SlideShare a Scribd company logo
1 of 36
Kiranmoy Samanta
๏‚ก Introduction
๏‚ก Significance of Drainage
๏‚ก Requirements of Highway Drainage
๏‚ก Surface Drainage
๏‚ง Methods of Surface Drainage
๏‚ก Shoulder Drainage
๏‚ก Median Drainage
๏‚ก Sub-Surface Drainage
๏‚ง Methods Of Sub-Surface Drainage
๏‚ก Road Construction in water logged area
๏‚ก Highway drainage is a process of removing and controlling excess
surface and sub-soil water within the right of way.
๏‚ก It includes interception and diversion of water from the road surface
and sub grade.
๏‚ก Excess moisture in soil subgrade causes considerable lowering of its
stability.
๏‚ก Increase in moisture cause reduction in strength of many pavement
materials like stabilized soil and water bound macadam.
๏‚ก Sustained contact of water with bituminous pavements causes failure
due to stripping of bitumen from aggregates like loosening or
detachment of some of the bituminous pavement layers and formations
of pot holes
๏‚ก Excess water on shoulders and pavement edges causes considerable
damage.
๏‚ก In clayey soil variation in moisture content causes considerable variation
in volume of sub grade.
๏‚ก High moisture content causes increases in weight and thus increase in
stress and simultaneous reduction in strength of soil mass.
๏‚ก Erosion of soil from top of unsurfaced roads and slopes of embankment,
cut and hill side is also due to surface water.
๏‚ก In cold regions presence of water in the subgrade and a continuous
supply of water from the ground water can cause considerable damage
to the pavement due to frost action.
๏‚ก The surface water from the carriageway and shoulder should effectively
be drained off without allowing it to percolate to sub grade.
๏‚ก Surface water from adjoining land should be prevented form entering
the roadway.
๏‚ก Side drain should have sufficient capacity and longitudinal slope to carry
away all surface water collected.
๏‚ก Flow of surface water across the road and shoulders and along slopes
should not cause formation of cross ruts or erosion.
๏‚ก Seepage and other sources of under ground water should be drained off
by the subsurface drainage system.
๏‚ก Highest level of ground water table should be kept well below the level
of subgrade, preferably by atleast 1.2m.
๏‚ก In waterlogged areas special precautions should be taken, especially if
detrimental salts are present or if flooring is likely to occur.
๏‚ก During rains, part of the rain water flows on surface and part of it
percolate through the soil mass as gravitational water until it reaches the
ground water below the water table.
๏‚ก Removal and diversion of surface water from the road way and adjoining
land is termed as surface drainage.
๏‚ก Diversion and removal of excess of soil water from the subgrade is
termed as Surface Drainage.
1. By Longitudinal side drains.
2. Catch basins and Inlets in urban areas
3. Providing damp proof course
4. Providing proper camber
5. Providing sufficient slope to the sides
6. Keeping the level of carriage way at least 60 cm above the HFL.
A) Side drains for road in embankment
-
๏‚ก It is necessary to provide side drain on one side or both sides, when road
is constructed in embankment.
๏‚ก Side drains should be at least 2.0 m away from bottom edge of an
embankment.
๏‚ก Depth of side drains is kept 1.0 to 1.5 m to prevent the entry of drain
water into the embankment.
๏‚ก B) Side drains for road in cutting
๏‚ก A) Catch basins
๏‚ก Catch basin is a structure like chamber constructed on a sewer line.
๏‚ก Water from pavement surface is collected in catch basin and discharged
to the sewer line.
๏‚ก The catch basin (catch pit) is provided with grating to prevent the entry
of rubbish into the drainage system.
๏‚ก Inlets is a concrete box with grating either at the top or in the side.
๏‚ก For a quick drainage it is necessary to ensure that shoulder surface is
properly sloped and free from irregularities and depressions.
๏‚ก In impervious type, it is practiced to extend the subbase course with
drainage across the shoulder upto side drain.
๏‚ก Alternatively we can provide cont layer of 75- 100 mm thick laid under
the shoulder at the bottom layer of sub base about 150 mm thick
extended upto the edge.
๏‚ก The paved shoulder should be at least 0.5% steeper then camber
subjected to min of 3%
๏‚ก The unpaved shoulder should be further 0.5% steeper along the
horizontal curve, Shoulder on inner side of the curve should have slope
steeper than that of pavement.
๏‚ก On the outer side, the shoulder should be made to drain away from the
pavement, a low rate of super elevation are provided.
๏‚ก On the other hand, where higher rate of super elevation, the outside
shoulder are kept level or rounded.
๏‚ก Except for a median less than 5m wide, it is not desirable to drain the
median area towards the pavement surface.
๏‚ง 1.2-1.8 m wide median โ€“ Provided with kerbs and always paved.
