations into sand or sandy gravel soils. The effect is limited in firm to stiff clay soils containing much coarse gravel, cobbles or boulders.
  • 13. D. Jack-in piling This is a silent (noise free) method used for installing precast piles into the ground with minimum head damage. The pile is clamped and injected into the ground using hydraulic cylinders
  • 14. E. Boring methods Boring can be done by auguring or percussion drilling and when the required bore depth is achieved, it is concreted with or without reinforcement and with or without a casing. Boring Lowering Casing
  • 17. Drilled Pier Foundations Piles and piers serve the same function with no great difference between them, except for their method of installation. A pile is installed by driving and a pier by excavation. A pile cast in-situ with a diameter greater than 0.75m (2.5ft) in the USA is called a drilled pier or drilled shaft, and in other countries apart from the USA, a large-diameter bored cast-in-situ pile. Types of drilled piers May be described in four types similar in construction techniques but different in design assumptions and mechanism of load transfer.
  • 18. A. Straight-shaft end-bearing piers Their load support mechanism is similar to end bearing piles and the soil around the pier perimeter is assumed to contribute no support to the exerted load.
  • 19. B. Straight-shaft side wall friction piers These pass through overburden soils and are assumed to carry none of the load and penetrate far enough to a bearing stratum to develop design load capacity by side wall friction.
  • 20. C. Combination of Straight-shaft side wall friction and Straight-shaft end-bearing piers Both side wall friction and end bearing capacity contribute to the carrying of design load. When the load is carried into a rock layer, this pier is referred to as a socketed pier or a drilled pier with a rock socket
  • 21. D. Belled or Undreamed Piers These are piers with a bottom bell or under ream and a greater percentage of the load is assumed to be carried by these.
  • 22. Caisson Foundation These are prefabricated enclosed structures which may be round, square or rectangular in shape. They are partially or fully filled with concrete and constructed in-situ or precast and towed to the site. Function They have the same function as piles. They can also be sunk through the water or soft soils to provide a fry working place for other activities. Caissons for bridge foundations are usually cellular reinforced concrete structures with circular, rectangular shapes. They are wholly or partially constructed at a high level and sunk in stages to the desired level through internal excavation assisted by the application of a kentledge.
  • 23. Types of Caissons A. Box Caissons (floating caissons) These are precast concrete boxes that are open at the top and closed at the bottom. They are cast on land and towed to the site to be sunk slowly by filling the inside with sand, gravel and water or concrete. The bottom is at times made of wood to make it float during towing.
  • 24. B. Open caissons (well foundations) These are open at the top and bottom. Upon reaching the final depth, concrete seal of 2-5m thick is cast through water (if present) to seal the bottom. After the seal has cured, water present inside is pumped out and the space filled with concrete.
  • 25. C. Pneumatic caissons (compressed air caissons) In this type, the top is sealed and compressed air is used to prevent water from entering the inside working chamber. This will help in sinking and concreting in dry conditions. On reaching the required depth, the chamber is filled with concrete. Pneumatic caissons are used in difficult subsoil conditions below water. They are usually designed to form part of the finished structure.
  • 26. A. Monolithic Caissons These are usually rectangular in plan and are divided into a number of voids or wells through which the excavation is carried out. They are similar to open caissons but are larger and have greater self-weight and wall thickness, making them suitable for structures which have to resist considerable impact forces.
  • 27. CHUDLEY, R., & GREENO, R. (2006). ADVANCED CONSTRUCTION TECHNOLOGY. Edinburgh: Pierson Prentice Hall. Murty, V. (2002). Geotechnical Engineering: Principles and Practices of Soil Mechanics and Foundation Engineering. CRC Press. References