value stream mapping and metrics based process mapping
 Consultant – We help clients in all industries establish
and grow Lean management systems, globally.
 Author & Speaker:
Karen Martin, President
The Karen Martin Group, Inc.
@karenmartinopex
2
www.ksmartin.com/subscribe
Shingo Award
Winning
Shingo Award
Winning
ON SALE NOW!
After the Webinar…
3
• Please provide feedback
• Materials: www.slideshare.net/karenmartingroup
• Recorded webinars:
• www.ksmartin.com/webinars
• www.youtube.com/karenmartingroup
• www.vimeo.com/karenmartingroup
• www.slideshare.net/karenmartingroup
www.ksmartin.com/webinars
4
5
6
You will learn…
• The similarities and differences between value
stream maps (VSM) and metrics-based process
maps (MBPM).
• The circumstances under which to select each
type of map.
• Tips for successful mapping activities.
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 8
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 9
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
What problem are you trying to solve?
© 2015 The Karen Martin Group, Inc. 10
Desired State
(or known standard)
Current State
Gap =
Problem
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc.
11
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
Value Stream Transformation is Strategic
© 2015 The Karen Martin Group, Inc. 12
For more information, see Value Stream Mapping, Karen Martin & Mike Osterling
Process Improvement is Tactical
© 2015 The Karen Martin Group, Inc. 13
For more information, see Metrics-Based Process Mapping, Karen Martin & Mike Osterling
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 14
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
Work: Degrees of Granularity
Value
Stream
Process Process Process
Step StepStep
15
Macro
Perspective
• Define strategic
direction (“what”)
• Heavy leadership
involvement
• Value Stream
Mapping
Micro
Perspective
• Identify the
tactical “how”
• Heavy frontline
involvement
• Metrics-Based
Process Mapping
Which do you need?
Macro or Micro View?
16
Work: Levels of Granularity
© 2015 The Karen Martin Group, Inc. 17
Negotiate
contract
Process
order
Configure
software
Value
Stream
Process Negotiate
pricing
Approve
Negotiate
terms
Approve Execute
Degrees of Granularity:
Hiring Value Stream
Hire
Recruit Select Onboard
Write job
description
Post
externally
Post
internally
18
Process-level
Perspective
Value-stream
Perspective
What problem are you trying to solve?
© 2015 The Karen Martin Group, Inc. 19
Desired State
(or known standard)
Current State
Gap =
Problem
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 20
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
Visualize the entire cycle of value delivery on a single sheet of paper
21
Timeline
3
Basic Value Stream Map
Work
Flow
Information
Flow
1
2
Customer
0.0 hrs.
0.5 days
1.0 hrs.
5.0 days
3.6 hrs.
0.6 days
0.0 hrs.
1.0 days
0.2 hrs.
0.5 days
16.0 hrs. 0.0 hrs.
7.0 days
8.0 hrs. 0.0 hrs.
7.0 days
0.1 hrs.
26.0 days
0.0 hrs.
0.2 days Total LT =
Total PT =
ActivityRa
SAP
Summary
Invoice
(Excel)Obtain Order;
Enter Order in
Offline Order
Form
Sales
(Key at night)
LT = 4.5 hrs.
PT = 18 mins.
%C&A: 80%
1
Review &
Release
Credit Holds
Sales
LT = 4 hrs.
PT = 10 mins.
%C&A: 99%
3
Issue DO To
Transporter;
Create Pick
List
WH1
LT = 8 hrs.
PT = 1 mins.
%C&A: 95%
5
Pick
& Load
Order
Logistics
LT = 4 hrs.
PT = 15 mins.
%C&A: 95%
6
Collect
POD from
Customer
Transporter
LT = 2 days
7
Collect POD
From
Transporter
WH1
LT = 7 days
PT = 1 mins.
%C&A: 99%
8
Deliver
POD to
Accounting
Messenger
Batch = 1x/day
LT = 1 days
9
Review POD
For
Accuracy
Accounting
LT = 7 days
PT = 2 mins.
%C&A: 99%
10
Deliv er Bill;
Collect from
Customer;
Deposit
Sales
Batch = 1x
monthly
LT = 26 days
PT = 5 mins.
11
COLOR LEGEND
Logistics / W arehouse
Sales
Order Management
Production
10%
90%
Produce
Product
Plant 1
LT = 280 mins.
PT = 215 mins.
%C&A: 99%
4B
Pick
& Load
Order
WH2
LT = 40 mins.
PT = 3 mins.
%C&A: 99%
5B
40 Days Delivery to Payment Received3.5 Days Order Receipt to Ship
MonthlySales Volume
Wk1 = 14-23%
Wk2 = 19-24%
Wk3 = 23-25%
Wk4 = 30-42%
Obtain &
Revise Sales
Forecast
Sales
LT = 0 days
PT = 270 mins.
%C&A: 99%
1B
Hold S&OP
Meeting
6-7 People
LT = 5 days
PT = 3 hrs.
%C&A: 99%
2B
Create
Production
Plan
Production
Planning
LT = 5 days
PT = 1 hrs.
%C&A: 99%
3B
Produce
Product
Plant 2
LT = 280 mins.
PT = 215 mins.
%C&A: 99%
4C
Offline
Order
Form
Enter
Payment;
Clear Billing
Accounting
LT = 2 hrs.
PT = 1 mins.
%C&A: 99%
12
Accounting
Delivery
Order
(DO)
Pick
List
Proof of
Delivery
(POD)
Transfer
Report
Prod.
Plan
Check
Stock &
Reallocate
Logistics &
Warehouse
Batch = 1x/day
LT = 4 hrs.
PT = 2 mins.
%C&A: 99%
4
Prod.
Plan
plier
Receive
Material
Store
3C
Current State Value Stream Map
Order to Cash
Customer
3.0 hrs.
21.0 days
1.0 hrs.
5.0 days
3.6 hrs.
0.6 days
0.0 hrs.
0.5 days
15.0 hrs.
30.0 days
0.0 hrs.
7.0 days
8.0 hrs. 0.0 hrs.
5.0 days
0.1 hrs.
26.0 days
0.0 hrs.
0.2 days Tota
Tota
Acti
SAP
Collect
Order From
Customer
Sales
LT = 15 mins.
PT = 15 mins.
%C&A: 99%
2
Collect
Customer
Orders
Order
Mgmt
LT = 15 mins.
PT = 15 mins.
%C&A: 99%
2B
Review &
Release
Credit Holds
Sales
LT = 4 hrs.
PT = 10 mins.
3
Issue DO
To
Transporter
WH1
LT = 4 hrs.
PT = 1 mins.
4
Load &
Prepare
Invoice
Logistics
LT = 4 hrs.
PT = 15 hrs.
5
Collect
POD from
Customer
Transporter
LT = 2 days
6
Enter
POD
WH1
LT = 7 days
PT = 1 mins.
%C&A: 99%
7
Deliver
POD to
Accounting
Messenger
LT = 1 days
8 Rev iew POD
for Accuracy;
Email Receipt
to Sales
Accounting
LT = 5 days
PT = 2 mins.
9
Produce
Product
Plant 1
LT = 285 mins.
PT = 215 mins.
%C&A: 99%
3B
Pick &
Stage
WH2
PT = 15 mins.
%C&A: 95%
4B
Create
Production
Plan
Production
Planning
LT = 5 days
PT = 1 hrs.
%C&A: 99%
2C
2%
Produce
Product
Plant 2
LT = 285 mins.
PT = 215 mins.
%C&A: 99%
3C
Accept
Customer
e-Payment
Bank
LT = 30 days
