The Lean Enterprise
        Philosophy and Key Concepts



Lean Foundations
Continuous Improvement Training
Learning Objectives



       The purpose of this module is to present
             the 5 core principles of Lean;
  define value-added and non-valued added activity;
      define the 7 most common types of waste
                   and their causes.

Review a systematic approach to discover waste within
                     a process.




                        freeleansite.com
First Step to understanding Process Analysis
   Learn the 5 Core Principles of Lean:

     1) Specify value in the eyes of the customer


     2) Identify value stream and eliminate waste


     3) Make value flow at pull of the customer


     4) Involve & empower employees


     5) Continuously improve in pursuit of perfection
                            freeleansite.com
Customer perceives value

Value Added Activity                       Non-Value Added Activity
An activity that changes the               Those activities that consume
size, shape, fit, form, or                 time or resources, but do not
function of material or                    add value in the eyes of the
information (for the first time)           customer.
to satisfy the customer.




                                   freeleansite.com
Definitions
   Value Added
     – Any activity or operation performed that helps transform a product or
       service from its raw state into its finished form.
     – Completed right the first time.
     – Any activity customer is prepared to pay for. Activity required to ensure
       that a product or service is delivered in conformance to specification.

   Non-Value Added
     – Any activity that doesn’t help to transform a product or service into its final
       form. Activity not performed right. Activity customer not willing to pay for.
     – This includes:
          Unnecessary process steps
          Movement of inventory, paperwork, etc.
          Re-work, corrections, etc.
          Storage between operations, batching inventory
          Wait times, delay times, idle times

                                        freeleansite.com
MUDA = non-value added activity
(waste)…
     Identify and reduce:
      – Defects (repair, rework, scrap)
      – Overproduction (inventory)
      – Transportation (conveyance)
      –   Waiting (queue time)
      –   Inspection (reliance on mass inspection/ verification)
      –   Motion (parts, paper, people)
      –   Process, itself (over-processing, long cycles)


          “Commonly referred to as the 7W’s…”
          “Commonly referred to as the 7W’s…”
              *7 common wastes of production
               *7 common wastes of production
                              freeleansite.com

                         (Shingo)
                          (Shingo)
The Causes of Waste in most Processes
Focus on
                                 Types of Waste        Problems/ Causes
reduction                             (7W’s)
               Value                                   Incorrect layouts
    Waste
               Added                                   Lack of proximity of machines
                                     Motion            Off-line resources

                                                       Waiting workers, machines, materials
                                                       Long set-ups and lead times
                                  Waiting time
                      e poe P                          Large batches, raw material stocks
 Non- Value Added,                                     High WIP, finished goods stocks
   but necessary                 Overproduction        Making for the sake of it
                                                       Ignoring customer demands
                      l



                                                       Long cycle times- process, itself
                                 Processing time       Reduced efficiency- over processing
                                                       High overall lead times
                      ssec o P




                                    Defects            Long delays for rectification
                            r




                                                       Costly rework
                                                       Dissatisfied customers
                                   Inspection          Approvals of approvals
                                                       High number of verification steps
                                                       Reliance- Mass inspection techniques
                                 Transportation
                                                       Unnecessary movement
                     t c udo P




                                                       Extra handling
                            r




                                    freeleansite.com
Product Lead-Time

  Raw                                         Finished
Materials                  TIME                Goods




        Value Added
            Time




              Non- Value
              Added Time


                           freeleansite.com
Product Lead-Time




       95% Non- Value Added

                                   Historically,
                               improvement efforts
                             have been focused here.


                    freeleansite.com
Product Lead-Time




       95% Non- Value Added


      Whereas, “Process Analysis” activities
                      should
      Focus here - the Elimination of Waste
                     (MUDA)
                    freeleansite.com
Identifying Waste

  •   Waste can take many forms; some causes of
      the most common forms of waste include:

       lack of adherence
       unnecessary approvals or signatures
       reviews of reviews
       multiple hand-offs
       transportation
       long setup time
       correction, and
       over-production
                       freeleansite.com
Identifying Waste
  •   Other causes of waste may include:

       poor maintenance
       lack of training
       poor supervisory skills
       ineffective production planning/ scheduling
       lack of workplace organization
       Supplier quality/ reliability

  •   In most cases, inventory is wasteful; more
      importantly, inventory hides all sorts of
      problems in the company
                         freeleansite.com
Inventory Hides Problems
                                     Your
                                   Company                             Finished Goods
 Raw Material




                              Long            Poor
                 Quality     Set-up        Scheduling              Down-
                Problems     Time                                  Time          Poor
          Line                                            Poor
       Imbalance                                           5-S                  Process
   Poor                                                                        Capability
Communication              Vendor Delivery Problems
                                       freeleansite.com          Absenteeism
Process Analysis to the Rescue

… we have only begun to deal with issues involved in trying
to tie everything together for a whole-system approach.
Some of the problems that continue to confound us are the
following:
   The way manufacturing works with Sales makes
    scheduling and running the plants difficult.
         We compound the above problem by the way we order from
          suppliers.
         Labor and management still don’t trust each other.
         The way we measure performance doesn’t provide information
          useful to running a plant and often encourages wrong
          decisions.

