1. KhaleD FathY
Al-Waleed Bin Oqba St., Gender: Male
Dammam, Saudi Arabia Marital State: Married
00966-541005300 Nationality: Egyptian
Khalid.fathy.ahmed@gmail.com Date of Birth: Feb. 02, 1978
CIVIL ENGINEER / PROJECT MANAGER
Accomplished, proactive engineer with significant experience in structural design, testing,
analysis, executing and project coordination. possess extensive educational qualifications with
Bachelor`s degree in civil engineering. Recognized strong adherence to safety, ability to work well
as team member and ledder, and exceptional work ethic. Proven technical, interpersonal
communications, and training skills.
Core competencies and professional strengths include:
Project Management Personnel Oversight Budget Development
Documentation Safety Compliance Project Scheduling
Project Development Cost Controls Structural Design
Structural Inspections Quality Control Project Funding
Outsourcing Services Contracted Services Purchasing
Report Preparation Process Improvements Customer Service
PROFESSIONAL EXPERIENCE
Process Instrumentation Technical Company – PITCO 2014 - Present
Project Manager
Oversee all activities within construction operation. Led team of 85
members, provide support to over 20 suppliers / contractors, plan
and administer SAR 27 million budget. Manage full cycle of project
to meet time and cost directive. Ensure adherence to operational policies and procedures,
implementing steps for corrective actions as needed. Maintain quality and safety objectives.
Project Al-Khobar Gardens
Location /
Owner
Ramlat Juman master plan in Azizya, KSA / JENAN real estate company
2. Page 02
Project
Components
and facts
Number of units: 36 Villas for phase (I). Grand mosque, large garden centering
the project. Types of villas: Arabic and Spanish (3 types for each model), Built
Area: From 278 to 465 sq.m.
Budget SAR 27.00 million
Contact
person
Eng. Medhat Koshok, owner Area Manager mob.(
Abdul Ali AL-AJMI Company – AJAMI 2011 - 2014
Project Manager
Oversee all activities within construction operation. Led team of 135 members,
provide support to over 20 suppliers / contractors, plan and administer SAR 33
million budget. Manage full cycle of project to meet time and cost directive.
Ensure adherence to operational policies and procedures, implementing steps
for corrective actions as needed. Maintain quality and safety objectives.
Project Completion linking Dammam Second Industrial City - Part 2.
Location / Owner Dammam, KSA / MODON
Project
Components and
facts
Number of units: 2 protection culverts for SWCC main pipes, the length
for each culvert is 85 m. asphalt road was executed as per MOT
specifications.
Budget SAR 33.00 million
Contact person Eng. Mohamed Ajami, General Manager.
SAID RADAD ZAHRANI Co. – SRACO 2008 - 2011
Senior Structural Engineer
Preparation of estimates, material submittals and take-offs, complete preparation of quantity
statements, purchase orders, procurement of materials and self-checking
of all required site material deliverables. Preparing of payment certificates,
weekly reports, monthly reports and all necessary periodical reports on the
progress of the work. Edit all structural and construction drawings.
Project Technical College of Girls.
Location / Owner Al hassa – Eastern Province, KSA / TVTC
Budget SAR 84.00 million
Project English Language Center
3. Page 03
Location / Owner Dammam, KSA / Dammam University
Budget SAR 21.00 million
Project Judaidah General Hospital
Location / Owner Judaidah, KSA / Ministry Of Health
Budget SAR 16.00 million
Project Investigation Admin Building
Location / Owner Hafr Albatin – Eastern Province / Ministry Of Interior
Budget SAR 21.00 million
Project Vocational Training Center
Location / Owner Naeria – Eastern Province, KSA / TVTC
Budget SAR 32.00 million
PROMPT CONTRACTING LLC – PROMPT 2006 - 2008
Project Engineer
Preparation of estimates, material submittals and take-offs, complete
preparation of quantity statements, purchase orders, procurement of
materials and self-checking of all required site material deliverables.
Preparing of payment certificates, weekly reports, monthly reports and
all necessary periodical reports on the progress of the work. Edit all
structural and construction drawings.
Project 12000m3/ day STP sludge dewatering equipment room lay out plan &
section.
Location / Owner Doha, Qatar / BARWA Housing
Project
Components
Proposed STP civil works 12000 m3/day
Budget QR 20.80 million
ARAB CONTRACTORS COMPANY – ACC 2003 - 2006
Technical Engineer
Preparation of estimates, material submittals and take-offs, complete
preparation of quantity statements, purchase orders, procurement of
materials and self-checking of all required site material deliverables.
Preparing of payment certificates, weekly reports, monthly reports and all
4. Page 04
necessary periodical reports on the progress of the work. Edit all structural and construction
drawings. Design and re-design for all structural projects both of RCC and steel.
Project Railway bridge Project Nasser tunnel
Location / Owner Egypt / MOT Location / Owner Ismailia / MOT
Main job Design Main job Design
Project Al Nasr canal bridge. Project Al salam tower
Location / Owner Egypt / MOT Location / Owner Ismailia / privet
Main job Design Main job Design
Project Suiz mall Project Shebin tower
Location / Owner Egypt/suiz municipality Location / Owner Ismailia / privet
Main job Design Main job design
EDUCATION DATA
Bachelor of Science of Engineering, Minor in Civil Engineering, 2003
ALEXANDRIA UNIVERSITY, EGYPT.
Graduated cumulative is 65% (Good).
SKILLS PROFESSIONAL MEMBERSHIPS
o Fluent in Arabic.
o Knowledge of English (speak and written).
o Microsoft expertise (word, excel, outlook)
o AutoCAD expertise.
o SAP expertise.
o ETABS expertise.
o SAFE expertise.
o MS project expertise.
o PMI association (PMP).
o Member of the Egyptian Engineers
Syndicate.
o Member of the Saudi Engineers
Commission.
EXTRA INFORMATION
o Have Saudi driving license.
o Have Egyptian driving license.
o Reference available upon request.
o Work in team.
o Work under stress.
Warm regards,
KhaleD FathY