PT = 0 hrs.
%C&A: 99%
6B
Enter
Payment,
Clear Billing
Accounting
LT = 2 hrs.
PT = 1 mins.
11
Invoice
70%30%
Hold S&OP
Meeting
LT = 1 mo.
PT = 3 hrs.
1
40 Days Delivery to Payment Received1.5 Days Order Receipt to Ship
MonthlySales Volume
Wk1 = 25%
Wk2 = 25%
Wk3 = 25%
Wk4 = 25%
Prod.
Plan
Prod.
Plan
Pick
List
Invoice
Excel
Sheet
Inv entory
Report
Deliv er
Receipt &
Collect from
Customer
Sales
Batch = 1x
monthly
LT = 26 days
PT = 5 mins.
10
POD
50%
50%
98%
COLOR LEGEND
Logistics / W arehouse
Sales
Order Management
Production
Accounting
Future State Value Stream Map
Order to Cash
© 2015 The Karen Martin Group, Inc. 25
Current State Value Stream Map
Outpatient Imaging
© 2015 The Karen Martin Group, Inc. 26
Future State Value Stream Map
Outpatient Imaging
Traditional Mapping Method:
Process Flow Chart
How is this process performing?
Look up Customer
in Eclipse
SALES
New
Customer?
Enter Order
SALES
Print Ship Ticket
SALES
Load Trucks
SHIPPING
Enter Customer
Information
ADMIN
Perform Credit
Check
FINANCE
Okay?
Notify Sales COD
Only; Notify Admin
to update
Customer Profile
FINANCE
Yes
No
No
Yes
Product in
Stock?
Yes
Order Material
PURCHASING
No
Receive Material
RECEIVING
Complete
New Hire
Setup Form
Complete
Drug test
within 24
hours
HR Receives
results within
3 days and
issues offer
letter
P: Setup New hire as a vendor
IT: Setup user logins and provide
hardware, if needed,
F: Assign vehicle, issue cell phone
order uniforms and guides, if needed.
Submit
Candidate
for
background
check and
drug test.
HR Issues
Employee ID
and Notifies
HM & Support
Organizations
Signs offer
letter and
required yellow
forms. Fax to
HR
Call candidate
to welcome
and remind to
complete
forms
Gather
Support items
to transfer to
new hire on
day one
New Hire Setup Process Map
Good training tool, but how do we know what to improve?
CandidateHiringManagerAdministratorHumanResources
SupportTeam[IT,
Purchasing(P),
Fleet(F)]
Value Stream Map ≠ Swim Lane Process Map
Benefits
Administrator
Receive
negative
drug
screen
results
Complete
“New Hire
Approval”
form; send
to recruiter
Recruiter
Sign “New
Hire
Approval”
form
Recruiter
Sign “New
Hire
Approval”
form
Set up
employee
in SAP;
notify
hiring
manager
Hiring
Manager
Request
laptop on
“New Hire
Equip.
Request”
form
IT
Manager
Approve
“New Hire
Equip.
Request”
29
Metrics-Based Process Mapping (MBPM)
The Improved State Becomes Standard Work
0
1
0
15
6
-1
0
Activity PT LT %C&A Activity PT LT %C&A Activity PT LT %C&A Activity PT LT %C&A Activity PT LT %C&A
1
Fax PO to Sales
Rep
0 0 45%
2
Review PO;
clarify with
customer as
needed
20 2 90%
Fax PO to
warehouse
10 4 90%
5
6
Check inventory
levels; notify
Sales Rep re:
status
5 4 95%
Fax PO to Sales
Rep
5 0.33 90%
0 20 10 5 5
0 2 4 4 0.33
45% 90% 90% 95% 90%
0 20 10 5 5
Rolled %C&A
Critical Path LT
Total PT
Critical Path PT
5431 2
Mary Townsend
Hours Worked per Day Sally Dampier
Occurrences per Year Sam Parks
Current State Metrics-Based Process Map
Dave Morgan25-Jun-08
8 Facilitator
Process Details
Michael Prichard
Order FulfillmentProcess Name
Specific Conditions Domestic orders through sales force
37,500
Date Mapped
Sean Michaels
Sales Rep
Ryan AustinDiane O'Shea
Mapping Team
LT Units
Function /
Department
PT Units
Step # ►
Customer
Finance
Warehouse /
Shipping
Seconds
Minutes
Hours
Days
Seconds
Minutes
Hours
Days
Excel tool included with Metrics-Based Process Mapping book
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 32
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
Current State Value Stream Map
Outpatient Imaging
34
Value Stream Maps Help Visualize Problems
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 35
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
VSM & MBPM: Same Metrics
36
Barriers
to flow
# people
PT
LT%C&A
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 37
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
© 2015 The Karen Martin Group, Inc. 38
Real-World VSM Facilitation Examples
• Two VPs arguing over which leader’s area should perform a
certain process
• Discussion about outsourcing a functional area that will result
in 30 people being laid off
• Candid discussion about the risk of losing the company’s #1
customer
• Candid discussion about a legal or regulatory matter
• Value stream needs level loading, work balancing and pull
© 2015 The Karen Martin Group, Inc. 39
Real-World MBPM Facilitation Examples
• Frontline team member begins to recognize that the work he
does is 100% non-value-adding
• Supervisor dictates future state improvement ideas
• Manager reveals that she doesn’t support the targets begin
set (nor the objective of the mapping session)
• Team doesn’t feel authorized to make tactical decisions
• Two team members have obvious tension between them
• A team member shuts down
© 2015 The Karen Martin Group, Inc. 40
Value Stream Mapping vs. Metrics-Based Process Mapping
© 2015 The Karen Martin Group, Inc. 41
Feature Value Stream Mapping Metrics-Based Process Mapping
Purpose / outcome Strategic improvement plan Tactical improvement plan
Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy
When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc.
Perspective Macro – Interconnected processes Micro – Steps within each processes
Physical look Circular loop; request to delivery Swim lanes
Information flow Essential component Less obvious
Key metrics
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Lead time (LT), Process time (PT),
Percent Complete & Accurate (%C&A)
Facilitator
Must be strong & able to relate to
strategic thinkers
Must be strong & able to relate to the
people who do the work
How long to create? 3 days 1-2 days
Prepare
Understand
Current State
Design
Future State
Develop
Transformation
Plan
Execute
Transformation
Plan
Three Consecutive Days4 Weeks Prior
to Mapping
Following
Mapping
