1. The Lean Enterprise
Philosophy and Key Concepts
Lean Foundations
Continuous Improvement Training
2. Learning Objectives
The purpose of this module is to present
the 5 core principles of Lean;
define value-added and non-valued added activity;
define the 7 most common types of waste
and their causes.
Review a systematic approach to discover waste within
a process.
freeleansite.com
3. First Step to understanding Process Analysis
Learn the 5 Core Principles of Lean:
1) Specify value in the eyes of the customer
2) Identify value stream and eliminate waste
3) Make value flow at pull of the customer
4) Involve & empower employees
5) Continuously improve in pursuit of perfection
freeleansite.com
4. Customer perceives value
Value Added Activity Non-Value Added Activity
An activity that changes the Those activities that consume
size, shape, fit, form, or time or resources, but do not
function of material or add value in the eyes of the
information (for the first time) customer.
to satisfy the customer.
freeleansite.com
5. Definitions
Value Added
– Any activity or operation performed that helps transform a product or
service from its raw state into its finished form.
– Completed right the first time.
– Any activity customer is prepared to pay for. Activity required to ensure
that a product or service is delivered in conformance to specification.
Non-Value Added
– Any activity that doesn’t help to transform a product or service into its final
form. Activity not performed right. Activity customer not willing to pay for.
– This includes:
Unnecessary process steps
Movement of inventory, paperwork, etc.
Re-work, corrections, etc.
Storage between operations, batching inventory
Wait times, delay times, idle times
freeleansite.com
6. MUDA = non-value added activity
(waste)…
Identify and reduce:
– Defects (repair, rework, scrap)
– Overproduction (inventory)
– Transportation (conveyance)
– Waiting (queue time)
– Inspection (reliance on mass inspection/ verification)
– Motion (parts, paper, people)
– Process, itself (over-processing, long cycles)
“Commonly referred to as the 7W’s…”
“Commonly referred to as the 7W’s…”
*7 common wastes of production
*7 common wastes of production
freeleansite.com
(Shingo)
(Shingo)
7. The Causes of Waste in most Processes
Focus on
Types of Waste Problems/ Causes
reduction (7W’s)
Value Incorrect layouts
Waste
Added Lack of proximity of machines
Motion Off-line resources
Waiting workers, machines, materials
Long set-ups and lead times
Waiting time
e poe P Large batches, raw material stocks
Non- Value Added, High WIP, finished goods stocks
but necessary Overproduction Making for the sake of it
Ignoring customer demands
l
Long cycle times- process, itself
Processing time Reduced efficiency- over processing
High overall lead times
ssec o P
Defects Long delays for rectification
r
Costly rework
Dissatisfied customers
Inspection Approvals of approvals
High number of verification steps
Reliance- Mass inspection techniques
Transportation
Unnecessary movement
t c udo P
Extra handling
r
freeleansite.com
8. Product Lead-Time
Raw Finished
Materials TIME Goods
Value Added
Time
Non- Value
Added Time
freeleansite.com
9. Product Lead-Time
95% Non- Value Added
Historically,
improvement efforts
have been focused here.
freeleansite.com
10. Product Lead-Time
95% Non- Value Added
Whereas, “Process Analysis” activities
should
Focus here - the Elimination of Waste
(MUDA)
freeleansite.com
11. Identifying Waste
• Waste can take many forms; some causes of
the most common forms of waste include:
lack of adherence
unnecessary approvals or signatures
reviews of reviews
multiple hand-offs
transportation
long setup time
correction, and
over-production
freeleansite.com
12. Identifying Waste
• Other causes of waste may include:
poor maintenance
lack of training
poor supervisory skills
ineffective production planning/ scheduling
lack of workplace organization
Supplier quality/ reliability
• In most cases, inventory is wasteful; more
importantly, inventory hides all sorts of
problems in the company
freeleansite.com
13. Inventory Hides Problems
Your
Company Finished Goods
Raw Material
Long Poor
Quality Set-up Scheduling Down-
Problems Time Time Poor
Line Poor
Imbalance 5-S Process
Poor Capability
Communication Vendor Delivery Problems
freeleansite.com Absenteeism
14. Process Analysis to the Rescue
… we have only begun to deal with issues involved in trying
to tie everything together for a whole-system approach.