                                 freeleansite.com
How to Discover Waste . . .

Look at the “3 Real Things” in every operation …

   • Material Flow
   (or Business Steps i.e. transactional processes)


   • Information Flow (data)



   • Work-in-process (could be both…)



                               freeleansite.com
How to Discover Waste . . .

     Ask what?
        What is the operation doing?

     Ask why?
                                                ?
        Why is the operation necessary?
        Ask why at least 5 times to lead you to the root cause
     Everything that is not work is waste
        Once you know the function, you can identify as waste
        anything that does not execute that function




?
     Draft an improvement plan…
        Ask how?

                           freeleansite.com
How to Discover Waste . . .

Be on the look-out for these
  3 Major contributors …

  • Overburden/ Overdoing

  • Unevenness

  • Process methods

                       freeleansite.com
How to Discover Waste . . .

Be on the look-out for these
  3 Major contributors …

  • Overburden/ Overdoing (muri)
    - waste caused by how work and tasks are designed

  • Unevenness (mura)
    - waste caused by poor quality (process unpredictability)

  • Process methods (muda)
    - waste caused by “DOT WIMP”
                            freeleansite.com
The “Perfect” Targets . . .
Remember, Value-added is the physical
transformation of raw material.

Machining           World-class
                   % of person time                      Assembly        World-class
                                                                       % of person time
Pure waste                  0                             Pure waste           0
NVA                       100                             NVA                 20
VA                          0                             VA                  80
 1:15 person/machine                                      person/machine n/a
 set-ups less than 10 minutes                             ‘0’ change-over time

      Step back and take an impartial look at your area.
           What are the barriers to adding value?
                                      freeleansite.com
What actions must we take?

We must …
  • decrease cycle times
  • reduce travel distances
  • standardize our processes
  • reduce scrap, rework and waste
  • improve all of our business processes
  • reduce the variation in our schedules
  • provide a constant, steady supply of
    parts to production, assembly, and test

                     freeleansite.com
What actions must we take?

We must …
  • design products to match a stable,
     standard production process
  • gain Market share
        - and -
  • increase our competitiveness !



  Now – how do we get there ??
                     freeleansite.com
Utilize the process “DMAIC” …
(Define, Measure, Analyze, Improve and Control)
  • Understand the Problem
  • Form the Team
  • Understand the Process
  • Gather Process Data
  • Analyze the Process
  • Identify possible Corrective Actions
  • Screen/ Experiment to select best action
  • Implement Action
  • Verify Action
  • Sustain Improvement
                      freeleansite.com
The Lean Enterprise is a Strategy …

… for turning manufacturing and business
processes into competitive weapons.

Producing what is needed, when it is
 needed, with a minimum amount of
   materials, equipment, labor and space.

“Prime Directive” - to continually seek out and
eliminate waste and wasteful practices.

                     freeleansite.com
Defining Project Criteria - Breakout (Optional)

 This breakout will give you the opportunity to apply
 the things you have learned.

 Each team is asked to brainstorm a list of criteria for
 a good KAIZEN (Process Analysis) project. These
 criteria could include Customer complaint, company
 culture issues, length of time to complete, area of
 Lean focus or anything else that the team feels is a
 important criteria to consider in Process Analysis
 type project selection.

 The team will have 20 minutes to brainstorm criteria
 and then we will discuss the results.
                          freeleansite.com
The Lean Enterprise
        Philosophy and Key Concepts



Lean Foundations
Continuous Improvement Training

More Related Content

What's hot (19)

Streamlining the mfg process webinar
Streamlining the mfg process webinarStreamlining the mfg process webinar
Streamlining the mfg process webinar
 
Cmtc Lean Introduction
Cmtc Lean IntroductionCmtc Lean Introduction
Cmtc Lean Introduction
 
Lean sytems lecture ayub jake salik 2012
Lean sytems lecture ayub jake salik 2012Lean sytems lecture ayub jake salik 2012
Lean sytems lecture ayub jake salik 2012
 
Lean Kanban Systems Training Module
Lean Kanban Systems Training ModuleLean Kanban Systems Training Module
Lean Kanban Systems Training Module
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Kanban Pull System
Kanban Pull SystemKanban Pull System
Kanban Pull System
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Business Process
Business ProcessBusiness Process
Business Process
 