Repeat
Value Stream Mapping
Phases and Timing
42
Prepare
Understand
Current State
Design
Future State
Develop
Transformation
Plan or Execute
Execute
Transformation
Plan
1-2 Consecutive Days4 Weeks Prior
to Mapping
Following
Mapping
Repeat
Metrics-Based Process Mapping
Phases and Timing
43
Mapping Tips
45
1
2 1
3 2
4 3
5 4
5
1 6
2 7
3 8
4 9
5 10
1
2 1
3 2
4 3
5 4
1
2
3
4
Specific
Conditions
Engineer to order, requires both hardware &
software customization
Value Stream
Champion
Nancy Little
Demand Rate 1,000 per year
Facilitator Dave Parks
Value Stream Mapping Charter
Scope Accountable Parties Logistics
Value Stream Capital equipment
Executive
Sponsor
Allen Ward
Event Dates
& Times
July 24-26, 2013
8:00 am - 5:00 pm
Last Step Production ships product
Boundaries &
Limitations
No new software; only minor changes to existing IT
systems; no additional staff; no budget changes
Briefing
Attendees
** required
*optional
** Allen W (COO), Joe M (CIO),
Sal T (VP Sales)
* Bruce R (VP Ops), Carlos P
(HR), Su T (CFO), Bill M (VP CS)
Base-camp
Location
Surf's Up - Room A
Trigger Customer submits RFQ
First Step Sales reviews the RFQ Logistics
Coordinator
Dave Parks
Meals
Provided
Continential breakfast & lunch
Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name Contact Information
Forecasted growth of 15% for next fiscal year. Sales, Director Sean Michaels
Briefing
Dates &
Times
July 24, 25, & 26
4:00-5:00 pmImprovement Time
Frame
Future state design is fully realized by
December 31, 2013.
Current State Problems & Business Needs Mapping Team
Competition's RFQ LT is 1 wk; PO to delivery is 4 wks Scrum Master Ryan Austin
Goals & Measurable Target Conditions Engineering, Vice President Nancy Little
Unclear & incorrect information flowing through value stream. IT, Director Diana Marie
RFQ lead time = 2 weeks; PO to software dev lead time = 5 weeks Finance, Controller Dave Gerald
Improve quality of information flowing throughout value stream. Customer (contract manufacturer) JR Hunt
Reduce RFQ LT from 2 weeks to 3 days (70% improvement). Manufacturing, Director Ambreen Motiwala
Reduce PO to software dev LT from 5 wks to 3 wks (40% improvement) Customer Service, Manager Danny Tran
Faster delivery; less hassle; less cost. Function Name Contact Information
Better working relationships between sales, estimating & engineering. Planning / Purchasing, Planner Lourdes Dwyer
Benefits to Customers & Business On-Call Support
Relevant Data Agreement
Freed capacity to absorb additional business w/o increasing staff. Production Supervisor Tom St. James
Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature:
Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator
Financial: Estimate-to-actual cost comparison.
Date: Date: Date:
Value Stream Scoping Diagram
Defining Specific Conditions
Golden State
Equipment, Inc.
Capital
Equipment
Catalog
Configure
to order
Engineer
to order
Custom
hardware
Custom
software
Both
New Product
Development
Spares &
subassemblies
Catalog
Engineer to
order
46
47
1
2 1
3 2
4 3
5 4
5
1 6
2 7
3 8
4 9
5 10
1
2 1
3 2
4 3
5 4
1
2
3
4
Specific
Conditions
Engineer to order, requires both hardware &
software customization
Value Stream
Champion
Nancy Little
Demand Rate 1,000 per year
Facilitator Dave Parks
Value Stream Mapping Charter
Scope Accountable Parties Logistics
Value Stream Capital equipment
Executive
Sponsor
Allen Ward
Event Dates
& Times
July 24-26, 2013
8:00 am - 5:00 pm
Last Step Production ships product
Boundaries &
Limitations
No new software; only minor changes to existing IT
systems; no additional staff; no budget changes
Briefing
Attendees
** required
*optional
** Allen W (COO), Joe M (CIO),
Sal T (VP Sales)
* Bruce R (VP Ops), Carlos P
(HR), Su T (CFO), Bill M (VP CS)
Base-camp
Location
Surf's Up - Room A
Trigger Customer submits RFQ
First Step Sales reviews the RFQ Logistics
Coordinator
Dave Parks
Meals
Provided
Continential breakfast & lunch
Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name Contact Information
Forecasted growth of 15% for next fiscal year. Sales, Director Sean Michaels
Briefing
Dates &
Times
July 24, 25, & 26
4:00-5:00 pmImprovement Time
Frame
Future state design is fully realized by
December 31, 2013.
Current State Problems & Business Needs Mapping Team
Competition's RFQ LT is 1 wk; PO to delivery is 4 wks Scrum Master Ryan Austin
Goals & Measurable Target Conditions Engineering, Vice President Nancy Little
Unclear & incorrect information flowing through value stream. IT, Director Diana Marie
RFQ lead time = 2 weeks; PO to software dev lead time = 5 weeks Finance, Controller Dave Gerald
Improve quality of information flowing throughout value stream. Customer (contract manufacturer) JR Hunt
Reduce RFQ LT from 2 weeks to 3 days (70% improvement). Manufacturing, Director Ambreen Motiwala
Reduce PO to software dev LT from 5 wks to 3 wks (40% improvement) Customer Service, Manager Danny Tran
Faster delivery; less hassle; less cost. Function Name Contact Information
Better working relationships between sales, estimating & engineering. Planning / Purchasing, Planner Lourdes Dwyer
Benefits to Customers & Business On-Call Support
Relevant Data Agreement
Freed capacity to absorb additional business w/o increasing staff. Production Supervisor Tom St. James
Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature:
Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator
Financial: Estimate-to-actual cost comparison.
Date: Date: Date:
10
people
max!
Daily Briefings
#1 – Reduce resistance
#2 – Build consensus
#3 – Gain commitment
49
Mapping results are
proportional to the quality of the
planning and chartering process
and facilitator skill
© 2015 The Karen Martin Group, Inc. 50
Karen Martin, President
info@ksmartin.com
@karenmartinopex
Blog & newsletter: www.ksmartin.com/subscribe