๏‚ง 1.8-5 m wide median โ€“ Usually turfed and crowned so that surface
water could run towards the pavement maybe with or without kerbs.
๏‚ก Median wider than 5m are without any kerbs at edge
๏‚ก If carriage way slopes towards the median, central drain maybe made to
carry the runoff and slope should not be steeper than 6:1.
๏‚ก When the median has only earthen surface, it should not be crowned
because it can result in soil particles being carried to the pavement
surface making it slippery.
๏‚ก Removal or Diversion of excess soil-water from sub-grade is termed as
sub-surface drainage.
๏‚ก The change in moisture of sub-grade are caused by the following
๏‚ง Fluctuations in GroundWaterTable
๏‚ง Seepage Flow
๏‚ง PercolationOf RainWater
๏‚ง Movement of CapillaryWater
๏‚ก In sub-surface drainage it is practiced to keep the variation of moisture in
sub-grade to a minimum.
๏‚ก When road is in cutting and water seeping from sides.
๏‚ก When road is near the foot or hill and is likely to be damaged by water
flowing down the hill.
๏‚ก When road is passing through plain area and water is likely to
accumulated on sides.
๏‚ก Where water rises up to sub-grade by capillary action.
๏‚ก Where sub-grade soil is affected by the drain passing near the road.
Lowering ofWater
Table
Controlling Seepage
Flow
Controlling Capillary
Water
๏‚ก In order to that the sub-grade and pavement are not subjected to
excessive moisture the water table should kept at least 1.0 to 1.2 m
below the sub-grade.
๏‚ก In places where water table is high to take the road formation on
embankment of height not less than 1.0-1.2m is the best approach.
๏‚ก ButWhen the formation level is at or below the general ground level it is
necessary to lower the water table.
(a) If soil is relatively permeable, it may be possible to lowerWT by
constructing longitudinal drainage trenches with drain pipe and filter
sand and top of trenches is covered with clay seal
The depth of trench depend on:
(i) The required lowering of water table
(ii) distance b/w the drainage trenches
(iii) Types of soil
(b) If the soil is relatively
less permeable, the
lowering of groundWT
may not be adequate.
Hence in addition to the
longitudinal drains
traverse drains have to be
installed at suitable
intervals in effectively
drain off the water.
๏‚ก When the general ground as well as impervious strata below are sloping,
seepage flow is likely to exist.
๏‚ก If seepage zone is at depth less than 0.6-0.9 m from sub-grade level,
longitudinal pipe drain in trench filled with filter material and clay seal
may be constructed to intercept the flow.
๏‚ก If the water reaching the sub-grade due to capillary rise is likely to be
detrimental, it is possible to solve the problem by arresting the capillary
rise.
๏‚ก It can be done by following methods:
(a) A layer of granular materials of suitable thickness is provided during
the construction of embankment, between the sub-grade and the
highest level of sub surface water table.
(b) Alternate method is providing the capillary cut off is by inserting an
impermeable or a bituminous layer in place of granular blanket.
๏‚ก The size and spacing of the sub-surface drainage system depend on the
quantity of water to be drained off, the type of soil and type of drain.
๏‚ก The filter material used in sub-surface drains should be designed to have
sufficient permeability offering negligible resistance to the flow.
๏‚ก And also resist the flow of the fine foundation soil resulting in soil piping.
The Steps are as follows:
๏‚ก Draw grain size distribution curve on log scale %passing vs. particles size
for the foundation soil.
๏‚ก Find the value of D15 size of foundation soil.
*Note D15- particle size such that 15%of soil is finer than this size
๏‚ง The size of filter material should be 5 times more than the size of
foundation soil
๏‚ง D15 of filter/D15 of foundation > 5
๏‚ก To fulfill the condition to prevent piping.
๏‚ง D15 of filter/D85 of foundation < 5
๏‚ก Hence plot a point represent the upper limit of D15 size of filter given by
5D85 of foundation.
๏‚ก Find the size of the perforation in the drain pipe or the gap in the open
jointed pipes and let this be = Dp
๏‚ก Plot a point representing D85 size of filter given by the size 2Dp.
๏‚ก The Shaded area thus obtained represents the region within which the
grain size distribution curve of satisfactory filter material should lie.
๏‚ก In case of sub-grade subjected soil water to soaking cond., capillary rise,
and in extreme cond. Even flooding for prolonged periods is termed as
water logged areas.
๏‚ก In such areas construction and maintenance of road is a problem.
๏‚ก Methods adopted to Overcome
๏‚ง Raising the road level by constructing embankment
๏‚ง Providing a capillary cut off to arrest capillary water
๏‚ง Providing Cement Concrete Block
๏‚ง Depressing the sub surface water level by drainage system
Highway Drainage (Highway Engineering)