Using Value Stream Mapping As a Strategic Planning & Implementation Tool
Using Value Stream Mapping As a Strategic Planning & Implementation ToolUsing Value Stream Mapping As a Strategic Planning & Implementation Tool
Using Value Stream Mapping As a Strategic Planning & Implementation Tool
 
Jit
JitJit
Jit
 
JUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEMJUST IN TIME PRODUCTION SYSTEM
JUST IN TIME PRODUCTION SYSTEM
 
CSAC Champion Training 2013
CSAC Champion Training 2013CSAC Champion Training 2013
CSAC Champion Training 2013
 
Jit principles
Jit principlesJit principles
Jit principles
 
Jit
JitJit
Jit
 
Lean production
Lean production Lean production
Lean production
 
Quality english
Quality englishQuality english
Quality english
 
Lead Time: What We Know About It...
Lead Time: What We Know About It...Lead Time: What We Know About It...
Lead Time: What We Know About It...
 
just in time
just in timejust in time
just in time
 

Viewers also liked

Modernization workshop2
Modernization workshop2Modernization workshop2
Modernization workshop2Kimmo Haapea
 
Joros Oy Invites to 24h Industrial Hackathon
Joros Oy Invites to 24h Industrial HackathonJoros Oy Invites to 24h Industrial Hackathon
Joros Oy Invites to 24h Industrial HackathonKimmo Haapea
 
7 problématiques de la négociation
7 problématiques de la négociation7 problématiques de la négociation
7 problématiques de la négociationMélinda Tschanz
 
Clinic 2 : Periodisering 'Fail to plan - plan to fail' (31/02/11)
Clinic 2 : Periodisering  'Fail to plan - plan to fail' (31/02/11)Clinic 2 : Periodisering  'Fail to plan - plan to fail' (31/02/11)
Clinic 2 : Periodisering 'Fail to plan - plan to fail' (31/02/11)Topsportlab
 
Training Planning en Periodisering
Training Planning en PeriodiseringTraining Planning en Periodisering
Training Planning en PeriodiseringEvert van der Zee
 
Ivan Minnaert U16 player development
Ivan Minnaert U16 player developmentIvan Minnaert U16 player development
Ivan Minnaert U16 player developmentIvan Minnaert
 
Ivan Minnaert U19 player development
Ivan Minnaert U19 player developmentIvan Minnaert U19 player development
Ivan Minnaert U19 player developmentIvan Minnaert
 
BFC U9 - Week 3 Session Plans. - Ball Mastery Play out
BFC U9 - Week 3 Session Plans. - Ball Mastery Play outBFC U9 - Week 3 Session Plans. - Ball Mastery Play out
BFC U9 - Week 3 Session Plans. - Ball Mastery Play outMattar M'Boge
 
Ivan Minnaert U19 player development
Ivan Minnaert U19 player developmentIvan Minnaert U19 player development
Ivan Minnaert U19 player developmentIvan Minnaert
 
Ivan minnaert style of play
Ivan minnaert style of playIvan minnaert style of play
Ivan minnaert style of playIvan Minnaert
 
Vitor pereira defensive organization
Vitor pereira   defensive organizationVitor pereira   defensive organization
Vitor pereira defensive organizationNick Cowell
 
Defensive organization fc porto
Defensive organization   fc portoDefensive organization   fc porto
Defensive organization fc portoNick Cowell
 

Viewers also liked (20)

Modernization workshop2
Modernization workshop2Modernization workshop2
Modernization workshop2
 
Sixmet uusi2
Sixmet uusi2Sixmet uusi2
Sixmet uusi2
 
Joros Oy Invites to 24h Industrial Hackathon
Joros Oy Invites to 24h Industrial HackathonJoros Oy Invites to 24h Industrial Hackathon
Joros Oy Invites to 24h Industrial Hackathon
 
7 problématiques de la négociation
7 problématiques de la négociation7 problématiques de la négociation
7 problématiques de la négociation
 
When,Where,Why,Win.
When,Where,Why,Win.When,Where,Why,Win.
When,Where,Why,Win.
 