More Related Content

What's hot

Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeTKMG, Inc.
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...TKMG, Inc.
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleTKMG, Inc.
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training TipsTKMG, Inc.
 
Value stream mapping training
Value stream mapping trainingValue stream mapping training
Value stream mapping trainingJusto Castellon
 
Value Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to SuccessValue Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to SuccessTKMG, Inc.
 
Improvement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open ForumImprovement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open ForumTKMG, Inc.
 
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)TKMG, Inc.
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping TKMG, Inc.
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3TKMG, Inc.
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The ConceptSubhrajyoti Parida
 

What's hot (20)

Value Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management PracticeValue Stream Mapping: From Tool to Management Practice
Value Stream Mapping: From Tool to Management Practice
 
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
Value Stream Mapping: How to Visualize Work & Align Leadership for Organizati...
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not people
 
Process Change: Communication & Training Tips
Process Change:  Communication & Training TipsProcess Change:  Communication & Training Tips
Process Change: Communication & Training Tips
 
Value stream mapping training
Value stream mapping trainingValue stream mapping training
Value stream mapping training
 
Value Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to SuccessValue Stream Transformation: 10 Keys to Success
Value Stream Transformation: 10 Keys to Success
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Improvement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open ForumImprovement Facilitation and Coaching: An Open Forum
Improvement Facilitation and Coaching: An Open Forum
 
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
Value Stream Analysis: Beyond the Mechanics - Part 2 (Mapping Execution)
 
Value Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) PosterValue Stream Mapping (VSM) Poster
Value Stream Mapping (VSM) Poster
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
Metrics-Based Process Mapping
Metrics-Based Process Mapping Metrics-Based Process Mapping
Metrics-Based Process Mapping
 
Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)Lean management, lean leadership and leader standard work (AME Webinar)
Lean management, lean leadership and leader standard work (AME Webinar)
 
Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3Lean Leadership - Part 3 of 3
Lean Leadership - Part 3 of 3
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
13. value stream mapping
13. value stream mapping13. value stream mapping
13. value stream mapping
 
Value Stream Mapping in the Office
Value Stream Mapping in the Office Value Stream Mapping in the Office
Value Stream Mapping in the Office
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Value Stream Mapping -The Concept
Value Stream Mapping -The ConceptValue Stream Mapping -The Concept
Value Stream Mapping -The Concept
 

Viewers also liked

Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleFrank-G. Adler
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsTKMG, Inc.
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping TechniquesStephen Deas
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsWilson Perumal and Company
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3TKMG, Inc.
 
Kanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream MappingKanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream MappingMichael Sahota
 
Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...Wilson Perumal and Company
 
Achieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex worldAchieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex worldWilson Perumal and Company
 
Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011Michael Sahota
 
Process mapping with flowcharts
Process mapping with flowchartsProcess mapping with flowcharts
Process mapping with flowchartsSteven Bonacorsi
 
PDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio OptimizationPDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio OptimizationWilson Perumal and Company
 
Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!Wilson Perumal and Company
 
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)TKMG, Inc.
 
Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...Process Safety Culture
 
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...TKMG, Inc.
 

Viewers also liked (19)

Lean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training ModuleLean Value Stream Mapping (VSM) Training Module
Lean Value Stream Mapping (VSM) Training Module
 
Value Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service SetttingsValue Stream Mapping in Office & Service Setttings
Value Stream Mapping in Office & Service Setttings
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Simple Process Mapping Techniques
Simple Process Mapping TechniquesSimple Process Mapping Techniques
Simple Process Mapping Techniques
 
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programsOperational Excellence: Getting the most out of your Lean and Six Sigma programs
Operational Excellence: Getting the most out of your Lean and Six Sigma programs
 
Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3Lean Leadership: Part 2 of 3
Lean Leadership: Part 2 of 3
 
Kanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream MappingKanban 101 - 1 - Perfection, Waste and Value Stream Mapping
Kanban 101 - 1 - Perfection, Waste and Value Stream Mapping
 
Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...Creating a Culture of Operational Discipline that leads to Operational Excell...
Creating a Culture of Operational Discipline that leads to Operational Excell...
 
Mapping the End to End Process
Mapping the End to End ProcessMapping the End to End Process
Mapping the End to End Process
 
Achieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex worldAchieving Operational Excellence - A better approach for a complex world
Achieving Operational Excellence - A better approach for a complex world
 
Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011Innovation Games at Product Camp 2011
Innovation Games at Product Camp 2011
 
End-to-End processes
End-to-End processesEnd-to-End processes
End-to-End processes
 
Process mapping with flowcharts
Process mapping with flowchartsProcess mapping with flowcharts
Process mapping with flowcharts
 
PDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio OptimizationPDMA: 5 Key Lessons for Successful Portfolio Optimization
PDMA: 5 Key Lessons for Successful Portfolio Optimization
 
Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!Operational Excellence Management Systems: 10 things you must get right!
Operational Excellence Management Systems: 10 things you must get right!
 
Presentación PDMA Mexico
Presentación PDMA MexicoPresentación PDMA Mexico
Presentación PDMA Mexico
 
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
Value Stream Analysis: Beyond the Mechanics - Part 1 (Planning)
 
Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...Tier 4 Events - Operational Discipline - Do you know how are you performing i...
Tier 4 Events - Operational Discipline - Do you know how are you performing i...
 
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
 

Similar to value stream mapping and metrics based process mapping

Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupTKMG, Inc.
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsTKMG, Inc.
 
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...Workday, Inc.
 
2015 momentum en vista hsn-final_20150518
2015 momentum en vista hsn-final_201505182015 momentum en vista hsn-final_20150518
2015 momentum en vista hsn-final_20150518envista01
 
Pm group project implementation of cargo storage planning system
Pm group project  implementation of cargo storage planning systemPm group project  implementation of cargo storage planning system
Pm group project implementation of cargo storage planning systemMohan Vp
 
AnilSethResume
AnilSethResumeAnilSethResume
AnilSethResumeAnil Seth
 
Collaboration - A Key Enabler of Innovation (Mirion).pdf
Collaboration - A Key Enabler of Innovation (Mirion).pdfCollaboration - A Key Enabler of Innovation (Mirion).pdf
Collaboration - A Key Enabler of Innovation (Mirion).pdfTim McMahon
 
Connecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthConnecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthW3 Group Canada Inc.
 