Some of the problems that continue to confound us are the
following:
The way manufacturing works with Sales makes
scheduling and running the plants difficult.
We compound the above problem by the way we order from
suppliers.
Labor and management still don’t trust each other.
The way we measure performance doesn’t provide information
useful to running a plant and often encourages wrong
decisions.
freeleansite.com
15. How to Discover Waste . . .
Look at the “3 Real Things” in every operation …
• Material Flow
(or Business Steps i.e. transactional processes)
• Information Flow (data)
• Work-in-process (could be both…)
freeleansite.com
16. How to Discover Waste . . .
Ask what?
What is the operation doing?
Ask why?
?
Why is the operation necessary?
Ask why at least 5 times to lead you to the root cause
Everything that is not work is waste
Once you know the function, you can identify as waste
anything that does not execute that function
?
Draft an improvement plan…
Ask how?
freeleansite.com
17. How to Discover Waste . . .
Be on the look-out for these
3 Major contributors …
• Overburden/ Overdoing
• Unevenness
• Process methods
freeleansite.com
18. How to Discover Waste . . .
Be on the look-out for these
3 Major contributors …
• Overburden/ Overdoing (muri)
- waste caused by how work and tasks are designed
• Unevenness (mura)
- waste caused by poor quality (process unpredictability)
• Process methods (muda)
- waste caused by “DOT WIMP”
freeleansite.com
19. The “Perfect” Targets . . .
Remember, Value-added is the physical
transformation of raw material.
Machining World-class
% of person time Assembly World-class
% of person time
Pure waste 0 Pure waste 0
NVA 100 NVA 20
VA 0 VA 80
1:15 person/machine person/machine n/a
set-ups less than 10 minutes ‘0’ change-over time
Step back and take an impartial look at your area.
What are the barriers to adding value?
freeleansite.com
20. What actions must we take?
We must …
• decrease cycle times
• reduce travel distances
• standardize our processes
• reduce scrap, rework and waste
• improve all of our business processes
• reduce the variation in our schedules
• provide a constant, steady supply of
parts to production, assembly, and test
freeleansite.com
21. What actions must we take?
We must …
• design products to match a stable,
standard production process
• gain Market share
- and -
• increase our competitiveness !
Now – how do we get there ??
freeleansite.com
22. Utilize the process “DMAIC” …
(Define, Measure, Analyze, Improve and Control)
• Understand the Problem
• Form the Team
• Understand the Process
• Gather Process Data
• Analyze the Process
• Identify possible Corrective Actions
• Screen/ Experiment to select best action
• Implement Action
• Verify Action
• Sustain Improvement
freeleansite.com
23. The Lean Enterprise is a Strategy …
… for turning manufacturing and business
processes into competitive weapons.
Producing what is needed, when it is
needed, with a minimum amount of
materials, equipment, labor and space.
“Prime Directive” - to continually seek out and
eliminate waste and wasteful practices.
freeleansite.com
24. Defining Project Criteria - Breakout (Optional)
This breakout will give you the opportunity to apply
the things you have learned.
Each team is asked to brainstorm a list of criteria for
a good KAIZEN (Process Analysis) project. These
criteria could include Customer complaint, company
culture issues, length of time to complete, area of
Lean focus or anything else that the team feels is a
important criteria to consider in Process Analysis
type project selection.
The team will have 20 minutes to brainstorm criteria
and then we will discuss the results.
freeleansite.com
25. The Lean Enterprise
Philosophy and Key Concepts
Lean Foundations
Continuous Improvement Training
Editor's Notes
freeleansite.com Thank all for their attendance. (Please retain the free lean site reference with the materials.)
freeleansite.com
freeleansite.com Cover each bullet point with participants but, especially #5) Pursue perfection with a Continuous Improvement Mentality !
freeleansite.com Describe Value Added (VA) as tasks performed during the production of a product or service that INCREASE its VALUE to the CUSTOMER.