Clinic 2 : Periodisering 'Fail to plan - plan to fail' (31/02/11)
Clinic 2 : Periodisering  'Fail to plan - plan to fail' (31/02/11)Clinic 2 : Periodisering  'Fail to plan - plan to fail' (31/02/11)
Clinic 2 : Periodisering 'Fail to plan - plan to fail' (31/02/11)
 
Training Planning en Periodisering
Training Planning en PeriodiseringTraining Planning en Periodisering
Training Planning en Periodisering
 
Ivan Minnaert U16 player development
Ivan Minnaert U16 player developmentIvan Minnaert U16 player development
Ivan Minnaert U16 player development
 
Team building
Team buildingTeam building
Team building
 
Clinic Football
Clinic FootballClinic Football
Clinic Football
 
Ivan Minnaert U19 player development
Ivan Minnaert U19 player developmentIvan Minnaert U19 player development
Ivan Minnaert U19 player development
 
Présentation Clinic Football
Présentation Clinic FootballPrésentation Clinic Football
Présentation Clinic Football
 
BFC U9 - Week 3 Session Plans. - Ball Mastery Play out
BFC U9 - Week 3 Session Plans. - Ball Mastery Play outBFC U9 - Week 3 Session Plans. - Ball Mastery Play out
BFC U9 - Week 3 Session Plans. - Ball Mastery Play out
 
Ivan Minnaert U19 player development
Ivan Minnaert U19 player developmentIvan Minnaert U19 player development
Ivan Minnaert U19 player development
 
Ivan minnaert style of play
Ivan minnaert style of playIvan minnaert style of play
Ivan minnaert style of play
 
Knvb conditioning
Knvb conditioningKnvb conditioning
Knvb conditioning
 
Pep guardiola inglés
Pep guardiola inglésPep guardiola inglés
Pep guardiola inglés
 
Vitor pereira defensive organization
Vitor pereira   defensive organizationVitor pereira   defensive organization
Vitor pereira defensive organization
 
FC Barcelona style of play
FC Barcelona style of playFC Barcelona style of play
FC Barcelona style of play
 
Defensive organization fc porto
Defensive organization   fc portoDefensive organization   fc porto
Defensive organization fc porto
 

Similar to 00 lean concepts_foundations_23_pgs

00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgsfreelean
 
Lean Culture Introduction
Lean Culture IntroductionLean Culture Introduction
Lean Culture IntroductionAnkit Patel
 
Introduction to lean six sigma
Introduction to lean six sigmaIntroduction to lean six sigma
Introduction to lean six sigmaSteve Carleysmith
 
Process optimization & innovation in fabrication
Process optimization & innovation in fabricationProcess optimization & innovation in fabrication
Process optimization & innovation in fabricationnaddirpatel
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in TimeMusfiqur Rahman
 
Utsav Mahendra : Designing and Managing Service Processes
Utsav Mahendra :  Designing and Managing Service Processes Utsav Mahendra :  Designing and Managing Service Processes
Utsav Mahendra : Designing and Managing Service Processes Utsav Mahendra
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Hedakrishnaheda
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutionssashi prabhu
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)Leanleaders.org
 
Quit Paper Approach
Quit Paper ApproachQuit Paper Approach
Quit Paper Approachsjtownsend
 
Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...
Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...
Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...Coupa Software
 
Lean Methodology July Monthly
Lean Methodology July MonthlyLean Methodology July Monthly
Lean Methodology July MonthlyJoe Kalchbrenner
 

Similar to 00 lean concepts_foundations_23_pgs (20)

Lean Mangement
Lean MangementLean Mangement
Lean Mangement
 
00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs00 Lean Concepts Foundations 23 Pgs
00 Lean Concepts Foundations 23 Pgs
 
Lean Culture Introduction
Lean Culture IntroductionLean Culture Introduction
Lean Culture Introduction
 
Introduction to lean six sigma
Introduction to lean six sigmaIntroduction to lean six sigma
Introduction to lean six sigma
 
Process optimization & innovation in fabrication
Process optimization & innovation in fabricationProcess optimization & innovation in fabrication
Process optimization & innovation in fabrication
 
TPT 2011
TPT  2011TPT  2011
TPT 2011
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Group b opm-ppt_final
Group b opm-ppt_finalGroup b opm-ppt_final
Group b opm-ppt_final
 
Presentation on Just in Time
Presentation on Just in TimePresentation on Just in Time
Presentation on Just in Time
 
Utsav Mahendra : Designing and Managing Service Processes
Utsav Mahendra :  Designing and Managing Service Processes Utsav Mahendra :  Designing and Managing Service Processes
Utsav Mahendra : Designing and Managing Service Processes
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
Wk8lect1.pptx
Wk8lect1.pptxWk8lect1.pptx
Wk8lect1.pptx
 
37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
lean-simple-solutions
 lean-simple-solutions lean-simple-solutions
lean-simple-solutions
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Quit Paper Approach
Quit Paper ApproachQuit Paper Approach
Quit Paper Approach
 
Scrum and Lean - Om Band
Scrum and Lean - Om BandScrum and Lean - Om Band
Scrum and Lean - Om Band
 
Waste
WasteWaste
Waste
 
Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...
Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...
Urgent Purchasing - How One Procurement Professional Took Matters Into His Ow...
 