More Related Content

What's hot

Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
Aditya Mistry
ย 

What's hot (20)

Importance of highway maintenance
Importance of highway maintenanceImportance of highway maintenance
Importance of highway maintenance
ย 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
ย 
3.alignment of railway lines
3.alignment of railway lines3.alignment of railway lines
3.alignment of railway lines
ย 
Highway drainage
Highway drainageHighway drainage
Highway drainage
ย 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
ย 
Embankment
EmbankmentEmbankment
Embankment
ย 
Canal lining
Canal liningCanal lining
Canal lining
ย 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal Alignment
ย 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
ย 
GEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYGEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAY
ย 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
ย 
Highway drainage
 Highway drainage Highway drainage
Highway drainage
ย 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
ย 
Site distance in highway engineering
Site distance in highway engineeringSite distance in highway engineering
Site distance in highway engineering
ย 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
ย 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
ย 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
ย 
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
2.5 HIGHWAY TRANSPORTATION : PAVEMENT MAINTENANCE (TRE) 3150611 GTU
ย 
Cross section of the canal, balancing depth and canal fsl
Cross section of the canal, balancing depth  and canal fslCross section of the canal, balancing depth  and canal fsl
Cross section of the canal, balancing depth and canal fsl
ย 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
ย 

Similar to Highway Drainage (Highway Engineering)

LWCE-402 L#06 (b).pdf
LWCE-402 L#06 (b).pdfLWCE-402 L#06 (b).pdf
LWCE-402 L#06 (b).pdf
MuhammadHaseeb207586
ย 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water logging
NIKHIL PAKWANNE
ย 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil Pakwanne
NIKHIL PAKWANNE
ย 
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringSpecial Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Venkata Sai Kari
ย 
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Ambo University (Ethiopia)
ย 

Similar to Highway Drainage (Highway Engineering) (20)

Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
ย 
Chapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdfChapter Four -4 Highway Drainage slide.pdf
Chapter Four -4 Highway Drainage slide.pdf
ย 
Highway drainage
Highway drainageHighway drainage
Highway drainage
ย 
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
2.6 HIGHWAY TRANSPORTATION : HIGHWAY DRAINAGE, ARBORICULTURE AND LIGHTING (TR...
ย 
To be presented
To be presentedTo be presented
To be presented
ย 
Module 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway EconomicsModule 5: Highway Drainage and Highway Economics
Module 5: Highway Drainage and Highway Economics
ย 
Water logging.pptx
Water logging.pptxWater logging.pptx
Water logging.pptx
ย 
F3 Subsoil drainage and installation
F3 Subsoil drainage and installationF3 Subsoil drainage and installation
F3 Subsoil drainage and installation
ย 
LWCE-402 L#06 (b).pdf
LWCE-402 L#06 (b).pdfLWCE-402 L#06 (b).pdf
LWCE-402 L#06 (b).pdf
ย 
20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt20160716_WATER SUPPLY.ppt
20160716_WATER SUPPLY.ppt
ย 
Highway drainage system
Highway drainage systemHighway drainage system
Highway drainage system
ย 
Ground water recharge & water logging
Ground water recharge & water loggingGround water recharge & water logging
Ground water recharge & water logging
ย 
Ground water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil PakwanneGround water recharge & water logging by Nikhil Pakwanne
Ground water recharge & water logging by Nikhil Pakwanne
ย 
Drainage water management
Drainage water management Drainage water management
Drainage water management
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining EngineeringSpecial Methods of Sub Surface Drainage: Agricultural Draining Engineering
Special Methods of Sub Surface Drainage: Agricultural Draining Engineering
ย 
Drainage system
Drainage systemDrainage system
Drainage system
ย 
Drainage
DrainageDrainage
Drainage
ย 
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREASIMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
IMPORTANCE OF DRAINAGE IN IRRIGATED AREAS
ย 
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
Chapter 5 methods of irrigation Dr. Thomas Abraham_19-3-14
ย 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
amitlee9823
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 

Recently uploaded (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 

Highway Drainage (Highway Engineering)