Delivery Head with 16 yrs experience.docx
Delivery Head with 16 yrs experience.docxDelivery Head with 16 yrs experience.docx
Delivery Head with 16 yrs experience.docxKarthic Ramamurthy
 
CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...
CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...
CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...TheConnectedCause
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handoutsguest0981f4
 
LSS Intro
LSS IntroLSS Intro
LSS Introevansjr
 
Demand Management - Food and Beverage
Demand Management - Food and BeverageDemand Management - Food and Beverage
Demand Management - Food and BeverageSteve Lewin
 

Similar to value stream mapping and metrics based process mapping (20)

Value Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User GroupValue Stream Mapping: Talk with Omaha Lean User Group
Value Stream Mapping: Talk with Omaha Lean User Group
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work Enviroments
 
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
The C-Suite Data Advantage: How Workday Executives Reduce Costs and Make Bett...
 
Six sigma
Six sigmaSix sigma
Six sigma
 
2015 momentum en vista hsn-final_20150518
2015 momentum en vista hsn-final_201505182015 momentum en vista hsn-final_20150518
2015 momentum en vista hsn-final_20150518
 
Pm group project implementation of cargo storage planning system
Pm group project  implementation of cargo storage planning systemPm group project  implementation of cargo storage planning system
Pm group project implementation of cargo storage planning system
 
AnilSethResume
AnilSethResumeAnilSethResume
AnilSethResume
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
Salesforce PPT.pptx
Salesforce PPT.pptxSalesforce PPT.pptx
Salesforce PPT.pptx
 
Collaboration - A Key Enabler of Innovation (Mirion).pdf
Collaboration - A Key Enabler of Innovation (Mirion).pdfCollaboration - A Key Enabler of Innovation (Mirion).pdf
Collaboration - A Key Enabler of Innovation (Mirion).pdf
 
Connecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True NorthConnecting Kata with Hoshin Kanri and True North
Connecting Kata with Hoshin Kanri and True North
 
Delivery Head with 16 yrs experience.docx
Delivery Head with 16 yrs experience.docxDelivery Head with 16 yrs experience.docx
Delivery Head with 16 yrs experience.docx
 
Matt D Turner Resume
Matt D Turner ResumeMatt D Turner Resume
Matt D Turner Resume
 
CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...
CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...
CRMready Webinar Series - Part 3 - How to Make Your Nonprofit’s CRM Implement...
 
SHASHI SOCRATES
SHASHI SOCRATESSHASHI SOCRATES
SHASHI SOCRATES
 
CV_Bharani Tharan Chiti Babu
CV_Bharani Tharan Chiti BabuCV_Bharani Tharan Chiti Babu
CV_Bharani Tharan Chiti Babu
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
Lean Six Sigma Awareness Handouts
Lean Six Sigma Awareness HandoutsLean Six Sigma Awareness Handouts
Lean Six Sigma Awareness Handouts
 
LSS Intro
LSS IntroLSS Intro
LSS Intro
 
Demand Management - Food and Beverage
Demand Management - Food and BeverageDemand Management - Food and Beverage
Demand Management - Food and Beverage
 

More from TKMG, Inc.

Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process MappingTKMG, Inc.
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean ManagementTKMG, Inc.
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsTKMG, Inc.
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.TKMG, Inc.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - YouTKMG, Inc.
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving TKMG, Inc.
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesTKMG, Inc.
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)TKMG, Inc.
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleTKMG, Inc.
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemTKMG, Inc.
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeTKMG, Inc.
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3TKMG, Inc.
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)TKMG, Inc.
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerTKMG, Inc.
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI CultureTKMG, Inc.
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesTKMG, Inc.
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSATKMG, Inc.
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right QuestionsTKMG, Inc.
 

More from TKMG, Inc. (20)

Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
Clarity the Essence of Lean Management
Clarity the Essence of Lean ManagementClarity the Essence of Lean Management
Clarity the Essence of Lean Management
 
CLEAR Problem-Solving Questions
CLEAR Problem-Solving QuestionsCLEAR Problem-Solving Questions
CLEAR Problem-Solving Questions
 
Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.Clarity First: What it is. Why you need it. How to get it.
Clarity First: What it is. Why you need it. How to get it.
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - You
 
Clarity First - Problem Solving
Clarity First - Problem Solving Clarity First - Problem Solving
Clarity First - Problem Solving
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
Clarity First: Purpose and Priorities
Clarity First: Purpose and PrioritiesClarity First: Purpose and Priorities
Clarity First: Purpose and Priorities
 
Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)Clarity First: Overview (1 of 5 webinars)
Clarity First: Overview (1 of 5 webinars)
 
Know How Data is Calculated - OEE example
Know How Data is Calculated - OEE exampleKnow How Data is Calculated - OEE example
Know How Data is Calculated - OEE example
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
The Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable SystemThe Trust Factor: Eliminating Waste with a Reliable System
The Trust Factor: Eliminating Waste with a Reliable System
 
Metrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount CodeMetrics Based Process Mapping Discount Code
Metrics Based Process Mapping Discount Code
 
Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3Lean Leadership: Part 1 of 3
Lean Leadership: Part 1 of 3
 
Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)Building the Fit Organization (with guest presenter Dan Markovitz)
Building the Fit Organization (with guest presenter Dan Markovitz)
 
Lean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob StollerLean and the Corporate Agenda with Guest Jacob Stoller
Lean and the Corporate Agenda with Guest Jacob Stoller
 
How to Truly Establish a CI Culture
How to Truly Establish a CI CultureHow to Truly Establish a CI Culture
How to Truly Establish a CI Culture
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom Lines
 
Problem Solving: The P in PDSA
Problem Solving: The P in PDSAProblem Solving: The P in PDSA
Problem Solving: The P in PDSA
 
Coaching: Asking the Right Questions
Coaching: Asking the Right QuestionsCoaching: Asking the Right Questions
Coaching: Asking the Right Questions
 

Recently uploaded

NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023Steve Rader
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
Mihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZMihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZKanakChauhan5
 
To Create Your Own Wig Online To Create Your Own Wig Online
To Create Your Own Wig Online  To Create Your Own Wig OnlineTo Create Your Own Wig Online  To Create Your Own Wig Online
To Create Your Own Wig Online To Create Your Own Wig Onlinelng ths
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsWristbands Ireland
 
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...IMARC Group
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhangmcgroupjeya
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxJemalSeid25
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessAPCO
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursKaiNexus
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024Stephan Koning
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)tazeenaila12
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Winbusinessin
 
Lecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toLecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toumarfarooquejamali32
 
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John MeulemansBCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John MeulemansBBPMedia1
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Reportamberjiles31
 
Entrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsEntrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsP&CO
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...Khaled Al Awadi
 

Recently uploaded (20)

NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
Mihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZMihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZ
 