Lean Methodology July Monthly
Lean Methodology July MonthlyLean Methodology July Monthly
Lean Methodology July Monthly
 

More from Kimmo Haapea

Periodisointi jalkapallossa
Periodisointi jalkapallossaPeriodisointi jalkapallossa
Periodisointi jalkapallossaKimmo Haapea
 
Infograafi Etelä-Savon Uudistuva Teollisuus
Infograafi Etelä-Savon Uudistuva TeollisuusInfograafi Etelä-Savon Uudistuva Teollisuus
Infograafi Etelä-Savon Uudistuva TeollisuusKimmo Haapea
 
3D-tulostuksen työpajaa Mikkelissä 3.6.
3D-tulostuksen työpajaa Mikkelissä 3.6.3D-tulostuksen työpajaa Mikkelissä 3.6.
3D-tulostuksen työpajaa Mikkelissä 3.6.Kimmo Haapea
 
Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...
Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...
Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...Kimmo Haapea
 
Industrial hackathon 15 16.01.2016
Industrial hackathon 15 16.01.2016Industrial hackathon 15 16.01.2016
Industrial hackathon 15 16.01.2016Kimmo Haapea
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKimmo Haapea
 
Etelä-Savon Uudistuva Teollisuus
Etelä-Savon Uudistuva TeollisuusEtelä-Savon Uudistuva Teollisuus
Etelä-Savon Uudistuva TeollisuusKimmo Haapea
 
Future forecasting
Future forecastingFuture forecasting
Future forecastingKimmo Haapea
 
UTE Esittely Pipe 13112015
UTE Esittely Pipe 13112015UTE Esittely Pipe 13112015
UTE Esittely Pipe 13112015Kimmo Haapea
 
UTE -hankkeen infograafi 05112015
UTE -hankkeen infograafi 05112015UTE -hankkeen infograafi 05112015
UTE -hankkeen infograafi 05112015Kimmo Haapea
 
Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)
Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)
Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)Kimmo Haapea
 
Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015
Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015
Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015Kimmo Haapea
 
Digitalisaatiokartoitus Etela-Savossa
Digitalisaatiokartoitus Etela-SavossaDigitalisaatiokartoitus Etela-Savossa
Digitalisaatiokartoitus Etela-SavossaKimmo Haapea
 
Kutsu 3D-tulostuksen työpajaan
Kutsu 3D-tulostuksen työpajaanKutsu 3D-tulostuksen työpajaan
Kutsu 3D-tulostuksen työpajaanKimmo Haapea
 
Technology industry networking...
Technology industry networking...Technology industry networking...
Technology industry networking...Kimmo Haapea
 
Etelä-Savon maakuntaohjelma 2014 2017 (1)
Etelä-Savon maakuntaohjelma 2014 2017 (1)Etelä-Savon maakuntaohjelma 2014 2017 (1)
Etelä-Savon maakuntaohjelma 2014 2017 (1)Kimmo Haapea
 
Tuomas Purtonen, LUT: 3D-tulostus ja metallit
Tuomas Purtonen, LUT: 3D-tulostus ja metallitTuomas Purtonen, LUT: 3D-tulostus ja metallit
Tuomas Purtonen, LUT: 3D-tulostus ja metallitKimmo Haapea
 

More from Kimmo Haapea (20)

Periodisointi jalkapallossa
Periodisointi jalkapallossaPeriodisointi jalkapallossa
Periodisointi jalkapallossa
 
Infograafi Etelä-Savon Uudistuva Teollisuus
Infograafi Etelä-Savon Uudistuva TeollisuusInfograafi Etelä-Savon Uudistuva Teollisuus
Infograafi Etelä-Savon Uudistuva Teollisuus
 
ExpoHack Program
ExpoHack ProgramExpoHack Program
ExpoHack Program
 
3D-tulostuksen työpajaa Mikkelissä 3.6.
3D-tulostuksen työpajaa Mikkelissä 3.6.3D-tulostuksen työpajaa Mikkelissä 3.6.
3D-tulostuksen työpajaa Mikkelissä 3.6.
 
Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...
Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...
Pk-teollisuus ja digitalisaatio - uudistuminen ja kansainvälistyminen yrityst...
 
Industrial hackathon 15 16.01.2016
Industrial hackathon 15 16.01.2016Industrial hackathon 15 16.01.2016
Industrial hackathon 15 16.01.2016
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Etelä-Savon Uudistuva Teollisuus
Etelä-Savon Uudistuva TeollisuusEtelä-Savon Uudistuva Teollisuus
Etelä-Savon Uudistuva Teollisuus
 
RBM and LFA
RBM and LFARBM and LFA
RBM and LFA
 
Future forecasting
Future forecastingFuture forecasting
Future forecasting
 
UTE Esittely Pipe 13112015
UTE Esittely Pipe 13112015UTE Esittely Pipe 13112015
UTE Esittely Pipe 13112015
 