freeleansite.com 3 “unique” parts of the VA definition… 1) TRANSFORMS PRODUCT/ SERVICE 2) DONE RIGHT the FIRST TIME 3) CUSTOMER WILLING TO PAY FOR
freeleansite.com Facilitator Note: Might want to play the push vs. pull skit - post-it note (signature), Lego assembly, Airplane or “DOT” game here to illustrate the 7 wastes …
freeleansite.com This is probably the most important principle of LEAN THINKING and is based upon the categorization of activities into the following: Value added - Those activities that: 1) Alter the product; 2) Are completed right the first time and 3) The customer is prepared to pay for Non-value added - Those activities that are essential, but add no value to the product (payroll preparation or in-process quality inspection are examples) Waste - Those activities which do not add value and are not essential Progressive reduction of non-value added or elimination of waste activities places a greater focus on what is important to the customer. The waste activities can be addressed in several ways: through improved process layout, better product design from a manufacturability standpoint, improved production scheduling, and more efficient shop floor production techniques through adoption of best practice principles. In the following viewcells, which focus on the best practices in use today in manufacturing, the common thread is the focus on the elimination of waste. In Lean, you will often hear the term "continuous improvement" or "continuous process improvement." Continuous improvement aims at the gradual elimination of waste through improvements in product design, process design, production planning and production control. This concept is applied seriously by progressive manufacturers to their internal operations and with respect to their suppliers as well, whom they expect to adopt continuous improvement programs to improve the quality and reduce the costs of raw materials.
freeleansite.com Timeline shows duration of non-value-added work. ASK participants where they might get that data from ?? (Timecards, Process Travellers, Value-stream Map) PERFECT Example: Day at Disneyland – wait an hour to ride a 1 minute ride,,, then wait an hour to ride a 90 second ride … etc etc or Post Office, DMV, Bank et al
freeleansite.com IMPROVEMENT INITIATIVES have typically been focused in the 5 to 10% of the activities that “add value”… but - Lean focuses on the other side of the “time” equation… THOSE NON-VALUE ADDING activities. THIS IS WHY it is called a “time-based” improvement strategy. Value added percentages of total cycle times of 5% or less are common. I have found a procurement process (total cycle time) at another facility that had a value-added percentage of POINT THREE… 3/10ths of a percent.
freeleansite.com Analyzing a “Process” with the Lean tools… begins by identifying and eliminating those NON-VALUE ADDING steps.
freeleansite.com These are common causes of waste… (what to look for when analyzing a process)
freeleansite.com More common causes, plus INVENTORY !!
freeleansite.com When INVENTORY is lowered, it exposes the rocks in the river ! (Sources of waste in the VALUE STREAM.)
freeleansite.com Besides pure ‘logistics”… There are other issues as well - in striving to become “WORLD-CLASS” A lot of work ahead of us to do !!
freeleansite.com We can, however, begin slowly and start to discover waste in our immediate operation.
freeleansite.com Here is an approach… don’t be afraid to ask questions! Especially the 5-why technique! Also, refer to the Module on ROOT CAUSE ANALYSIS ( Root Cause/ Corrective Action )
freeleansite.com
freeleansite.com
freeleansite.com This is the “IDEAL” – World-class targets !! OUR VISION – what we are striving toward. NOTHING CHANGES, unless you change something !
freeleansite.com Management has the responsibility to eliminate waste and provide job security. This sets the stage for an expectation to be discussed later – as “Lean Linking” takes hold and is used, which includes participation and input from affected areas within an organization – you must TRY IT… Change of magnitude required to overcome the current system is not easy. Disagreement is sure to happen, sometimes for good reason – based on facts, and sometimes for bad reason – based on opinion. Not all of the plans will be perfect the first time through. But improvements have already been made, and progress will continue. Don’t fall into “it won’t work here”, “we’re different”, or “we have already tried that”.
freeleansite.com LINK to DMAIC !!
freeleansite.com DMAIC – the universal process - for Six Sigma or Lean techniques, doesn’t matter.
freeleansite.com Does the Machine or Machinist add value? (The machine – it physically transforms the product. Discuss.) Is in-process Inspection value added? (no) Automated Test Procedure (temp cycle, pressure, vacuum etc) is non-value added but required. It fulfills a Custom requirement, but does not physically transform the product. Is getting a tool from the tool crib value added? (no) Attaching a flange to a pump body is value added. Completing information blocks on a proposal form is value-added because information required by the customer (internal and external) is required AND necessary. Reviews and (certain) signatures on the form are non-value added.
freeleansite.com OPTIONAL exercise…
freeleansite.com Thank all for their attendance and contributions.