To Create Your Own Wig Online To Create Your Own Wig Online
To Create Your Own Wig Online  To Create Your Own Wig OnlineTo Create Your Own Wig Online  To Create Your Own Wig Online
To Create Your Own Wig Online To Create Your Own Wig Online
 
Fabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and FestivalsFabric RFID Wristbands in Ireland for Events and Festivals
Fabric RFID Wristbands in Ireland for Events and Festivals
 
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
 
MC Heights construction company in Jhang
MC Heights construction company in JhangMC Heights construction company in Jhang
MC Heights construction company in Jhang
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptx
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, Ours
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024
 
Lecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toLecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb to
 
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John MeulemansBCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
BCE24 | Virtual Brand Ambassadors: Making Brands Personal - John Meulemans
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Report
 
Entrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizationsEntrepreneurship & organisations: influences and organizations
Entrepreneurship & organisations: influences and organizations
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
 

value stream mapping and metrics based process mapping

  • 2.  Consultant – We help clients in all industries establish and grow Lean management systems, globally.  Author & Speaker: Karen Martin, President The Karen Martin Group, Inc. @karenmartinopex 2 www.ksmartin.com/subscribe Shingo Award Winning Shingo Award Winning ON SALE NOW!
  • 3. After the Webinar… 3 • Please provide feedback • Materials: www.slideshare.net/karenmartingroup • Recorded webinars: • www.ksmartin.com/webinars • www.youtube.com/karenmartingroup • www.vimeo.com/karenmartingroup • www.slideshare.net/karenmartingroup
  • 5. 5
  • 6. 6
  • 7. You will learn… • The similarities and differences between value stream maps (VSM) and metrics-based process maps (MBPM). • The circumstances under which to select each type of map. • Tips for successful mapping activities.
  • 8. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 8 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 9. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 9 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 10. What problem are you trying to solve? © 2015 The Karen Martin Group, Inc. 10 Desired State (or known standard) Current State Gap = Problem
  • 11. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 11 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 12. Value Stream Transformation is Strategic © 2015 The Karen Martin Group, Inc. 12 For more information, see Value Stream Mapping, Karen Martin & Mike Osterling
  • 13. Process Improvement is Tactical © 2015 The Karen Martin Group, Inc. 13 For more information, see Metrics-Based Process Mapping, Karen Martin & Mike Osterling
  • 14. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 14 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 15. Work: Degrees of Granularity Value Stream Process Process Process Step StepStep 15 Macro Perspective • Define strategic direction (“what”) • Heavy leadership involvement • Value Stream Mapping Micro Perspective • Identify the tactical “how” • Heavy frontline involvement • Metrics-Based Process Mapping
  • 16. Which do you need? Macro or Micro View? 16
  • 17. Work: Levels of Granularity © 2015 The Karen Martin Group, Inc. 17 Negotiate contract Process order Configure software Value Stream Process Negotiate pricing Approve Negotiate terms Approve Execute
  • 18. Degrees of Granularity: Hiring Value Stream Hire Recruit Select Onboard Write job description Post externally Post internally 18 Process-level Perspective Value-stream Perspective
  • 19. What problem are you trying to solve? © 2015 The Karen Martin Group, Inc. 19 Desired State (or known standard) Current State Gap = Problem
  • 20. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 20 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 21. Visualize the entire cycle of value delivery on a single sheet of paper 21
  • 22. Timeline 3 Basic Value Stream Map Work Flow Information Flow 1 2
  • 23. Customer 0.0 hrs. 0.5 days 1.0 hrs. 5.0 days 3.6 hrs. 0.6 days 0.0 hrs. 1.0 days 0.2 hrs. 0.5 days 16.0 hrs. 0.0 hrs. 7.0 days 8.0 hrs. 0.0 hrs. 7.0 days 0.1 hrs. 26.0 days 0.0 hrs. 0.2 days Total LT = Total PT = ActivityRa SAP Summary Invoice (Excel)Obtain Order; Enter Order in Offline Order Form Sales (Key at night) LT = 4.5 hrs. PT = 18 mins. %C&A: 80% 1 Review & Release Credit Holds Sales LT = 4 hrs. PT = 10 mins. %C&A: 99% 3 Issue DO To Transporter; Create Pick List WH1 LT = 8 hrs. PT = 1 mins. %C&A: 95% 5 Pick & Load Order Logistics LT = 4 hrs. PT = 15 mins. %C&A: 95% 6 Collect POD from Customer Transporter LT = 2 days 7 Collect POD From Transporter WH1 LT = 7 days PT = 1 mins. %C&A: 99% 8 Deliver POD to Accounting Messenger Batch = 1x/day LT = 1 days 9 Review POD For Accuracy Accounting LT = 7 days PT = 2 mins. %C&A: 99% 10 Deliv er Bill; Collect from Customer; Deposit Sales Batch = 1x monthly LT = 26 days PT = 5 mins. 11 COLOR LEGEND Logistics / W arehouse Sales Order Management Production 10% 90% Produce Product Plant 1 LT = 280 mins. PT = 215 mins. %C&A: 99% 4B Pick & Load Order WH2 LT = 40 mins. PT = 3 mins. %C&A: 99% 5B 40 Days Delivery to Payment Received3.5 Days Order Receipt to Ship MonthlySales Volume Wk1 = 14-23% Wk2 = 19-24% Wk3 = 23-25% Wk4 = 30-42% Obtain & Revise Sales Forecast Sales LT = 0 days PT = 270 mins. %C&A: 99% 1B Hold S&OP Meeting 6-7 People LT = 5 days PT = 3 hrs. %C&A: 99% 2B Create Production Plan Production Planning LT = 5 days PT = 1 hrs. %C&A: 99% 3B Produce Product Plant 2 LT = 280 mins. PT = 215 mins. %C&A: 99% 4C Offline Order Form Enter Payment; Clear Billing Accounting LT = 2 hrs. PT = 1 mins. %C&A: 99% 12 Accounting Delivery Order (DO) Pick List Proof of Delivery (POD) Transfer Report Prod. Plan Check Stock & Reallocate Logistics & Warehouse Batch = 1x/day LT = 4 hrs. PT = 2 mins. %C&A: 99% 4 Prod. Plan plier Receive Material Store 3C Current State Value Stream Map Order to Cash