UTE -hankkeen infograafi 05112015
UTE -hankkeen infograafi 05112015UTE -hankkeen infograafi 05112015
UTE -hankkeen infograafi 05112015
 
Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)
Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)
Etelä-Savon Uudistuva Teollisuus -infograafi (Miktech Oy)
 
Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015
Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015
Teollinen internet, Talous ja Rahoitus seminaari 30.1.2015
 
Digitalisaatiokartoitus Etela-Savossa
Digitalisaatiokartoitus Etela-SavossaDigitalisaatiokartoitus Etela-Savossa
Digitalisaatiokartoitus Etela-Savossa
 
Kutsu 3D-tulostuksen työpajaan
Kutsu 3D-tulostuksen työpajaanKutsu 3D-tulostuksen työpajaan
Kutsu 3D-tulostuksen työpajaan
 
Technology industry networking...
Technology industry networking...Technology industry networking...
Technology industry networking...
 
Invest In Mikkeli
Invest In MikkeliInvest In Mikkeli
Invest In Mikkeli
 
Etelä-Savon maakuntaohjelma 2014 2017 (1)
Etelä-Savon maakuntaohjelma 2014 2017 (1)Etelä-Savon maakuntaohjelma 2014 2017 (1)
Etelä-Savon maakuntaohjelma 2014 2017 (1)
 
Tuomas Purtonen, LUT: 3D-tulostus ja metallit
Tuomas Purtonen, LUT: 3D-tulostus ja metallitTuomas Purtonen, LUT: 3D-tulostus ja metallit
Tuomas Purtonen, LUT: 3D-tulostus ja metallit
 