  • 2. ๏‚ก Introduction ๏‚ก Significance of Drainage ๏‚ก Requirements of Highway Drainage ๏‚ก Surface Drainage ๏‚ง Methods of Surface Drainage ๏‚ก Shoulder Drainage ๏‚ก Median Drainage ๏‚ก Sub-Surface Drainage ๏‚ง Methods Of Sub-Surface Drainage ๏‚ก Road Construction in water logged area
  • 3. ๏‚ก Highway drainage is a process of removing and controlling excess surface and sub-soil water within the right of way. ๏‚ก It includes interception and diversion of water from the road surface and sub grade.
  • 4. ๏‚ก Excess moisture in soil subgrade causes considerable lowering of its stability. ๏‚ก Increase in moisture cause reduction in strength of many pavement materials like stabilized soil and water bound macadam. ๏‚ก Sustained contact of water with bituminous pavements causes failure due to stripping of bitumen from aggregates like loosening or detachment of some of the bituminous pavement layers and formations of pot holes ๏‚ก Excess water on shoulders and pavement edges causes considerable damage.
  • 5. ๏‚ก In clayey soil variation in moisture content causes considerable variation in volume of sub grade. ๏‚ก High moisture content causes increases in weight and thus increase in stress and simultaneous reduction in strength of soil mass. ๏‚ก Erosion of soil from top of unsurfaced roads and slopes of embankment, cut and hill side is also due to surface water. ๏‚ก In cold regions presence of water in the subgrade and a continuous supply of water from the ground water can cause considerable damage to the pavement due to frost action.
  • 6. ๏‚ก The surface water from the carriageway and shoulder should effectively be drained off without allowing it to percolate to sub grade. ๏‚ก Surface water from adjoining land should be prevented form entering the roadway. ๏‚ก Side drain should have sufficient capacity and longitudinal slope to carry away all surface water collected. ๏‚ก Flow of surface water across the road and shoulders and along slopes should not cause formation of cross ruts or erosion.
  • 7. ๏‚ก Seepage and other sources of under ground water should be drained off by the subsurface drainage system. ๏‚ก Highest level of ground water table should be kept well below the level of subgrade, preferably by atleast 1.2m. ๏‚ก In waterlogged areas special precautions should be taken, especially if detrimental salts are present or if flooring is likely to occur.
  • 8. ๏‚ก During rains, part of the rain water flows on surface and part of it percolate through the soil mass as gravitational water until it reaches the ground water below the water table. ๏‚ก Removal and diversion of surface water from the road way and adjoining land is termed as surface drainage. ๏‚ก Diversion and removal of excess of soil water from the subgrade is termed as Surface Drainage.
  • 9. 1. By Longitudinal side drains. 2. Catch basins and Inlets in urban areas 3. Providing damp proof course 4. Providing proper camber 5. Providing sufficient slope to the sides 6. Keeping the level of carriage way at least 60 cm above the HFL.
  • 10. A) Side drains for road in embankment -
  • 11. ๏‚ก It is necessary to provide side drain on one side or both sides, when road is constructed in embankment. ๏‚ก Side drains should be at least 2.0 m away from bottom edge of an embankment. ๏‚ก Depth of side drains is kept 1.0 to 1.5 m to prevent the entry of drain water into the embankment.
  • 12. ๏‚ก B) Side drains for road in cutting
  • 14. ๏‚ก Catch basin is a structure like chamber constructed on a sewer line. ๏‚ก Water from pavement surface is collected in catch basin and discharged to the sewer line. ๏‚ก The catch basin (catch pit) is provided with grating to prevent the entry of rubbish into the drainage system.
  • 15. ๏‚ก Inlets is a concrete box with grating either at the top or in the side.
  • 16. ๏‚ก For a quick drainage it is necessary to ensure that shoulder surface is properly sloped and free from irregularities and depressions. ๏‚ก In impervious type, it is practiced to extend the subbase course with drainage across the shoulder upto side drain. ๏‚ก Alternatively we can provide cont layer of 75- 100 mm thick laid under the shoulder at the bottom layer of sub base about 150 mm thick extended upto the edge. ๏‚ก The paved shoulder should be at least 0.5% steeper then camber subjected to min of 3%
  • 17. ๏‚ก The unpaved shoulder should be further 0.5% steeper along the horizontal curve, Shoulder on inner side of the curve should have slope steeper than that of pavement. ๏‚ก On the outer side, the shoulder should be made to drain away from the pavement, a low rate of super elevation are provided. ๏‚ก On the other hand, where higher rate of super elevation, the outside shoulder are kept level or rounded.
  • 18.
  • 19. ๏‚ก Except for a median less than 5m wide, it is not desirable to drain the median area towards the pavement surface. ๏‚ง 1.2-1.8 m wide median โ€“ Provided with kerbs and always paved. ๏‚ง 1.8-5 m wide median โ€“ Usually turfed and crowned so that surface water could run towards the pavement maybe with or without kerbs.