  • 24. Customer 3.0 hrs. 21.0 days 1.0 hrs. 5.0 days 3.6 hrs. 0.6 days 0.0 hrs. 0.5 days 15.0 hrs. 30.0 days 0.0 hrs. 7.0 days 8.0 hrs. 0.0 hrs. 5.0 days 0.1 hrs. 26.0 days 0.0 hrs. 0.2 days Tota Tota Acti SAP Collect Order From Customer Sales LT = 15 mins. PT = 15 mins. %C&A: 99% 2 Collect Customer Orders Order Mgmt LT = 15 mins. PT = 15 mins. %C&A: 99% 2B Review & Release Credit Holds Sales LT = 4 hrs. PT = 10 mins. 3 Issue DO To Transporter WH1 LT = 4 hrs. PT = 1 mins. 4 Load & Prepare Invoice Logistics LT = 4 hrs. PT = 15 hrs. 5 Collect POD from Customer Transporter LT = 2 days 6 Enter POD WH1 LT = 7 days PT = 1 mins. %C&A: 99% 7 Deliver POD to Accounting Messenger LT = 1 days 8 Rev iew POD for Accuracy; Email Receipt to Sales Accounting LT = 5 days PT = 2 mins. 9 Produce Product Plant 1 LT = 285 mins. PT = 215 mins. %C&A: 99% 3B Pick & Stage WH2 PT = 15 mins. %C&A: 95% 4B Create Production Plan Production Planning LT = 5 days PT = 1 hrs. %C&A: 99% 2C 2% Produce Product Plant 2 LT = 285 mins. PT = 215 mins. %C&A: 99% 3C Accept Customer e-Payment Bank LT = 30 days PT = 0 hrs. %C&A: 99% 6B Enter Payment, Clear Billing Accounting LT = 2 hrs. PT = 1 mins. 11 Invoice 70%30% Hold S&OP Meeting LT = 1 mo. PT = 3 hrs. 1 40 Days Delivery to Payment Received1.5 Days Order Receipt to Ship MonthlySales Volume Wk1 = 25% Wk2 = 25% Wk3 = 25% Wk4 = 25% Prod. Plan Prod. Plan Pick List Invoice Excel Sheet Inv entory Report Deliv er Receipt & Collect from Customer Sales Batch = 1x monthly LT = 26 days PT = 5 mins. 10 POD 50% 50% 98% COLOR LEGEND Logistics / W arehouse Sales Order Management Production Accounting Future State Value Stream Map Order to Cash
  • 25. © 2015 The Karen Martin Group, Inc. 25 Current State Value Stream Map Outpatient Imaging
  • 26. © 2015 The Karen Martin Group, Inc. 26 Future State Value Stream Map Outpatient Imaging
  • 27. Traditional Mapping Method: Process Flow Chart How is this process performing? Look up Customer in Eclipse SALES New Customer? Enter Order SALES Print Ship Ticket SALES Load Trucks SHIPPING Enter Customer Information ADMIN Perform Credit Check FINANCE Okay? Notify Sales COD Only; Notify Admin to update Customer Profile FINANCE Yes No No Yes Product in Stock? Yes Order Material PURCHASING No Receive Material RECEIVING
  • 28. Complete New Hire Setup Form Complete Drug test within 24 hours HR Receives results within 3 days and issues offer letter P: Setup New hire as a vendor IT: Setup user logins and provide hardware, if needed, F: Assign vehicle, issue cell phone order uniforms and guides, if needed. Submit Candidate for background check and drug test. HR Issues Employee ID and Notifies HM & Support Organizations Signs offer letter and required yellow forms. Fax to HR Call candidate to welcome and remind to complete forms Gather Support items to transfer to new hire on day one New Hire Setup Process Map Good training tool, but how do we know what to improve? CandidateHiringManagerAdministratorHumanResources SupportTeam[IT, Purchasing(P), Fleet(F)]
  • 29. Value Stream Map ≠ Swim Lane Process Map Benefits Administrator Receive negative drug screen results Complete “New Hire Approval” form; send to recruiter Recruiter Sign “New Hire Approval” form Recruiter Sign “New Hire Approval” form Set up employee in SAP; notify hiring manager Hiring Manager Request laptop on “New Hire Equip. Request” form IT Manager Approve “New Hire Equip. Request” 29
  • 31. The Improved State Becomes Standard Work 0 1 0 15 6 -1 0 Activity PT LT %C&A Activity PT LT %C&A Activity PT LT %C&A Activity PT LT %C&A Activity PT LT %C&A 1 Fax PO to Sales Rep 0 0 45% 2 Review PO; clarify with customer as needed 20 2 90% Fax PO to warehouse 10 4 90% 5 6 Check inventory levels; notify Sales Rep re: status 5 4 95% Fax PO to Sales Rep 5 0.33 90% 0 20 10 5 5 0 2 4 4 0.33 45% 90% 90% 95% 90% 0 20 10 5 5 Rolled %C&A Critical Path LT Total PT Critical Path PT 5431 2 Mary Townsend Hours Worked per Day Sally Dampier Occurrences per Year Sam Parks Current State Metrics-Based Process Map Dave Morgan25-Jun-08 8 Facilitator Process Details Michael Prichard Order FulfillmentProcess Name Specific Conditions Domestic orders through sales force 37,500 Date Mapped Sean Michaels Sales Rep Ryan AustinDiane O'Shea Mapping Team LT Units Function / Department PT Units Step # ► Customer Finance Warehouse / Shipping Seconds Minutes Hours Days Seconds Minutes Hours Days Excel tool included with Metrics-Based Process Mapping book
  • 32. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 32 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 33. Current State Value Stream Map Outpatient Imaging
  • 34. 34 Value Stream Maps Help Visualize Problems
  • 35. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 35 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 36. VSM & MBPM: Same Metrics 36 Barriers to flow # people PT LT%C&A
  • 37. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 37 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 38. © 2015 The Karen Martin Group, Inc. 38
  • 39. Real-World VSM Facilitation Examples • Two VPs arguing over which leader’s area should perform a certain process • Discussion about outsourcing a functional area that will result in 30 people being laid off • Candid discussion about the risk of losing the company’s #1 customer • Candid discussion about a legal or regulatory matter • Value stream needs level loading, work balancing and pull © 2015 The Karen Martin Group, Inc. 39
  • 40. Real-World MBPM Facilitation Examples • Frontline team member begins to recognize that the work he does is 100% non-value-adding • Supervisor dictates future state improvement ideas • Manager reveals that she doesn’t support the targets begin set (nor the objective of the mapping session) • Team doesn’t feel authorized to make tactical decisions • Two team members have obvious tension between them • A team member shuts down © 2015 The Karen Martin Group, Inc. 40
  • 41. Value Stream Mapping vs. Metrics-Based Process Mapping © 2015 The Karen Martin Group, Inc. 41 Feature Value Stream Mapping Metrics-Based Process Mapping Purpose / outcome Strategic improvement plan Tactical improvement plan Team composition Cross-functional; leadership heavy Cross-functional; frontline heavy When created Precedes kaizen events, projects, etc. During kaizen events, projects, etc. Perspective Macro – Interconnected processes Micro – Steps within each processes Physical look Circular loop; request to delivery Swim lanes Information flow Essential component Less obvious Key metrics Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Lead time (LT), Process time (PT), Percent Complete & Accurate (%C&A) Facilitator Must be strong & able to relate to strategic thinkers Must be strong & able to relate to the people who do the work How long to create? 3 days 1-2 days