00 lean concepts_foundations_23_pgs

  • 1. The Lean Enterprise Philosophy and Key Concepts Lean Foundations Continuous Improvement Training
  • 2. Learning Objectives The purpose of this module is to present the 5 core principles of Lean; define value-added and non-valued added activity; define the 7 most common types of waste and their causes. Review a systematic approach to discover waste within a process. freeleansite.com
  • 3. First Step to understanding Process Analysis Learn the 5 Core Principles of Lean: 1) Specify value in the eyes of the customer 2) Identify value stream and eliminate waste 3) Make value flow at pull of the customer 4) Involve & empower employees 5) Continuously improve in pursuit of perfection freeleansite.com
  • 4. Customer perceives value Value Added Activity Non-Value Added Activity An activity that changes the Those activities that consume size, shape, fit, form, or time or resources, but do not function of material or add value in the eyes of the information (for the first time) customer. to satisfy the customer. freeleansite.com
  • 5. Definitions  Value Added – Any activity or operation performed that helps transform a product or service from its raw state into its finished form. – Completed right the first time. – Any activity customer is prepared to pay for. Activity required to ensure that a product or service is delivered in conformance to specification.  Non-Value Added – Any activity that doesn’t help to transform a product or service into its final form. Activity not performed right. Activity customer not willing to pay for. – This includes:  Unnecessary process steps  Movement of inventory, paperwork, etc.  Re-work, corrections, etc.  Storage between operations, batching inventory  Wait times, delay times, idle times freeleansite.com
  • 6. MUDA = non-value added activity (waste)…  Identify and reduce: – Defects (repair, rework, scrap) – Overproduction (inventory) – Transportation (conveyance) – Waiting (queue time) – Inspection (reliance on mass inspection/ verification) – Motion (parts, paper, people) – Process, itself (over-processing, long cycles) “Commonly referred to as the 7W’s…” “Commonly referred to as the 7W’s…” *7 common wastes of production *7 common wastes of production freeleansite.com (Shingo) (Shingo)
  • 7. The Causes of Waste in most Processes Focus on Types of Waste Problems/ Causes reduction (7W’s) Value Incorrect layouts Waste Added Lack of proximity of machines Motion Off-line resources Waiting workers, machines, materials Long set-ups and lead times Waiting time e poe P Large batches, raw material stocks Non- Value Added, High WIP, finished goods stocks but necessary Overproduction Making for the sake of it Ignoring customer demands l Long cycle times- process, itself Processing time Reduced efficiency- over processing High overall lead times ssec o P Defects Long delays for rectification r Costly rework Dissatisfied customers Inspection Approvals of approvals High number of verification steps Reliance- Mass inspection techniques Transportation Unnecessary movement t c udo P Extra handling r freeleansite.com
  • 8. Product Lead-Time Raw Finished Materials TIME Goods Value Added Time Non- Value Added Time freeleansite.com
  • 9. Product Lead-Time 95% Non- Value Added Historically, improvement efforts have been focused here. freeleansite.com
  • 10. Product Lead-Time 95% Non- Value Added Whereas, “Process Analysis” activities should Focus here - the Elimination of Waste (MUDA) freeleansite.com
  • 11. Identifying Waste • Waste can take many forms; some causes of the most common forms of waste include:  lack of adherence  unnecessary approvals or signatures  reviews of reviews  multiple hand-offs  transportation  long setup time  correction, and  over-production freeleansite.com
  • 12. Identifying Waste • Other causes of waste may include:  poor maintenance  lack of training  poor supervisory skills  ineffective production planning/ scheduling  lack of workplace organization  Supplier quality/ reliability • In most cases, inventory is wasteful; more importantly, inventory hides all sorts of problems in the company freeleansite.com
  • 13. Inventory Hides Problems Your Company Finished Goods Raw Material Long Poor Quality Set-up Scheduling Down- Problems Time Time Poor Line Poor Imbalance 5-S Process Poor Capability Communication Vendor Delivery Problems freeleansite.com Absenteeism
  • 14. Process Analysis to the Rescue … we have only begun to deal with issues involved in trying to tie everything together for a whole-system approach. Some of the problems that continue to confound us are the following: The way manufacturing works with Sales makes scheduling and running the plants difficult.  We compound the above problem by the way we order from suppliers.  Labor and management still don’t trust each other.  The way we measure performance doesn’t provide information useful to running a plant and often encourages wrong decisions. freeleansite.com
  • 15. How to Discover Waste . . . Look at the “3 Real Things” in every operation … • Material Flow (or Business Steps i.e. transactional processes) • Information Flow (data) • Work-in-process (could be both…) freeleansite.com
  • 16. How to Discover Waste . . . Ask what? What is the operation doing? Ask why? ? Why is the operation necessary? Ask why at least 5 times to lead you to the root cause Everything that is not work is waste Once you know the function, you can identify as waste anything that does not execute that function ? Draft an improvement plan… Ask how? freeleansite.com
  • 17. How to Discover Waste . . . Be on the look-out for these 3 Major contributors … • Overburden/ Overdoing • Unevenness • Process methods freeleansite.com
  • 18. How to Discover Waste . . . Be on the look-out for these 3 Major contributors … • Overburden/ Overdoing (muri) - waste caused by how work and tasks are designed • Unevenness (mura) - waste caused by poor quality (process unpredictability) • Process methods (muda) - waste caused by “DOT WIMP” freeleansite.com
  • 19. The “Perfect” Targets . . . Remember, Value-added is the physical transformation of raw material. Machining World-class % of person time Assembly World-class % of person time Pure waste 0 Pure waste 0 NVA 100 NVA 20 VA 0 VA 80  1:15 person/machine  person/machine n/a  set-ups less than 10 minutes  ‘0’ change-over time Step back and take an impartial look at your area. What are the barriers to adding value? freeleansite.com
  • 20. What actions must we take? We must … • decrease cycle times • reduce travel distances • standardize our processes • reduce scrap, rework and waste • improve all of our business processes • reduce the variation in our schedules • provide a constant, steady supply of parts to production, assembly, and test freeleansite.com
  • 21. What actions must we take? We must … • design products to match a stable, standard production process • gain Market share - and - • increase our competitiveness ! Now – how do we get there ?? freeleansite.com
  • 22. Utilize the process “DMAIC” … (Define, Measure, Analyze, Improve and Control) • Understand the Problem • Form the Team • Understand the Process • Gather Process Data • Analyze the Process • Identify possible Corrective Actions • Screen/ Experiment to select best action • Implement Action • Verify Action • Sustain Improvement freeleansite.com
  • 23. The Lean Enterprise is a Strategy … … for turning manufacturing and business processes into competitive weapons. Producing what is needed, when it is needed, with a minimum amount of materials, equipment, labor and space. “Prime Directive” - to continually seek out and eliminate waste and wasteful practices. freeleansite.com
  • 24. Defining Project Criteria - Breakout (Optional) This breakout will give you the opportunity to apply the things you have learned. Each team is asked to brainstorm a list of criteria for a good KAIZEN (Process Analysis) project. These criteria could include Customer complaint, company culture issues, length of time to complete, area of Lean focus or anything else that the team feels is a important criteria to consider in Process Analysis type project selection. The team will have 20 minutes to brainstorm criteria and then we will discuss the results. freeleansite.com
  • 25. The Lean Enterprise Philosophy and Key Concepts Lean Foundations Continuous Improvement Training