  • 20. ๏‚ก Median wider than 5m are without any kerbs at edge ๏‚ก If carriage way slopes towards the median, central drain maybe made to carry the runoff and slope should not be steeper than 6:1. ๏‚ก When the median has only earthen surface, it should not be crowned because it can result in soil particles being carried to the pavement surface making it slippery.
  • 21. ๏‚ก Removal or Diversion of excess soil-water from sub-grade is termed as sub-surface drainage. ๏‚ก The change in moisture of sub-grade are caused by the following ๏‚ง Fluctuations in GroundWaterTable ๏‚ง Seepage Flow ๏‚ง PercolationOf RainWater ๏‚ง Movement of CapillaryWater ๏‚ก In sub-surface drainage it is practiced to keep the variation of moisture in sub-grade to a minimum.
  • 22. ๏‚ก When road is in cutting and water seeping from sides. ๏‚ก When road is near the foot or hill and is likely to be damaged by water flowing down the hill. ๏‚ก When road is passing through plain area and water is likely to accumulated on sides. ๏‚ก Where water rises up to sub-grade by capillary action. ๏‚ก Where sub-grade soil is affected by the drain passing near the road.
  • 24. ๏‚ก In order to that the sub-grade and pavement are not subjected to excessive moisture the water table should kept at least 1.0 to 1.2 m below the sub-grade. ๏‚ก In places where water table is high to take the road formation on embankment of height not less than 1.0-1.2m is the best approach. ๏‚ก ButWhen the formation level is at or below the general ground level it is necessary to lower the water table.
  • 25. (a) If soil is relatively permeable, it may be possible to lowerWT by constructing longitudinal drainage trenches with drain pipe and filter sand and top of trenches is covered with clay seal The depth of trench depend on: (i) The required lowering of water table (ii) distance b/w the drainage trenches (iii) Types of soil
  • 26.
  • 27. (b) If the soil is relatively less permeable, the lowering of groundWT may not be adequate. Hence in addition to the longitudinal drains traverse drains have to be installed at suitable intervals in effectively drain off the water.
  • 28. ๏‚ก When the general ground as well as impervious strata below are sloping, seepage flow is likely to exist. ๏‚ก If seepage zone is at depth less than 0.6-0.9 m from sub-grade level, longitudinal pipe drain in trench filled with filter material and clay seal may be constructed to intercept the flow.
  • 29.
  • 30. ๏‚ก If the water reaching the sub-grade due to capillary rise is likely to be detrimental, it is possible to solve the problem by arresting the capillary rise. ๏‚ก It can be done by following methods: (a) A layer of granular materials of suitable thickness is provided during the construction of embankment, between the sub-grade and the highest level of sub surface water table. (b) Alternate method is providing the capillary cut off is by inserting an impermeable or a bituminous layer in place of granular blanket.
  • 31.
  • 32. ๏‚ก The size and spacing of the sub-surface drainage system depend on the quantity of water to be drained off, the type of soil and type of drain. ๏‚ก The filter material used in sub-surface drains should be designed to have sufficient permeability offering negligible resistance to the flow. ๏‚ก And also resist the flow of the fine foundation soil resulting in soil piping. The Steps are as follows: ๏‚ก Draw grain size distribution curve on log scale %passing vs. particles size for the foundation soil. ๏‚ก Find the value of D15 size of foundation soil. *Note D15- particle size such that 15%of soil is finer than this size
  • 33. ๏‚ง The size of filter material should be 5 times more than the size of foundation soil ๏‚ง D15 of filter/D15 of foundation > 5 ๏‚ก To fulfill the condition to prevent piping. ๏‚ง D15 of filter/D85 of foundation < 5 ๏‚ก Hence plot a point represent the upper limit of D15 size of filter given by 5D85 of foundation. ๏‚ก Find the size of the perforation in the drain pipe or the gap in the open jointed pipes and let this be = Dp ๏‚ก Plot a point representing D85 size of filter given by the size 2Dp. ๏‚ก The Shaded area thus obtained represents the region within which the grain size distribution curve of satisfactory filter material should lie.
  • 34.
  • 35. ๏‚ก In case of sub-grade subjected soil water to soaking cond., capillary rise, and in extreme cond. Even flooding for prolonged periods is termed as water logged areas. ๏‚ก In such areas construction and maintenance of road is a problem. ๏‚ก Methods adopted to Overcome ๏‚ง Raising the road level by constructing embankment ๏‚ง Providing a capillary cut off to arrest capillary water ๏‚ง Providing Cement Concrete Block ๏‚ง Depressing the sub surface water level by drainage system