  • 42. Prepare Understand Current State Design Future State Develop Transformation Plan Execute Transformation Plan Three Consecutive Days4 Weeks Prior to Mapping Following Mapping Repeat Value Stream Mapping Phases and Timing 42
  • 43. Prepare Understand Current State Design Future State Develop Transformation Plan or Execute Execute Transformation Plan 1-2 Consecutive Days4 Weeks Prior to Mapping Following Mapping Repeat Metrics-Based Process Mapping Phases and Timing 43
  • 45. 45 1 2 1 3 2 4 3 5 4 5 1 6 2 7 3 8 4 9 5 10 1 2 1 3 2 4 3 5 4 1 2 3 4 Specific Conditions Engineer to order, requires both hardware & software customization Value Stream Champion Nancy Little Demand Rate 1,000 per year Facilitator Dave Parks Value Stream Mapping Charter Scope Accountable Parties Logistics Value Stream Capital equipment Executive Sponsor Allen Ward Event Dates & Times July 24-26, 2013 8:00 am - 5:00 pm Last Step Production ships product Boundaries & Limitations No new software; only minor changes to existing IT systems; no additional staff; no budget changes Briefing Attendees ** required *optional ** Allen W (COO), Joe M (CIO), Sal T (VP Sales) * Bruce R (VP Ops), Carlos P (HR), Su T (CFO), Bill M (VP CS) Base-camp Location Surf's Up - Room A Trigger Customer submits RFQ First Step Sales reviews the RFQ Logistics Coordinator Dave Parks Meals Provided Continential breakfast & lunch Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name Contact Information Forecasted growth of 15% for next fiscal year. Sales, Director Sean Michaels Briefing Dates & Times July 24, 25, & 26 4:00-5:00 pmImprovement Time Frame Future state design is fully realized by December 31, 2013. Current State Problems & Business Needs Mapping Team Competition's RFQ LT is 1 wk; PO to delivery is 4 wks Scrum Master Ryan Austin Goals & Measurable Target Conditions Engineering, Vice President Nancy Little Unclear & incorrect information flowing through value stream. IT, Director Diana Marie RFQ lead time = 2 weeks; PO to software dev lead time = 5 weeks Finance, Controller Dave Gerald Improve quality of information flowing throughout value stream. Customer (contract manufacturer) JR Hunt Reduce RFQ LT from 2 weeks to 3 days (70% improvement). Manufacturing, Director Ambreen Motiwala Reduce PO to software dev LT from 5 wks to 3 wks (40% improvement) Customer Service, Manager Danny Tran Faster delivery; less hassle; less cost. Function Name Contact Information Better working relationships between sales, estimating & engineering. Planning / Purchasing, Planner Lourdes Dwyer Benefits to Customers & Business On-Call Support Relevant Data Agreement Freed capacity to absorb additional business w/o increasing staff. Production Supervisor Tom St. James Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature: Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator Financial: Estimate-to-actual cost comparison. Date: Date: Date:
  • 46. Value Stream Scoping Diagram Defining Specific Conditions Golden State Equipment, Inc. Capital Equipment Catalog Configure to order Engineer to order Custom hardware Custom software Both New Product Development Spares & subassemblies Catalog Engineer to order 46
  • 47. 47 1 2 1 3 2 4 3 5 4 5 1 6 2 7 3 8 4 9 5 10 1 2 1 3 2 4 3 5 4 1 2 3 4 Specific Conditions Engineer to order, requires both hardware & software customization Value Stream Champion Nancy Little Demand Rate 1,000 per year Facilitator Dave Parks Value Stream Mapping Charter Scope Accountable Parties Logistics Value Stream Capital equipment Executive Sponsor Allen Ward Event Dates & Times July 24-26, 2013 8:00 am - 5:00 pm Last Step Production ships product Boundaries & Limitations No new software; only minor changes to existing IT systems; no additional staff; no budget changes Briefing Attendees ** required *optional ** Allen W (COO), Joe M (CIO), Sal T (VP Sales) * Bruce R (VP Ops), Carlos P (HR), Su T (CFO), Bill M (VP CS) Base-camp Location Surf's Up - Room A Trigger Customer submits RFQ First Step Sales reviews the RFQ Logistics Coordinator Dave Parks Meals Provided Continential breakfast & lunch Desire to stay ahead of the competition & deepen customer loyalty. Function / Title Name Contact Information Forecasted growth of 15% for next fiscal year. Sales, Director Sean Michaels Briefing Dates & Times July 24, 25, & 26 4:00-5:00 pmImprovement Time Frame Future state design is fully realized by December 31, 2013. Current State Problems & Business Needs Mapping Team Competition's RFQ LT is 1 wk; PO to delivery is 4 wks Scrum Master Ryan Austin Goals & Measurable Target Conditions Engineering, Vice President Nancy Little Unclear & incorrect information flowing through value stream. IT, Director Diana Marie RFQ lead time = 2 weeks; PO to software dev lead time = 5 weeks Finance, Controller Dave Gerald Improve quality of information flowing throughout value stream. Customer (contract manufacturer) JR Hunt Reduce RFQ LT from 2 weeks to 3 days (70% improvement). Manufacturing, Director Ambreen Motiwala Reduce PO to software dev LT from 5 wks to 3 wks (40% improvement) Customer Service, Manager Danny Tran Faster delivery; less hassle; less cost. Function Name Contact Information Better working relationships between sales, estimating & engineering. Planning / Purchasing, Planner Lourdes Dwyer Benefits to Customers & Business On-Call Support Relevant Data Agreement Freed capacity to absorb additional business w/o increasing staff. Production Supervisor Tom St. James Operational: LT in segments (RFQ to quote; PO to development). Signature: Signature: Signature: Sales effectiveness: RFQ conversion rate. Executive Sponsor Value Stream Champion Facilitator Financial: Estimate-to-actual cost comparison. Date: Date: Date: 10 people max!
  • 48. Daily Briefings #1 – Reduce resistance #2 – Build consensus #3 – Gain commitment
  • 49. 49 Mapping results are proportional to the quality of the planning and chartering process and facilitator skill
  • 50. © 2015 The Karen Martin Group, Inc. 50 Karen Martin, President info@ksmartin.com @karenmartinopex Blog & newsletter: www.ksmartin.com/subscribe