Editor's Notes

  1. freeleansite.com Thank all for their attendance. (Please retain the free lean site reference with the materials.)
  2. freeleansite.com
  3. freeleansite.com Cover each bullet point with participants but, especially #5) Pursue perfection with a Continuous Improvement Mentality !
  4. freeleansite.com Describe Value Added (VA) as tasks performed during the production of a product or service that INCREASE its VALUE to the CUSTOMER.
  5. freeleansite.com 3 “unique” parts of the VA definition… 1) TRANSFORMS PRODUCT/ SERVICE 2) DONE RIGHT the FIRST TIME 3) CUSTOMER WILLING TO PAY FOR
  6. freeleansite.com Facilitator Note: Might want to play the push vs. pull skit - post-it note (signature), Lego assembly, Airplane or “DOT” game here to illustrate the 7 wastes …
  7. freeleansite.com This is probably the most important principle of LEAN THINKING and is based upon the categorization of activities into the following: Value added - Those activities that: 1) Alter the product; 2) Are completed right the first time and 3) The customer is prepared to pay for Non-value added - Those activities that are essential, but add no value to the product (payroll preparation or in-process quality inspection are examples) Waste - Those activities which do not add value and are not essential Progressive reduction of non-value added or elimination of waste activities places a greater focus on what is important to the customer. The waste activities can be addressed in several ways: through improved process layout, better product design from a manufacturability standpoint, improved production scheduling, and more efficient shop floor production techniques through adoption of best practice principles. In the following viewcells, which focus on the best practices in use today in manufacturing, the common thread is the focus on the elimination of waste. In Lean, you will often hear the term "continuous improvement" or "continuous process improvement." Continuous improvement aims at the gradual elimination of waste through improvements in product design, process design, production planning and production control. This concept is applied seriously by progressive manufacturers to their internal operations and with respect to their suppliers as well, whom they expect to adopt continuous improvement programs to improve the quality and reduce the costs of raw materials.
  8. freeleansite.com Timeline shows duration of non-value-added work. ASK participants where they might get that data from ?? (Timecards, Process Travellers, Value-stream Map) PERFECT Example: Day at Disneyland – wait an hour to ride a 1 minute ride,,, then wait an hour to ride a 90 second ride … etc etc or Post Office, DMV, Bank et al
  9. freeleansite.com IMPROVEMENT INITIATIVES have typically been focused in the 5 to 10% of the activities that “add value”… but - Lean focuses on the other side of the “time” equation… THOSE NON-VALUE ADDING activities. THIS IS WHY it is called a “time-based” improvement strategy. Value added percentages of total cycle times of 5% or less are common. I have found a procurement process (total cycle time) at another facility that had a value-added percentage of POINT THREE… 3/10ths of a percent.
  10. freeleansite.com Analyzing a “Process” with the Lean tools… begins by identifying and eliminating those NON-VALUE ADDING steps.
  11. freeleansite.com These are common causes of waste… (what to look for when analyzing a process)
  12. freeleansite.com More common causes, plus INVENTORY !!
  13. freeleansite.com When INVENTORY is lowered, it exposes the rocks in the river ! (Sources of waste in the VALUE STREAM.)
  14. freeleansite.com Besides pure ‘logistics”… There are other issues as well - in striving to become “WORLD-CLASS” A lot of work ahead of us to do !!
  15. freeleansite.com We can, however, begin slowly and start to discover waste in our immediate operation.
  16. freeleansite.com Here is an approach… don’t be afraid to ask questions! Especially the 5-why technique! Also, refer to the Module on ROOT CAUSE ANALYSIS ( Root Cause/ Corrective Action )
  17. freeleansite.com
  18. freeleansite.com
  19. freeleansite.com This is the “IDEAL” – World-class targets !! OUR VISION – what we are striving toward. NOTHING CHANGES, unless you change something !
  20. freeleansite.com Management has the responsibility to eliminate waste and provide job security. This sets the stage for an expectation to be discussed later – as “Lean Linking” takes hold and is used, which includes participation and input from affected areas within an organization – you must TRY IT… Change of magnitude required to overcome the current system is not easy. Disagreement is sure to happen, sometimes for good reason – based on facts, and sometimes for bad reason – based on opinion. Not all of the plans will be perfect the first time through. But improvements have already been made, and progress will continue. Don’t fall into “it won’t work here”, “we’re different”, or “we have already tried that”.
  21. freeleansite.com LINK to DMAIC !!
  22. freeleansite.com DMAIC – the universal process - for Six Sigma or Lean techniques, doesn’t matter.
  23. freeleansite.com Does the Machine or Machinist add value? (The machine – it physically transforms the product. Discuss.) Is in-process Inspection value added? (no) Automated Test Procedure (temp cycle, pressure, vacuum etc) is non-value added but required. It fulfills a Custom requirement, but does not physically transform the product. Is getting a tool from the tool crib value added? (no) Attaching a flange to a pump body is value added. Completing information blocks on a proposal form is value-added because information required by the customer (internal and external) is required AND necessary. Reviews and (certain) signatures on the form are non-value added.
  24. freeleansite.com OPTIONAL exercise…
  25. freeleansite.com Thank all for their attendance and contributions.